Loading…
Loading…
Tender Value
₹7.7 Cr
EMD Value
₹15.5 L
Closing Date
10 Aug 2026, 11:00 am
TVC Division - Improvements to Goods shed at TCR,CKI, AFK, AWY & KLMR
1-TVC-3-GSU-2026
1-TVC-3-GSU-2026
Open
Works - General
9 Months
Unknown (Unspecified Location)
₹0
₹15.5 L
15 Jul 2026
15 Jul 2026
27 Jul 2026
- Supply of reinforcement steel
Item- 1 SW-I: Goods Shed work at TCR,CKI, AFK, AWY & KLMR
S No. Item No Description of Item Unit Qty Rate Amount
5.0 REINFORCED CEMENT CONCRETE
5.22S STEEL REINFORCEMENT
Steel reinforcement for R.C.C. work including
5.22 straightening, cutting, bending, placing in position
and binding all complete upto plinth level.
THIRUVANANTHAPURAM DIVISION-GATI SHAKTI/SOUTHERN RLY
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D Kg 29800 89.65 2671570
Steel reinforcement for R.C.C. work including
5.22A straightening, cutting, bending, placing in position
and binding all complete above plinth level.
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D Kg 52124 89.65 4672916.6
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SitePlansforTCRCKIAFKAWYKLMR.pdf
ATTACHMENT
Additional_Special_Conditions_of_Contract_for_Track_Work_General.pdf AddtlSpecialconditionsfortrackwrk
ATTACHMENT
SpecialConditionsofContractcorrected.pdf
ATTACHMENT
GCCACS6.pdf
ATTACHMENT
GCCACS5.pdf
ATTACHMENT
GCCACS3.pdf
ATTACHMENT
GCCACS2.pdf
ATTACHMENT
GCCACS4.pdf
ATTACHMENT
GCCApril2022.pdf
ATTACHMENT
GCCACS1.pdf
ATTACHMENT
GCCACS7.pdf
ATTACHMENT
GCCACS8.pdf
ATTACHMENT
GCCACS9.pdf
ATTACHMENT
GCCACS10.pdf
ATTACHMENT
AdditionalSplConditioncorrected.pdf
ATTACHMENT
5PurlinPFShelter-1-2.pdf
ATTACHMENT
5PurlinPFShelter-7.pdf
ATTACHMENT
5PurlinPFShelter-3-4.pdf
ATTACHMENT
5PurlinPFShelter-5-6_compressed.pdf
ATTACHMENT
BANKGUARANTEEBOND.pdf
ATTACHMENT
Handbook_on_Safety_precautions_at_work_site_adjacent_to_track.pdf
ATTACHMENT
INSTRUCTIONSTOTHETENDERERcorrected.pdf
ATTACHMENT
Rly_Bd_Letter_Dt.14.05.2024.pdf
ATTACHMENT
SafetyprecautionsTRD26.11.2025final.pdf
ATTACHMENT
SplconditionofContractformovementofVehiclescorrected.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
AnnexureVAVIAVIB.pdf
ATTACHMENT
Additional_Special_Conditions_of_Contract_for_Track_Work_General.pdf
ATTACHMENT
Download all tender documents and submit your bid