Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
7 May 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - HC 546; HB 1004 Entire superstructure Area 50Sqmtr to be painted as per paint scheme including area above water line to be painted using Ms Akzonoble makes paint Wanda 2..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; HB1005 Renew rubber beading of 03 in nos water tight doors and 02 hatch and chalk test to be carried out Material yard supply Beading Mat EPDM rubber length 1..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - HC 546; HA 1006 Door and hatches 03 Nos Hatches and 03 Nos doors holding arrangement of Bridge Crew cabin DA Compartment Engine room compartment and boatswain store defe..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; HB 1008 Clean the bilges of main engine DA compartment Boatswain store and night Cabin Void space thoroughly inspect the structure to main engine foundation for ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; HB 1012 Wooden panelling of Bulkhead including lane at Crew cabin Bridge and Wc area deformed uprooted Same to be renewed as per samples Mat fire proof plywood A..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; HB 1020 Entire inner compartment wood polishing to be carried out for smoothness MatYard supply All in way jobs included; Service Provider
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; EA 3003 Following job to be carried out in AC system Post completion of jobs AC plant to be proved for satisfactory operation and performance a Overhaul sea wat..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; EA 3011 GEAR BOX 02 NOS Make Twin Disc Model MG 5082A Ratio 2 05 1 Following jobs to be carried out in both Gear Boxes : Mat/Spares yard supply a Retighte..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; EA 3007 MOTOR DRIVEN FIRE PUMP Make Flow Chem Model FPE SJ 40 110 Following jobs to be carried out in Fire pump System Mat Spares yard supply a Overhau..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - HC 546; LA 5001 MAIN SWITCH BOARD 03 NOS Clean all contacts with CTC and overhaul the complete 03 Nos Main switch boards general 230V AC 24V DC Main Navigation Panel D..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; LA-5002 EXHAUST FANS 03 NOS Make Crompton Greaves Model CGFA233514S3 02 No 075 Kw CGFA232014S1 01 No 1 Kw Exhaust fans 03 Nos overhaul motors and replace beari..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; LA 5004 BATTERY CHARGER 02 NOS Overhaul the battery chargers renew defective components Calibrate 01 in No Ammeter and provide calibration certificate Material..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - HC 546; LA 5014 FIRE DETECTION SYSTEM ZEAL MARKETING Overhaul the main unit
check the functionality of all sensors Heat detector 03 Nos Smoke detector 02 Nos Manual cal..
7765276
GEM/2025/B/6163183
Two Packet Bid
Repair
South Andaman
Total value wise evaluation
SERVICE
6 documents required · 6 mandatory
2 yrs
₹3
Exempted
7 May 2025
1 May 2025
7 May 2025
and Installation of Plant Systems/Equipments (Version 2) - HC 546; HB 1004 Entire superstructure Area 50Sqmtr to be painted as per paint scheme including area above water line to be painted using Ms Akzonoble makes paint Wanda 2..
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; HB1005 Renew rubber beading of 03 in nos water tight doors and 02 hatch and chalk test to be carried out Material yard supply Beading Mat EPDM rubber length 1..
and Installation of Plant Systems/Equipments (Version 2) - HC 546; HA 1006 Door and hatches 03 Nos Hatches and 03 Nos doors holding arrangement of Bridge Crew cabin DA Compartment Engine room compartment and boatswain store defe..
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; HB 1008 Clean the bilges of main engine DA compartment Boatswain store and night Cabin Void space thoroughly inspect the structure to main engine foundation for ..
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; HB 1012 Wooden panelling of Bulkhead including lane at Crew cabin Bridge and Wc area deformed uprooted Same to be renewed as per samples Mat fire proof plywood A..
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; HB 1020 Entire inner compartment wood polishing to be carried out for smoothness MatYard supply All in way jobs included; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; EA 3003 Following job to be carried out in AC system Post completion of jobs AC plant to be proved for satisfactory operation and performance a Overhaul sea wat..
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; EA 3011 GEAR BOX 02 NOS Make Twin Disc Model MG 5082A Ratio 2 05 1 Following jobs to be carried out in both Gear Boxes : Mat/Spares yard supply a Retighte..
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; EA 3007 MOTOR DRIVEN FIRE PUMP Make Flow Chem Model FPE SJ 40 110 Following jobs to be carried out in Fire pump System Mat Spares yard supply a Overhau..
and Installation of Plant Systems/Equipments (Version 2) - HC 546; LA 5001 MAIN SWITCH BOARD 03 NOS Clean all contacts with CTC and overhaul the complete 03 Nos Main switch boards general 230V AC 24V DC Main Navigation Panel D..
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; LA-5002 EXHAUST FANS 03 NOS Make Crompton Greaves Model CGFA233514S3 02 No 075 Kw CGFA232014S1 01 No 1 Kw Exhaust fans 03 Nos overhaul motors and replace beari..
and Installation of Plant/Systems/Equipments (Version 2) - HC 546; LA 5004 BATTERY CHARGER 02 NOS Overhaul the battery chargers renew defective components Calibrate 01 in No Ammeter and provide calibration certificate Material..
and Installation of Plant Systems/Equipments (Version 2) - HC 546; LA 5014 FIRE DETECTION SYSTEM ZEAL MARKETING Overhaul the main unit
check the functionality of all sensors Heat detector 03 Nos Smoke detector 02 Nos Manual cal..
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7765276.pdf
GEM_BID
1745401302.pdf
OTHER
1745401385.pdf
OTHER
ATC_f6c642d0-5a6c-45a2-99a51746093127700_DTO14.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .