Tender Value
₹30.0 L
EMD Value
₹59,962
Closing Date
31 Aug 2026, 6:55 pm7d left
SHATRUGHANA BOURI/ EE/ NBDD
Annex Building, Uttarkanya, Fulbari, Jalpaiguri
Construction of CC road from Belu Ali House to Arjun Basak with RCC drain at Momintola under Mothurapur G P Manikchak Dev block in the district of Malda. (Length 174 Mtr. Width 3.00 Mtr. and Drain-174.00m)
2026_NBDD_1038508_7
NBDD/BS/EE/ NIe-T- 28/2026-27 (Sl. No. 01 to 20)
Open Tender
CIVIL WORKS
Percentage
240 days
Malda
Please refer Tender documents.
6 documents required · 6 mandatory
₹59,962
Yes
17 Aug 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
31 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DRAIN
Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work (Reference to MoRT&H's specification clause 304).
13(i) Ordinary soil
13(i)A Manual Means (Depth upto 3 m) with dewatering | 169.16 | Cu.m | 409.12 | ₹69,208 |
| 2 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. | 31.32 | Cu.m | 1,326.85 | ₹41,556.97 |
| 3 | PCC 1:3:6 in Foundation
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days (Reference to MORT&H's
specification 2100).
Note Vibrator is a part of minor T & P which is already included in overhead charges of the contractor. | 15.72 | Cu.m | 6,147.4 | ₹96,637.11 |
| 4 | Plain/Reinforced cement concrete in sub-structure complete all including vibrating and compacting, finishing,curing, sampling, testing etc. by mechanically mixed as per drawing and Technical Specifications
(Reference to MORT&H's specifications
1500, 1700 & 2200).
RCC Grade M25
5F(p) Height upto 5m
Using Concrete Mixer
1) Add 10% extra cost as formwork over cost of material.
2) Needle Vibrator is an item of minor T & P which is already included in overhead charges. Hence
not added in rate analysis of cement concrete works. | 82.14 | Cu.m | 7,411.65 | ₹6,08,793 |
| 5 | Supplying, binding, fixing etc. including initial straightening, cutting to requisite length, hooking and bending to correct shape, placing in proper position of uncoated HYSD reinforcement bar in sub-structure complete as per drawing and Technical Specifications (Reference to MORT&H's
specifications 1600 & 2200). | 7.74 | MT | 81,089.72 | ₹6,27,634.42 |
| 6 | ROAD
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated location sand disposal of dismantled materials upto a lead of 1000 metres, stacking
serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202). | 79.87 | Cu.m | 1,685.78 | ₹1,34,643.52 |
| 7 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal ofunserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Reference to MoRT&H's specification clause 201)
3(II) By Mechanical Means
3(II)(A) In area of light jungle | 0.03 | Hectare | 59,747.31 | ₹1,792.42 |
| 8 | Compacting original ground supporting embankment
Loosening, leveling and Compacting original ground supporting
embankment to facilitate placement of first layer of embankment,
scarified to a depth of 150 mm, mixed with water at OMC and then
compacted by rolling so as to achieve minimum dry density as given in Table 300-2 & 300-1for embankment construction. (Reference to MoRT&H's specification clause 305.3.4). | 78.3 | Cu.m | 42.69 | ₹3,342.81 |
| 9 | Construction of Subgrade and Earthen Shoulders
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site,spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Reference to MoRT&H's specification clause 305). Cost of compensation for Earth material & its carriage from private land at 5km distance have been included in the rate. | 266.22 | Cu.m | 306.73 | ₹81,657.45 |
| 10 | Construction of granular sub-base by providing graded materials such as natural sand/crushed gravel/crushed stone/combination depending upon the required grading , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator and compacting with vibratory roller toachieve at least 98% of the maximum dry density for the material determined as per IS: 2720 (Part 8), complete as per clause 401 desire density, complete as per clause 401 Rate per cum for grading-III Material. | 53.04 | Cu.m | 2,823.49 | ₹1,49,758.03 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2551200.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].