| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 CrAccepted-AOC 1111 PHASE 3 MODEL TOWN BATHINDA 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹3.5 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹3.6 Cr+₹13.8 L (3.95%)Rejected-AOC 1 DHANLAXMI CHHIPWAD VALSAD VALSAD GUJARAT 396001 | VALSAD | GUJARAT | 396001 | ₹3.6 Cr+₹13.8 L (3.95%) | 2 | Rejected-AOC L2 |
| 3 | 3₹3.8 Cr+₹32.4 L (9.27%)Rejected-AOC MANSA | PATIALA | PUNJAB | 140401 | ₹3.8 Cr+₹32.4 L (9.27%) | 3 | Rejected-AOC L3 |
| 4 | 4₹3.9 Cr+₹36.7 L (10.5%)Rejected-AOC NA | NA | NA | 121004 | ₹3.9 Cr+₹36.7 L (10.5%) | 4 | Rejected-AOC L4 |
Tender Value
₹3.7 Cr
EMD Value
₹7.3 L
Closing Date
30 Oct 2023, 5:00 pmClosed
XEN BML CANAL AND GROUND WATER DIV PTA
XEN BML CANAL AND GROUND WATER DIV PTA
Rehabilitation of Khanna Disty Rd 61100-72728 by concrete lining including pucca structure
2023_WR_110685_1
44/23-24
Open Tender
Civil Works - Canal
Item Wise
60 days
SAMRALA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹7.3 L
XEN BML CANAL AND GROUND WATER DIV PTA
22 Nov 2023
10 Oct 2023
31 Oct 2023
10 Oct 2023
30 Oct 2023
10 Oct 2023
18 Oct 2023
Amount
Ordinary jungle clearance of both banks of Distributries, minors and drains with discharge 1.50 to 4.50 cumecs including boundary road
Excavation in soil (any type) using hydraulic excavator CK 90 with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections including all lifts and combined lead upto 30 m
Excavation in soil using hydraulic jcb and hydraulic trolley with disposal upto 450 m including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to embankment location within all lifts and lead. (lead =9 km)
Earthwork for compaction in 20 cm layers and dressing., Extra for watering the earth., Extra for rolling to specifications.
Dressing of earthwork.
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above upto 1.50 m
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above1.5 mtr depth but upto 3.0 m
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification.
Dressing of Bed and prepration of sub grade for lining complete in all respect as per pwd specification.
Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes.
Cement concrete lining 100 mm thick or less with mechanical paver for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (for vertical height upto 2.0 m)(For Lining)
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For coping)
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For Sleeper)
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Filling Contraction/Construction Joint with sealing compound complete in all respect
Extra bitumen painting over concrete surface at joints @ 0.69 kg per Sqm
250 wide LDPE film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.
Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation.
Laying cement concrete in 1:3:6 with stone ballast or shingle with machine mixed.
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixture as per IS 1791 and vibrator by needele vibrator but excluding steel reinforcement and centring-shuttering complete in all respect.
Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete.
Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade.
Painting new letters and figures of black synthetic enamel paint to an even shade
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing) .
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m.
PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
RCC M-20 in superstructure
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete.
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976
Earthwork excavation in foundations trenches extra in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 meters.
Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect
Supplying, fitting and placing HYSD bar reinforcement in super structure complete as per drawing and Technical Specifications.
V.K.& SONS
BRIJ LAL GOVT CONTRACTOR
SUKHDEV SINGH CONTRACTOR
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .