Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC 00 VPO MALIKPUR BANGER TEH BILASPUR DISTT YAMUNANAGAR 135102 | MALIKPUR BANGER | YAMUNANAGAR | HARYANA | 135102 | L1 | Accepted-AOC AOC | |
| 2 | L2₹3.7 L+₹12,324.70 (3.44%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.7 L+₹13,917.05 (3.88%)Rejected-AOC YAMUNANAGAR HARYANA | L3 | Rejected-AOC L3 | |
| 4 | L4₹3.9 L+₹35,898.21 (10.0%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹4.2 L
EMD Value
₹5,010
Closing Date
9 Jan 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BHARAT BHUSHAN
Municipal Committee Sadhaura
Construction of Street and Drain from Mahinder Singh to Ho Khazzan Singh and laying of cement concerete from Kashmiri Dang to H o Manjeet Bhatia and from Shyam Lal Lamba to H o Shyam Lal Lohe wala and from main Bazar to H o of Gautam and from H o Gau
2024_HRY_420765_1
20240BF112A4 D2AF 4709 B7F1 47F1269731B71314ULB
Open Tender
Civil Works
Works
180 days
SADHAURA
2 documents required · 2 mandatory
₹1,000
Yes
₹5,010
Yes
24 Jan 2025
30 Dec 2024
10 Jan 2025
30 Dec 2024
9 Jan 2025
30 Dec 2024
Amount
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
[17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate]
[21.53]Constructing standard drain type I drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be of 1.3.6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar [Through Rate]
[21.55]Constructing standard drain type II drain complete consisting of concrete drain moulded and laid concrete foundation, rendered and smooth with 6mm thick rendering concrete to be of I :3:6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar [Through Rate]
[3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km]
[4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate]
[4.4.1]Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 1. All kinds of soil [Through Rate]
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
The Natraj L and C Coop Society Ltd. (BID ID -1198578)
The Sunrise Co op LandC Society ltd. (BID ID -1198591)
The Mahaveer Coop L and C Society Ltd (BID ID -1197981)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .