Loading…
Loading…
Tender Value
₹80.0 L
EMD Value
₹80,012
Closing Date
20 Jul 2026, 5:00 pm
SE R and B Division, Sundargarh
O/o the SE R and B Division, Sundargarh
Repair and Renovation of Sub Collector Office at Sundargarh for 2026.27 including EI and PH Works
2026_EICCL_134505_1
Bid Identification No-SE-R AND B-SNG-03 OF 2026-27
Open Tender
Civil Works - Buildings
180 days
Sundargarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹80,012
Yes
6 Jul 2026
6 Jul 2026
21 Jul 2026
6 Jul 2026
20 Jul 2026
6 Jul 2026
6 Jul 2026 - 20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repair & Renovation of Sub Collector Office at Sundargarh for 2026.27 including EI & PH Works | |||||
| 1.1 | Dismantling brick or stone masonary in cement mortar under 3.00m height including all costs complete. Stacking the useful materials for reuse and removing the debris 50 mtr lead. | 7.5 | Cum | 1,646.6 | ₹12,349.5 |
| 2 | Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed and disposal of the excavated materials with mechanical means within 5.00km. initial leads and lifts as per direction of E.I.C. | 77.43 | Cum | 282.9 | ₹21,904.95 |
| 3 | Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete. | 78.22 | Cum | 541.4 | ₹42,348.31 |
| 4 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | 12.63 | Cum | 6,014.7 | ₹75,965.66 |
| 5 | C.C. (1:2:4) with 12mm and down grade C.B. chips approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | 1.58 | Cum | 7,642.8 | ₹12,075.62 |
| 6 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete. Column Base | 11.56 | Cum | 6,459.7 | ₹74,674.13 |
| 6.01 | Plinth | 1.13 | Cum | 7,334.1 | ₹8,287.53 |
| 6.02 | Column in Superstructure | 0.9 | Cum | 18,281.9 | ₹16,453.71 |
| 6.03 | Staircase | 4.88 | Cum | 15,704.7 | ₹76,638.94 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_599800.xls
BOQ • 0.41 MB
DTCN1.pdf
Tender Documents • 5.56 MB
Download all tender documents and submit your bid