Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 CrAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹17.9 Cr+₹19,744.43 (0.01%)Rejected-AOC WARD NO 06 NAC KUCHINDA P O P S KUCHINDA DIST SAMBALPUR ODISHA 768222 | KUCHINDA | SAMBALPUR | ODISHA | 768222 | L2 | Rejected-AOC L2 Bidder |
Tender Value
₹17.9 Cr
EMD Value
₹17.9 L
Closing Date
11 Nov 2025, 5:00 pmClosed
Sub-Collector,Bargarh-cum-Chairman,RMC, Attabira
At/P.O- Attabira, Dist.Bargarh ( Odisha ) PIN 768027
Godown, covershed, Building, road etc
2025_OSAMB_120218_1
RMC ATTABIRA e-procurement No. 01/2025-26 and TCN No.997 dtd 24.10.2025
Open Tender
Civil Works - Buildings
Percentage
330 days
Different MYs and PPCs of Attabira and Bheden Bloc
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹17.9 L
Yes
29 Nov 2025
28 Oct 2025
12 Nov 2025
28 Oct 2025
11 Nov 2025
28 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Attabira Block: Construction of embankment with approved material obtained from borrow pits with all lifts and 10km lead, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 1,323.54 | Each cum | 198.36 | ₹2,62,537.69 |
| 2 | Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire & running charges of water pumps sundries T & P & all other machineries required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge. | 412.5 | Each cum | 201.6 | ₹83,160 |
| 3 | Supplying and filling in foundation and plinth with good river sand well watered and rammed in layers not exceeding 23 cm in each layer including all leads and lifts, cost of all materials, labour,cess, sundries, T&P required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge. | 825 | Each cum | 580.6 | ₹4,78,995 |
| 4 | Providing and lying plain cement concrete of proportion (1:3:6) in foundation and plinths using approved quality cement , 40 mm. size black hard hand broken granite stone metal and screened, washed sharp sand for mortar of approved quality and from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, cess, sundries, T&P & all other machineries required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump etc.complete in all respect as per latest specification & direction of the Engineer in charge. | 275 | Each cum | 5,845.9 | ₹16,07,622.5 |
| 5 | Cost, conveyance and labour for spreading stone screened dust and consolidation with PRR including watering, cost and conveyance of stone screen dust etc complete as per specification and direction of Engineer | 275 | Each cum | 1,441.9 | ₹3,96,522.5 |
| 6 | Providing and lying plain cement concrete of proportion (1:2:4) using approved quality cement , 20 mm.down graded size black hard crusher broken granite stone chips and screened, washed sharp sand for mortar of approved quality and from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, cess, sundries, T&P & all other machineries required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump etc.complete in all respect as per latest specification & direction of the Engineer in charge. | 489.87 | Each cum | 7,470.3 | ₹36,59,476.98 |
| 7 | Providing fixing and placing of Tor steel (HYSD FE-500 Make- (SAIL/ JINDAL/ RINL/ SHYAM/ TISCON) for RCC work in all floors of required diameter of approved quality with straightening bent up or coiled rods" Tor rods" cutting, bending, cracking, hooking, welding or jointing(if required) the "Tor steels rods" & binding wire and tying the grills hoisting laying and placing in proper position as required for RCC works for providing if an hooks including cost, conveyance and taxes of Tor steel and binding wire of 18 to 20 gauge and labour with T & P required for the work etc. complete in all respect in all floors (weight of the binding wire will not be considered for payment) complete. | 195.95 | Each Qtl | 9,110.8 | ₹17,85,222.54 |
| 8 | Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire & running charges of water pumps sundries T & P & all other machineries required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge. | 1,737.83 | Each cum | 276.9 | ₹4,81,205.13 |
| 9 | Earth work in excavation of foundation trenches in hard soil of soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire & running charges of water pumps sundries T & P & all other machineries required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge. | - | Each cum | 206.1 | - |
| 10 | Supplying and filling in foundation and plinth with good river sand well watered and rammed in layers not exceeding 23 cm in each layer including all leads and lifts, cost of all materials, labour,cess, sundries, T&P required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge. | - | Each cum | 666.7 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
DTCN997.pdf
Tender Documents • 0.59 MB
BOQ_559188.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .