Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | L1 | Accepted-AOC ACO | |
| 2 | L2₹17.1 L+₹1.0 L (6.49%)Rejected-Finance 150 45 SHANTI VIHAR GOVIND GARH DISTT DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | L2 | Rejected-Finance Price
Quoted High | |
| 3 | L3₹18.1 L+₹2.0 L (12.7%)Rejected-Finance | L3 | Rejected-Finance Price
Quoted High | |
| 4 | L4₹18.4 L+₹2.4 L (15.0%)Rejected-Finance | L4 | Rejected-Finance Price
Quoted High | |
| 5 | L5₹20.7 L+₹4.6 L (28.9%)Rejected-Finance | L5 | Rejected-Finance Price
Quoted High |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
16 Dec 2020, 11:00 amClosed
EE IRRIGATION DIVISION DUGADDA
OFFICE OF EXECUTIVE ENGINEER IRRIGATION DIVISION DUGADDA
FLOOD PROTECTION WORKS ON BOTH BANK OF HENWAL RIVER FOR PROTECTION OF KATGHAR, BHAGHALA AND TITHOL VILLAGES OF DISTRICT PAURI GARHWAL UNDER NABARD. (REACH Right bank, 874.0m to 1024m)
2020_IRDCE_27847_1
03/EE/2020-21 DATED 21.11.2020
Open Tender
Civil Works
Item Rate
90 days
YAMKESHWAR BLOCK
AS PER STANDARD BIDDING DOCUMENT
3 documents required · 3 mandatory
₹2,360
EXECUTIVE ENGINEER IRRIGATION DIVISION DUGADDA
₹75,000
IRRIGATION DIVISION DUGADDA
6 Sept 2023
30 Nov 2020
16 Dec 2020
30 Nov 2020
16 Dec 2020
1 Dec 2020
2 Dec 2020
Amount
Excavation in hilly area in ordinary rock not requiring blasting by mechanical means without using Dozer including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.
Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire onforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
Providing and laying of Empty Cement Bags ( Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work.
Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material, labour and T&P etc. required for proper completion of the work.
Ashok Kuamr
M/S RUKMANI DEVI CONTRACTOR
M /S NATHI LAL UNIYAL
V.S. ENGINEERS
suresh chandra nainwal
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .