| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.9 LAccepted-AOC 200 NAVAGAM NAVAGAM TA SAYLA SURENDRA NAGAR GUJARAT 363430 | SURENDRANAGAR | GUJARAT | 363430 | ₹36.9 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹38.9 LRejected-Finance 274 210 DAFNALA ROAD SHAHIBAUG AHMEDABAD GUJARAT 380009 | AHMADABAD | GUJARAT | 380009 | ₹38.9 L | L2 | Rejected-Finance Other then lowest bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected due to shortfall of docus as per NIT. Physical copy of application, DD, EMD not received. Solvency certificate of requisite amount, Working capital certificate, EPFO registration and list of work executed during last 5 years not found encl. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected due to not enlisted in requisite categories as per NIT |
| Sl No | Description | Qty | Unit | ALBA AC AND REF SERVICES L2 | ARTI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | M&L for comprehensive maintenance /repair and servicing of 13 passengers lift (01 No) total 10 Floors (G+9)make thyssan Krupp installed C-7 Block installation fully comprehensive (i.e All in all) regular maintenance for round the clock, of the lift, including regular servicing, inspections, preventive maintenance by trained technicians and repair of the installation with bear the cost of repair / replacement of any of the worn out part which is covered under AMC by OEM without any additional charges at C-7 Block for 12 Months complete all as specified and as directed .
Note-
(i) Six routine maintanance services for fully oiling & greasing at interval of 02 Months.
(ii) one visit by state lift inspection is included in the quoted rates.
The following items shall be replaced as & when required under AMC 'A' type contract i.e ("all in all").For thyssan Krupp as existing at site
(iii) Any unserviceable electronics parts shall be replaced under AMC without any extra cost to Govt.
(iv) Rate quoted is including of PRE AMC maint work. | 12 | EACH JOB PER MONTH | 18,000 ₹2.2 L | 16,585 ₹2.0 L |
| 2.00 | All as per item No 1 above but, for 8 passengers lift (01 No lift ) total 10 Floors (G+9) | 12 | EACH JOB PER MONTH | 16,200 ₹1.9 L | 16,585 ₹2.0 L |
| 3.00 | M&L for comprehensive maintenance /repair and servicing of 13 passengers lift (02 Nos) total 09 Floors (G+8)make thyssan Krupp installed at C-4, C-5 Block installation fully comprehensive (i.e All in all) regular maintenance for round the clock, of the lift, including regular servicing, inspections, preventive maintenance by trained technicians and repair of the installation with bear the cost of repair / replacement of any of the worn out part which is covered under AMC by OEM without any additional charges at C-4, C-5 Block for 12 Months complete all as specified and directed .
Note-
(i) Six routine maintanance services for fully oiling & greasing at interval of 02 Months.
(ii) one visit by state lift inspection is included in the quoted rates.
The following items shall be replaced as & when required under AMC 'A' type contract i.e ("all in all").For thyssan Krupp as existing at site
(iii) Any unserviceable electronics parts shall be replaced under AMC without any extra cost to Govt.
(iv) Rate quoted is including of PRE AMC maint work. | 12 | EACH JOB PER MONTH | 36,900 ₹4.4 L | 33,200 ₹4.0 L |
| 4.00 | All as per item No 3 above but, for 8 passengers lift (02 Nos lifts ) total 09 Floors (G+8) | 12 | EACH JOB PER MONTH | 31,500 ₹3.8 L | 33,200 ₹4.0 L |
| 5.00 | M&L for comprehensive maintenance /repair and servicing of 13 passengers lift (06 Nos) total 08 Floors (G+7) make thyssan Krupp intalled at W-3, S-2, S-4, S-6, S-7, S-8 Block installation fully comprehensive (i.e All in all) regular maintenance for round the clock, of the lift, including regular servicing, inspections, preventive maintenance by trained technicians and repair of the installation with bear the cost of repair / replacement of any of the worn out part which is covered under AMC by OEM without any additional charges at W-3, S-2, S-4, S-6, S-7, S-8 Block for 12 Months complete all as specified and directed .
Note-
(i) Six routine maintanance services for fully oiling & greasing at interval of 02 Months.
(ii) one visit by state lift inspection is included in the quoted rates.
The following items shall be replaced as & when required under AMC 'A' type contract i.e ("all in all").For thyssan Krupp as existing at site
(iii) Any unserviceable electronics parts shall be replaced under AMC without any extra cost to Govt.
(iv) Rate quoted is including of PRE AMC maint work. | 12 | EACH JOB PER MONTH | 99,900 ₹12.0 L | 91,800 ₹11.0 L |
| 6.00 | All as per item No 5 above but, for 8 passengers lift (06 Nos lifts) total 08 Floors (G+7) | 12 | EACH JOB PER MONTH | 90,000 ₹10.8 L | 91,800 ₹11.0 L |
| 7.00Note - for item No 1 to 6 : (i) Contractor should make AMC with OEM only, any requisite electrical/ machenical parts for above mentioned lifs or any other parts also are to be repair/replaced as & when it become unserviceable as per terms & conditions of omega/ Thyssen under the AMC 'A' type contract, any cost of material & labour charge will not be paid extra . (ii) Any other material become un serviceable which is not in the scope of AMC 'A' type contract is also to be repaired/replaced timely to run the lift smoothely without any extra cost to Govt. . (iii) The terms & conditions of this AMC as applicable as given in Annexure I & II by OMEGA and thyssen krupp (iv) The comprehensive maintenance inclusive of inspection/testing/preventive maintenance replacement of unsv parts/material including labour, transportaton. (v) the complaints shall be attended forthwith as the complaints/failure from the time of receipt of same . (vi) Contractor shall rectify the defects with in 24 hrs after receipt of complaints , thereafter recovery Rs 1000/- per hrs will be charged from contractor till functioning of lift and repair of lift by other agency, the repair cost should be made by contractor in presence of Eng-in-Charge. (vii) The schedule A consists of comprehensive maintenance of lifts (viii) The load testing of lifts ie 8 passenger and 13 passenger shall be carried out as per standard norms of OMEGA/thyssen and hand over certificate to the department without any extra cost to Govt.. (ix) Contractor has to tie up with civil authority for lift license and he will be responsible to renewal of lift license without any extra cost to Govt. | |||||
| 8.00 | Supply and fix fan of lift cabin, removing the old one and fixing of new fan as per existing including all electrical connection& testing complete all as specified and directed by Engr- in- Charge. | 6 | EACH | 4,140 ₹24,840 | 1,850 ₹11,100 |
| 9.00 | Supply and fix cabin light of lift 10 watt, including removing the old one and fixing of new light as per existing including all electrical connection& testing complete all as specified and directed by Engr- in- Charge | 16 | EACH | 162 ₹2,592 | 110 ₹1,760 |
| 10.00 | Supply and fix cabin LED light SMT 0701 , including removing the old one and fixing of new light as per existing including all electrical connection& testing complete all as specified and directed by Engr- in- Charge | 12 | EACH | 900 ₹10,800 | 400 ₹4,800 |
Updated dates
Tender Value
₹43.9 L
EMD Value
₹87,800
Closing Date
7 Feb 2026, 6:00 pmClosed
Col Manish Dhaka CWE
HQ CWE (AF) Chiloda Military Engineer Services P.O CRPF Campus Vayu Shakti Nagar Gandhinagar 382042
COMPREHENSIVE REPAIR AND MAINTENANCE TO CERTAIN LIFT OF MAP ACCN AT VSN CHILODA GANDHINAGAR
2026_MES_747689_1
82291/CHL/E8
Open Tender
Electrical and Maintenance Works
365 days
Gandhinagar
As per tender documents
7 documents required · 7 mandatory
₹500
GE (AF) Chiloda
₹87,800
Yes
13 Mar 2026
8 Jan 2026
16 Feb 2026
9 Jan 2026
7 Feb 2026
24 Jan 2026
9 Jan 2026 - 23 Jan 2026
All as per item No 1 above but, for 8 passengers lift (01 No lift ) total 10 Floors (G+9)
All as per item No 3 above but, for 8 passengers lift (02 Nos lifts ) total 09 Floors (G+8)
All as per item No 5 above but, for 8 passengers lift (06 Nos lifts) total 08 Floors (G+7)
Note - for item No 1 to 6 : (i) Contractor should make AMC with OEM only, any requisite electrical/ machenical parts for above mentioned lifs or any other parts also are to be repair/replaced as & when it become unserviceable as per terms & conditions of omega/ Thyssen under the AMC 'A' type contract, any cost of material & labour charge will not be paid extra . (ii) Any other material become un serviceable which is not in the scope of AMC 'A' type contract is also to be repaired/replaced timely to run the lift smoothely without any extra cost to Govt. . (iii) The terms & conditions of this AMC as applicable as given in Annexure I & II by OMEGA and thyssen krupp (iv) The comprehensive maintenance inclusive of inspection/testing/preventive maintenance replacement of unsv parts/material including labour, transportaton. (v) the complaints shall be attended forthwith as the complaints/failure from the time of receipt of same . (vi) Contractor shall rectify the defects with in 24 hrs after receipt of complaints , thereafter recovery Rs 1000/- per hrs will be charged from contractor till functioning of lift and repair of lift by other agency, the repair cost should be made by contractor in presence of Eng-in-Charge. (vii) The schedule A consists of comprehensive maintenance of lifts (viii) The load testing of lifts ie 8 passenger and 13 passenger shall be carried out as per standard norms of OMEGA/thyssen and hand over certificate to the department without any extra cost to Govt.. (ix) Contractor has to tie up with civil authority for lift license and he will be responsible to renewal of lift license without any extra cost to Govt.
Supply and fix fan of lift cabin, removing the old one and fixing of new fan as per existing including all electrical connection& testing complete all as specified and directed by Engr- in- Charge.
Supply and fix cabin light of lift 10 watt, including removing the old one and fixing of new light as per existing including all electrical connection& testing complete all as specified and directed by Engr- in- Charge
Supply and fix cabin LED light SMT 0701 , including removing the old one and fixing of new light as per existing including all electrical connection& testing complete all as specified and directed by Engr- in- Charge
Supply and fix UPS 01 KVA of lift as per existing site,removing the old one and fixing of new UPS including all electrical connection& testing complete all as specified and directed by Engr- in- Charge
Supply and fix UPS 3 KVA smart online UPS line interactive with internal batteries of lift Thyssen Krupp as present at site, removing the old one and fixing of new UPS including all electrical connection& testing complete all as specified and directed by Engr- in- Charge
Supply and fix batteries of capacity 12 Volt and 7 AH of lift UPS device , removing the old one and refixing the serviceable batteries as existing on site of thyssen krupp for smooth functioning of lifts complete all as specified and directed by Engr- in- Charge.
Supply and fix batteries of capacity 12 Volt and 18 AH of lift UPS device , removing the old one and refixing the serviceable batteries as present on site of thyssen krupp for smooth functioning of lifts complete all as specified and as directed by Engr- in- Charge.
S&F in replacement of RCCB 'A' type FP 240 V,50 Hz,10 KA of capacity 25 Amp and 300mA as suitable for lift panel all as directed by Engr-in-Charge
Supply and fix in replacement of UPS 2.2 KVA, 920 Watts smart online UPS line interactive with internal batteries of lift Thyssen Krupp as existing at site, removing the old one and refixing the serviceble UPS as present on site of thyssen krupp for smooth functioning of lifts complete all as specified all as directed by Engr-in-Charge
S&F in replacement of Exhaust fan 380 mm sweep, metal body single phase including connection complete all as directed by Engr-in-Charge
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tender82291.pdf
Tender Documents • 1.17 MB
BOQ_837307.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid