Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹4.2 Cr
EMD Value
₹4.2 L
Closing Date
13 Feb 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer GIDC Rajkot
Up gradation of Road resurfacing along with Box Culvert of Internal Industrial Roads and Street light works incl. 5 years free maintenance guarantee period at Rafaleshwar GIDC Industrial estate under AII Scheme-2020 with 5 years Street light Operation guarantee period. (4th-invitation)
267624
E -TENDER NOTICE NO: 11 of 2025-26
Open
Civil Works - Roads
Works
Rajkot
17 documents required · 17 mandatory
₹7,080
Yes
EXECUTIVE ENGINEER “GIDC" Rajkot
₹4.2 L
Yes
23 Jan 2026
23 Jan 2026
27 Jan 2026
13 Feb 2026
27 Jan 2026
DETAILED SPECIFICATION OF THE ITEMS OF WORK TO BE CARRIED OUT
Name of Work: Up gradation of Road resurfacing along with Box Culvert of Internal
Industrial Roads and Street light works incl. 5 years free maintenance guarantee period
at Rafaleshwar GIDC Industrial estate under AII Scheme-2020 with 5 years Street light
Operation guarantee period. (4th-invitation)
FOR SCHEDULE “B”
Clearing and grubbing of road land including uprooting rank vegetation, grass,
bushes, shrubs, saplings and trees of girth upto 300 mm removal of stumps of
trees cut earier and disposal of unserviceable materials. (C) By Mechanical means
in area of light Jungle.
This work shall consist of cutting, removing and disposing of all materials such as
trees, bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding
150 mm in thickness, rubbish etc., which in the opinion of the Engineer are
unsuitable for incorporation in the works, from the area of road land containing
road embankment, drains, cross drainage structures and such other areas as may
be specified on the drawings or by the Engineer. It shall include necessary
excavation, backfilling of pits resulting from uprooting of trees and stumps to
required compaction, handling, salvaging, and disposal of cleared materials with
all leads and lights. Clearing and grubbing shall be performed in advance of
earthwork operations and in accordance with the requirements of these
Specifications.
2. Preservation of Property/Amenities
Roadside trees, shrubs, any other plants, pole lines, fences, signs, monuments,
buildings, pipelines, sewers and all highway facilities within or adjacent to the
highway which are not to be disturbed shall be protected from injury or damage.
The Contractor shall provide and install at his own cost, suitable safeguards
approved by the Engineer for this purpose.
During clearing and grubbing, the Contractor shall take all adequate precautions
against soil erosion, water pollution, etc., and where required, undertake
additional works to that effect vide Clause 306. Before start of operations, the
Contractor shall submit to the Engineer for approval, his work plan including the
procedure to be followed for disposal of waste materials, etc., and the schedules
for carrying out temporary and permanent erosion control works as stipulated in
3. Methods, Tools and Equipment
Only such methods, tools and equipment as are approved by the Engineer and
which will not affect the property to be preserved shall be adopted for the Work. If
the area has thick vegetation/roots/trees, a crawler or pneumatic tyred dozer of
adequate capacity may be used for clearance purposes. The dozer shall have
ripper attachments for removal of tree stumps. All trees, stumps, etc., falling within
excavation and fill lines shall be cut to such depth below ground level that in no
case these fall within 500 mm of the subgrade. Also, all vegetation such as roots,
under-growth, grass and other deleterious matter unsuitable for incorporation in
the embankment/subgrade shall be removed between fill lines to the satisfaction
of the Engineer. All branches of trees extending above the roadway shall be
trimmed as directed by the Engineer.
All excavations below the general ground level arising out of the removal of trees,
stumps, etc., shall be filled with suitable material and compacted thoroughly so as
to make the surface at these points conform to the surrounding area.
Ant-hills both above and below the ground, as are liable to collapse and obstruct
free subsoil water flow shall be removed and their workings, which may extend to
several metres, shall be suitably treated.
4. Disposal of Materials
All materials arising from clearing and grubbing operations shall be taken over and
shall be disposed of by the Contractor with all leads and lifts. The rates deemed to
include credit towards value of usable materials and salvage value of unusable
materials. The offset price of cut trees and stumps as per guidelines/ estimates of
State Forest Department shall be deducted from the amount due to the Contractor
and deposited with the State Forest Department. The rate is deemed to account
for this off-set price also.
5. Measurements for Payment
Clearing and grubbing for road embankment, drains and cross-drainage structures
shall be measured on area basis in terms of hectares. Clearing and grubbing of
borrow areas shall be deemed to be a part of works preparatory to embankment
construction and shall be deemed to have been included in the rates quoted for
the embankment construction item and no separate payment shall be made for
the same. Cutting of trees upto 300 mm in girth including removal of stumps and
roots, and trimming of branches of trees extending above the roadway shall be
considered incidental to the clearing and grubbing operations.
Cutting of trees, excluding removal of stumps and roots of trees of girth above
mm shall be measured in terms of number according to the sizes given below :-
i) Above 300 mm to 600 mm
ii) Above 600 mm to 900 mm
iii) Above 900 mm to 1800 mm
iv) Above 1800 mm
Removal of stumps and roots including backfilling with suitable material to
required compaction shall be a separate item and shall be measured in terms of
number according to the sizes given below:-
i) Above 300 mm to 600 mm
ii) Above 600 mm to 900 mm
iii) Above 900 mm to 1800 mm
iv) Above 1800 mm
For the purpose of cutting of trees and removal of roots and stumps, the girth shall
be measured at a height of 1 metre above ground or at the top of the stump if the
height of the stump is less than one metre from the ground.
1 . The Contract unit rates for one hector for the various items of clearing and
grubbing shall be payment in full for carrying out the required operations including
full compensation for all labour, materials, tools, equipment and incidentals
necessary to complete the work. These will also include removal of stumps of
trees less than 300 mm girth excavation and back-filling to required density, where
necessary, and handling, giving credit towards salvage value disposing of the
cleared materials with all lifts and leads. Ground levels shall be taken prior to and
after clearing and grubbing. Levels taken prior to clearing and grubbing shall be
the base level and will be accordingly used for computation of quantity of material
arising due to clearing and grubbing, including the computation of unsuitable
material, if any, which may be required to be removed as per the approval of the
Engineer. The levels taken subsequent to clearing and grubbing shall be the base
level for computation of earthwork for embankment. Clearing and grubbing shall
be restricted to 150 mm only for payment purpose. Where clearing and grubbing
is done a level beyond 150 mm, the excess excavation shall be made good as per
Clause 301.3.3 and 301.6 to the satisfaction of the Engineer prior to taking up
earthwork. This shall not be paid and shall be treated as part of clearing and
2 .The Contract unit rate for cutting trees of girth above 300 mm shall include
handling, giving credit towards salvage value disposing of the cleared materials
with all lifts and leads.
3 .The Contract unit rate for removal of stumps and roots of trees girth above
mm shall include excavation and backfilling with suitable material to required
compaction, handling, giving credit towards salvage value disposing of the cleared
materials with all lifts and leads.
4 .The Contract unit rate is deemed to include credit towards value of usable
materials and salvage value of unusable materials. The off-set price of cut trees
and stumps as per guidelines/ estimates of State Forest Department shall be
deducted from the amount due to the Contractor and deposited with the State
Forest Department. The rate is deemed to account for this off-set price also.
5 .Where a Contract does not include separate items of clearing and grubbing, the
same shall be considered incidental to the earthwork items and the Contract unit
prices for the same shall be considered as including clearing and grubbing
MODE OF MEASUREMENT AND PAYMENT :
The work shall be measured as finished work in position in Hect.
Preparing Existing road surface by brushing with wire brushes and with
mechanical equipments for removing caked mud etc. sweeping with brooms and
finally fanning the cleaned surface with gunney bags or mechanical air compressor
to remove all loose dirt etc.
Preparing an existing granular surface
All loose and extraneous materials should be removed and surface cleaned where
a granular profile Corrective course is to be provided prior to laying a bituminous
course; the existing granular surface after cleaning should be slightly watered and
the granular course laid.
The surface of all granular layers on which a bituminous course is to be laid
should be cleaned of all loose material and dust by air jet or wire brushes or other
approved means and should be correct to line, level and camber within the
tolerances specified for base course.
Where a profile corrective course of bituminous material is to be laid, the granular
surface after removal of all loose material and dust should be primed with a
suitable bituminous primer as per ‘Sub-section’ 502 of MORTH Scarifying an
existing bituminous surface Where an existing bituminous layer is required to be
Removed, it should be done by hand picking without causing undue disturbance
to the underlying layers. Any underlying material which may have been disturbed
should be removed and fresh base
material supplemented, if necessary and compacted.
The compacted granular surface, finished to line, level and cross-slope should be
primed as per specified procedure.
Preparing an existing bituminous surface
The surface shall be cleaned and any pot holes and cracks repaired before laying
bituminous treatment.
Pothole and Patch Repairs
The existing bituminous surface should be inspected and all pothole and patch
areas made free of any loose, defective material. The edges of all potholes shall
be cut / trimmed with hand tools vertically to form rectangular shape and shall be
thoroughly cleaned with wire brush, compressed air or other approved means. All
dust and loose materials should be removed from site. Layers below the level of
bituminous construction should be replaced using material of equivalent
specification to the original construction and degree of compaction. The area of
bituminous construction should be primed and/or tacked with an emulsion
(meeting requirements of IS:8887) depending on whether the lower area is
granular or bituminous in nature. The sides of the excavated position should be
painted with tack coat material using a hand brush/sprayer.
The bituminous patching material should be either a hot mix or a cold mix,
adopting the respective specification. The bituminous mixture, prepared in a plant
of suitable capacity should be placed in layers of not more than 100 mm (loose)
and compacted in layers with roller/plate compactor/hand roller/rammer to the
desired compaction.
MODE OF MEASUREMENT AND PAYMENT:
The work shall be measured as finished work in position in square meter
Box cutting the road surface to proper slope and camber for making a base for
road work including removing the excaveted stuff and depositing on the road side
slope as directed upto 50 Mt. Lead.
The sub grade / sub base / base to receive the water bound macadam course
shall be prepared to the specified grade and camber and made of dust and other
extraneous materials. Any nets of soft places shall be corrected in on approved
manner and rolled until firm.
Cutting shall be paid on cross section area as established by the longitudinal level
and cross sections for this purpose. The work shall be started after the initial
longitudinal section of the ground and cross sections are taken and recorded.
The final surface shall confirm to proper profile, camber and super elevation etc.
as directed by the Engineer. The earthwork shall be paid on sectional
measurements, cross sectional etc. taken.
No allowance or payments shall be made for materials excavated prior to the
taking of level by the Engineer.
The rate is inclusive of cutting in all soil and murrum including removal of all
shrubs, jungle cutting, cutting stuff in slopes, side drain bank etc. complete.
This item also includes the clearing the sides and demarking the line as per
requirement and cutting out the existing tress on the road side, not extra payment
will be paid for.
At the time of preparing final bill, the road formation in embankment and cutting
shall have be perfect condition true to grade, camber and side slope duly dressed
and damages due to rain cuts etc. during entire working period shall have to be
done by the contractor.
The work taken in length shall be completed in all respects viz. width, grades,
camber, side drains, side slopes etc. and measurements for incomplete work shall
not be taken otherwise.
ode of Measurement & Payment:
The unit rate box cutting shall include the cost of all materials, tools and plant
required for excavation in all type of soils in grade and camber, line and levels and
finishing as per direction of the Engineer-in-charge, excavation and all other
incidental expenses for producing item of box cutting of specified breadth and
depth and grade to complete the item or its components as shown on the
drawings and according to these specifications.
The box cutting shall be measured for its cross section area and compacting
volumes in cubic metres by the method of average areas.
The rate will be made on Cubic Meter basis of the finished work.
Rolling of earthwork in layers with power roller including filling in depressions
which occur during the process.
This item shall consist of Rolling the earth work (having minimum CBR 11%) in
the required layers, not exceeding 20 cms in loose thickness, to be done for
construction of embankments., side shoulders and miscellaneous back fill with
excavated stuff under this contract. The consolidation of earth work shall be
carried out in accordance with the requirements of these specifications and in
conformity with the lines, grades and cross sections shown in the drawings or as
directed by the Engineer-in-charge. If earth having minimum CBR 11% is not
available then lime-fly ash treatment as approved by engineer in charge must be
given to earth brought from out side and 15% effective CBR must be achieved.
Moisture content of each layer of the loose excavated stuff of soil, soft murrum
etc. shall be checked in accordance with IS:2720 (PART-II) and suitably adjusted
by sprinkling additional water from a hose line, truck mounted water tank or other
approved means so that at the time of compaction, it is from 1% to 2% below
O.M.C., corresponding to IS:2720 (PART-VII). While adding water, due allowance
shall be made for evaporation losses. After adding the required amount of water,
the soil shall be processed by means of harrows, rotary mixers or as otherwise
approved until the layer is uniformly wet.
Immediately thereafter, rolling shall be started with vibrator roller of 80 to 100 KN
static weight with plain drum or heavy pneumatic tyred roller of minimum 200 to
300 KN weight having tyre pressure 0.70 MN / M2 of other approved plant. Rolling
shall commence at the edges and progress towards the centre longitudinally
except that on super elevated portions, it shall progress from the lower to the edge
parallel to the centre line of the pavement, Each pass of the roller shall uniformly
overlap not less one third of the track made in the proceeding pass. During rolling,
the grade and camber shall be checked and any high spots or depressions which
become apparent corrected by removing or adding fresh material.
Utmost care shall be taken during the rolling work so that earth do not get
disturbed and pushed out so as to cause unevenness lumps, irregularities etc. in
Each layer of the earth work shall be thoroughly compacted to densities specified
in table below:
Sr. Type of work Relative compaction as percentage of
No. maximum laboratory dry density as per
I.S.2720 (Part- 8)
1 Subgrade and earthen shoulders Not less than 97 %
2 Embankment Not less than 95 %
3 Expansive Clays Not allowed
a) Subgrade and 500 mm portion
just below the sub-grade
b) Remaining portion of 90 - 95 %
When density measurements reveal any soft areas in the embankment, further
compaction shall be carried out as directed by the Engineer-in-charge. If in spite
of that, the specified compaction is not achieved, the materials in the soft areas
shall be removed and replaced by approved material compacted to the density
requirements and satisfaction of the Engineer-in-charge.
The surface of any layers of earthwork on completion of compaction shall be well
closed free from movement under compaction plant and from compaction planes,
ridges, cracks or loose, segregated or otherwise defective areas shall be made
good to the full thickness of layer and re-compacted.
The contract unit rate shall be for a unit of one Cubic meter of finished work at the site
Watering of earth work as directed.
This item shall consist of watering the earth work (having minimum CBR 11%) in
the required layers, not exceeding 20 cms in loose thickness, to be done for
construction of embankments., side shoulders and miscellaneous back fill with
excavated stuff under this contract. The consolidation of earth work shall be
carried out in accordance with the requirements of these specifications and in
conformity with the lines, grades and cross sections shown in the drawings or as
directed by the Engineer-in-charge. If earth having minimum CBR 11% is not
available then lime-fly ash treatment as approved by engineer in charge must be
given to earth brought from out side and 15% effective CBR must be achieved.
Moisture content of each layer of the loose excavated stuff of soil, soft murrum
etc. shall be checked in accordance with IS:2720 (PART-II) and suitably adjusted
by sprinkling additional water from a hose line, truck mounted water tank or other
approved means so that at the time of compaction, it is from 1% to 2% below
O.M.C., corresponding to IS:2720 (PART-VII). While adding water, due allowance
shall be made for evaporation losses. After adding the required amount of water,
the soil shall be processed by means of harrows, rotary mixers or as otherwise
approved until the layer is uniformly wet.
The contract unit rate shall be for a unit of one Cubic meter of finished work at
the site of work
Graded Granular sub base (GSB)
Construction of granular sub-base by providing & laying of compacted thickness of
200 mm Grading 5th Granular sub base (GSB) in layers and graded granular
material consisting of machine cut black trap stone aggregate as per grading - V
given in table 400-1 of the specification MORT&H and compactor to the required
density with vibratory roller in all seasons as per MORT&H , maintaining the
required slope & grade during the operation as approved by the engineer in charge
& watering to the proper moisture content and sprinkled with the help of truck
mounted water tank fitted with suitable arrangement. (fully saturated having CBR
value minimum 30)
This work shall consist of laying and compacting, composition of coarse & medium
sand as a sub-base, brought from outside other than the GIDC land. The sub-
base shall be constructed in accordance with the requirements of these
specifications and in conforming with lines, grades, and cross sections shown on
the drawing or as directed by the Engineer-in-charge.
The granual materials specified in description, coarse sand & medium sand shall
be obtained from outside sources / area other than the GIDC land. The contractor
will have to make his own arrangement to get sources / area for obtaining the
granual materials specified in description, coarse and medium sand of the
approved quality with all leads and lifts at his own cost.
The source / quarries arranged by the contractor to obtain the granual materials
specified in description, coarse & medium sand shall be got approved from the
Executive Engineer prior to use in the work.
The sample of the granual materials specified in description,coarse & medium
sand collected from approved quarries shall be got tested at Govt. recognized
laboratory as may be directed to the contractor at his own cost. The results shall
conform to the standard requirements set down hereunder. The course and
medium sand of the approved quality shall be only permitted for use in the work.
Grading for granylar Sub-base materials as per Table no 400.1, MoRth -5 rivision
The material to be used for the work shall be natural sand, moorum, gravel,
crushed stone, or combination the reof depending upon the grading required.
Materials like crushed slag, crushed concrete, brick metal and kankar may be
allowed only with the specific approval of the Engineer. The material shall be free
from organic or other deleterious constituents and conform to one of the three
gradings given in Table 400- 1.While the gradings in Table 400-1 are in respect of
close-graded granular sub- base materials, one each for maximum particle size of
75 mm, 53 mm and 26.5 mm, the corresponding gradings for the coarse- graded
materials for each of the three maximum particle sixes are given
TABLE 400-1. GRADING FOR CLOSE-GRADED GRANULAR SUB-BASE
IS Sieve Per cent by weight passing the IS sieve
Designation Grading I Grading II Grading III
TABLE 400-2. GRADING FOR COARSE GRADED GRANULAR SUB -BASK
IS Sieve Per cent by weight passing the IS sieve
Designation Grading I Grading 11 Grading III
CBR Value (Minimum) 30 25
Note :- The material passing 425 micron (0.425 mm) sieve for all the here grading
when vested according to IS : 2720 (Pan 5) shall have liquid limit and plasticity
index not more than 25 and 6 per cent respectively.
2.2)General Requirements:
The material to be used for the work shall be natural course. The coarse and
medium sand shall be clean, well graded, hard strong durable and gritty partition
free from injuries amount of dust, clay, kankar, nodules or of flaky partition alkali,
salt, organic matter, loam mica or other deleterious substances.
If inferior quality of the granual materials specified in description, coarse and
medium sand is used in the work, same shall be removed by the contractor at his
2.3)Physical Requirements :
The material shall have a 10% fine value of 50 KN or more (for sample in soaked
condition) when tested in compliance with B.S. 812-PART-III. The C.B.R. should
not less than 30% and shall be determined at the density and moisture content
likely to be developed in equilibrium conditions which shall be taken as being the
density relating to a uniform air voids content of 5%. The grading of the granual
materials specified in description, coarse and medium graded sand shall be as
directed by the Engineer-in-charge.
Physical Requirement for materials for Granular Sub-base ( As per MoRth ,pg.no
Aggregate Impact Value IS 40 maximum
Liquid limit IS 2720 ( Part-5) Maximum
Plasticity Index IS 2720 ( Part-5) Maximum
3)CONSTRUCTION OPERATIONS:
3.1)Site Clearance :
Immediately prior to the laying of sand, original ground / sub-grade / sub – base
shall be prepared by removing all vegetation and other extraneous matter, lightly
sprinkled with water if necessary and rolled with one or more pass of 80/ 100 KN
static weight vibrator roller, as directed by the Engineer-in-charge. The relevant
specification of MoRTH clause No.201 shall also be followed.
3.2)Setting out :
After clearing the site or preparing the sub – grade / sub-base the alignment of the
road shall be properly set out true to lines curves, slopes, grades and sections as
shown in the plan or as directed by the Engineer-in-charge. The contractor shall
provide all labours and materials such as lime, string, pegs, nails, bamboos,
stones, mortar, concrete etc. required for setting out, establishing temporary &
permanent bench marks, centre line stones and other marks and giving profiles,
alignments and other marks, as longer they are required for the marks and long as
opinion of the Engineer-in- charge.
3.3)Dewatering:
MoRTH Clause No.305.3.2.shall be followed.
3.4)COMPACTING GROUND SUPPORTING EMBANKMENT/SUB‐GRADE:
The original ground shall be leveled to facility placement of first layer of
embankment mix with water & then compacted by rolling so as to achieve
minimum dry density. The MoRTH specification Clause No.305.3.4 shall be
3.5)SPREADING MATERIALS IN LAYERS:
The granual materials specified in description, Sand course shall not be preceded
until the foundation of embankment have been inspected by the Engineer-in-
charge for satisfactory condition and approval.
The granual materials specified in description, sand (composition of coarse &
medium sand) shall be mixed properly and spread on the prepared road
foundation with the help of a drag spreader, motor graders or other approved
means. The thickness of loose layers shall be so regulated that the maximum
thickness of the each layer after consolidation does not exceed 200 mm or
required thickness, shown on the drawing or as directed by the Engineer-in-
charge. Successive layers of the granual materials specified in description and
sand shall not be placed until the layer under construction has been thoroughly
compacted to the requirements set down hereunder and accepted by the
Engineer in charge. The motor grader blade shall have hydraulic control suitable
for initial adjustment and maintain the same so as to achieve specific slope and
The operation of laying the successive layers of the granual materials specified in
description and sand shall have to be suitably synchronized with the consolidation
Moisture content of the selected soil shall be checked at the site of placement
prior to commencement of compaction, if found to be out of agreed limit, the same
shall be made good. Where water is required to be added in such construction,
water shall be sprinkled from a water tanker fitted with sprinkle capable of
applying water uniformly with a controllable rate of flow to variable widths of
surface but without any flooding. The water shall be added uniformly & thoroughly
mixed in murrum by blading, discing or harrowing until a unit of moisture content is
obtained through out the depth of the layer.
If the sand delivered to the road bed is too wet, it shall be dried, by aeration and
exposure to the sun, till the moisture content is acceptable for compaction. Such
circumstances arises, where owing to wet weather the moisture content can not
be reduced to the required amount by the above procedure, compaction shall be
After water has been added the material shall be processed by mechanical or
other approved means if so directed by the Engineer-in-charge until the layer is
uniformly wet confirming to MoRTH. Specification clause no. 305.3.5.2
Only the compaction equipment approved by the Engineer shall be employed to
compact the selected soil.
The compaction shall be done with the help of vibrator roller of 80 to 100 KN static
weight with plain drum or heavy pneumatic tyred roller of minimum 200/300 KN
weight having a minimum tyre pressure of 0.70 MN/M2 as approved by the
Engineer-in-charge, capable for achieving required compaction. The contractor
shall demonstrate the efficiency of the equipment he intends to use by carrying
out compaction trials. The procedure to be adopted this site trials shall first be
submitted to the Engineer-in-charge for approval.
Immediately there after rolling shall be started with approved roller or other
approved plant. Rolling shall commence at the edges and progress towards the
centre longitudinally except that on super elevated portions it shall progress from
the lower to the upper edge parallel to the centre line of the pavement. Each pass
of roller shall uniformly overlap not less than on third of the track made in the
proceeding pass. During rolling the grade and camber shall be checked and any
high spots or depressions which become apparent corrected by removing or
adding fresh material. Rolling shall be continued till the density achieved is at least
100% of the maximum dry density for the material determined as per IS:
(Part – 8). The surface of any layer of sand on completion of compaction shall be
well closed free from movement under compaction plant from compaction planes,
ridges, cracks or loose material. All loose segregated or otherwise defective areas
shall be made good to the full thickness of layer and re-compacted.
3.7)FINISHING OPERATIONS
The embankment/sand layer shall be finished in conformity with the alignments,
levels, cross sections and dimensions shown on the plans or as directed by the
Engineer-in-charge. Finishing operations shall include work of shaping and
dressing the sub-base / shoulders and the side slopes to conform to the cross
section shown on the drawings.
When earthwork operations have been subsequently completed, the road way
area shall be cleared of all debris and ugly scrubs in the construction area,
responsible for objectionable appearance shall be eliminated. The defective
portion shall be removed and re-constructed as directed by the Engineer-in-
The surface finish of construction shall conform to the requirement as per general
technical specification for quality control on works and materials attached
MoRTH specification clause no. 305.3.9 shall be also followed.
3.8)ARRANGEMENT OF TRAFFIC :
MoRTH specification clause no.112 shall be followed.
4)QUALITY CONTROL OF WORK :
Control on the quality of materials and works shall be exercised by the Engineer-
in-charge in accordance with these specifications and general technical
specifications for quality control on works and materials attached herewith. The
Engineer-in-charge shall have the right to modify the frequencies of testing
according to the needs.
5)MODE OF MEASUREMENT AND PAYMENT :
The work of providing, laying, spreading, dressing & compacting the composition
of coarse and medium sand for constructing a sub–grade / sub- base shall be
measured as compacted and finished work in position in cubic meters. The
finished and compacted thickness to be paid on volume basis shall be computed
in the following manner. Levels shall be taken before & after construction at a grid
of points 10m or 30m centre to centre longitudinally in straight but 5 meters at
curves. normally on two lane roads, the levels shall be taken at four position
transversely at 0.75 and 2.75meters from either edge of the carriage way or as
directed by the Engineer-in-charge and on single lane roads these shall be taken
at two positions transversely being at 1.25m from the either edge of the carriage
way or as directed by the Engineer-in-charge. The measurement may be taken at
closer intervals also if so desired by the Engineer- in-charge.
The average thickness of the layer of composition of coarse and medium sand in
any area shall be the arithmetical mean of the difference of levels before and after
construction at all the grid points falling in that area, provides that thickness of
finished work shall be limited to those shown on the drawings or approved by the
Engineer-in-charge in writing.
The contractor shall sign day to day leveling work and also original cross section,
longitudinal section in token of his acceptance etc. The working sections both
longitudinal and cross of the sub-grade shall be taken by the Engineer-in-charge
before the work is started. The contractor or his authorized representative shall
attend day to day leveling work and sign with date the field book daily in token of
this acceptance. If there is any dis-agreement the contractor shall inform of it in
writing to the officer concerned with specific reference the cognizance of any
complaint taken, merely not signing of the level book shall not be deemed as dis-
agreement. The contractor shall maintain the finished work to proper formation
and grade till this item is finally measured and accepted by department. The
measurement shall be taken on compacted work.
The Contract unit rate for granular sub-base shall be payment in full for carrying
out the required operations including full compensation for : Making arrangements
for traffic lo Clause 112 except for initial treatment to verges, shoulders and
construction of diversions; furnishing all materials to be incorporated in the work
including all royalties, fees, rents where necessary and all leads and lifts; all
labour, tools, equipment and incidentals to complete the work to the
Specifications;carrying out the work in pan widths of road where directed;
andcarrying out the required tests for quality control.
5.0 DRAINAGE LAYER (125mm)( FILTER MEDIA)
5.01 Drainage layer ( Filter Media) of 125 mm above GSB layer black trap stone
crushed material (Morth Specification Section 401) (Table 400- I Gade-IV or V of
MORTH Specification Rev. V-2013).
6.0 WBM base course of 225 mm in three layers ( Morth specifications s ection
7.0 Bituminous layer comprising of 50mm DBM and 25 mm SDBC as per Morth
Specification Rev. V-2013.
8.0 Geotextile and Geogrid specifications will be as per IRC:113-2013 titled “
Guidelines for the design and construction of geosynthetic reinforced
embankment on soft soil”. Geotextile and bio axial Geogrid materials testing
should be done from the laboratory of BTRA. The Ultimate tensile strength of
bioxialgeogrid and remaining material properties should be satisfied as per
9.0TESTING OF MATERIAL
9.1 A site Testing Laboratory shall be set up by the contractor at his own cost. The
equipments for following tests, in addition to the equipment already specified, are
to be arranged by the contractor.
9.1.1 Aggregate Impact value (IS: 5640)
9.1.2 Sieve Analysis of Coarse and Fine aggregate (IS: 2386 Pt 1)
9.1.3 Flakiness Index (IS: 2386 Pt 1)
9.1.4 Moisture Content (IS: 2720 Pt II)
9.1.5 Plasticity (IS: 2720 Pt V) 9.1.6 Proctor Density test (IS 2720 Pt VIII)
9.1.7 Field Density (IS 2720 Pt III) 9.1.8 Water Absorption test (IS 2720 Pt III)
9.1.9 Surface Moisture Content of aggregates
9.2 Wherever possible, the materials shall be got tested at site lab of the
contractor. The cost of samples including packing, transportation and other
incidental charges shall be borne by Contractor.
9.3 The testing of materials, if required by the Officer-in –charge of the Quality
control wing of NBCC or his authorized representative, beyond specified
frequency of testing shall also be carried out at site laboratory of the contractor or
wherever possible by the contractor without any extra cost. The cost of samples
including packing, transportation and other incidental charges shall be borne by
the contractor.
9.4 In case the tests are conducted at any laboratory other than site laboratory of
the contractor, the testing charges shall be borne by the contractor. Here the
selection of laboratory will be done by Engineer-in-charge. However cost of
samples including packing, transportation, and other incidental charges shall be
borne by the contractor.
9.5 The test result shall be final and binding on the contractor. The decision of
Engineer-in-charge in this regard shall be final and binding on the Contractor.
9.6 All necessary tests as per CPWD specification / relevant BIS codes shall be
carried out on all the materials whether ISI marked or otherwise. Wherever CPWD
specification / relevant BIS codes are not available the tests shall be carried out
as per directions of Engineer-in charge. Nothing extra will be payable on this
9.7 At the time off handing over of completed work to the department all the
damages, pot holes and undulations caused by any traffic shall be made good
and road repaired properly by the contractor to the satisfaction of Engineer-in-
charge. Nothing extra shall be payable to the contractor.
9.8 Necessary platforms of required size etc shall be made by the contractor to
prevent the blinding material (for W.B.M) and other items of work from coming into
direct contact with the local soil. Nothing extra will be payable to the contractor.
9.9 Geo Textile and Geo-grid material testing should be approved by BTRA and
the ultimate tensile strength of bi-axial geogrid and remaining material properties
should be satisfied as per IRC:113-2013.
10.0 No payment will be made to the contractor for damages caused by cyclones,
hurricanes, sand storms, flood waters or by pounding of water due to any reason
etc, during execution of the work and no claims on these accounts will be
11.0 Some restrictions may be imposed by the security staff/BSF/Army etc on the
working and /or movement of labour, vehicles, materials etc on BSF Link roads
and in Rann of Kutch and contractor shall be bound to follow all such restrictions/
instructions and nothing extra shall be payable on this account or due to less
/reduced working hours etc.
12.0 Royalty at the prevalent rates wherever payable, shall have to be paid by the
contractors on the boulders, metal, shingle, sand and bajrietc or any other
materials collected by him for the work direct to the revenue authority of the
District /State Government concerned. He should submit money receipts in lieu of
deposits made or obtain clearance from Geological Department for getting
released his final bill.
13.0 The contractor shall ensure that sufficient quantity of water (suitable for
construction) is available at site for proper execution of work. Nothing extra for
arranging of water at site will be paid to the contractor by the corporation.
14.0 Unless otherwise specified in the schedule of quantities, the rates for all
items of work shall be considered as inclusive of pumping out or bailing out water
from all depths if required for which no extra payment will be made. This will
include water encountered from any source, such as rains, floods, sub soil water
being high due to any other cause whatsoever etc.
15.0 The malba /garbage, removed from site shall be disposed off by the
Contractor at his own cost to any suitable place as directed by Engineerin-charge.
16.0 The existing salty and slushy layer if any of borrow pits, and earth filling area
should be removed and disposed off as directed by the Engineer in charge.
Nothing extra shall be paid to the contractor on this account.
17.0 The contractor should make all arrangements for the alignment, survey and
fixing the shortest distance by using GPRS and measuring the distance by using
road meter etc., Nothing extra will be payable on this account.
The contract unit rate for The work of providing, laying, spreading, dressing &
compacting the composition of coarse and medium sand for constructing a sub–
grade / sub-base , shall be payment in full for carrying out the required operations
including full compensation for :
xv) Cost of arrangement of land as a source of supply of coarse sand & medium
sand of required quality for construction.
xvi) Setting out
xvii) Compacting ground surrounding embankment sub-grade except where
removal & replacement of unsuitable material or loosening and re compacting is
xviii) Scarifying or cutting continues horizontal benches 300mm wide on side slope
of existing embankment and sub-grade as applicable.
xix) Cost of watering.
xx) Spreading in layers, bringing to the appropriate moisture content and
compacting to specifications requirement
xxi) Shaping & dressing the top and slope of the sub base & sub-grade including
rounding of corners.
xxii) Transporting the material to embankment & sub-grade side with all lead and
xxiii) All materials, labours, tools, equipments and incidental necessary to
complete the work to the specifications.
xxiv) Dewatering.
xxv) Keeping the embankment / completed formation free of water as per MoRTH
xxvi) Carrying out required tests for Quality control.
xxvii) Making arrangement of traffic.
xxviii) Furnishing of all material to be incorporated in the work including all royalty,
fee, rent & all lead & lift.
xxix) Dewatering
The contract unit rate shall be for a unit of one cubic meter of finished compacted
work in position at site of work.
Wet Mix Macadam (WMM)
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam spacification including premixing the materials with water at OMC in
mechanical mix plant carriage of mixed materials by tipper to site, laying in uniform
layers (Layer should not be more than 200 mm)with paver in sub base/base course
on well prepared surface and camber with Sensor paver consolidation by vibratory
road roller to achieve the desired density by using machine crushed chips as per
required gradation mixing with required optimum quantity of water incl material,
labour, plant and machinary and equipment etc. complete by plant mix method.
(Using mechanical paver).
This work shall consist of lying and compacting clean, machine crushed stone
graded aggregate and granular materials, premixed with water to a dense mass
on a prepared sub-base/base in accordance with the requirement of these
specifications. The material shall be laid in two layers of each 100mm & in One
layer of 150 mm thick for overlay work compacted thickness to lines grades and
cross sections shown on the approved drawing or as directed by the Engineer-in-
2.0) MATERIAL :
The machine crushed black stone coarse aggregates & granular materials of
approved quality shall be obtained from outside sources / area other than G.I.D.C.
land. The contractor will have to make their own arrangement at his own cost to
obtain the M.C. stone dust, soft murrum & required materials of approved quality
from existing or new sources / Quarries.
The M.C. stone aggregate, stone dust and required materials shall be obtained
only from sources / Quarries approved by the Executive Engineer. The M.C. stone
aggregate, stone dust and required materials shall be of approved quality and
shall have to be brought on site from all leads and lifts. The sample of aggregate
shall be got approved from Engineer-in-charge, prior to collection.
2.2.) GENERAL REQUIREMENTS:
The M.C. stone aggregate, stone dust and required materials shall be obtained
from hard, tough, sound, durable, stone of close texture as is locally available and
reasonably free from decay and weathering. Pieces of the stone shall be angular
and roughly cubical in shape and round. Elongated or flaky aggregates shall be
rejected. No round or oblong pebbles or angular chips large or smaller than
specified size shall be allowed. All unsound, weathered or disintegrated stone
obtained from the upper surface layer of the quarry or other layers of boulders
shall be rejected.
The screening material to be used for the work shall be machined stone
aggregate of specific size. The M.C. stone aggregate shall be hard, durable, &
free from excess flat, elongated, soft and disintegrated particles, dirt and other
deleterious materials.
Inferior quality of M.C. stone aggregate, stone dust and required materials and
excess quantity over the actual requirement at any place shall be rejected and
shall have to be removed from site of work by the contractor at his own cost.
Approval of the samples of materials given by the Executive Engineer shall not
absolve the contractor from the responsibility of replacing defective and materials
brought on site. The contractor shall have no claim to any payment or
compensation whatsoever on account of any such materials being rejected by the
Engineer-in-charge.
2.3.) PHYSICAL REQUIREMENTS:
The samples of required materials/ machine crushed black stone aggregate
collected from approved sources/quarries shall be got tested at Govt. recognized
laboratory as may be directed to the contractor at his own cost. The test results of
M.C. Stone aggregates shall conform to the physical requirement laid down in
Physical requirement of M.C. stone aggregates for wet Mix Macadam
Sr. Test Test method Requirement
(A) MACHINE CRUSHED STONE AGGREGATES:
1 *Los angles Abrasion value IS:2386(Part-4) 40% maximum.
*Aggregates impact value IS:2386 (Part-4) OR 30% maximum
2 Combined flakiness & IS:2386 (Part-1) 30% maximum**
elongation indices (total)
* Aggregate may satisfy requirements of either of the two tests.
** To determine this combined proportion, the flaky stone from a representative
sample should first be separated out. Flakiness index is weigh of flaky stone metal
divided by weight of stone sample. Only the elongated particles be separated out
from the remaining (non-flaky) stone metal. Elongation index is weight of
elongated particles divided by total non-flaky particles. The value of flakiness
index and elongation index so found are added up.
If the water absorption value of the coarse aggregate is greater than2% the
soundness test shall be carried out on the material delivered to site as per IS-
2.4.) GRADING REQUIREMENTS:
The Machine crushed stone coarse aggregate shall conform to the grading given
in table below:
I.S. Sieve designation Percentage by weight passing the I.S. sieve.
600 Micron 8-22
Wherever any doubt exists as to where the above requirements are satisfied,
whole or any part of the collection of aggregate shall be got screened by the
contractor at his own cost, is so ordered by the Engineer-in-charge.
Materials finer than 425 Micron shall have plastic index (P.I.) not exceeding
The final gradation approved within this limits shall be well graded from coarse to
fine and shall not vary from the low limit on one sieve to the high limit on the
adjacent sieve or vice versa.
3) CONSTRUCTION OPERATION:
3.1.) PREPARATION OF BASE:
The surface of the sub-base/ base to receive wet mix macadam course shall be
prepared to the specified lines and cross fall (camber) & make free from dust &
other extraneous materials. Any roots or soft yielding place shall be corrected in
an approved manner and rolled until firm surface is obtained if necessary by
sprinkling water. Any sub base/ base surface irregularities where predominant,
shall be made good by providing appropriate type of profile corrective course
(leveling course) to M.O.R.T. & H. clause No.
3.2.) SETTING OUT:
After completion of the sub-base/base the alignment of the road shall be properly
set out true to lines curves, slopes, grades and sections as shown in the plan or
as directed by the Engineer-in-charge. The contractors shall provide all labours
and materials such as lime, string, pegs, nails, bamboos, stones, mortar, concrete
etc. required for setting out, establishing temporary & permanent bench marks,
center line stone & other marks and giving profiles, alignments and other marks,
as longer they are required for the marks and long as opinion of the Engineer-in-
3.3.) PREPARATION OF MIX:
Wet mix macadam shall be prepared in an approved mixing plant of suitable
capacity having provision for controlled addition of water and forced/positive
mixing arrangement like pug mill or pan type mixer of concrete batching plant, as
approved by the Engineer-in-charge.
Optimum moisture for mixing shall be determined in accordance with I.S.
(Part-8) after replacing the aggregate fraction retained on 22.4 mm sieve with
material of 4.7 mm to 22.4 mm size. While adding water, due allowance should be
made for evaporation losses. However, at the time of compaction, water in the wet
mix should not vary from the optimum value by more than agreed limits. The mix
material should be uniformly wet and no segregation should be permitted.
3.4.) SPREADING OF MIX:
The work of spreading the mix shall be synchronized with the work of rolling and
consolidation of mix.
The mix shall not be spread without permission of the Engineer-in-charge.
Immediately after mixing, the aggregates shall be spread uniformly and evenly
upon the prepared sub-base / base in required quantities to achieve the
compacted thickness. In no case should these be dumped in heaps directly on the
area where these are to be laid nor shall their hauling over a party compacted
stretch be permitted.
The mix shall be spread by the paver finisher with electronic sensor device for
automatic leveling & profile control having at least 7.00m screed. As approved by
Engineer-in-charge.
The paver finisher shall be self-propelled having the features mentioned in the
special condition for bitumen surface work with use of M.O.R.T. & H. D.M.P. and
P.F. attached herewith.
The surface of the aggregates shall be carefully checked with templates and all
high or low spots remedied by removing or adding aggregate as may be required.
The layer may be tested by depth blocks during construction. No segregation of
larger and fine particles should be allowed. The aggregate as spread should be
uniform gradation with no pockets of fine materials.
The surface shall be checked frequently with a straight edge while spreading and
rolling so as to ensure a finished surface as per approved drawing or as desired.
3.5.) COMPACTION :
The work of rolling and consolidating the mix shall be synchronized with the work
of spreading the mix.
After the mix has been laid to the required thickness, grade & cross fall / camber
the same shall be uniformly compacted, to the full depth with help of vibratory
roller. If the thickness of single compacted layer does not exceed 100 mm. a
smooth wheel roller of 80 to 100 KN weight shall be used. For a compacted single
layer up-to 200 mm, the compaction shall be done with the help of vibratory roller
of minimum static weight of 80 to 100 KN or equivalent capacity roller. The speed
of the roller shall exceed 5 km/hr.
In portion having unidirectional cross fall / super elevation, rolling shall commence
from the lower edge and progress gradually towards the upper edge. There after
roller should progress parallel to the center of road, uniformly overlapping each
preceding track by at least 1 meter away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running
forward and backward until the edges have been firmly compacted. The roller
shall then progress gradually towards the center parallel to the center line of the
road uniformly overlapping each of the preceding track by at least one-third width
until the entire surface had been rolled.
Any displacement occurring as a result of reversing of the direction of roller or
from any other cause shall be corrected at once as specified / or removed and
Along forms, kerbs, walls or other places not assessable to the roller. The mixture
shall be thoroughly compacted with the mechanical tampers or a plate compactor
as approved. Skin patching of an area without scarifying the surface to permit
proper bounding of the added material shall not be permitted.
Rolling should not be done when the sub-grade is soft or yielding or when it
causes a wave like motion in the sub-base course or sub-grade. If irregularities
develop during rolling which exceed 12mm when tested with a 3 meter straight
edge, the surface should be loosen and premixed material added or removed as
required before rolling again so as to achieve uniform surface confirming to the
desired grade and cross fall. In case the use of un mix material be permitted to
make up the depressions.
Rolling shall be continued till the density achieve is at least 98% of the maximum
dry density for material as determined by the method outlined in IS 2720 ( Part-8)
After completion the surface of any finished layer shall be well closed, free from
movement under compaction equipment or any compaction planes, ridges, cracks
& loose material. All loose segregated or otherwise defective area shall be made
good to the full thickness of the layer and re-compacted.
3.6.) SETTING AND DRYING :
After the final compaction of W.M.M. course, the road shall be allowed to dry for
4) ARRANGEMENT OF TRAFFIC:
No traffic shall be allowed on the finished wet mix macadam surface till it has
dried and the wearing coarse laid.
During the period of executing the work, flow of traffic shall be maintained in
accordance with M.O.R.T. & H. specification clause no.112 or as directed by
Engineer-in-charge.
5) SURFACE FINISH AND QUALITY CONTROL ON WORK:
The relevant provision of general specification for quality control for works and
materials attached with the technical bid with pre-qualification application and
under M.O.R.T.& H. specification close number 900 shall be apply.
All tests shall be got carried out in Govt. or as approved laboratories and cost
thereof shall be entirely borne by the contractor. The general specification for
Quality control on works and materials attached herewith shall be also followed.
6) FINISHING OPERATIONS & SITE CLEARANCE:
The work shall be carried out as directed by the Engineer-in-charge. Relevant
M.O.R.T.& H. clause made also be applicable.
7) RECTIFICATION OF SURFACE IRREGULARITY:
Where the surface irregularity of the wet mix macadam course exceed the
permissible or where the course is otherwise defective due to sub grade soil
getting mixed with the aggregates, the full thickness of the layer shall be scarified
over the affected area, re-shaped with added premix material or removed and
replaced with fresh premixed materials as applicable and re compacted in
accordance with MORT & H clause No. 406.3. The area treated in aforesaid
manner shall not be less than 5 mtr. long and 2 mtr. wide in no case shall
depressions be filled up with the unmixed and un graded materials or fines.
8) MODE OF MEASUREMENT AND PAYMENT:
The work of providing, laying, spreading & compacting, specified graded M.C.
stone aggregate of specific size in two compacted layer (each of 125 MM
compacted thickness) for construction of 250 MM thick base to W.M.M.
specification shall be measured as compacted and finished work in position in
cubic meters. The finished and compacted thickness to be paid on volume basis
shall be computed in the following manner. Levels shall be taken before and after
construction at a grid of points 10 or 30 M centre to centre longitudinally in straight
but 5 meters at curves. Normally on two lane roads, the levels shall be taken at
four position transversely at 0.75 and 2.75 meters from either edge of the carriage
way or as directed by the Engineer-in-charge and on single lane roads these shall
be taken at two positions transversely being at 1.25 M from either edge of the
carriage way or as directed by the Engineer-in-charge. The measurements may
be taken at closer intervals also if so desired by the Engineer-in-charge.
The average thickness of the layer of coarse aggregate in any area shall be the
arithmetical mean of the difference of levels before and after construction at all the
grid points falling in that area, provided that thickness of finished work shall be
limited to those shown on the drawings or approved by the Engineer-in-charge in
The contractor shall sign day to day leveling work and also original cross section,
longitudinal section in token of his acceptance etc. The working sections both
longitudinal and cross of the sub-grade shall be taken by the Engineer-in- charge
before the work is started. The contractor or his authorized representative shall
attend day to day leveling work and sign with date the field book daily in token of
this acceptance. If there is any dis-agreement the contractor shall inform of it in
writing to the officer concerned with specific reference to the sections before
starting further work. Once the work is started no cognizance of any complaint
taken, merely not signing of the level book shall not be deemed as dis-agreement.
The contractor shall maintain the finished work to proper formation and grade till
this item is finally measured and accepted by department. The measurement shall
be taken on compacted work.
The contract unit rate for the work of providing, Laying, & compacting of specified
graded M.C. stone aggregates of specific size having 125mm compacted
thickness ( of each layers ), shall be payment in full for carrying out the required
operations including full compensation for :
i) Cost of arrangement of land as a source of supply of all materials of
required quality for construction.
ii) Furnishing of all material to be incorporated in the work including all royalty,
fee, rent & all lead & lift.
iii) Setting out
iv) Compacting ground surrounding embankment prepared sub-base, base
except where removal & replacement of unsuitable material or loosening
and re compacting is involved.
v) Cost of watering.
vi) Spreading in layers, compacting to specifications requirement.
vii) Shaping & dressing etc.
viii) All materials, labours, tools, equipment's and incidental necessary to
complete the work to the specifications.
ix) Carrying out required tests for quality control on work and & materials.
x) Making arrangement for traffic as per M.O.R.T & H. clause no
The contract unit rate shall be for a unit of one cubic meter of finished
compacted work in position at site of work.
Providing and applying primer coat with bitumen emulsion SS1 on prepared
surface of granular Base including clearing of road surface and spraying primer at
the rate of 0.70 kg/sqm using mechanical means.
This work shall consist of the application of a single coat of medium viscosity liquid
bituminous material over porous granular base surface preparatory to the super
imposition of bituminous treatment or mix.
The primer shall be bitumen emulsion (Grade-SS1) complying with IS-
The agency shall have to purchase bitumen from only Govt. recognized refinery.
The agency has to produce the original purchase bills of bitumen of refinery along with
original gate passes.
Gate pass no. and Tanker no. shall be invariably mentioned in the original bills produced
The grade of bitumen emulsion purchase by the agency shall be mentioned in the original
bills of the refinery.
The agency shall have to produce the certificate of the test results of the bitumen
emulsion showing the actual grade of bitumen emulsion purchased & tested.
Agency shall have to make adequate arrangement for storage of bitumen emulsion at
plant site according to requirement.
Bitumen emulsion shall be stored as to allow easy inspection and in such place as well
not damage the stored primer and cause the leakage or allow water and other foreign
matter to enter. Agency has to make his own arrangement / insurance at his own cost for
safety of stocked primer brought on plant as well as site of work. For the purpose of
calculating consumption, wastage will not be allowed be yond ( + / -) 2.00 percent.
Quantity of excess Consumption over (+) 2.00% shall not be paid. If actual consumption
of bitumen emulsion is found below (-) 2.00% then the theoretically consumption,
necessary reduce rate analysis for this item shall be worked out and accordingly paid.
The agency shall keep a day to day account of the receipt, consumption and balance of
bitumen emulsion in a separate bound register having numbered pages and in the
Performa’s prescribed by the department day to day signature of the agency’s
representatives shall be initiated in this register. The register shall be maintained by the
agency. “ P “ form shall not be provided by the corporation for purchasing the primer no
claim shall be made by the agency on account of delay in supply of bitumen emulsion by
I.O.C. The bitumen emulsion shall be got tested at govt. recognized laboratory as may be
directed the agency at his own cost. The result shall confirm the IS 8887 (grade MS).
VISCOSITY REQUIREMENT AND QUANTITY OF LIQUID BITUMINOUS PRIMER.
Kinetic Viscosity of Quantity of liquid
Type of surface primer at 60 deg. bituminous material per
Low porosity 30 - 60 7.00 Kg.
The testing frequencies set forth in the table – 2 control test and their frequency for
bituminous construction for general specification for quality control on works & materials
attached here with are the minimum as desired by the Engineer-in-charge or shall have
the full Authority to carry out test as per frequently or he may found necessary to satisfy
himself that the materials and works comply the appropriate specification. All testing
charges involved in the entire work shall be borne by the contractor.
3. CONSTRUCTION :
3.1) WEATHER AND SEASONAL LIMITATIONS :
Bituminous primer shall not be applied to a wet surface or during a dust storm or when
the weather is foggy / rainy / windy or when the temperature in the shade is less than
degree centigrade. Surfaces which are to receive emulsion primer shall be damp but no
free or standing water shall be present.
The primer distributor shall be a self-propelled or towed bitumen pressure sprayer
equipped for spraying the material uniformly at specified rates i.e. 7.00 kg. per 10 sq. and
temperatures. Hand spraying shall not be allowed at any cause.
3.3) PREPARATION OF ROAD SURFACE :
The surface to be primed shall be prepared in accordance as MoRTH clause no. 501.8 &
clause no. 902 as appropriate
Immediately prior to applying the primer, the surface shall be carefully swept, clean of
dust and loose particles, care being taken not to disturb the interlocked aggregates.
There is best achieved when the surface layer is slightly moist (Lightly sprayed with water
and the surface allowed to dry) and the surface should kept moist until the primer is
3.4) APPLICATION OF BITUMINIOUS PRIMER
The viscosity and rate of application of the primer shall be 7.00 Kg per 10 m2 the
bituminous primer shall be spread uniformly in accordance with MoRTH clause no.
The method of application of the primer shall depend on the type of equipment to be
used, size of nozzles, pressure at the spray par and speed of forward movement as
approved by the Engineer-in-charge. The contractor shall demonstrate at a spraying
trial, that the equipment and method to be used is capable of producing a uniformly spray
within the tolerances specified, if required.
3.5) CURING OF PRIMER AND OPENING TO TRAFFIC :
A primed surface shall be allowed to cure at least 24 hours or such other period as is
found to be necessary to allow all the volatiles to evaporate before any sub sequent
surface treatment or mix is laid.
Any unabsorbed primer shall first to be blotted with an application of sand using the
minimum quantity possible as directed by Engineer-in-charge.
A Primed surface shall not be opened to traffic other than that necessary to lay the next
course a very thin layer of clean sand shall be applied to the surface of the primer, to
prevent the primer picking – up under the wheels of the paver and trucks delivering
bituminous material to the paver, if required or as directed by Engineer-in-charge.
4. QUALITY CONTROL OF WORK :
For control of the quality of materials supplied and the works carried out, the relevant
provisions of MoRTH clause No. 900 and General specification of quality control on works
and materials attached herewith shall be applied.
5. ARRANGEMENT FOR TRAFFIC :
During construction operation, arrangements for traffic shall be made in accordance with
the provision of MoRTH clause no.112.
6. MEASUREMENT FOR PAYMENT :
The contract unit rate of prime coat with adjustment as described in MoRTH clause no.
502.7, shall be payment in full for carrying out the required operation including full
compensation for all components listed in MoRTH clause no.401.8 ( I to V ) and as
applicable to be to the work specified in this specifications. Payment shall be made on the
basis of the provision of prime coat at an application rate of 6.00 kg per 10 m2, with
adjustment, plus or minus, for the variation between this amount and the actual amount
approved by the Engineer-in-charge after preliminary trails referred to in accordance with
MoRTH clause no. 502.4.3 as directed by Engineer-in-charge.
Prime coat shall be measured in terms of area of application and payment shall be
made in square meter
Providing & laying compacted 50 mm thick dense graded bituminous
macadam (DBM) Grade-II in Single layer using 100-120 TPH batch type HMP
with tack coat at the rate of 2.5 kg / 10 m2 (VG10) in each using crushed
aggregates of specified grading premixed with bituminous binder @ 4.5% (
VG - 40) bitumen by weight of total mix and filler , transporting the hot mix
to work site laying with a hydrostatic paver finisher with sensor control with
full road carpet width (Single screed) or as directed by Engineer in charge to
the required grade, level and alignment, rolling with smooth wheeled roller,
intermediate rolling 8-10 tonnes dead weight or vibratory roller & pneumatic
tire roller of 12 to 15 tonnes weight having sufficient width and pressure &
the finishing rolling shall be done with 6 to 8 tonnes smooth wheeled
tendem rollers to acheive the desired compaction as per MORT&H
specification etc complete in all respects. The agency shall have to get the
mix design done from approved laboratory and submit to the Engineer in
charge for approval.(Va = 3.5% & Vbe= 11.50% must be considered in mix
design ) If the asphalt (bituminous) content is more than above, the agency
shall have to bear the cost of additional asphalt. The payment shall be done
on the permissible field density achieved on the site instead of density
derieved in the mix design. (The density obtained by mix design above
MT/M3 shall be boarn by agency)
This work shall consist of construction of Dense Graded Bitumen Macadam in single layer
of 50 mm thick thickness course of compacted crushed aggregates premixed with a
bituminous binder on a previously prepared base to the requirements of these
specifications.
The work in general shall be carried out as per specification No. 507 of Ministry of Road.
Transport & Highways specification for road and bridgework published by the Indian
Roads Congress, New Delhi (4th Revision).
(2) MATERIALS :
The bitumen shall beVG- 30 complying with IS: 73 - 2006 / paving bitumen of penetration
Grade complying with I.S.S. for "paving bitumen” IS: 73 & of the penetration indicated in
the Table-3. A-65 or S-65 (60/70 GRADE) for mixing as a Binder and Bitumen Emulsion
(VG-10) complying with IS : 8887 for tack coat.
The agency shall have to purchase the bitumen from only Govt. recognized refinery.
The agency shall have to produce the original purchase bills of bitumen of refinery along
with original gate passes.
Gate pass No. & Tanker No. shall be invariably mentioned in the original bills produced
by the contractor.
The grade of binder purchased by the agency shall be mentioned in the original bills of
The agency shall have to produce the certificate of the test results of the bitumen showing
the actual grade of bitumen purchased & tested.
Contractor shall have to make adequate arrangement for storage of bulk bitumen at plant
site according to requirement.
Bitumen shall be so stored to allow easy inspection and in such place as will not damage
the stored asphalt and cause the leakage or allow water and other foreign matter to enter.
Contractor has to make his own arrangement/ Insurance at his own cost for safely of
stacked bitumen brought on plant site.
For calculating consumption, wastage will not be allowed beyond (+/-) 2.00 percent.
Quantity of excess consumption over (+) 2.00% shall not be paid. If actual consumption of
bitumen is found below (-) 2.00% then the theoretically consumption will be worked out
and necessary reduced rate analysis for this item will be worked out and accordingly
The contractor shall keep a day to day account of the receipt, consumption, & balance of
bitumen in a separate bound register having numbered pages and in the Performa as
prescribed by the department. Day to-day signature of the contractor's representative
shall be initiated in this register. The register shall be maintained by the agency.
"P" form shall not be provided by the corporation for purchasing the bitumen. No claim
shall be made by the contractor on account of delay in supply of bitumen by the I.O.C.
The bitumen shall be got tested at Govt. recognized laboratory as may be directed to the
contractor at his own cost. The results shall conform to the standards requirements laid
down in I.S. Code or M.O.R.T. & H. specifications.
The testing frequencies set forth in the Table-2, control Test & Their frequency for
bituminous construction of general specification for quality control on works & materials
attached herewith are the minimum as desired by the Engineer in charge or shall have
the full authority to carry out tests as per frequently or he may found necessary to satisfy
himself that the materials and works comply with the appropriate specifications.
All testing charges involving in the entire work shall be borne by the contractor.
2.2: COARSE AGGREGATE:
2.1) Coarse aggregates:
The coarse aggregate shall consist of crushed stone. These shall be strong, durable, of
cubical shape, free of disintegrated pieces, organic or other deleterious matter and
adherent coatings. The aggregate shall preferably by hydrophobic and of low porosity and
shall satisfy the physical requirements set forth in table –
TABLE -1: PHYSICAL REQUIREMENTFORCOARSE AGGREGATE
PROPERTY TEST AND TEST METHOD SPECIFICATION
Cleanness Grainsize analysis (IS : 2386-Part-1) Maximum 5% passing
Particle shape Flakiness & Elongation combined Maximum 30%
(IS: 2386-Part-1)
Strength* Los Angle Abrasion Value. Maximum 35%
Aggregate impactvalue (IS: 2386 Part-4) Maximum 27%
Durability Soundness (IS: 2326- Part-5)
Sodium sulphate Maximum 12%
Magnesium sulphate Maximum 18%
Water absorption Water absorption (IS: 2386, PART-3) Maximum 2%
Stripping Coating & stripping of bitumen aggregate Minimum retained
mixture (IS: 6241) coating 95%
Water sensitive** Retained tensile strength Minimum 80%
1) (*)Aggregate satisfy the requirements of either of these two tests.
2) (**)The water sensitive test is only to be carried out if the minimum retained
coating in the stripping test is less than 95%.
2.2) Fine aggregate:
The fineaggregates shall consist of crusher run screenings, natural sand or a mixture of
both, passing 2.36mm sieve and retrained on 75-micron sieve. These shall be clean,
hard, durable, dry and free from dust, & soft or friable matters, organic or other
deleterious matter.
The fine aggregate shall have a sand equivalentvalue not less than 50 when tested in
accordance with the requirement of IS-2720-Part-37. The plasticity index of the fraction
passing the 0.425mm sieve shall not exceed 4, when tested in accordance with IS:
The aggregate shall satisfy the physical requirements set forth in the table -1 above.
Filler shall consist of finely divided mineral matter such as rock dust, hydrated line or
cement as approved by the Engineer.
The filler shall begraded within the limits indicated in Table-2 as under.
TABLE – 2 : GRADING REQUIREMENTFOR MINERAL FILLER :
Cumulative percent passing by weight of
I.S. sieve (mm)
total aggregate.
The filler shall befree from organic impurities and have a plastic index not greater than
The plastic index requirement shall not apply if filler is cement or lime. Where the
aggregates fail to meet the requirement of water sensitivity test in Table-1 then 2% by
total weight of aggregate, of hydrated line shall be added without additional cost.
2.4) Aggregate grading& binder content:
When tested in accordance with I.S 2326 – Part-1 (Wet sieving method), the combined
grading of the course and fine aggregate and added filler shall fall within the limit shown
in table-3 for grading No. 2 as specified.
TABLE – 3 : COMPOSITION OF DENSE GRADED BITUMINIOUS MACADAM
PAVEMENT LAYERS
Nominal aggregate sieve 25 MM
Layer thickness 50 MM
I,.S. Sieve (mm) Commutative percentageby weight of total
aggregate passing.
Bitumen contentpercentage
by mass of total mix
Bitumen grade (pen) VG – 40 /
1) The combined aggregate grading shall not vary from the low limit on one sieve to
the high limit on the adjacent sieve.
2) Determined by the Marshal method.
(3) MIXTURE DESIGN :
3.1) Requirement of the mixture:
Apart from confirmative with the grading and qualityrequirementforindividual ingredients
mixture shall meet the requirement set out in Table -
TABLE – 4: REQUIREMENT OF BITUMINIOUS CONCRETE PAVEMENT LAYER
Minimum, stability (KN at 600 C)
Minimum flow (MM)
Maximum flow (MM)
75 blows on each of the two faces of the
Compaction level (No. of blows)
Percent air voids 3-6
Percent voids in mineral aggregate
See Table – 5 below
Percent voids failed with bitumen (VFB) 65-75
The requirementforminimumpercent voids in mineral aggregate (VMA) are set out
TABLE – 5 : MINIMUM PERCENT VOIDS IN MINERAL AGGREGATE.
Nominalmaximum Minimum VMA, percent related to Design Air voids,
particle size1 (mm) Percent
1) The nominalmaximum particle size is one size larger than the first sieve to retain
more than 10 per cent.
2) Interpolate minimum voids in the mineral aggregate (VMA) for design air voids
values between those listed.
3.2) Binder content:
The binder content shall be optimized to achieve the requirement of the mixture set out in
Table – 3 & 4 and the traffic volume (may be obtained from the Engineer-in- charge). The
marshal method for determining the optimum binder content shall be adopted as
described in the asphalt institute manual at MS-2, replacing the aggregates retains on the
26.5mm sieve and retained on the 22.4mm where approved by the Engineer.
3.3) Job mix formula :
The contractor shall inform the Engineer in writing, at least 20 days before the start of the
work, of the job mix formula proposed for use in the work and shall give following details.
(i) Source and location of all materials.
(ii) Proportion of all materials expressed as follows where is applicable.
(a) Binder type&percentageby weight of total mixture.
(b) Course aggregate, fine aggregate, mineral filler as percentage by weight of total
aggregate including mineral filler.
(iii) A single definite percentage passing each sieve for the mix aggregate
(iv) The individual grading of the individual aggregate fractions, and the proportion of
each in the combined grading.
(v) The result of test numerated in Table-3 as obtained by the contractor.
(vi) Where mixture is a batch mixture, the individual weights of each type of
aggregate, & binder per batch.
(vii) The test result of physical characteristics of the aggregate to be used.
(viii) Mixing temperature and compacting temperature.
While establishing the job mix formula, the contractor shall ensure that it is based on a
correct and truly representative sample of the materials that will actually be used in the
work and that the mixture and its different ingredients satisfied the physical and strength
requirements of these specifications.
Approval of the job mix formula shall be based on independent testing by the Engineer for
which samples of all ingredients of its mix shall be furnished by the contractor as required
by the Engineer.
The approved job mix formula shall remain effective unless and until a revised job mix
formula is approved, should a change in the source of materials be proposed, a new job
mix formula shall be forwarded to the Engineer for approval before the placing of the
3.4) Planttrial – permissible various in Job mix formula:
Once the laboratory job mix formula is approved, the contractor shall carry outplant trials
at the mixture to establish that the plant can be set up to produce uniform mix confirming
to the approved job mix formula. The permissible variations of the individual percentages
of the various ingredients in the actual mix from the job mix formula to be used shall be
within the limits as specified in the table – 6 as under:
The various are intended to apply to individual specimens taken forqualitycontroltestin
accordance with General quality control works on materials attached herewith.
TABLE – 6 : PERMISSIBLE VARIATIONS FROM THE JOB MIX FORMULA
Permissible variation
Description Base / binder
Aggregate passing 19mm sizeor larger +/- 8% +/-7%
Aggregate passing 13.2mm , 9.5mm +/- 7% +/- 6%
Aggregate passing 4.75mm +/- 6% +/- 5%
Aggregate passing 2.36mm, 1.8mm, 0.6mm +/- 5% +/- 4%
Aggregate passing 0.3mm,0.15mm +/- 4% +/- 3%
Aggregate passing 0.075mm +/- 2% +/- 1.5%
Binder content +/- 0.3% +/- 0.3%
Mixing temperature +/- 10 C +/- 10 C
Once the plant trails have demonstrated the capability of the plant, and the trials are
approved, the laying operation may commence. Over the period of the first month of
productionfor laying on the work, the Engineer shall require additional testing of the
product to establish the reliability and consistency of the plants.
3.5) Laying trials :
Once the plant trails have been successfully completed and approved, the contractor
shall carry out laying trial to demonstrate the proposed mix can be successfully laid, and
compacted all in accordance with MoRTH Clause -501. The laying trial shall be carried
out on a suitable area which is not form part of the works, unless specifically approved in
writing, by the engineer. The area of the laying trial shall be a minimum of 100 sq.mtr. of
construction similar to that of the project road and it shall be in all respect particularly
compaction, the same as the project construction, on which the bituminous materials is to
The contractor shall previously inform the Engineer of the proposed method for laying and
compacting the materials. The planttrial shall then establish if the proposed laying plant,
compaction plant, and methodology is capable of producing satisfactory results. The
density of the finished paving layer shall be determined by taking cores, no sooner then
24 hours after lying, or by other approved method. Once the laying trial have been
approved, the same plant and methodology shall be applied to the laying of the material
on the project, and no various of either shall be acceptable, unless approved in writing by
the Engineer, who may at discretion require further laying trials.
3.6) Keeping Records :
The department shall keep a day-to-day account of incoming material i.e. aggregate and
consumption of material in a bond register having numbered pages and in the preforms
prescribed by the department. Day-today signature of the contractor's representative shall
be obtained in this register.
Bound and numbered register in the form prescribed by the Department shall be
maintained to show daily outgoing tipper trucks which are measured before leaving the
depot by the authorized departmental representative. Gate pass shall be issued at the
Drum mix plant site while leaving the depot, which shall be collected at the paver work
site by another departmental representative. The same should also be signed by the
contractor or his authorized representative.
The samples of aggregate of required grading for the work shall be got approved from the
Engineer in charge prior to transportation and collection on plant site. The aggregates
shall be of approved quality with all leads and lifts. The rejected materials shall have to be
removed from the plant site by the contractor at his own cost. If contractor fails to remove
the inferior type of materials from the plant site, the same will be removed by the
department at the cost of contractor. Collection of aggregate shall be in different stacks
according to various sizes of aggregates.
The materials shall be got tested at Govt. recognized laboratory as may be directed to the
contractor at his own cost. The results shall conform to the standards requirements laid
down in Table No. 1 & 2 above.
The testing frequencies set forth are the desirable minimum and the Engineer-in-charge
shall have the full authority to carry out tests as frequently as he may deem necessary to
satisfy himself that the materials and works comply with the appropriate specifications.
Testing charges shall be borne by the contractor.
The aggregate shall be proportioned and blended to produce a uniform mixture complying
with the requirement of Table No. 1 &
3.8) SURFACE FINISH AND QUALITY CONTROL OF WORK :
The relevant specifications as per para No. 2.8 above and the general specification for
quality control on works & materials attached with tender shall be made applicable.
(4) CONSTRUCTION OPERATION:
Weathered & Seasonal Limitation:
Bitumen macadam shall not be laid during rainy weather or when the base course is
damp or wet. The provision of clause 501.5.1 of M.O.R.T. & H shall also apply.
Preparation of base:
The base on which D.G.B.M. is to be laid shall be prepared. Shaped and conditioned to
the specified lines grade and cross-sections in accordance with requirements as directed
by the Engineer-in-charge.
The surface shall be thoroughly swept and scraped clean and free of dust and foreign
matter as directed by the Engineer-in-charge.
MoRTH specification clause No. 501.8 & 902.3 as appropriate shall also followed.
Equipment & preparation of surface:
Relevant specifications of MoRTH clauses shall be followed.
Application of Binder:
The application of tack coat shall be at the rate specified in tendered i.e. 2.5 kg per
smt. and shall be applied in uniformly. The normal range of spraying temperature for
BitumenEmulsion (VG-10)shall be 20 degree C to 70 Degree C.
Before applying tack coat road surface shall be divided in suitable blocks by marking with
line. so as to be ensure that the tack coat is applied at the specified rate i.e. 2.50 kg per
10m2 area for W.M.M. surface. The binder shall be applied uniformly with a self-propelled
or tower bitumen pressure sprayer, equipped for spraying the binder uniformly at a
specified rate or mechanical sprayer as approved by Engineer-in-charge.
The tack coat shall be applied just ahead of the oncoming bituminous
construction.Control on the quality of material and works shall be exercised by the
engineer in charge by carrying out the test mentioned in table No. 3 at the frequencies
shown against each. Testing charges shall be borne by the contractor.
Preparation of the mix.
Drum mix plant of adequate capacity and capable of producing a proper and uniform
quality shall be used for preparing the mix. The plant shall be continuous type having co-
ordinate set of essential units such as dryer for heating the aggregates, devices for
feeding by weight or volume, the required quantities of aggregate, binder heating and
control unit for metering out the correct quantity of heated binder together with a paddle
mixer for intimate mixing of the binder and aggregates. For details regarding Drum mix
plant, special condition bituminous surface with use of drum mix plant attached with
tender may be referred.
Drum mix plant should be used for heating the aggregate and bitumen.
The temperature of binder at the time of mixing shall be in the range of 150 centigrade to
165 centigrade. The aggregate of requisite proportion as approved by the Engineer-in-
charge shall be mixed, dried and heated in aggregate drier to a temperature of
centigrade to 170 centigrade, provided also that at no time shall the difference in
temperature between the aggregate and the binder exceed 14 centigrade. The hot
aggregate and bitumen shall be measured separately and accurately to the proportion in
which they are to be mixed as specified in No. 2.6 above. Mixing shall be through to
ensure that a homogenous mixture is obtained in which all the particles of the mineral
aggregates are coated uniformly.
Control on the quality of material and works shall be exercised by the Engineer in charge
by carrying out the test mentioned in Table No. 3 at the frequencies shown against each.
MANUFACTURING & ROLLING TEMPERATURES
Bitumen Bitumen Aggregate Mixed Rolling Laying (oC)
penetration mixing mixing material
TRANSPORTING OF PREMIX:
The mix shall be transported from the mixing plant to the point of use in clean insulated
vehicles and covered with suitable covers to protect the mixture against weather, if so
directed by the Engineer-in-charge.
Transportation of mix to paver site shall be fully borne by the contractor.
A thin coating of diesel for lubricating may be applied to the interior of the vehicle to
prevent sticking &to facility discharge of the material.
The mix transported from the Drum mix plant to the site, shall be spread by means of
hydraulic operated paver finisher with electronic sensor, suitable screens capable of
spreading, temping and finishing the mix, true to specified grade, lines and cross section,
as directed by the Engineer-in-charge.
The temperature of mix at the time of lying shall be minimum 1250 centigrade.
Immediately after the mix is spread and before rolling is started, surface shall be checked
and in equalities if any, shall be adjusted by putting additional mix. for this labour, no
extra payment shall be made.
The paver shall be so set that asphalt surface is laid to give a compacted thickness as
specified or as desired with required camber, as directed by the Engineer in charge. The
travel rate of the paver and its method of operation shall be adjusted to ensure an even &
uniform flow of mix material across the screed, free from dragging, tearing & segregation
of the material. Specifications under clause No. 504.3.5 of MoRTH shall be also followed.
D.B.M. will have to be laid in one layer of 50 mm thick (compacted) and consolidated
without any extra cost to the corporation.
Immediately after the spreading of mix, It shall be thoroughly compacted by rolling with
approved plant.
Bituminous materials shall be laid and compacted in layers, which enable the specified
thickness, surface levels regularity, requirements, & compaction to be achieved. The
Compaction of bituminous material commence as soon as possible after laying.
Rolling shall commence at the edges & progress towards center longitudinally except that
on super-elevated portion it shall progress from the lower to upper edge parallel to the
center line of the pavement. The roller should be proceed on the fresh material with rear
or fixed wheel leading so as to minimize the pushing of the mix and each pass of the
roller shall uniformly overlap not less than one third of the track made in the whole area
once, any high spots or depressions which become apparent shall be corrected by
removing or adding fresh material. The rolling shall then be continued till the entire
surface has been rolled to compaction, there is no crushing of aggregate and roller marks
have been eliminated. All deficiency in the surface after lying shall be made good by the
attendance behind the paver, before initial rolling is commenced.
The initial or break down rolling shall be done with 8 / 10 tonnes dead weight smooth
wheeled roller. The intermediate rolling shall be done with 8-10 toones dead weight or
vibrator roller or with a pneumatic tyred roller of 12 to 15 tonnes weight having nine
wheels with a tyre pressure of at least 5.6 kg / sq.m. The finished rolling shall be done
with 6 to 8 tonnes smooth wheeled Tandem rollers. The final rolling shall be done while
the material is still workable enough for removal of roller marks.
Rolling operations shall be completed in every respect before the temperature of the mix
falls below minimum 90 centigrade.
Rolling shall be done by the contractor and contractor shall supply labours for watering
wheels of rollers.
Roller should move at a speed of not more than 5 kmt. per hour. The roller shall not be
permitted to stand on pavement which has not been fully compacted and necessary
precaution shall be taken to prevent dropping of oil, grease, petrol etc. on the payment
either when the roller are operating or standing.
The wheels of rollers shall be kept moist with water and the spray system provided with
the machine shall be in good working order, to prevent the mixture from adhering to the
wheels. Only sufficient moisture to prevent adhesion between the wheels of roller and the
mixture should be used. Surplus water shall not be allowed to stand on the partially
compacted pavement.
Rolling shall be continued until the specified density is achieved.
No traffic shall be allowed on the road till the wearing course has been places.
The compaction shall be also carry out in accordance with the MoRTH clause No.
i) Transverse Joints:
The transverse joints shall be carefully constructed and thoroughly compacted to provide
smooth riding surface over these joints in the pavement. Joints shall be straight edged
and string lined to ensure smoothness and true alignment.
If the joint/s is/are formed with a bull bead such as board to provide a straight and
vertical face the joints face head not be trimmed before fresh materials is placed against it
to complete the joints. If a bull head is not used to form the joint and the roller is permitted
to roll over the end of the new materials lime of joint shall be located back of the rounded
edge a sufficient distance to provide a true surface and cross section. If the joint has been
disturbed by traffic or by other means if shall be trimmed to line. In either case, the joint
face shall be painted with a thin coating of asphalt before the fresh materials is placed
b) Longitudinal Joints:
The longitudinal joints shall be rolled directly behind the paving operations. The plate
placed shall be true to line, section and grade and have a vertical face. The materials
being placed in the abutting lane shall be tightly crowded against vertical face of the
previously placed lane. The finishing machine shall be positioned, so that in spreading by
20mm to 25mm and shall be left sufficiently high to allow for compaction. The machine
shall closely follow the lines of making placed along the joints for alignment purpose. The
width and depth of the lapping materials shall be kept uniform at all times. Before rolling
the materials over lapping the joint shall be carefully brushed down on the surface of the
unrolled lane. Rolling shall be continued until a thoroughly compacted seat joint is
obtained. If only tandem rollers are available, they shall be similarly operated to complete
the joints. When abutting lane is not placed in the same day or joint is disturbed the day
work by traffic or by means the edge of the lane shall be carefully trimmed to line and
painted with a very thin coating of asphalt before the abutting lane is placed.
c) The final surface shall be of uniform texture con firming to line section and grade
as directed before final acceptance of the project or during the progress of work, the
thickness of the work and surface shall be required, replaced or corrected. For this
purpose of testing the finished surface, 5mt, straight edge shall be used except that 3 mt
straight edges may be used on vertical curves. The straight edge shall be held in
successive positions parallel to the road center line in contract with surface and the entire
areas checked from one side to the other, advance along the pavement shall be in
successive stage or not more than half the length of the straight edge. Also variation in
camber shall be got rectified when the same is more than 6mm. Irregularities which may
develop before the completion of rolling shall be rectified by loosening the surface mix
and removing or adding fresh mix materials as may be required. Should any irregularities
or defects remain after the final compaction, the surface course shall be removed
properly and sufficient new materials laid to form a true and even surface All minor
surface projections of joints and minor honey combed surface shall be rolled smooth as
may be directed. The surface shall be checked by line and camber board for the line,
grade and section or super elevation from time to time during and after rolling and un-
evenness shall be corrected as directed by the Executive Engineer or his agent.
After the rolling is completed to the entire satisfaction of the Engineer-in charge, sand or
stone dust shall be applied and spread by the contractor at the rate of 0.30 cum/100
sq.m. Without any extra cost to G.I.D.C. The rate is inclusive of collecting and spreading
the sand or stone dust as directed above.
(5) SURFACE FINISH & QUALITY CONTROL OR WORK :
The test shown in table No. 2 as given in the General Specification of Quality control on
Material and work attached with tender document shall be followed. The charges of which
shall be borne by the contractor including cost of materials and the charges of
transportation to the approved laboratory and testing charges of the laboratory.
The surface finish of the completed construction shall confirm the requirement of quality
control on works & material attached herewith.
(6) DIVERSION AND CONTROLLING THE TRAFIC:
a) The Contractor shall at all-time carry out the work on road in a manner coating
least interference to the flow of traffic while consistent with the satisfactory execution of
the same. For all works involving improvements to the existing road the contractor shall.
In accordance with the directive of the Engineer-in-charge, provide and maintain during
the execution of work a passage for traffic either along part of the existing carriage way
under improvement.
b) The contractor shall take all necessary measures for the safety of traffic during the
construction and provide and maintain such barricades, signs, flags, lights and flagman
as may be required by the Engineer-in-charge for the proper notification for the
construction area and protection of traffic approaching or passing through the section of
the road under improvement. Before taking up any construction agreed phased
programmed for the diversion of traffic on the road shall be drawn up in consultation with
the Engineer-in-charge. The signs set up shall be of approve design and of refectory type
if so directed. Temporary warning red lamps shall be installed at all barricades during the
hours of darkness and kept it all times during this hour. If required by Engineer in charge
flagman shall be posted at the both ends of work and such other intermediate points as
necessary during the hours specified. Nothing extra shall be paid for providing diversions
and controlling the traffic.
(7) PLANTS & EQUIPMENTS & MACHINERIES:
The contractor shall have to make his own arrangement for all machineries etc. for
carrying out the work including Drum mix plant and paver finisher. Road rollers 8 to
tonnes capacity etc.
The plant and paver etc. shall be run by the contractor. This includes the cost of running,
maintenance, fuel charges etc. to be borne by the contractor. The contractor shall have to
set that the aggregate are mixed in proper proportion, asphalt is heated to the required
temperature and the same is mixed with materials as per the requirements furnished by
the department from time to time. He shall also see that materials are uniformly spread to
set uniform grade and camber and smooth surface.
a) Drum Mix Plant :
As per the special condition for bitumen surface work with use of M.O.S.T. drum mix plant
& paver finisher attached herewith.
b) Hydraulic operated paver finisher with Electronic sensor:
As per the special condition for Bitumen surface work with use of M.O.S.T. Drum mix
plant & paver finisher attached herewith.
c) Transportation:
Vehicles used for transportation of the mix shall have in tight metal bottom and shall be
free from dust, screening petroleum oils, other materials spirits and truck bottom must be
lightly lubricated with thin oil or such solution just before loading to prevent, the mix from
sticking to the vehicles. The vehicles body shall be insulted as per requirements.
d) Inspection and control of Drum Mix Plant:
i) General Provision:
For verification of weight and measures character of materials and determination of
temperature used in the preparation of the paving mixtures, the Engineer-in-charge or his
authorized representative, shall inspect at all portions of the paving plant aggregate,
processing the materials of constructions, all samples and testing proportion of gauging.
Longitudinal joints and edge shall be constructed to the line established by the Engineer-
in-charge parallel to the center line of the proposed road way for paver to follow in placing
individual lanes. The paver shall be positioned and operated to closely follow the
established lines. In backing trucks against the finisher care shall be taken not to far the
mix materials to the paver and shall be at uniform rate in amount wall within the capacity
of the paving and compacting equipment. As soon as the first load of materials has been
spread the texture of the unrolled surface shall be checked to determine its uniformity.
The adjustment of the screed temping, bars, foot screws hopper feeds etc. shall be
checked frequently to ensure uniform spreading of mix to proper line and grades and
adequate initial compacting segregation occurs the spreading operation shall immediately
be suspended until the cause is determined and corrected.
Any Irregularities in alignment left by the paver shall be corrected by trimming directly
behind the machine. Immediately after trimming the edges of the course, shall thoroughly
compacted by temping. Disturbance of the pavement string this operations shall be
Edges against which additional payment is to be placed shall be vertically formed to true
line. A lute or covered rack shall be used immediately behind the finisher when required
to obtain a true line and vertical edges. Any irregularities in the surface of the pavement
course shall no be corrected directly behind the paver. Excess materials forming high
spots shall be removed by the shovel or lute. Indicted areas shall be filled with fresh hot
mix and smoothened with crack or shovel being rolled over the surface. Panning of the
materials over such area shall not be permitted. In small areas where the use of
mechanical finishing equipment is not practicable the mix may be spread & finished
manually if so directed by the Engineer-in-charge.
The work of laying D.B.M. shall be carried out in such a manner that D.B.M. is covered
with seal coating including sand finishing on same day.
In case, this is not done contractor shall provide a tack coat on D.B.M. surface at rate of
2.5kg / 10m2 of bitumen incl. cleaning, prior to tack coatwhile the seal coat is to be laid
next day or any day thereafter, at his own cost.
(8) MODE OF MEASUREMENT & PAYMENT:
The payment shall be made on the tonnage basis of the weight of mix of aggregate and
bitumen actually used in the finished work. For this purpose, the contractor shall have to
install a weight bridge of suitable capacity for the purpose of weight of dumpers at
suitable of place near hot mix plant site. Weight of empty dumper and weight of loaded
dumper will be recorded in bound and numbered register on plant site. The register shall
be maintained by the department and signed by the contractor.
Department will be free to get some loaded dumpers/empty dumpers test checked at
other weight bridge. WeighBridge will be periodically got calibrated and verified from
weight and measure authorities.
The weigh bridge shall be of approved quality and test will have to be given as and when
demanded by the Department for its accuracy without any extra cost to the corporation.
Proper gate pass system shall be established for the vehicles coming to the plant and
outgoing from the plant site. The location of the km. and meter in which individual
dumpers are unloaded is recorded carefully.
The Contractunitrate for D.G.B.M. shall bepaid in full for carrying out the required
operations including all compensation for :
1) Making arrangement of control and safety of traffic.
2) Preparation of surface to receive the materials.
3) Providing all materials to beincorporated in the works with all lead and lifts, including
all royalties, fees, all taxes, rents where necessary.
4) Mixing, transporting, laying, & compacting the mix etc.
5) All labour, tools, equipment, plant including installation of drum mix plant, power
supply units and all machinery, and incidental to complete the work to the
specifications.
6) Carrying out the work in part widths where directed.
7) Carrying out all tests forcontrol of quality.
8) The rate shall cover the provision of bitumen at the purchased rate with the
provision that the variation actualpercentage of bitumen used willbe assessed and
paidor adjusted accordingly.
9) The rates for premixed materials are to include for all wastage in cutting of joints
10) The rate is to include for all necessary testing, Mixture design, Job mix formula,
Plant trails, laying trails, transporting and testing of samples and cores. If there is
not a project specific laboratory, the contract must arrange to carry out all necessary
testing at an outside Govt. approved laboratory approved by the Engineer-in-charge
& all costs incurred are deemed included in the rate quoted for the materials.
11) The cost of all plants and laying trials as specified to prove the mixing and laying
method is deemed to be included in the contractor rates.
12) The average consolidated thickness of one layer of the DBM shall be 100 mm at
specified density.
The contract rate shall before a one M.T of a mixture, except that the rate shall
include the provision of bitumen at 4.50%, by weight of total mixture. The variation
in actual percentage of bitumen used will be assessed and the payment adjusted
up or down accordingly. In any case, consumption of bitumen should not be
exceed than 4.50% as mentioned in Schedule “B” without approval of Competent
Providing & laying compacted 100 mm thick dense graded bituminous macadam
(DBM) Grade-II in Single layer using 100-120 TPH batch type HMP with tack coat at
the rate of 2.5 kg / 10 m2 (VG10) in each using crushed aggregates of specified
grading premixed with bituminous binder @ 4.0% ( VG - 40) bitumen by weight of
total mix and filler , transporting the hot mix to work site laying with a hydrostatic
paver finisher with sensor control with full road carpet width (Single screed) or as
directed by Engineer in charge to the required grade, level and alignment, rolling
with smooth wheeled roller, intermediate rolling 8-10 tonnes dead weight or
vibratory roller & pneumatic tire roller of 12 to 15 tonnes weight having sufficient
width and pressure & the finishing rolling shall be done with 6 to 8 tonnes smooth
wheeled tendem rollers to acheive the desired compaction as per MORT&H
specification etc complete in all respects. The agency shall have to get the mix
design done from approved laboratory and submit to the Engineer in charge for
approval.(Va = 3.5% & Vbe= 11.50% must be considered in mix design ) If the
asphalt (bituminous) content is more than above, the agency shall have to bear the
cost of additional asphalt. The payment shall be done on the permissible field
density achieved on the site instead of density derieved in the mix design. ( The
density obtained by mix design above 2.31 MT/M3 shall be boarn by agency )
The relevant specifications and mode of measurement as per Item No. 9 shall be
made applicable.
Providing and laying compacted 40 mm thick Bituminous Concrete ( BC ) Grade -II
in single layer using 100-120 TPH batch type hot mix plant and using emulsion
asphalt as a tack coat @ 2.5 kg / 10 sq.m (VG 10) in each using crushed stone
aggregateof specified gradation and filler, Premix with VG-40 grade bitumenous
binder at 5.40 % by total weight of mix & filler incl. transporting the hot mix to work
site and laying with hydrostatic paver finisher having sensor control with Full road
carpet width ( Single screed) or as directed by Engineer in charge to the required
grade, level and alignment, rolling with smooth wheeled roller, intermediate rolling
8-10 tonnes dead weight or vibratory roller & pneumatic tire roller of 12 to
tonnes weight having sufficient width and pressure & the finishing rolling shall be
done with 6 to 8 tonnes smooth wheeled tendem rollers to acheive the desired
compaction as per MORT&H specification etc complete in all respects. The agency
shall have to get the mix design done from approved laboratory and submit to the
Engineer in charge for approval (Va = 3.5% & Vbe= 11.50% must be considered in
mix design ). If the asphalt (bituminous) content is more than above, the agency
shall have to bear the cost of additional asphalt. The payment shall be done on the
permissible field density achieved on the site instead of density derieved in the mix
design. (The density obtained by mix design above 2.36 MT/M3 shall be boarn by
This work shall consist of the preparation, laying and compaction of bituminous concrete
of 40mm thickness compose of graded aggregates premix with bituminous binder on a
previously prepared base, in accordance with the requirements of these specifications, to
serve as a wearing course and profile corrective course.
The work in general shall be carried out as per relevant specifications of Ministry of Road
Transport & Highway-specifications for Road and Bridge work published by the Indian
Roads Congress - New Delhi (4th Edition).
The bitumen shall be VG - 40 complying with IS: 73 - 2006 / paving bitumen of
penetration Grade complying with I.S.S. for "paving bitumen” IS: 73 & of the penetration
indicated in the Table-3. A-65 or S-65 (60/70 GRADE) for mixing as a Binder and
Bitumen Emulsion (VG-10) complying with IS : 8887 for tack coat.
The agency shall have to purchase the bitumen from only Govt. recognized Refinery.
The relevant specifications under Item No. 10 above shall be made applicable.
2.2) Course aggregates:
The coarse aggregate shall consist of crushed stone. These shall be strong, durable, of
cubical shape, free of disintegrated pieces, organic or other deleterious matter and
adherent coatings. The aggregate shall preferably by hydrophobic and of low porosity and
shall satisfy the physical requirements set forth in table –
TABLE -1: PHYSICAL REQUIREMENT FOR COURSE AGGREGATE
PROPERTY TEST AND TEST METHOD SPECIFICATION
Cleanness Grain size analysis (IS : 2386-Part-1) Maximum 5% passing
Particle shape Flakiness & Elongation combined
(IS: 2386-Part-1)
Strength* Los Angle Abrasion Value. Maximum 35%
Aggregate impact value (IS: 2386 Part-4) Maximum 27%
Polishing Polishing stone value
(B.S.:812-PART-114)
Durability Soundness (IS: 2326- Part-5)
Sodium sulphate Maximum 12%
Magnesium sulphate Maximum 18%
Water Water absorption (IS: 2386, PART-3)
Stripping Coating & stripping of bitumen aggregate Minimum retained coating
mixture (IS: 6241) 95%
Water Retained tensile strength
1) (*)Aggregate satisfy the requirements of either of these two tests.
2) (**)The water sensitive test is only to be carried out if the minimum retained
coating in the stripping test is less than 95%.
2.3) Fine aggregate:
The fine aggregates shall consist of crusher run screenings, natural sand or a mixture of
both, passing 2.36mm sieve and retrained on 75-micron sieve. These shall be clean,
hard, durable, dry and free from dust, & soft or friable matters, organic or other
deleterious matter.
The fine aggregate shall have a sand equivalent value not less than 50 when tested in
accordance with the requirement of IS-2720-Part-37. The plasticity index of the fraction
passing the 0.425mm sieve shall not exceed 4, when tested in accordance with IS:
The aggregate shall satisfy the physical requirements set forth in the table -1 above.
Filler shall consist of finely divided mineral matter such as rock dust, hydrated line or
cement approved by the Engineer.
The filler shall be graded within the limits indicated in Table-2 as under.
TABLE – 2 : GRADING REQUIREMENT FOR MINERAL FILLER :
Cumulative percent passing by weight
I.S. sieve (mm)
of total aggregate.
The filler shall be free from organic impurities and have a plastic index not greater than
The plastic index requirement shall not apply if filler is cement or lime. Where the
aggregates fail to meet the requirement of water sensitivity test in Table-1 then 2% by
total weight of aggregate, of hydrated line shall be added without additional cost.
2.5) Aggregate grading & binder content:
When tested in accordance with I.S 2326 – Part-1 (Wet sieving method), the combined
grading of the course and fine aggregate and added filler shall fall within the limit shown
in table-3 for grading No. 2 as specified.
TABLE – 3 : COMPOSITION OF BITUMINIOUS PAVING LAYERS
Nominal aggregate sieve 13 MM
Layer thickness 40 MM
I,.S. Sieve1 (mm) Commutative percentage by weight of total
aggregate passing.
Bitumen content percentage
by mass of total mix
Bitumen grade (pen) VG – 40 /
1) The combined aggregate grading shall not vary from the low limit on one sieve to
the high limit on the adjacent sieve.
2) Determined by the Marshal method.
3) MIXTURE DESIGN :
3.1) Requirement of the mixture:
Apart from confirmative with the grading and quality requirement for individual ingredients
mixture shall meet the requirement set out in Table -
TABLE – 4 : REQUIREMENT OF BITUMINIOUS PAVEMENT LAYER
Minimum, stability (KN at 600 C)
Minimum flow (MM)
Maximum flow (MM)
Compaction level
75 blows on each of the two faces of the specimen.
Percent air voids 3-6
Percent voids in mineral
See Table – 5 below
aggregate (VMA)
Percent voids failed with
Loss of stability on immersion in Min 75 per cent retained strength
water at 60o C(ASTM D1075)
The requirement for minimum percent voids in mineral aggregate (VMA) are set out
TABLE – 5 : MINIMUM PERCENT VOIDS IN MINERAL AGGREGATE.
Nominal maximum Minimum VMA, percent related to Design Air voids,
particle size1 (mm) Percent
1) The nominal maximum particle size is one size larger than the first sieve to retain
more than 10 per cent.
2) Interpolate minimum voids in the mineral aggregate (VMA) for design air voids
values between those listed.
3.2) Binder content:
The binder content shall be optimized to achieve the requirement of the mixture set out in
Table - 4 and the traffic volume (may be obtained from the Engineer-in- charge). The
marshal method for determining the optimum binder content shall be adopted as
described in the asphalt institute manual at MS-2, replacing the aggregates retains on the
26.5mm sieve and retained on the 22.4mm where approved by the Engineer.
3.3) Job mix formula :
The contractor shall inform the Engineer in writing, at least 20 days before the start of the
work, of the job mix formula proposed for use in the work and shall give following details.
(i) Source and location of all materials.
(ii) Proportion of all materials expressed as follows where is applicable.
(a) Binder type & percentage by weight of total mixture.
(b) Course aggregate, fine aggregate, mineral filler as percentage by weight of
total aggregate including mineral filler.
(iii) A single definite percentage passing each sieve for the mix aggregate
(iv) The individual grading of the individual aggregate fractions, and the proportion of
each in the combined grading.
(v) The result of test enumerated in Table-3 as obtained by the contractor.
(vi) Where mixture is a batch mixture, the individual weights of each type of aggregate, &
binder per batch.
(vii) The test result of physical characteristics of the aggregate to be used.
(viii) Mixing temperature and compacting temperature.
While establishing the job mix formula, the contractor shall ensure that it is based on a
correct and truly representative sample of the materials that will actually be used in the
work and that the mixture and its different ingredients satisfied the physical and strength
requirements of these specifications.
Approval of the job mix formula shall be based on independent testing by the Engineer for
which samples of all ingredients of its mix shall be furnished by the contractor as required
by the Engineer.
The approved job mix formula shall remain effective unless and until a revised job mix
formula is approved, should a change in the source of materials be proposed, a new job
mix formula shall be forwarded to the Engineer for approval before the placing of the
3.4) Plant trial – permissible various in Job mix formula:
Once the laboratory job mix formula is approved, the contractor shall carry out plant trials
at the mixture to establish that the plant can be set up to produce uniform mix confirming
to the approved job mix formula. The permissible variations of the individual percentages
of the various ingredients in the actual mix from the job mix formula to be used shall be
within the limits as specified in the table – 6 as under:
The various are intended to apply to individual specimens taken for quality control test in
accordance with General quality control works on materials attached herewith.
TABLE – 6 : PERMISSIBLE VARIATIONS FROM THE JOB MIX FORMULA
Permissible variation
Base / binder course Wearing course
Aggregate passing 19mm size or larger +/- 8% +/-7%
Aggregate passing 13.2mm , 9.5mm +/- 7% +/- 6%
Aggregate passing 4.75mm +/- 6% +/- 5%
Aggregate passing 2.36mm, 1.8mm,
Aggregate passing 0.3mm,0.15mm +/- 4% +/- 3%
Aggregate passing 0.075mm +/- 2% +/- 1.5%
Binder content +/- 0.3% +/- 0.3%
Mixing temperature +/- 10 C +/- 10 C
Once the plant trails have demonstrated the capability of the plant, and the trials are
approved, the laying operation may commence. Over the period of the first month of
production for laying on the work, the Engineer shall require additional testing of the
product to establish the reliability and consistency of the plants.
3.5) Laying trials :
Once the plant trails have been successfully completed and approved, the contractor
shall carry out laying trial to demonstrate the proposed mix can be successfully laid, and
compacted all in accordance with MoRTH Clause -501. The laying trial shall be carried
out on a suitable area which is not form part of the works, unless specifically approved in
writing, by the engineer. The area of the laying trial shall be a minimum of 100 sq.mtr. of
construction similar to that of the project road and it shall be in all respect particularly
compaction, the same as the project construction, on which the bituminous materials is to
The contractor shall previously inform the Engineer of the proposed method for laying and
compacting the materials. The plant trial shall then establish if the proposed laying plant,
compaction plant, and methodology is capable of producing satisfactory results. The
density of the finished paving layer shall be determined by taking cores, no sooner then
24 hours after lying, or by other approved method. Once the laying trial have been
approved, the same plant and methodology shall be applied to the laying of the material
on the project, and no various of either shall be acceptable, unless approved in writing by
the Engineer, who may at discretion require further laying trials.
4) KEEPING RECORDS:
The relevant specifications under Item No. 10 above shall be made applicable.
The relevant specifications under Item No. 10 above shall be made applicable.
6) CONSTRUCTION OPERATIONS:
6.1) Weather and seasonal limitations:
The relevant specifications under Item No. 10 above shall be made applicable.
6.2) Preparation of base:
The relevant specifications under Item No. 10 above shall be made applicable.
6.3) Tack coat:
The relevant specifications under Item No. 10 above shall be made applicable.
6.4) Mixing & Transportation of mixture:
The relevant specifications under Item No. 10 above shall be made applicable; however,
the department reserves the right to change the temperature of mix during transporting.
6.5) Spreading:
The relevant specifications under Item No. 10 above shall be made applicable; however,
the department reserves the right to change the temperature of mix at the time of lying.
6.6) Compactions:
The relevant specifications under Item No. 10 above shall be made applicable.
The relevant specifications under Item No. 10 above shall be made applicable.
6.8) Opening to traffic:
The newly laid surface shall not be opened to traffic for at least 24 hours after laying and
completion of compaction, without the express approval of the Engineer in writing.
7) SURFACE FINISHING & QUALITY CONTROL:
The relevant specifications under Item No. 10 above shall be made applicable.
8) ARRANGEMENT AND CONTROLLING TRAFFIC:
The relevant specifications under Item No. 10 above shall be made applicable.
9) PLANTS. EQUIPMENTS & MACHINERIES:
A) The relevant specifications under Item No. 10 above shall be made applicable.
B) Special requirements for continuous - mixing plant:
The relevant specifications under Item No. 10 above shall be made applicable.
C) Paver and finishing machineries:
The relevant specifications under Item No. 10 above shall be made applicable.
D) Transportation:
The relevant specifications under Item No. 10 above shall be made applicable.
E) Inspection and control of Drum mix plant:
The relevant specifications under Item No. 10 above shall be made applicable.
10) MODE OF MEASUREMENT & PAYMENTS:
The payment shall be made on the tonnage basis of the weight of mix of aggregate and
bitumen actually used in the finished work. For this purpose, the contractor shall have to
install a weigh bridge of suitable capacity for the purpose of weighting of dumpers at
suitable place near drum mix plant site. Weight of empty dumper and weight of loaded
dumper will be recorded in bound and numbered register on plant site. The register shall
be maintained by the department and signed by the contractor.
Department will be free to get some loaded dumpers/empty dumpers test checked at
other weight bridge. Weigh Bridge will be periodically got calibrated and verified from
Weight and Measure Authorities.
The weigh bridge shall be of approved quality and test will have to be given as and when
demanded by the Department for its accuracy without any extra cost to the Corporation.
Proper gate pass system shall be established for the vehicles coming to the plant and
outgoing from the plant site. The location of the K.M. and meter in which individual
dumpers are unloaded is recorded carefully.
The contract unit rate for B.C. shall be paid in full for carrying out the required operations
including all compensation for:
1) Making arrangement of control and safety of traffic.
2) Preparation of surface to receive the materials.
3) Providing all materials to be incorporated in the works with all lead and lifts, including
all royalties, fees, all taxes, rents where necessary.
4) Mixing, transporting, laying, & compacting the mix etc.
5) All labour, tools, equipment, plant including installation of drum mix plant, power
supply units and all machinery, and incidental to complete the work to the
specifications.
6) Carrying out the work in part widths where directed.
7) Carrying out all tests for control of quality.
8) The rate shall cover the provision of bitumen at the purchased rate with the provision
that the variation actual percentage of bitumen used will be assessed and paid or
adjusted accordingly.
9) The rates for premixed materials are to include for all wastage in cutting of joints etc.
10) The rate is to include for all necessary testing, Mixture design, Job mix formula, Plant
trails, laying trails, transporting and testing of samples and cores. If there is not a
project specific laboratory, the contract must arrange to carry out all necessary
testing at an outside Govt. approved laboratory approved by the Engineer-in-charge
& all costs incurred are deemed included in the rate quoted for the materials.
11) The cost of all plants and laying trials as specified to prove the mixing and laying
method is deemed to be included in the contractor rates.
12) The average consolidated thickness of one layer of the B.C. shall be 40 mm at
specified density.
The contract rate shall be for a one M.T of a mixture, except that the rate shall
include the provision of bitumen at 5.4%, by weight of total mixture. The variation
in actual percentage of bitumen used will be assessed and the payment adjusted
up or down accordingly. In any case, consumption of bitumen should not be
exceed than 5.4% as mentioned in Schedule “B” without approval of Competent
Providing and applying Asphalt painting with bitumen of VG 40 grade on
bitumenous surface including clearing of road surface and spraying Bitumen at the
rate of 0.60 kg/sqm using mechanical means.
This work shall consist of providing and applying asphalt painting for sealing the voids in
a bituminous surface laid to the specified levels, grade and cross fall (camber).Liquid seal
coat comprising of an application of a layer of bituminous binder followed by a cover of
stone chippings.
The bitumen shall be VG - 40 complying with IS: 73 -
The agency shall have to purchase the bitumen from only Govt. recognized Refinery.
The relevant specifications under Item No. 10 above shall be made applicable.
The quantity of fine aggregate 4.75 mm and below shall be 0.06 M3 per 10 square
2.2) Stone chips:
The stone chippings shall consist of angular fragments of clean, hard, tough and durable
rock of uniform quality throughout. They should be free of elongated or flaky pieces, soft
or disintegrated stone, organic, or other deleterious matter. Stone chippings shall be of
4.7 mm size defined as 100 per cent passing through 4.70 mm sieve and retained on
2.36 mm sieve. The quantity used for spreading shall be 0.06 cubic meter per 10 square
meters area. The chippings shall satisfy the quality requirements spelt out in Table -1
except that the upper limit for water absorption value shall be 1 per cent.
The quantity of bitumen shall be 6.00 kg per 10 square meters area
TABLE -1: PHYSICAL REQUIREMENT FOR STONE CHIPS :
PROPERTY TEST AND TEST METHOD SPECIFICATION
Cleanness Grain size analysis (IS : 2386-Part-1) Maximum 5% passing
Particle shape Flakiness & Elongation combined Maximum 30%
(IS: 2386-Part-1)
Strength* Los Angle Abrasion Value. Maximum 35%
Aggregate impact value (IS: 2386 Part-4) Maximum 27%
Durability Soundness (IS: 2326- Part-5)
Sodium sulphate Maximum 12%
Magnesium sulphate Maximum 18%
Water Water absorption (IS: 2386, PART-3)
Stripping Coating & stripping of bitumen aggregate Minimum retained coating
mixture (IS: 6241) 95%
Water Retained tensile strength
3. Construction Operations
3.1) WEATHER AND SEASONAL LIMITATIONS :
Liquid seal coat shall not be applied to a wet surface or during a dust storm or when the
weather is foggy / rainy / windy or when the temperature in the shade is less than
degree centigrade. Surfaces which are to receive emulsion primer shall be damp but no
free or standing water shall be present.
3.2) PREPARATION OF ROAD SURFACE :
The liquid seal coat shall be applied immediately after the laying of bituminous course
which is required to be sealed. Before application of liquid seal coat materials, the surface
shall be cleaned free of any dust or other extraneous matter.
Immediately prior to applying the primer, the surface shall be carefully swept, clean of
dust and loose particles, care being taken not to disturb the interlocked aggregates.
There is best achieved when the surface layer is slightly moist (Lightly sprayed with water
and the surface allowed to dry) and the surface should kept moist until the primer is
3.3) Providing and Spraying Asphalt painting:
Bitumen shall be heated to 150 C – 163 C and sprayed at rate of 6.00 Kg. per 10.00 M2
surface area on the dry surface in a uniform manner with a self –propelled mechanical
The method of application of Bitumen shall depend on the type of equipment to be used,
size of nozzles, pressure at the spray par and speed of forward movement as approved
by the Engineer-in-charge. The contractor shall demonstrate at a spraying trial, that the
equipment and method to be used is capable of producing a uniformly spray within the
tolerances specified, if required.
Immediately after the application of binder, stone chips, which shall be clean and dry,
shall be spread uniformly @ specified (0.06 M3 per 10.00 M2) on the surface preferably
by means of self-propelled or towed mechanical grit spreader so as to cover the surface
completely. If necessary, the surface shall be brushed to ensure uniform spread of chips.
Immediately after the application of the cover material, the entire surface shall be rolled
with a 8-10 tonne smooth wheeled steel roller, 8-10 tonne static weight vibratory roller or
other equipment approved by the Engineer after laying trial if required. Rolling shall
commence at the edges and proses toward the center except in super elevated and uni-
directional cambered positions where it shall proceed from the lower edges to the higher
edges. Each pass of the roller shall uniformly overlap not less than 1/3 of the track made
in the proceeding pass. While rolling is in progress, traditional chips shall be spread by
hand in necessary quantities required to make up irregularities. Rolling shall continue until
all aggregate particles are firmly embedded in the binder and present a uniform close
Where directed by the Engineer the Contractor shall remove the excess stone chippings
from the pavement by brooming it off on to the unsealed shoulder. Excess stone
chippings shall not be removed until the aggregate has properly bedded down into the
binder by either trafficking or additional rolling, and shall be removed from 6 hours to
hours of being sealed or primer sealed unless otherwise directed by the Engineer
The Contractor shall afford the Engineer every facility to check rates of application,
temperature and quantities and to take samples.
3.4) Opening to Traffic
Traffic shall not be permitted to run on any newly sealed area until the following day. In
special circumstances, however, the Engineer may allow the road to be opened to traffic
immediately after rolling, but in such cases traffic speed shall be limited to 16 km per hour
until the following day.
3.5) Surface Finish and Quality Control of Work
Surface Finish and Quality Control of Work The surface finish of construction shall
conform to the requirements of MoRTHClause 902. For control on the quality of materials
supplied and the works carried out, the relevant provisions of MoRTHSection 900shall
apply. All tests shall be conducted in accordance with Indian Standard test methods and
Codes of Practice.
3.6) Arrangements for Traffic
During the period of construction, arrangements for traffic shall be made in accordance
with the provisions of MoRTHClause
4. MODE OF MEASUREMENT AND PAYMENT :
Asphalt Painting shall be measured in square meters of area covered with stone
The rate for Asphalt Paintingshall be payment in full for carrying out the required
operations including full compensation for all components listed above.
The contract unit rate shall be for a unit of one square meter of finished work in
position at the site of work.
Road marking with hot applied thermoplastic paints with reflectorising glass beads
on bitumen surface providing and laying a hot applied thermoplastic compound
mm thick including reflectorising glass beads @ 250gms per sqm area, thickness
of 2.5mm is excluding of surface applied glass beds as per IRC:35- 2015. The
finished surface to be level, uniform and free from streaks and holes. zebra patta
/bump patta lane/center line/ edge line/cut patta. The white color marking should
provide luminance coefficient on cement road shall be min 130 mcd/m2/lux and
Asphalt road shall be min 100 mcd/m2/lux during the service life during the day
time. The marking should meet the performance criteria for night time reflectivity,
wet reflectivity and skid resistance as mentioned in the section-15 of IRC 35-2015.
Warranty for the Retro reflectivity should be two years.
The color, width, and layout of road markings shall be in accordance with the code
of practice of Road Marking with paints IRC: 35-2015 and specified in the
drawings or as directed by the Engineer.
Road markings shall not applied Thermoplastic compound as specified in the item
and the material shall meet the requirements as specified below.
Cleaning the surface :
The entire existing B.T. surface of road to be painted shall be cleaned with
suitable approved means as directed by the Engineer –in-charge and as per the
MoRTH specification.
HOT APPLIED THERMO PLASTIC ROAD MARKING:
The work under this section consists of marking traffic stripes using a
thermoplastic compound meeting the requirements specified herein.
The thermoplastic compound shall be screened / extruded on to the payment
surface in a molten state by suitable machine capable of controlled preparation
and laying with surface application of glass beads at a specific rate. Upon cooling
to ambient pavement temperature, it shall produce an adherent pavement marking
of specified thickness and width and capable of resisting deformation of traffic.
The color of the compound shall be white (IS Color No. 356) as specified in the
drawing or as directed by the Engineer.
1.4.2.1 General :
The thermoplastic material shall be homogeneously composed of aggregate,
pigment, resins and glass reflectorizing boads.
1.4.2.2 REQUIREMENTS :
Composition: The pigment, beads, and aggregate shall be uniformly dispersed in
the resins. The material shall be free from all skins, dirt and foreign objects and
shall comply with requirements indicated in Table -1
PROPORTIONS OF CONSTITUTENTS OF MARKING MATERIAL (Percentage
Component White
Binder 18.0 Min.
Glass Beads 30-40
Titanium Dioxide 10.0 Min.
Calcium Carbonate & insert fillers 42.0 Max.
Properties: The properties of thermoplastic material when tested in accordance
with ASTM D36/BS-3262(PART) shall be as below.
White: Daylight luminance at 45 degrees 65% min. as per ASSHTO-M-249.
Drying time: When applied at a temperature specified by the manufacturer and to
the required thickness the material shall be set to bear traffic in not more than
Skilled resistance: Not less than 45 as per BS-6044.
Cracking resistance at low temperature: The material shall show no cracks on
application to concrete blocks.
Softening point 102.5 / 96 C as per ASTMD-36.
Flow resistance: Not more than 25% as per AASHTO-M-249.
Yellowness Index (for white thermoplastic paint) not more than 0.12 as per
Storage life: The material shall meet the requirement of these specifications for a
period of one year. The Thermoplastic material must also melt uniformly with no
evidence of skins or un-melted particles for the one year storage period. Any
material not meeting the above requirements shall be replaced by the
manufacturer / supplier / contractor.
Reflectorization : Shall be achieved by incorporation of beads, the grading and
other properties of the beads shall be as specified in clause 1.3.3
Marking each container of the thermoplastic material shall be clearly and indelibly
marked with the following information:
The name, trademark, or other means of identification of manufacturer.
Date of manufacture.
Maximum application temperature and maximum safe heating temperature.
Sampling and testing: The thermoplastic material shall be sampled and tested in
accordance with appropriate ASTM /BS method. The contractor shall furnish to
the employer a copy of the certified test reports from the manufacturers of the
thermoplastic material showing results of all tests specified herein and shall certify
the material meets all requirements of this specification.
Reflectorizing Glass Beads:
General: This specification covers two types of glass beads to be used for the
production of reflectorized pavement markings.
Type -1 beads are those which are a constituent of the basic thermoplastic
compound vide Table-3 and Type -2 beads are those which are to be sprayed on
the surface vide clause- 1.5.3.
The Glass beads shall be transparent, colorless and free from milkiness, dark
particles and excessive air inclusions. These shall conform to the requirements
spelt out in clause 1.3.3.3.
Specific requirements:
Gradation: The glass beads shall meet the graduation requirements for the two
types as shown in Table -2
Table-2 GRADATION REQUIREMENT FOR GLASS BEADS.
Percent Retained
Sieve size Type-1 Type-2
850 Micron 5 to 20 0 to
600 Micron --- 5 to
425 Micron 65 to 95 ---
300 Micron --- 30 to
180 Micron 0 to 10 10 to
Below 180 Micron --- 0 to
(A) Roundness: The glass beads shall have a minimum of 70& true
(B) Refractive index : The glass beads shall have a minimum
refractive index of
(C) Free flowing properties: The glass beads shall be free from
hard lumps and clusters and shall dispense readily under any
conditions suitable for paint striping. They shall pass the free
1.4.3.2 Test method: The specific requirements shall be tested with
the following methods.
(i)Free flow test Spread 100 grams of beads evenly in a 100mm diameter glass
dish. Place the dish in a 250mm inside diameter desiccators which is filled within
25mm of the top of a desiccator’s plate with sulphuric acid water solution (specific
gravity 110) cover the desiccators and let it stand for 4 hours at 20 to 29 degree
C. Remove sample from desiccators, transfer beads to a pan and inspect for
lumps or cluster. Then pour beads into a clean, dry glass funnel having a 100mm
steam and 6mm on face, if necessary, initiate flow by lightly lapping the funnel.
The glass spheres shall be essentially free of lumps and clusters and shall flow
freely through the funnel.
(ii)The requirement of gradation, roundness and refractive index of glass beads
and the amount of glass beads in the compound shall be tested as per BS-6088 &
(iii)The contractor shall furnish to the employer a copy of certified test reports from
the manufacturer of glass beads obtained from a reputed laboratory showing
results of all tests specified herein and shall certify that the material meets all
requirements of this specification. However, if so required these tests may be
carried out as directed by the Engineer.
Application properties of thermoplastic material :The thermoplastic material
shall readily get screened / extruded at temperature specified by the
manufacturers for respective method of application to produce a line of specified
thickness which shall be continuous and uniform in shape having clear and sharp
The material upon heating to application temperatures shall not extrude fumes,
which are toxic, obnoxious or injurious to persons or propert
(i)The material shall be melted in accordance with the manufacturer’s instruction
in a heater fitted with a mechanical stirrer to give a smooth consistency to the
thermoplastic material to avoid local overheating. The temperature of the mass
shall be within the range specified by the manufacturer and shall on no account be
allowed to exceed the maximum temperature stated by the manufacturer. The
melted material should be used as expeditiously as possible and for thermoplastic
material which has natural binders or is otherwise sensitive to prolonged heating,
the material shall not be maintained in a melted condition for more than 4 h
Properties of finished road marking :
(a)The stripe shall not be slippery when wet.
(b) The marking shall not lift from the pavement in freezing weather
(c) After application and proper drying, the stripe show no applicable
deformation or discoloration under traffic and under road temperature upto
(d) The marking shall not deteriorate by contact with sodium chloride calcium
chloride or oil drippings from traffic.
(e) The stripe of marking shall maintain as original dimensions and position. Clod
ductility of the material shall be such as to permit normal movement with the road
surface without chopping or crackin
Refectories Paint :
Refectories paint shall conform to the specification by the manufacturers and
approved by the Engineer. Reflectorizing glass beads for reflectorising paints
where used shall conform to the requirement of clause 1.3.3.
Marking shall be done by machine for locations where painting cannot be done
by machine; approved manual methods shall be used with prior approval of the
Engineer. The contractor shall maintain control over traffic while painting
operations are in progress so as to cause minimum inconvenience to traffic
compatible with protecting the workmen
The thermoplastic material shall be applied hot either by screening or extrusion
process. After transfer to the laying apparatus, the material shall be laid at a
temperature within the range specified by the manufacturer for the particular
method of laying being used. The paint shall be applied using a screed or
extrusion machine.
The pavement temperature shall not be less than 10 degree C. during
application. All surfaces to be marked shall be thoroughly cleaned of all dust, dirt,
grease, oil and all other foreign matter before application of the paint.
The material when formed into traffic stripes must be readily renewed, able by
placing an overlay of new material directly over an old line of compatible material.
Such new material shall so bound itself to the old line that no splitting or
separations take place. Thermoplastic paint shall be applied in intermittent or
continuous lines of uniform thickness of at least 2.5mm unless specified otherwise
where arrows or letters are to be provided thermoplastic compound may be hand
sprayed. In addition to the beads included in the material, a further quantity of
glass beads of Type -2 conforming to the above noted specification shall be
sprayed uniformly into a mono-layer on to the hot paint line in quick succession of
the paint spraying operation. The glass beads shall be applied at the rate of
grams per square meter area.
The minimum thickness specified is exclusive of surface applied glass beads.The
method of thickness measurement shall be in accordance with Appendix – B and
Appendix-C of BS-3262 (P-3) The finished lines shall be free from ruggedness or
sides & ends & the parallel to the general alignment of the carriageway. The upper
surface of the lines shall be level, uniform & free from streaks.
Measurements for payments.
The painted markings shall be measured in Sqm. Meters of actual area marked
(excluding the gaps, if any)
The contract unit rate for road markings shall be payment in full compensation for
furnishing all labour, materials, tools, equipment, including all incidental costs,
necessary for carryout the work at the site conforming to these specifications
complete as per the approved drawing(s) or as directed by the Engineer and all
other incidental costs necessary to complete the work to these specification.
The contract rate shall be for a unit of one sq.m. Of actual area marked
Cat Eye / Road Stud / RPM: Supplying of Molded Twin Shanks Raised Pavement
Markers made of polycarbonate and ABS moulded body and reflective panels with
micro prismatic lens capable of providing total internal reflection of the light
entering the lens face and shall support a load of 13635 kgs. tested in accordance
to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH
Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length
shall not exceed 20 mm, 130 mm and 130 mm and with minimum reflective area of
13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The
strength of detachment of the integrated cylindrical shanks, (of diameter not less
than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a
minimum value of 500 Kgf. Fixing will be by drilling holes on the road for the
shanks to go inside, without nails and using epoxy resin based adhesive as per
manufacturers recommendation and The color of the marker should be as per the
IRC 35-2015 and as directed by Engineer-in-charge.
Reflective Pavement marker (RPM) or road stud is device which is bonded
to or anchored within the road surface for lane marking and delineation for night
time visibility. It reflects incident light in directions close to the direction from which
Description of Terms Specific to this standard
(a)Coefficient of luminous intensity (CIL) or specific intensity = the ratio of
luminous intensity of the retro-reflector in the direction of observation to luminance
at the retro-reflector on a plane perpendicular to the direction of the incident light
expressed in terms of Milaca deal as per incident lux (med/ lx).
(b)Horizontal entrance angle – the angle in the horizontal plant between the
direction of incident light and the normal to the leading edge of the marker.
(c)Observation angle – the angle in the reflector between the illumination axis and
the observation axis.
(d)Retro – reflection – reflection in which the radiation is returned in direction
close to the direction from which it came, this property being maintained over
were variations of the direction of incident radiation.
(e)Head – that part of a road stud which is above the road surface where the road
stud is fixed in position in the road.
(f)Upper surface – that part of the external surface of road stud which is visible
when the road stud is fixed in position in the road.
(g)Anchorage – that part of a road stud which is below the road surface above the
road stud is fixed position in the road.
Description of Terms Specific to this standard
(a) Coefficient of luminous intensity (CIL) or specific intensity = the ratio of
luminous intensity of the retro-reflector in the direction of observation to luminance
at the retro-reflector on a plane perpendicular to the direction of the incident light
expressed in terms of Milaca deal as per incident lux (med/ lx).
(b) Horizontal entrance angle – the angle in the horizontal plant between the
direction of incident light and the normal to the leading edge of the marker.
(c) Observation angle – the angle in the reflector between the illumination axis
and the observation axis.
(d)Retro – reflection – reflection in which the radiation is returned in direction
close to the direction from which it came, this property being maintained over
were variations of the direction of incident radiation.
(e)Head – that part of a road stud which is above the road surface where the road
stud is fixed in position in the road.
(f)Upper surface – that part of the external surface of road stud which is visible
when the road stud is fixed in position in the road.
(g)Anchorage – that part of a road stud which is below the road surface above the
road stud is fixed position in the road.
(h)Plastic body of RPM road stud shall be moulded from ASA (Acrylic Sterner
Acrylonitrile) or HIPS (Impacts polystyrene) or ABS or any other suitable material
approved by the Engineer-in-charge. The marker shall support a load of 13635 kg
tested in accordance with ASTM D4280.
(i)Reflective panels shall consist if number of lenses containing single or dual
prismatic cubes capable of providing total internal reflection of the light entering
the lens face. Lenses shall be moulded of methyl Methacrylate conforming to
ASTMD 788 or equivalent.
(a)The slope or retro-reflecting surface shall preferably be 35 + 5 degree to base.
(b)The area of each retro-reflecting surface shall not be less than
• Optical Performance
Unidirectional and bi-directional studs
(a) Each reflector or combination of reflectors on each face of the stud shall
have a CIL not less than given in Table 1 or 2 as appropriate.
Note: The entrance angle of 0"U corresponds to the normal aspect of the
reflectors when the reflecting road stud is installed in horizontal road surface.
(a)A stud that incorporates one or more corner cube reflectors shall be considered
to be included in category "A". A stud that incorporates one or more biconvex
reflectors shall be considered to be included in category "B".
(b)Omni – directional studs: Each Omni-directional stud shall have a minimum
C.I.L. of not less than med/ lx.
Coefficient of luminance intensity can be measured by produced described in
ASTMD 809 "Practice for Measuring Photometric Characteristics" or as
recommended in BS 873 Part 4:1973. Under test conditions a stud shall not be
considered to fall the photometric requirements of the measured C.I.L. at any one
position of measurement is less than the values specified in Table 1 or 2 provided
-The value is not less than 80% of the specified minimum, and
-The average of the left and right measurements for the specific angle is greater
than the specified minimum.
• Fixing of Reflective Markers Requirements
(a)The enveloping profile of the head of the stud shall be smooth and the suds
shall not present any sharp edges to traffic.
(b)The reflecting portions of the studs shall be free from crevice or ledges where
dirt might accumulate.
(c)All road studs shall be legibly marked with the name, trade mark of other
means of identification of the manufacture.
(d)Marker height shall not exceed 20 mm.
(e)Marker width shall not exceed 130 mm.
(f)The base of the marker shall be flat within 1.3 mm. If the bottom of the marker is
configured. The outermost faces of the configurations shall not deviate more than
1.3 mm form a flat surface.
(a)The reflective marker shall be fixed to the road surface using the adhesives
and the produced recommended by the manufacturer. No nails shall be used to
affix the marker as nails are hazardous for the roads.
(b)Regardless of the type of adhesive used. The markers shall not be fixed if the
pavement is not surface dry and on new asphalt concrete surfacing unit the
surfacing has been opened to traffic for a period of not less than 14 hours.
(c)The portions of the highway surface, to which the marker is to be bonded by
the adhesive, shall be free of dirt, curing compound, grease, oil, moisture, loose of
Unsound layers, paint and any other material which would adversely affect the
bond of the adhesive.
(d)Use a wire brush, if necessary to loosen and remove dirt. Then brush or blow
(e)The adhesive shall be places uniformly on the cleaned pavement surface or on
the bottom to the marker in a quantity sufficient to result in complete coverage of
the area of contact of the marker with no voids present and with a slight excess
after the marker has been lightly pressed in place.
(f)For epoxy installations, excess adhesive around the edge of the marker, excess
adhesive on the pavement and adhesive on the exposed surfaces of the markers
shall be immediately removed. Soft rags moistened with mineral spirits of
kerosene may be used a necessary to remove adhesive from exposed faces of
pavement marker.
• Warranty and durability:
The contractor shall obtain from the manufacturer a two year warranty for
satisfactory light performance including stipulated retro-reflectance of the
reflecting panel and submit the same to the Engineer. In addition, a two year
warranty for satisfactory infield performance of the finished road marker shall also
be given by the contractor who carried out the work of fixing of reflective road
markers. In case the markers are displaced, damaged get worn out or lose their
reflectivity compared to stipulated standards, the contractor would be required to
replace all such markers within 15 days of the intimation from the Engineer at his
own cost and with no extra remuneration to be paid for such works.
• Measurement for Payment
The measurement of Cats eye (MMC) shall be in numbers of markers supplied
The contact unit rate for Cats eye (MMC) shall be payment in full compensation
for furnishing all labour, material, tools, equipment including incidental costs
necessary for carrying out the work at site conforming to the Specifications
complete as per approved drawings or as directed.
The contract unit rate shall be for a unit of one Nos.
Demolition including stacking of serviceable materilas and disposal of
unserviceable materials with all lead and lift. (i) R.C.C. work.
1. This work shall consist of removing, as here in after set forth, existing culverts,
bridges, pavements, kerbes and other structures like guard- rails, fences utility
poles, manholes, catch basins, inlets, etc. Which are in place but interfere with the
new construction or are not suitable to remain in place and of salvaging and
disposing of the resulting materials and back filling the resulting trenches and pits.
2. Existing culverts, bridges, pavements and other structures which are within the
highway and which are designated to be removed shall be removed upto the lit-
nits and extent specified in the drawings or as indicated by the Engineer-in-
3. Dismantling and removal operations shall be carried out with such equipment
and in such a manner as to leave undisturbed, adjacent pavement, structures and
any other work to be left in place.
4. All operations necessary for the removal of any existing structure which might
endanger new construction shall be completed prior to the start of new work.
5. The structures shall be dismantled carefully and the resulting materials so
removed as not to cause any damage to the serviceable materials to be salvaged,
the part of the structure to be retained and any other properties or structures
6. Unless otherwise specified the superstructure portion of culverts/bridges shall
be entirely removed and other parts removed to below the ground level or as
necessary depending upon the interference they cause to the new construction.
Removal of overlying or adjacent material if required in connection with the
dismantling of the structures shall be incidental to this item.
7. Where existing culverts/bridges are to be extended or otherwise incorporated in
the new work, only such part of the existing structure shall be removed as are
necessary to provide a proper connection to the new work. The connecting edges
shall be cut, chipped and trimmed to the required lines and grades without
weakening or damaging any part of the structure to be retained. Reinforcing bars
which are to be left in place so as to project into new work as dowels or ties shall
not be injured during removal of concrete.
8. Pipe culverts shall be carefully removed in such a manner to avoid damage to
9. Steel structures shall unless otherwise provided be carefully dismantled in such
a manner as to avoid damage to members thereof. If specified in the drawing or
directed by the Engineer-in-charge that structure is to be removed in a condition
suitable for re-erection, all members shall be match marked by the contractor with
white lead paint before dismantling end pins, nuts, loose plates, etc. shall be
similarly marked to indicate their proper location, all pins, pin holes and machined
surfaces shall be painted with a mixture of white lead and tallow and all loose
parts shall be securely wired to adjacent members or packed in boxes.
10 Timber structures shall be removed in such a manner as to avoid damage to
such timber or lumber as is designated to be salvaged by the Engineer-in-charge.
11. In removing pavements, kerbs, gutters and other structures like guard rails,
fences, manholes, catch basines, inlets, etc. where portions of the existing
construction are to be left in the finished work the same shall be removed to an
existing joint or out and chipped to a true line with a face perpendicular to the
surface of the existing strata Sufficient removal shall be made to provide for
proper grades and connections with the new work as directed by the Engineer-in-
12. All concrete pavements, base course in carriage way and shoulders etc.
designated for removal shall be broken to pieces whose volume shall not exceed
0.02 cubic metre and stockpiled at designated locations if the material is to be
used later or otherwise arranged for disposal as directed.
13. Where directed by the Engineer-in-charge holes and depressions caused by
dismantling operations shall be backfilled with excavated or other approved
material and thoroughly compacted in line with surrounding at-ea.
14. All materials obtained by dismantling shall be the property of Government.
Unless otherwise specified, materials having any salvage value shall be placed in
neat stacks of like material within the right-of-way as directed by the Engineer- in-
charge, for which Contractor will remain responsible for its safe custody and
preservation for 60 days after recording measurements of the salvaged material.
15. Pipe culverts that are removed shall be cleared and neatly piled on the right-of
way at points designated by the Engineer-in-charge
16. Structural steel removed from old structure shall, unless otherwise specified or
directed, be stored in a neat and presentable manner. Structures or portions
thereof which are specified in the contract for re-erections shall be stored in
seperate piles.
17. Timber or lumber from old structure which is designated by the Engineer-in-
charge as materials to be shall have all rails and bolts removed the, efrom and
shall be stored in neat piles locations suitable for loading.
18. All the products of dismantling operations which in the opinion of the Engineer-
in-charge cannot be used or auctioned shall be disposed as directed, within
19. The work of dismantling structures shall be paid for in units indicated below by
taking measurements before and after, as applicable :
(i) Dismantling brick/concrete (Plain and Reinforced) masonry Cubic Metre
(ii) Dismantling flexible and cement concrete pavement. Cubic Metre
(iii) Dismantling steel structure. Tonne
(iv) Dismantling timber structure. Cubic Metre
(v) Dismantling pipes, guard rails, kerbs, gutters and fencing. Linear Metre
(iv) Utility poles. Nos.
20. The contract unit rates for the various items of dismantling shall be payment in
full for carring out the required operations including full compensation for all
labour, materials, tools, equipment, safeguards and incidentals necessary to
complete the work. These will also include excavation and backfilling where
necessary and for handling, salvaging, piling and disposing of the dismantled
materials within all lifts and upto a lead of 100 metre.
Mode of measurement: unit of one Cubic meter.
Excavation for foundation upto 1.5 m depth including sorting out and stacking of
useful materials and disposing off the excavated stuff upto 50 Meter lead. (B)
Dense or Hard soil.
1.1. Any soil which generally yields to the application of pickaxes and shovels,
phawaras rakes or any such ordinary excavating implement or organic soil, gravel
silt, sand turf loam, clay, peat etc., fail under this category
2.0. Clearing the site
2.1. The site on which the structure is to be built shall be cleared, and all
obstructions loose stone, materials and rubbish of all kind bush wood and trees
shall be remove! as directed The materials so obtained shall be property of the
Government and shall be conveyed und stacked as directed within 50 m lead. The
roots of the trees coming in the sides shall be cut and coated with a hot asphalt
2.2. The rate of side clearance is deemed to be included in the rate of earth work
for which no extra will be paid.
3.0. Setting out
After clearing the site the centre lines will be given, by the Engineer-in-charge.
The contractor shall assume full responsibility for alignment, elevation and
dimension of each and all 'parts of the work. Contractor shall supply labours
materials, etc. required for setting out the reference marks and bench 'marks and
shall maintain them as long as required and directed.
4.0. Excavation
The excavation in foundation shall be carried out in true line and level and shall
have the width and depth as shown in the drawings or as directed. The contractor
shall do the necessary shoring and shutting or providing necessary slopes to a
safe angle, at his own cost. The payment for such precautionary measures shall
be paid separately it not specified. The bottom of the excavated area shall be
leveled both longitudinally and transversely as directed by removing and watering
as required No. earth filling will be allowed for brining it to level If by mistake or
any excavation is made deeper or wider than, that shown on the plan or directed.
The extra depth or width shall be made up with concrete of same proportion as
specified for the foundation concrete at the cost of the contractor. The excavation
up to 1.5 m depth shall be measured under this item.
5.0. Disposal of the excavated stuff
5.1. The excavated stuff of the selected type shall be used in filling the trenches
and plinth or leveling the ground in layers including ramming and watering etc.
5.2. The balance of the excavated quantity shall be removed by the contractor
from the site of work to a place as directed with lead up to 50 M. and all lift.
6.0. Mode of measurements & payment
6.1. The measurement of excavation in trenches for foundation shall be made
according to the sections of trenches shown on the drawing or as per sections
given by the Engineer-m-charge. No payment shall be made for surplus
excavation made in excess of above requirements or due to stopping and sloping
back as found necessary on account of conditions of soil and requirements of
6.2. The rate shall be for a unit of one cubic meter
Excavation for foundation upto 1.5 to 3.0 m depth including sorting out and
stacking of useful materials and disposing of the excavated stuff upto 50 meter
lead. (C) Hard murrum.
Any soil which generally require close application of picks or jumpers or scarifies
to. loosen it stiff clay, gravel and stone etc. fall under this category.
2.0. Workmanship
The relevant technical specifications of item No. 16 shall be followed except that
the excavation work shall be carried out in hard murrum.
3.0. Mode of measurements & payment
3.1. The relevant technical specifications of item No. 16 shall be followed
3.2. The rate shall be for unit of one cubic meter.
Providing and laying controlled cement concrete M:150 for curing complete
excluding cost of formwork and reinforcement for reinforced concrete work in [A]
Foundations, footings, Base of Columns and Mass Concrete [More than 10 Ton].
The work shall cover furnishing & providing plain cement concrete foundation
placed in open excavation for Head wall of C.D. works, below pipes of C.D. works
etc in accordance with these specifications and in conformity with the lines,
grades & dimensions, as shown on the drawings or as directed by the Engineer-
A method statement for construction indicating the following shall be submitted by
the contractor for approval of the Engineer, well in advance of the commencement
of open foundation & structures: i)Sources of materials ii)Design, erection and
removal of formwork iii)Production, transportation, laying and curing of concret
iv)Personnel employed for execution and supervision v)Tests and sampling
procedures vi)Equipment details vii)any other points
Arrangements for execution under water wherever necessary, shall be indicated in
method statement.
Dimensions, lines and levels shall be set out and checked with respect to
permanent reference lines and permanent bench mark.
Cement conforming to IS: 269/ IS: 8112 or IS: 12269 as approved shall be used.
Coarse aggregate shall consist of clean, hard, strong, dense, nonporous, and
durable pieces of crushed stone. Aggregate shall not consists pieces of
disintegrated, stones, soft, flaky, elongated particles, salt, alkali, vegetable matters
or other deleterious materials in such quantity as to reduce the strength and
durability of the concrete. All coarse aggregate shall conform to IS: 383 & test for
conformity shall be carried out as per IS: 2386 (Part 1 to 8).
The size (maximum nominal) of coarse aggregate for concrete to be used for
various components shall be 20mm nominal size. The maximum value of flakiness
index for coarse aggregate shall satisfy the following requirement of grading:
IS sieve size Percentage by passing the sieve.
20mm nominal size coarse aggregate
Sand and fine aggregates:
For PCC work, fine aggregates shall consist of clean, hard, strong, dense, non-
porous, and durable pieces of crushed stone.
Aggregate shall not consists pieces of disintegrated, stones, soft, flaky, elongated
particles, salt, alkali, vegetable matters or other deleterious materials in such
quantity as to reduce the strength and durability of the concrete. All coarse
aggregate shall conform to IS: 383 & IS: 456 – 1978 & test for conformity shall be
carried out as per IS: 2386 (Part – 1 to 8).
The sand shall be natural & clean well graded, hard, strong, durable & free from
all amount of dust, clay & other deleterious substance and shall be got approved
from the Engineer-in-charge. Sand to be used for concrete work shall be of grades
as specified in IS: 383 – 1970 with fineness modules varying from 2.6 to 3.6 as
per requirement.
Water shall conform to MoRTH clause No. 1000 shall be made applicable.
3.0) WORKMANSHIP :
Before starting the concreting, foundation of head wall shall be cleared from all
loose materials, leveled, watered and rammed as directed.
The grade of concrete shall be ordinary cement concrete M –
In the designation of concrete mix, letter “ M “ refers to the mix and the number to
the specified 28 days works. Cube compressive strength of that mix on 150mm
cubes, expressed in kg / cm2 (M – 100 > 100 Kg/cm2 compressive strength at
days works cube)
The ordinary cement concrete M – 100 shall be by volume equivalent to 1: 3: 6 (
part of cement : 3 part of sand and 6 parts of coarse aggregate nominal 20mm
The proportion of cement to sand and coarse aggregates shall be 1: 3: 6 i.e.
part of cement : 3 parts of sand and 6 part of coarse aggregate by volume.
For cement, which normally comes in bags and is available by weight, volume
shall be worked out taking 50 kg cement as a 0.035 m3 in volume, while
measuring aggregate by volume, sinking, ramming & hammering shall not be
done. Proportioning of sand shall be per its by dry volume, in case it is damp,
allowance for “Bulking “shall be made as per IS : 2386 ( Part – III ).
Concrete shall be mixed in a concrete mixture as approved by the Engineer-in-
charge. Hand mixing shall not be permitted. The mixture shall be at a approved
location considering the properties of the mixes and the transportation
arrangement available with the contractor. The mixer shall be approved by the
Engineer-in-charge.
Form work shall including all temporary / permanent forms required for forming the
concrete. Forms for concrete shall be constructed of metal and be of substantial
and rigid construction true to the shape and dimensions shown on the drawings.
All bolts and rivets shall be countersunk and well ground to provide a smooth
The Engineer-in-charge shall be informed in advance by the contractor of his
intention of strike any form work. While fixing the time for removal of form work,
due consideration shall be given to local condition, character of structure. The
weather conditions that influence the setting of concrete and of the material used
in the mix. All form work shall be removed without causing any damage to the
concrete. No form work shall be removed prior to obtaining written permission
from Engineer in charge.
The form work shall also conform to MORTH clause No.
Mixing shall be continued till materials are uniformly distributed and a uniform
colour of the entire mass is obtained & each individual particle of the coarse
shows complete coating of mortar containing its proportionate amount of cement.
The concrete work shall be carried out as per relevant specification of MORTH
clause No. 1700, 2100, 2200 & 2300. Necessary vertical pin headers incl.
machine mixing, vibrating, ramming, curing, form work etc. incl. laying in line,
grade & slope and finishing etc. complete as directed at any height /depth shall be
provided as directed by the Engineer-in-charge and as per requirement laid down
in P.W.D. manual.
All concrete work shall be compacted to produce a dense homogeneous mass
with the assistance of vibrator. Sufficient vibrators in serviceable condition shall be
kept at site so that spare equipment is always available in the event of break
Weep holes shall be provided as directed by the Engineer-in-charge. P.V.C. pipe
6 kg, per cm2 of 100mm diameter shall be used for weep holes.
Exposed surface of concrete shall be kept continuously in a damp or wet condition
by ponding or by covering with a layer of sacks, canvas or similar material and
shall be kept constantly wet for a period of not less than 14 days from the date of
placing of concrete.
4.0) FINISHINGWORK:
The surface finish shall be smooth. Finishing work shall be carried out as per
MoRTH specification clause No.
Providing sand bedding (Minimum thickness: 15 cm)
5. 0)TEST & STANDARD OF ACCEPTANCE :
MoRTH clause No. 2100, 2200 & 2300 shall be made applicable.
6) QUALITY CONTROL OF WORK :
Testing of all materials to be used in the P.C.C. work shall be carried out as and
when required by the Engineer-in-charge. All testing charges shall be born by the
Control on the quality of materials and works shall exercise by the Engineer-in-
charge in accordance with these specifications and general technical
specifications for quality control on works and materials attached here with and
norms for testing given on page no. 21/15 of B2 agreement. The Engineer-in-
charge shall have the right to modify the frequencies of testing according to the
needs. MoRTH clause No. 1703 shall also be made applicable.
7) MODE OF MEASUREMENT AND PAYMENT :
The mode of measurement shall be as specified in IS 1200 part – II – 1974 or as
revised from time to time so far as applicable for measurement of cement
concrete work and MoRTH specification clause 2100, 2200 &
The unit rate for concrete shall cover costs of all materials, labour, tools, plant &
equipments required for mixing, transporting & placing in position, vibrating &
compacting, finishing and curing as direction of Engineer-in-charge, including all
cost towards quality control test, sampling and testing , quality assurance and
supervision, & all other incidental expenses for producing concrete of specified
strength to complete the structure its components as shown on the drawing and
according to this specifications. The contract unit rate for concrete shall also
include the cost of providing, fixing and removing all centering and formwork
required for the concrete work as per MoRTH clause No.
The contract unit rate shall be for a unit of one cubic meter of finished compacted
work in position at the site of work.
Mode of measurement: unit of one Cubic meter
Providing, Supplying & Installation of Precast Box Culvert units of various size.
The product should be meeting BIS requirements. The product shall be duly steam
cured in the plant to have requisite compressive strength and having load carrying
capacity of total 25 Tonnes vehicle load or 5 Tonnes wheel load for heavy vehicle
movement. The product shall be made by using advanced precast technology
using high performance self-compacting concrete of M50 grade and Fe 500 D grade
TMT steel reinforcement bar. The product shall have tie shape groove of 10-20 mm
width and 25 mm depth on both sides of each precast unit product for jointing two
precast units. The product shall have flange plate at corner haunch and male -
female groove in each precast unit product for jointing two precast units. Rubber
gasket shall be placed at the given groove to make it a water tight structure. The
product shall have in-built insert at optimized locations for mechanical installation
activities including supplying, laying with required necessary manpower,
machinary and material at site as per instruction of Engineer In-Charge
1. Design, Manufacture & Supply of factory-made (wet cast) Fuji Silvertech or
Equivalent Box Culvert of various sizes units of 1000 / 1500 / 2000 mm length
made up of high strength precast reinforced cement concrete duly steam cured in
a controlled environment and manufactured by using high performance self-
compacting concrete of M- 50 grade using Fe 500D grade TMT steel
reinforcement bar. Design should confirm to IRC class AA and class 70R/ JIS /
BIS standards / Guidelines/ Codes furthermore taking into consideration expected
handling and erection stresses etc. Any international guideline such as AASHTO,
FHWA (Accelerated Bridge Construction Guidelines) Japan and EURO codes
may be followed. Box culvert shall be manufactured using water tight formwork
made up of automobile steel to have accurate dimensional product. Box culvert
shall have joining arrangement, flange bolt connection, rubber gasket etc. for
proper connection.
2. Supply and providing accessory: Loading, transporting and unloading of precast
concrete box culverts shall be done with care. Handling shall be such as to avoid
impact. Rubber gasket required to ensure water-tight character and for jointing of
each segment flange-bolt connection with 12 mm diameter, 50 mm length Grade-
8.8 high tensile bolts with zinc coating and round washer or equivalent nut-bolt
connection will be supplied as part of the Box culvert. Technical assistance in form
of technical presentation for installation procedure of product and/or one-time visit
at site by technical team member of the manufacturer and supplier.
3. Quality Assurance: The product shall be manufactured from standard and
tested raw materials including cement, fine aggregate, coarse aggregate, concrete
and reinforcement. The water used for manufacturing of concrete should be
potable water with TDS value not more than 300 ppm. The product shall be steam
cured in the controlled environment for better quality control with a temperature
control of 45 ±2 Deg. Centigrade to 65 ±2 Deg. Centigrade. The factory-made
precast products shall be subject to strict quality control and assurance process
by the manufacturer and approved by quality assurance personnel. The product
must have reinforcement as per design drawings. The product should be handled
mechanically at site. The product shall have in-built inserts at optimized locations
for handling/transportation.
4. Precast manufacturer Qualification Criteria: Tenderer/Bidder will be required to
enter into MOU with Precast Box manufacturer fulfilling the following
requirements. MOU shall mention all points mentioned below with project
experience details in supply of Precast Box Culverts.
• The precast manufacturer should have valid legal registration in India for
manufacturing factory made precast products.
• The precast manufacturer should have successfully completed or substantially
i) Three similar works costing not less than the amount equal to 40% of estimated
cost of work OR ii) Two similar works costing not less than the amount equal to
50% of estimated cost of work OR iii) One similar work costing not less than the
amount equal to 80% of estimated cost of work in “last seven & current” financial
• • Precast manufacturer shall be certified for ISO 9001, ISO 14001 and ISO
45001 for design, manufacture and dispatch of products.
• • The precast factory should have in house QA-QC set up to ensure consistent
quality of precast products.
iv) Approved make: Fuji Silvertech, Teemage, FIT or Equivalent as approved by
Engineer In Charge.
v) Mode of measurement: Rate of precast units shall be for unit of one running
meter. Rate includes all cost of material, labour charges at plant, cost of
reinforcement, formwork and lifting accessories and direct and indirect overheads.
Rate shall also include technical assistance in form of technical presentation for
installation procedure of product and/or one-time visit at site by technical team
member of the manufacturer and supplier. Rate includes transportation,
installation and all tax, insurance etc. vi) Tolerance:
Finished segment tolerances should not exceed the following: e) Length of
segment (not cumulative) +/- 5mm
f) Overall span length +/-10mm
g) Web thickness, depths of top and bottom flanges, Width of top and bottom
flanges, Overall depth of Segment, Thickness of diaphragm +/-5mm h) Grade of
form and soffit
Mode of measurement: unit of one Running meter
Providing, Supplying & Installation of Precast Box Culvert units of various size.
The product should be meeting BIS requirements. The product shall be duly steam
cured in the plant to have requisite compressive strength and having load carrying
capacity of total 25 Tonnes vehicle load or 5 Tonnes wheel load for heavy vehicle
movement. The product shall be made by using advanced precast technology
using high performance self-compacting concrete of M50 grade and Fe 500 D grade
TMT steel reinforcement bar. The product shall have tie shape groove of 10-20 mm
width and 25 mm depth on both sides of each precast unit product for jointing two
precast units. The product shall have flange plate at corner haunch and male -
female groove in each precast unit product for jointing two precast units. Rubber
gasket shall be placed at the given groove to make it a water tight structure. The
product shall have in-built insert at optimized locations for mechanical installation
activities including supplying, laying with required necessary manpower,
machinary and material at site as per instruction of Engineer In-Charge
The relevant specifications and mode of measurement as per Item No. 19 shall
be made applicable.
Type -A "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam
crash barrier comprising of 3 mm thick corrugated sheet metal beam rail 90 cm
above finished road edge level, fixed on ISMC series channel to center, 1.3 m
height, fixing on top slab by anchor fastner as well as gusset plate, all steel parts
and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367
and IS 1364, metal beam rail to be fixed on the vertical post with a spacer of
channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810)
1 Metal beam rail shall be corrugated sheet steel beams of the class, type, section
and thickness indicated on the drawings. Railing posts shall be made of steel of
the section, weight and length as shown on the drawings. All complete steel rail
elements, terminal sections, posts, bolts, nuts, hardware and other steel fittings
shall be galvanized. All elements of the railing shall be free from abrasions, rough
or sharp edges and shall not be kinked, twisted or bent.
2 The “W” beam type safety barrier shall consist of a steel post and a 3 mm thick
“W” beam rail element. The steel post and the blocking out spacer shall both be
channel section of 75 mm x150 mm & size 5 mm thick. The rail shall be 70 cm
above the ground level and posts shall be spaced 2 m center-to-center. Double
“W” beam barrier shall be as indicated in IRC:5-1998. The thrie beam safety
barrier shall have posts and spacers similar to the ones mentioned above for “W”
beam type. The rail shall be placed at 85 cm above the ground level.
The “W” beam, the thrie beam, the posts, spacers and fasteners for steel barriers
shall be galvanized by hot dip process (zinc coated, 0.55 kg per square metre;
minimum single spot) unless otherwise specified. The galvanizing on all other
steel parts shall conform to the relevant IS Specifications. All fittings (bolts, nuts,
washers) shall conform to the IS:1367 and IS:1364. All galvanizing shall be done
after fabrication.
3 Concrete for bedding and anchor assembly shall conform to Section 1700 of
Specifications.
3.2 Construction Operations 3.2.1 The line and grade of railing shall be true to that
shown on the plans. The railing shall be carefully adjusted prior to fixing in place,
to ensure proper matching at abutting joints and correct alignment and camber
throughout their length. Holes for field connections shall be drilled with the railing
in place in the structure at proper grade and alignment.
3.2.2 Unless otherwise specified on the drawing, railing steel posts shall be given
one shop coat of paint (primer) and three coats of paint on structural steel after
erection, if the sections are not galvanized. Any part of assembly below ground
shall be painted with three coats of red lead paint.
3.2.3 Splices and end connections shall be of the type and designs specified or
shown on the plans and shall be of such strength as to develop full design
strength of the rail elements.
3.3 Installation of Posts 3.3.1 Holes shall be dug or drilled to the depth indicated
on the plans or posts may be driven by approved methods and equipment,
provided these are erected in proper position and are free from distortion and
burring or any other damage.
3.3.2 All post holes that are dug or drilled shall of such size as will permit proper
setting of the posts and allow sufficient room for backfilling and tapping.
3.3.3 Holes shall be backfilled with selected earth or stable materials in layers not
exceeding 100 mm thickness and each layer shall be thoroughly tamped and
rammed. When backfilling and tamping are completed, the posts or anchors shall
be held securely in place.
3.3.4 Post holes that are drilled in rock and holes for anchor posts shall be
backfilled with concrete.
3.3.5 Posts for metal beam guardrail on bridges shall be bolted to the structure as
detailed on the plans. The anchor bolts shall be set to proper location and
elevation with templates and carefully checked.
3.4.1 All guard rail anchors shall be set and attachments made and placed as
indicated on the plans or as directed by the Engineer.
3.4.2 All bolts or clips used for fastening the guardrail or fittings to the posts shall
be drawn up tightly. Each bolt shall have sufficient length to extend at least 6 mm
through and beyond the full nut, except where such extensions might interfere
with or endanger traffic in which case the bolts shall be cut off flush with the nut.
3.4.3 All railings shall be erected, drawn and adjusted so that the longitudinal
tension will be uniform throughout the entire length of the rail.
3.5 End Treatment for Steel Barrier 3.5.1 End treatments shall from an integral
part of safety barriers which should not spear, vault or roll a vehicle for head-on or
angled impacts. The two end treatments recommended for steel barriers are
“Turned-down-guardrail” and “Anchored in back slope”, as shown on the drawings
or as directed by the Engineer.
The posts shall be vertical with a tolerance not exceeding 6 mm in a length of 3 m.
The railing barrier shall be erected true to line and grade.
3.7 Measurements for Payment
Mode of measurement: unit of one running meter.
Providing and Casting in situ controlled Cement Concrete M-300 for R.C.C. Raft
and cutt-off walls including necessary shuttering laying, vibrating, ramming and
curing complete. (more than 10 ton)
a) The concrete shall be designed as M-15, M-20, M-25, M -30 & M-40 as
prescribed in I.S. 456-1978 or as revised from time to time.
Samples of the aggregates proposed to be used shall be got approved from the
Engineer- in-charge prior to collection of the materials at the site of work field test
for determining the content of silt, loam, clay etc. In fine aggregate and grading
and moisture content in both fine and coarse aggregate shall be carried out before
commencing the concreting work and record of the test shall be maintained till the
completion of the work.
The grading of aggregate shall be controlled by obtaining the fine and coarse
aggregate in different size being stocked in separate stock piles. The grading of
coarse and fine aggregate shall be checked as frequently as possible. The
frequency shall be as directed by the Engineer-in-charge, to ensure that the
uniform grading as per approved samples used in the preliminary tests is
As soon as possible, after receiving the order to commence the work the
contractor shall design the mix for different grades of concrete required in the
work submit details in respect of proportion of cement and aggregates water
cement ration etc. and arrangement to make trial mixes for preliminary tests to be
carried out in the Government or any other approved laboratory to satisfy the
Engineer-in-charge that the designed mix meets with the prescribed strength.
The maximum total quantity to aggregates by weight per 50 Kg. of cement shall
not exceed 450 Kg. except where otherwise specifically permitted by the
Engineer-in charge.
The minimum number of specimens for preliminary test and criteria for
acceptance of test strength shall conform to Table –V Acceptance criteria for
concrete of I.S. 456-2012.
On the satisfactory results of the above tests, the mix actually to be used shall be
got approved from Engineer-in-charge. The approval of the Engineer-in charge
will not relieve the contractor of his responsibility for obtaining the required
minimum strength in the work test. Record of all tests in support of mix design
shall be maintained as a part of record of the contract. d) Strength requirement of
The compressive strength requirements for various grades of concrete shall not
be lower than the figures given below
Grade of Concrete Compressive strength of cubes in
15 cms Kg./Cmt. at with
28 days conducted in I.S. 516-1959
Preliminary test Work test
e) Batching & Mixing:
Concrete materials shall be batched by weight, where combined batching and
mixing plants are not available, weight batches of adequate capacity shall be used
for weighting or aggregates and cement. In the later case the contractor shall
have additional weight batches as stand by. The contractor shall use power driven
mechanical concrete mixers of adequate capacity in conjunction with weight
batches. Dry weights per unit volume of fine and coarse aggregate shall be
determined by experiments. Water shall be either measured by volume in
calibrated tanks or weighted.
Whereas cement will be issued in bags and twenty bags will treated to weight one
tone. Cement shall be actually weighed during batching and any difference in
standard weight and actual weight of cement shall be contractor’s account and no
extra payment shall be made for such a difference. f) Water Cement Ratio:
It is most important to maintain the water cement ratio at its correct value.
Determination of moisture content in both fine and coarse aggregate shall be
made as frequently as possible the frequency for a given job being determined by
the Engineer-in- charge according to weather and site conditions. The amount of
the added water shall be adjusted to compensate for any observed variations in
the moisture contents. Determination of moisture content in aggregate shall done
as per I.S. 2386 (Part-III) Methods of test for aggregate for concrete Part-III
(Specific gravity, density, absorption, and bilking). To allow for the variation in
weight of aggregate due to variation in the moisture content, suitable adjustments
in the weight of aggregates shall be done. No substitution in materials used on the
work or alteration in the established proportions except as permitted in the
previous paragraph is made without additional test to show that quality and
strength are satisfactory. Work ability of the concrete shall be checked at frequent
intervals by the slump test.
g) Compression Test : (Work Test)
Samples (consisting of cubes 150mm x 150mm x 150mm) shall be taken as
Qty. of work in m3 Nos. of samples (SET)
51 & above 4+1 for each additional quantity of
m3 of part thereof.
The test shall be carried out in accordance with I.S. 516-1959. A register of cubes
shall be maintained at the site of work. The cost of casting of cubes, concrete
used for cubes and all other incidental charges such as curing, and cost of testing,
carriage to the testing laboratory etc. shall be borne by the Corporation. The
testing shall be got carried by the contractor in Government or any other approved
laboratory at his own cost.
At test one sample shall be taken from each shift.
Each sample consists of three test specimens for testing at 28 days. Additional
cubes may be required for various purpose such as to determine strength of
concrete at 7 days or at the time of stacking the form work or to determine the
duration of curing or to check the testing error.
When defective or rejected work cannot be replaced because of operation or other
reasons (decision of the Engineer-in-charge) in this respect shall be final and
binding on) payment shall be made for such rejected work but cost of dismantling
and removal shall be recovered from the contractor when such defective work is
subsequently replaced by the Corporation or not. The decision of Engineer-in
charge shall be final as regards the cost of dismantling and removal. h)
Consumption of cement:
Co-efficient for cement consumption shall be determined by the Engineer -in
charge for various mixes based on the accepted proportion for these mixes. The
theoretical quantity of cement to be used for the works shall be calculated on the
basis of these co-efficient.
i) Transporting:
Concrete shall be handled from the place of mixing of the final position as quickly
as practicable by methods which will prevent segregation or loss of ingredients. In
no case operation shall be taken more than 15 minutes. j) Placing:
The concrete shall be placed into its final position and completed and finished
within 30 minutes of mixing the water and before setting commence. Method of
placing shall be such as to avoid segregation, approved by the Engineer-incharge.
Concreting shall be carried out continuously up to construction joints, the position
and arrangement of which, shall be pre- determined by the designer.
When the work has to be resumed on a surface which has hardened, such
surface shall be roughened. It shall then be swept clean thoroughly wetted and
covered with a thin layer or mortar composed of cement and sand in the same
proportion as the cement and sand in the concrete mix. This layer of mortar shall
be freshly mixed and placed immediately before the placing of the concrete.
When the concrete has not fully hardened, all laitance shall be removed by
scrapping the wet surface with wire or bristles care being taken to avoid
dislodgement of particles or aggregates. The surface shall be thoroughly wetted
and all free water removed. The surface shall be coated with neat cement grout.
The first layer of concrete to be placed on this surface shall not exceed 150mm in
thickness and shall be well rammed against old work. Particular attention is paid
no corners and spots.
Concrete shall be thoroughly compacted during the operation of placing and
thoroughly worked around the reinforcement, around embedded fixtures and into
corners of the form work. Compacting shall be done by mechanical vibrations, in
such a way that a dense mixis obtained. l) Curing:
The concrete shall be kept covered with a layer of sacking canvas or similar
materials or by pounding and kept constantly wet for twenty one days from the
date of placing concrete. Curing by pounding shall preferably be done by erecting
suitable dykes of lean mortar. m) Form work:
The form work shall conform to the shape, lines and dimensions as on the plans
and be so constructed as to remain sufficiently rigid during the placing and
compacting of the concrete, and shall be sufficiently water tight to prevent loss of
liquid from concrete. Adequate arrangements shall be made by the contractor to
safeguard against any settlement of the form work during the course of concreting
and after concreting. The design of the form work and centering shall be got
approved form Engineer-in-charge before erection.
n) Cleaning & Treatment of Forms:
All rubbish, particularly chipping shavings and saw dust shall be removed from the
interior of the forms before the concrete is placed and the form work in contact
with concrete shall be cleaned and thoroughly wetted or treatment with an
approved composition. Care shall be taken that such approved composition is
kept out of contract with reinforcement. o) Stripping Time:
1.In normal circumstances and where ordinary cement is used, forms may be
struck after expiry of following period
2.a 3. Walls columns & 4. 24 to 48 hours as may
vertical side of beams be decided by the
Engineer- in charge.
5.b 6. Side of slabs 7. 3 days
8.c 9. Beam 10. 7 days
11.d 15. 7 days 14 days
12. Removal of props to
13. Slabs spanning up to
14. Spanning over 4.5 M
16.e (e) Removal of props to 19. 14 days 21 days
beams & arches.
17. Spanning up to 6 M
18. (ii) Spanning over 5 M
p) Procedure when removing the Form work:
All form shall be removed without such shock or vibrations as would damage the
reinforced concrete surface. Before the soffits and struts are removed and
concrete surface shall be exposed where necessary in order to ascertain that the
concrete has sufficiently hardened. The form work will be paid under the
respective item if provided in the tender. q) Cantering:
The cantering to be provided shall be got approved form the Engineer-in charge. It
shall be sufficiently strong to ensure absolute safety of the form work and concrete
work before, during, and after pouring concrete. Watch should be kept to see that
behaviour of centering and formwork is satisfactory during concreting. Erection
should also be such that it would allow removal of forms in proper sequence
without damaging either the concrete or the forms to be removed.
The props of centering shall be provided on firm foundation of base of sufficient
strength to carry the loads without settlement. The centering and form work will be
inspected and approved by the Engineer in-charge before concreting. But this will
not relive the contractor or his responsibility for strength, adequacy, and safety of
form work and if there is a failure of form work or centering, contractor shall be
responsible for the damages to work, injury to life and damage to the property. r)
3.0 Mode of measurement and payment:
3.1 The relevant specifications shall be followed except that the controller
concrete R.C.C. work for work as specified in item shall be measured under this
item. The rate including cost of form work.
Mode of measurement: unit of Cubic meter
Providing and casting in situ controlled cement concrete M-300 for R.C.C. return as
per drawings including centering shuttering, scaffolding where necessary, laying
vibrating, curing and finishing complete.(A) Height from 0.0 to 5.0 M. (1) Piers (2)
Abutment (3) RCC return (more than 10 ton)
The relevant specifications and mode of measurement as per Item No. 22 shall
be made applicable.
Providing and laying in position FE 500D TMT bar reinforcement including cutting,
bending, hooking and tying complete as per detailed drawings. [Upto 10 ton]
This work shall consist of furnishing and placing coated, T.M.T. or high strength
deformed reinforcement, bars (intentioned) of the shape and dimensions shown
on the drawings and conforming to these Specifications or as approved by the
Engineer in charge. The T.M.T. FE-500 bar shall be TATA, JINDAL,JSW brand as
directed by Engineer-in-charge.
TMT Bars Reinforcements may be either TMT/medium tensile steel or high
strength deformed bars.
2.2. TMT bars reinforcement for RCC work shall conform to IS 1786 FE-500 and
shall be of tested quality. It shall also comply with relevant part of IS 456-1966
2.3. All reinforcement shall be clean and free from dirt, paint, grease or oil, oil
scale or loose or thick rust at the time of placing
2.4. All steel shall be procured form original producers no re-rolled steel shall be
incorporated in the work
2.5. Only new steel shall be delivered to the site every bar shall be inspected
before placing to its position and defective brittle or burnt bar shall be discarded
cracked ends of bars shall be discarded
3.1. Distance between bars shall be as specified in drawings and as directed by
the Engineer in Charge. All bars shall be placed at an accurate distance from
each other and shall be bind tightly to maintain the desired pitch Suitable means
shall be provided for holding bars securely in position
4.0. Binding wire
4.1. Mild steel binding wire shall be of 1.63 mm or 1.22 mm (16 to 18 gauge
diameter and shall conform IS 280-1972
4.2. The use of black wire will be permitted for binding reinforcement bars. It shall
be free form free from dirt, paint, grease or oil, oil scale or loose or thick rust and
any other undesirable coating which may prevent adhesion of cement mortar at
the time of binding
4.3. Only new binding wire shall be delivered to the site all binding wire shall be
inspected before binding to its position and defective brittle, rusted, used wire,
shall be discarded
5.0. PROTECTION OF REINFORCEMENT
5.1. Uncoated reinforcing steel shall be protected from rusting or chloride
contamination. Reinforcements shall be free from rust, mortar, loose mill scale,
grease, oil or paints. This may be ensured either by using reinforcement fresh
from the factory or thoroughly cleaning all reinforcement to remove rust using any
suitable method such as sand blasting, mechanical wire brushing, etc. as directed
by the Engineer. Reinforcements shall be stored on bricks, racks or platforms and
above the ground in a clean and dry condition and shall be suitably marked to
facilitate inspection and identification.
5.2. Portions of uncoated reinforcing steel and dowels projecting from concrete
shall be protected within one week after initial placing of concrete with a brush
coat of neat cement mixed with water to a consistency, of thick paint. This coating
shall be removed by lightly tapping with a hammer or other tool not more than one
week before placing of the adjacent pour of concrete. Coated reinforcing steel
shall be protected against damage to the coating. If the coating on the bars is
damaged during transportation or handling and cannot be repaired, the same shall
6.0. Workmanship
6.1. The work shall consist of furnishing and placing reinforcement to the shape
and dimensions shown as on the drawings or as directed by The Engineer in
6.2. Reinforcing steel shall conform accurate to the dimensions given in the bar
bending schedules shown on relevant drawing
BENDING OF REINFORCEMENT
7.1. Bar bend g schedule shall be furnished by the Contractor and got approved
by the Engineer before start of work.
7.2. Reinforcing steel shall conform to the dimensions and shapes given in the
approved bar bending Schedules.
7.3. Bars shall be bent cold to the specified shape and dimensions or directed by
the Engineer using a proper bar bender operated by hand power to obtain the
correct radius of bends and shape. Bars, shall not be bent or straightened in a
manner that will damage parent material or the coating bars bent during transport
or handling shall, be straightened before being used on work and shall not be
heated to facilitate straightening.
8.0. PLACING OF REINFORCEMENT
8.1. The reinforcement cage should generally be fabricated in the yard at ground
level, and then shifted and placed in position. The reinforcement shall be placed
strictly, in accordance with the drawings and shall be assembled in position, only
when structure is otherwise ready for placing of concrete. Prolonged time gap,
between assembling of reinforcements and casting of concrete, which may result
in rust formation on the surface, shall not be permitted.
8.2. Reinforcement bars shall be placed accurately in position as shown on the
drawings. The bars, crossing one another shall be tied together at every
intersection with binding wire (annealed), conforming to IS: 280 to make the
skeleton of the reinforcement rigid such that the reinforcement does not get
displaced during placing of concrete, or any other operation. The diameter of
binding wire shall not be less than 1 mm.
8.3. Bars shall be kept in. position usually by the following methods:
In case of beam an slab construction, industrially produced polymer cover blocks
of thickness equal to the specified cover shall be placed between the bars and
formwork subject to satisfactory evidence that the polymer composition is not
harmful to concrete and reinforcement. Cover blocks made of concrete may be
permitted by the Engineer, provided they have the same strength and
specification as those of the member.
8.4. In case of dowels for Columns and walls the vertical reinforcement shall be
kept in position by means of timber templates with slots in them accurately, or with
cover blocks tied to the Reinforcement Timber templates shall be removed after
the concreting has progressed up to a level just below their location.
8.5. Layers of reinforcements shall be separated by spacer bars at approximately
One meter intervals. The minimum diameter of spacer bars shall be 12 mm or:
equal to maximum size of main reinforcement or maximum size of coarse
aggregate, whichever is greater. Horizontal reinforcement shall not be, allowed to
sag between supports.
8.6. Necessary stays, blocks, metal chairs, spacers, metal hangers supporting
wires etc, or other subsidiary, reinforcement shall be provided to fix the
reinforcements firmly in its correct position.
8.7. Use of pebbles, broken stone, metal pipe, brick, mortar or wooden blocks etc
as devices for positioning reinforcement shall not be permitted.
8.8. Placing and fixing of reinforcement shall be inspected and approved by the
Engineer before concrete is deposited.
9.1. All reinforcement shall be furnished in full lengths as indicated on the drawing.
No splicing of bars, except where shown on the drawing; will be permitted without
approval of the Engineer. The lengths of the splice shall be as indicated on
drawing or as approved by the Engineer. Where practicable, overlapping bars
shall not touch each other, and shall be kept apart by 25mm or 1:1.1/4 times the
maximum size of coarse aggregate, whichever is greater; if this is not feasible,
overlapping bars shall be bound with annealed steel binding wire, not less than
mm diameter and twisted tight in such a manner as to maintain minimum clear
cover to the reinforcement from the concrete surface. Lapped splices shall be
staggered or located at points, along the span where stresses are low.
10.1 Splicing by welding of reinforcement will be permitted only if detailed on the
drawing or approved by the Engineer. Weld shall develop an ultimate strength
equal to or greater than that of the bars connected.
10.2. While welding may be permitted for TMT .reinforcing bars conforming to IS:
432, welding of deformed bars conforming to IS: 1786 shall in general be
prohibited. Welding may be permitted in case of bars of other than S 240 grade
including special. Welding grade of S 500 grade bars conforming to IS: 1786, for
which necessary chemical analysis has been secured and the carbon equivalent
(CE) calculated from the chemical composition using the formula: CE = C + Mn +
Cr + Mg + V + Ni + Cu 6 5 15 are 0.4 or less.
10.3. The method of welding shall conform to IS: 2751 and IS: 9417 and to any
supplemental specifications to the satisfaction of the Engineer
10.4. Bars shall be bent cold to the specified shape and dimensions or as directed
by Engineer in charge using the proper bender tool, operated by hand or power to
attain proper radius of bends. Bars shall not be bending or straightened in a
manner that will injure the material. Bars bent during transport or handling shall be
straightened before being used in the work. Bars shall not be heated to facilitate
10.5. Unless otherwise specified a ‘U’ type hook at the end of each bar shall
invariably be provided to main reinforcement. The radius of the bane shall not be
less then twice the diameter of the round bar and the length of the straight part of
the bar beyond the end of the curve shall be at least four times of the diameter of
the round bar. In case of bars which are not round and in case of deformed bars,
the diameter shall be taken as the diameter of circle having an equivalent effective
area the hooks shall be suitably encased to prevent any spiting of the concrete.
10.6. All reinforcement bars shall be accurately placed in exact position shown on
the drawings and shall be securely held in position during placing of concrete by
annealed binding wire not less than 1 mm in size and by using say blocks or metal
chairs spacers, metal hangers, supporting wires or other approved devices at
sufficiently close intervals, Bars shall not be allowed to sag between supports not
displaced during concreting or any other operations of the work All devices used
for positioning shall be of not corrodible material wooden and metal supports shall
not extended to the surface of the concrete, except where shown in drawings.
Placing bars on layers of freshly laid concrete as the work progresses for
adjusting bar spacing shall not be allowed. Pieces of broken stone or brick and
wooden blocs shall not be used Layers of bars shall be separated by spacer bars
pre-cast mortar blocks or other approved devices. Reinforcement after bending
placed in position shall be maintained in a clean condition until completely
embedded in concrete, Special care shall be exercised to prevent any
displacement of reinforcement in concrete already placed. To prevent
reinforcement form corrosion, concrete cover shall be provided as indicated on
drawings. All bars protruding from concrete and to which other bars are to be
sliced and which are likely to be exposed for a period exceeding 10 days shall be
protected by a thick coat of neat cement grout
10.7. Bars crossing each other where required shall be secured by binding wire
(annealed) of size not less than 1 mm in such a manner that they do not slip over
at the time of fixing and concreting.
10.7. As far possible bars of full length shall be used In case this is not possible,
overlapping of bars shall be done as directed by the Engineer in charge When
practicable overlapping bars shall not touch each other, but be kept apart by
mm Where no feasible overlapping bars shall be bound with annealed wires not
less than 1 mm thick twisted tight The overlaps shall be staggered for different
bars and located at points along the span where neither sheer not bending
moments is maximum.
10.8. Whenever indicated on drawing or desired the Engineer in charge bars shall
be joined by coupling which shall have a cross section sufficient to transmit the full
stresses of bars The end of the bars that are joined by coupling shall be upset for
sufficient length so that the effective cross section at the base of threads is not
less than the normal cross section of the bar. Threads shall be standards threads
Steel for coupling shall conform to IS
10.8. When permitted or specified on the drawings joints of reinforcement bars
shall butt-welded so as to transmit their full stresses Welded joints shall preferably
be located at points when steel will not be subject to more than 75 percent of the
maximum permissible stresses and welds so staggered that at any one section
not more than 20 percent of the rods are welded Only electric are welding using a
process which excludes air form the molten metal and conforms to any or other
special provisions for the work shall be accepted Suitable means shall be
provided for holding bars securely in position during welding It shall be ensured
that no voids are left in welding and when welding is done in two or three stages
previous surface shall be cleaned properly Ends of bars shall be cleaned of all
loose scale rust stages paint and other foreign matter before welding Only
competent welders shall be employed on the work. The M S electrodes used for
welding shall conform IS 814 Welded pieces of reinforcement shall be tested.
Specimen shall be taken form the actual site and their number shall frequency to
test shall be as directed by the Engineer in charge
11.0 MODE OF MEASUREMENTS & PAYMENT
11.1. For the purpose of payment the bar shall be measured correct up to 10 mm
length and weight payable works out at the rate specified below
11.2. Reinforcement shall be measured in length including overlaps, separately for
different diameters as actually used in the work. Where welding or coupling is
resorted to, in place lap joints, such joints shall be measured for payment as
equivalent length of overlap as per design requirement. From the length so
measured, the weight of reinforcement shall be calculated in Kg. on the same
basis of as per table given above. Length shall include hooks at the ends.
Wastage and annealed steel wire for binding shall not be measured and the cost
of these items shall be deemed to be included in the rate for reinforcement.
11.3. The rate for reinforcement includes cost of steel binding wires, cutting,
bending, placing in position, binding and fixing in position as shown on the
drawings and as directed. It shall also include all devices for keeping
reinforcement in approved position, cost of joining as per approved method and all
wastage and spacer bars.
11.4. The contract rate shall be for a unit of one kilogram for completed item as
The payment will be made on one kilogram basis of the finished work.
Providing and laying filter media 600 mm. thick as directed at the back of abutment
return & wing wall as per detailed specification. (more than 10 ton)
1. Well graded pebbled or metal of 40 mm. to 63 mm. size shall be used. The
grading and tolerances of metal of pebbles shall be as under
Sr. No. of Size Range Sieve designation Percentage by weight
No designation passing through
The size shall be 40 mm. to 63 mm. where in tolerance limit for over size shall be
upto 15% and that for lower size should be upto 15% arid below 20 mm. it shall be
allowable upto 5%. The filter Material shall be tightly placed to a thickness of not
less that 600 mm. and provided over the entire surface behind abutments, wings
or return walls to the full height.
2. Materials shall be first stacked in boxed of 2 m. x 1½ m. x 0.5 m. size on fairly
level ground and measured.
3. The measurement for payment shall be made on cmt. basis of boxes. No
deduction shall be made for voids.
4. The unit rate includes the cost of materials, scaffolding labour and tools to
complete the work.
Mode of measurement and payment on basis of Sqmt.
Providing & laying weep hole in Aburtments, and returns by using A.C. pipe of
100mm including laying in proper grede and jointing the completed as per detailed
Weep holes shall be provided in solid plain concrete / reinforced concrete, bricks /
stone masonry abutment, wing wall and return walls as shown on the drawing or
directed by the Engineer to drive moisture from the back filling. Weep hols shall be
provided with 100 mm dia AC pipe for structures in plain / reinforced concrete or
brick masonry. In case of stone masonry, weep holes shall be 80 mm wide,
mm high or circular with 150 mm diameter. Weep holes shall extend through the
full width of concrete / masonry with slope of about 1 vertical: 20 horizontal
towards the draining face. The spacing of weep holes generally be 1 m in either
direction or as shown in the drawing with the lowest at about 150 mm above the
low water level or ground level whichever is higher or as directed by the Engineer.
The payment shall be made per number of weep holes provided in structure like
abutment and returns, wing walls etc.
Mode of measurement and payment on basis of Nos.
Filling available excavated earth [Excluding rock] in trenches, plinth, sides of
foundations etc. layers not exceeding 20 cm. in depth consolidating each
deposited layer by ramming and watering.
1.0 Workmanship:
1.1 The earth to be used for filling shall be free from salts, organic or other foreign
matter. All clods of earth shall be broken.
1.2 As soon as the work in foundation has been completed and measured, the site
of foundation shall be cleared of all debris, brick bats, mortar dropping etc; and
filled with earth in layers not exceeding 20 Cms. Each layer shall be adequately
watered, rammed and consolidated before the succeeding layer is laid. The earth
shall be rammed with iron rammers where feasible and with the butt ends of crow-
bars, where rammer cannot be used.
1.3 The plinth shall be similarly filled earth in layers not exceeding 20 Cms.
Adequately watered and consolidated by ramming with iron or wooden rammers.
When filling reaches finished level the surface shall be flooded with water for at
least 24 hours and allowed to dry and then rammed and consolidated.
1.4 The finished level of filling shall be kept to shape intended to be given to floor.
1.5 In case of large heavy duty flooring like factory flooring the consolidation may
be done by power rollers, where so specified. The extent of consolidation required
shall also be as specified.
1.6 The excavated stuff of the selected type shall be allowed to be used in filling
the trenches and plinth. Under no B.W.S. 5 circumstances black cotton soil be
used for filling the plinth.
2.0 Mode of measurement and payment:
2.1 The payment shall be made for filling in plinth and trenches. No deduction
shall be made for shrinkage or voids, if consolidated as instructed above.
2.2 The rate shall be for a unit of one cubic meter.
Rate: - The contract unit rate for a unit of one cubic meter. The rate included all
labours, materials, tools, machinery, etc. and all incidental cost to complete the
work as per the specifications and description of tender item.
The contract rate shall be for a unit of one cubic meter (compacted)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TB 00 - Index.pdf
TB 01 - Front sheet.pdf
TB 02 - Tender notice no. 11.pdf
TB 03 - Memo.pdf
TB-04 - Performance and maintanance bond.pdf
TB-05 - Information and Inst. to bidder.pdf
TB-06 - Special Condition.pdf
TB-07 - Qualification criteria for PQ.pdf
TB-08 - General Technical Specifications.pdf
TB-09 - General Technical Specifications for QC.pdf
TB-10 - Specification of material.pdf
TB-11 - Code of practice.pdf
TB-12 - Annextures F to I.pdf
TB-13 - Detailed Specification for schedule-B Civil work Rafaleshwar.pdf
TB-13 - Detailed Specification for schedule-B Electric work Rafaleshwar.pdf
TB-14 - B1 page 1-24.pdf
TB-14 - B1 page 25-48.pdf
PB 00 - Front sheet.pdf
PB 01 - INDEX.pdf
PB 02 - Bidders to read carefully.pdf
PB 03 - Instruction for two cover.pdf
PB 04 - Schedule A.pdf
PB 05 Schedule B Rafaleshwar.pdf
5.1_General Specification of Electrical Wiring in Govt Building.pdf
5.2_Page no.34 to 46.pdf
5.3_FOR ELECTRICAL MATERIAL.pdf
6.1_Contractor Registration Paripatra.pdf
6.2Clause in Tender for Registration of Labour - 09.03.2022.pdf
7.1_Foundation Drawing.pdf
7.2_Typical Drawing_Decorative Sword type Fitting-converted.pdf
7.3_Earthing Drawing.pdf
LED Luminaire- Annexure-G.pdf
Corrigendum 01.pdf
Revised TB-14 - B1 page 1-24.pdf
Revised TB-14 - B1 page 25-48.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .