Loading…
Loading…
Tender Value
₹98,000
EMD Value
₹1,960
Closing Date
5 Aug 2026, 6:00 pm
Executive Engineer
Executive Engineer
As BOQ
2026_RDPR_317676_22
37 REW Samba of 2026-27 Dated-24-07-2026
Open Tender
Civil Works
Percentage
30 days
Vijaypur
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executve Engineer Rew Samba
₹1,960
25 Jul 2026
25 Jul 2026
6 Aug 2026
25 Jul 2026
5 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 9 | cum | 276 | ₹2,484 |
| 2 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 5: 10: ( 1: cement 5: coarse sand : 10 graded | 0.2 | cum | 4,826.5 | ₹965.3 |
| 3 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 3: 6: ( 1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size,20% boulders | 3.94 | cum | 5,733.6 | ₹22,590.38 |
| 4 | Centring and shuttering including strutting, propping etc. and removal of form work for:-a) Foundation, footings, bases of columns. | 35 | sqm | 286.35 | ₹10,022.25 |
| 5 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade by block making machine with strong vibratory compaction and of approved size and design shape laid in equired colour and patternover and including 50 mm thick compacted bed of coarse sand ,filling the joints with coarse sand etc all complete job as per dIrection of engineer in charge. | 25.4 | sqm | 816.15 | ₹20,730.21 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring. shuttering, finishing and reinforcement-All work upto plinth level.1.1.5:3 (1 cement : 1.5 coarse sand : 3graded stone aggregate 20mm nominal size). | 1.25 | cum | 7,275.25 | ₹9,094.06 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level- Thermo-Mechanically Treated bars of grade Fe-500D | 90 | kg | 123.2 | ₹11,088 |
| 8 | Structural steel work in built up sections, trusses and framed work,
including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Welded | 100 | kg | 138 | ₹13,800 |
| 9 | Laying of labour engaged | 4 | no | 500 | ₹2,000 |
| 10 | Laying of PVC 75 mm drain pipe | 3 | mtr | 150 | ₹450 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.00 MB
BOQ_1043318.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].