| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.5 CrRejected-Finance 0 BADHALGANJ SADAR SADAR ROAD AZAMGARH UTTAR PRADESH 276128 UDYAM UP 07 0021622 | AZAMGARH | UTTAR PRADESH | 276128 | ₹1.5 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.5 CrRejected-Finance | ₹1.5 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.5 CrRejected-Finance | ₹1.5 Cr | L4 | Rejected-Finance L4 |
Tender Value
₹1.5 Cr
EMD Value
₹3.5 L
Closing Date
15 Apr 2026, 5:00 pmClosed
GM CIVIL
Main Administrative Building Sector-6 Noida
Development of Sector-118 (C/o Balance road, Drain, Culvert and Boundary wall of Park facility plot and repair of road and Drains), Noida
2026_NOIDA_1132415_1
52/GM/SM-WC-6/2025-26
Open Tender
Civil Works
180 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹3.5 L
13 May 2026
1 Apr 2026
16 Apr 2026
1 Apr 2026
15 Apr 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of Engineer-in -In cement mortar | - | Cum | - | - | |
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | - | Sqm | - | - | |
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m, The Contractor has to dectect different utilities like sewer line, water supply line, electric cable, telephone cable , gas pipe line etc, using utility decteting machine before start of excavation and shall start excavation only after getting permission of E/I. All kind of soil (Letter No. Noida/CPE/2015/464, Dt. 20.07.2015).l | - | Cum | - | - | |
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | Cum | - | - | |
Filling available excavated earth (excluding rock) in trenches, plinth,sides.watering, lead upto 50 m and lift upto 1.5 m. | - | Cum | - | - | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand(zone-III) : 8 graded stone aggregate 40 mm nominal size). | - | Cum | - | - | |
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Cum | - | - | |
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - | |
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size | - | Cum | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_2113491.xls
BOQ • 0.88 MB
TD.pdf
Tender Documents • 5.16 MB
Capability.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid