Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
19 Sept 2026, 6:00 pmClosed
CHIEF OFFICER,PATADI NAGARPALIKA
Appointment of Consultant for Project Management Consultancy Works and various types of Civil Engineering Works in PATDI Nagarpalika Area
344099
2026-27
Open
Civil - All
Service
Surendranagar
8 documents required · 8 mandatory
₹1,500
chief officer,patdi nagarpalika
₹25,000
10 Sept 2026
10 Sept 2026
10 Sept 2026
19 Sept 2026
10 Sept 2026
Appointment of Consultant for Project Management
Consultancy Works and various types of Civil Engineering
Works in PATDI Nagarpalika Area.
MILE STONE DATES
1 LAST DATE FOR TENDER DOWNLOADING &
ONLINE SUBMISSION 19.09.2026 UPTO 18:00 HRS
2 LAST DATE OF PHYSICAL SUBMISSION 23.09.2026 UPTO 18:00 HRS
3 DATE OF OPENING OF TECHNICAL BID 24.09.2026 AT 11:00 HRS.
4 DATE OF OPENING OF PRICE BID 24.09.2026 AT 11:05 HRS.
TENDER FEE : Rs. 1500/- (Demand Draft)
in the form of a Demand Draft issued by any Nationalized Bank only and having branch in
6 EMD : Rs. 25000/- (Bank FDR)
in the form of a Bank FDR of 1 year issued by any Nationalized Bank only and having branch in
CHIEF OFFICER PATDI NAGARPALIKA
DETAIL TENDER NOTICE
Tender Notice No. SNP/CONSULTANT/09/2026
Organization Name PATDI NAGARPALIKA – PATDI, DISTRIC T SURENDRANAGAR
Departme nt Name CIVIL DEPARTMENT, PATDI NAGARPALIKA – PATDI, DISTRICT SURENDRANAGAR
Name of work Appointment of Consultant for Project Management Consultancy Works of various types of Civil
Engineering Works in PATDI Nagarpalika Area
Tender Type Item Rate
Bidder Nationality Indian
Having(As a consultant) registration/empanelment in Government / Semi Government
Qualification of
Organizations including any State Govt. Undertaking (like G M F B , GU DM , G UD C , GWSSB, GRHB
AHM, GHB, GPHCL, DUDA)
Bidding Currency Indian Rupee
Pre-Bid Meeting d ate & Ti me No Pre-Bid Meeting
Bid available and Last date and time
19/09/2026 up to 18:00 hrs on w w w .nprocu re.com.
of bid submission on line
Physical submission of bid
document fee, EMD, Tech . bid, On or before Dt.: 23/09/2026 up to 18:00 hrs. at Office of
and Suppo rting d ocuments, Chief Offcer, PATDI Nagarpalika, PATDI, District
Certificates etc as per elig ibility SURENDRANAGAR by speed post or by Register AD only
qualification criteria
Last date On-line On or before Dt.: 19/09/2026 up to 18:00 hrs on
Submission of Price Bid w ww.nprcure.com.
Opening of Tech . Bid. on line and
Dt: 24/09/2026 at 11:00 hrs (If possible).
Opening of Price
Dt: 24/09/2026 at 11:05 hrs (If possible).
Bid. online only
Bid validity p eriod 120 days from opening of price bid
Payment Document Fee Rs. 1500 (non refundable)
Details EMD Rs. 25000/-
Evaluation As given in Tender/Offer documents
Availability of
Agency may down load from the Web site www .nprocure.com
Tender/Offer bid (1) TECH. BID ONLY IN HARD COPIES. In sealed one main cover which shall contain two sealed
Submission covers i.e. one is for Tech. bid in Original and containing all supporting documents in it + one CD-
ROM including entire technical proposal; where as a second cover carries only Tender Fee, EMD.
and empanelled registration
(2) Main cover must show- "Consultancy Work" And last date of submission
(3) Tender Fee in the form of DD in favor of Chief Officer, PATDI Nagarpalika, must be
enclosed with Tech. bid for down loaded documents and EMD should be by D.D. or by FDR of
a n y Nationalized Bank only in favor of Chief Officer.
(4) Submission of Tender/Offer documents only by Regd. A.D. or by Speed Post as per above
mentioned schedule time, to : The Chief Officer, PATDI Nagarpalika, PATDI, District
Information for 1. Internet site address for e-Tendering activities will be http s:// np rocu r e.com
online participation 2. Interested bidders can view detailed tender notice and download tender documents from
the above mentioned website.
3. Bidders who wish to participate in online tender have to register with the website through
the “New User Registration” link provided on the home page. Bidder will create login id &
password on their own in registration pro cess.
4. Bidders who wish to participate in this tender need to procure Digita l Certificate as per
Information Technology Act-2000 using that they can digitally sign their electronic bids.
Bidders can procure the same from any of the CCA approved certifying agencies, or they
may contact (n) code Solution at below mentioned address and they will assist them in
procuring the same. Bidders who already have a valid Digital Certificate need not to procure
the same. In case bidders need an y clarification regarding online participation, they can
M/S (n)code Solu tion
301, G.N.F.C. Info Tower, Near grant
Bhagwati Hotel, AHMEDABAD
India. Tel: +91 79
URL: https://nprocure.com
PATDI Nagarpalika
TECHNICAL PROPOSAL
Appointment of Consultant for Project Management
Consultancy Works of various types of Civil Engineering
Works in PATDI Nagarpalika Area
Chief Officer PATDI Nagarpalika
Dist. SURENDRANAGAR
Section – 1: Letter of Invitation
Section – 2: Information to Consultants
ELIGIBILITY CRITERIA
SPECIAL INSTRUCTIONS
Section – 3: Technical Proposal - Standard Forms
Section – 4: Terms of Reference
Section – 5: Standard Form of Contract.
Section – 6: PRICE BID/ PRICE PROPOSAL
LETTER OF INVITATION
PATDI Nagarpalika PATDI
Subject : Request For Appointment of Consultant for Project Management Consultancy Works of various types
of Civil Engineering Works in PATDI Nagarpalika Area
Sr. No. SCOPE OF WORK AT A GLANCE
1 For project : Carry out Site survey, existing status, its analysis, preparation of DPR (with detail
estimates and drawings), tender documents, evaluation of bidders and bid prices, including,
approval of plans, designs and QAPs etc., inspection of materials and brought out items. Day
to day construction and erections supervision, contractor's measurement and bill preparation,
submission of daily, weekly and monthly progress reports with photographs and charts,
liasoning duties and monthly visit and reporting during defect liability period etc. up to
completion of work.
1) The Nagarpalika has taken up implementation of the various civil engineering work funded by
State/Central Government. The eligible payments under this contract shall be made from the funds
received from of Govt. Grant.
2) Nagarpalika invites proposals to provide following Consultancy services:
To Municipal Engineer in implementation of the above mentioned project. The consultant shall
study existing status of work decided by Municipality. Prepare the DPR with plan and estimate and
take technical as well as Administrative approval . The consultant shall prepare Tend er Documents and
assist municipal engineer, 100% supervision of construction activities, Preparation of bill &
certificate to payment of contractor, up to completion of work.
3) Nagarpalika intends to appoint a consultant for providing project monitoring services for
preparations of DPR, tender documents, tender evaluations, inspection of materials, 100% day to day
supervision of various civil engineering work activities at the site as well as at the office.
4) A firm will be selected under Qualification & Cost Based Selection procedures described in this RFP.
5) Bidders have to submit Technical bid (including price bid without filling prices) in hard copy and
Price bid in Electronic format only on above mentioned website till the date & time as specified.
Bidder to note that submission of price bid with prices along with technical bid in hard copy shall
lead to disqualification of bidder and his bid shall not be considered for further evaluation and their
price bid shall not be opened.
Bidders who wish to participate in online tenders will have to procure/should have legally valid
Digital Certificate as per Information Technology Act-2000 using which they can sign their
electronic bids. Bidders can procure the same from any of the license certifying Authority of India
or can contact (n) code solutions- a division of GNFC Ltd, who are licensed Certifying Authority by
Govt. of India.
All bids should be digitally signed, for details regarding digital signature certificate and related
trainin g involved the below mentioned address should be contacted:
(n)Code solutions A division of GNFC
301, GNFC Info tower, Bodakdev,
SURENDRANAGAR-380 054 (India)
E-mail:nprocure@gn vfc.n et
6) The RFP includes the following documents:
Section – 1: Letter of Invitation.
Section – 2: Information to Consultants
Section – 3: Technical Proposal - Standard Forms
Section – 4: Terms of Ref erence.
Section – 5: Standard Form of Contract.
Section – 6: Financial Proposal - Standard Forms
Kindly acknowledge us the receipt of this letter of invitation (RFP) Sincerely.
PATDI Nagarpalika
PATDI NAGARPALIKA – PATDI
INFORMATION TO CONSULT ANTS
1. INTRODUCTION:
1.1 The Client named in the "Data Sheet" will select a firm in accordance with the method of
selection indicated in the Data Sheet and detailed in the Guidelines given in the Data Sheet.
1.2 The consultants are invited to submit a Technical Proposal and a Financial Proposal as specified in
the Data Sheet (the proposal) f or consulting services required for the Assignment named in the Data
Sheet. The Proposal will be the basis for contract negotiations and ultimately signature of a
contract with the selected firm.
1.3 The Assignment shall be implemented in accordance with the phasing indicated in the Data Sheet.
When the Assignment includes several phases, continuation of services for the next phase shall
b e subject to satisfactory performance of the previous phase, as determined by the Client.
1.4 The Consultants must familiarize themselves with local conditions and take them into account
in preparing their proposals. To obtain firsthand information on the Assignment and on the local
conditions, consultants are encouraged to a visit to the Client before submitting a Proposal.
Th e Consultant's representative should contact the officials named in the Data Sheet to arrange
for their visit or to obtain additional information. Consultants should ensure that these officials
are advised of the visit in adequate time to allow them to make appropriate arrangements.
1.5 The Client will provide the inputs specified in the Data Sheet, assist the firm in obtaining licenses and
permits needed to carry out the services, and make available relevant project data and reports.
1.6 Please note that (i) the costs of preparing the proposal and of negotiating the contract, including a
visit to the Client, are not reimbursable as a direct cost of the Assignment; and (ii) the Client is
not bound to accept any of the Proposals submitted.
1.7 The Client policy requires that consultants provide professional, objective, and impartial advice
and at all times hold the Client's interests paramount, without any consideration for future work,
and strictly avoid conflicts with other assignments or their own corporate interests. Consultants
shall not be h ired for any assignment that would be in conflict with their prior or current
obligations to other clients, or that may place them in a position of not being able to carry out the
assignment in the best interest of the Client.
1.8 It is the Client's policy to require that consultants under contracts observe the highest standard of
ethics during the sel ection and execution of contracts. In pursuance of this policy, the Client;
(a) Defines, for the purposes of this provision, the terms set forth below as follows:
i) "corrupt practice" means the offering, giving, receiving, or soliciting of anything of
value to influence the action of a BNP official in the selection process or in contract
ii) "fraudulent practice" means a misrepresentation of facts in order to influence
a selection process or the execution of a contract to the detriment of the Borrower,
and includes collusive practices among consultants (prior to or after
submission of proposals) designed to establish prices at artificial, non
competitive levels and to deprive the Borrower of the benefits of free and open
(b) will reject a proposal for award if it determines that the firm recommended for
award has engaged in corrupt or fraudulent activities in competing for the
contract in question;
(c) will cancel the portion of the payment allocated to the firm's contract if it at any
time determines that corrupt or fraudulent practices were engaged in by
representatives of the Consultant during the selection process or the execution of
that contract, without the Consultant having taken timely and appropriate action
satisfactory to the Client to remedy the situation;
(d) will declare a firm ineligible, either indefinitely or for a stated period of time, to
be awarded a contract if it at any time determines that the firm has engaged in
corrupt or fraudulent practices in competing for, or in executing, a contract; and
(e) will have the right to require that, in contract a provision be included
requiring consultants to permit the Client to inspect their accounts and records
relating to th e performance of the contract and to have them audited by auditors
appointed by th e Client.
1.9 Consultants shall not be under a declaration of ineligibility for corrupt and fraudulent practices
issued by the Client in accordance with the above sub para 1.8(d).
1.10 The terms / conditions and detailed scope of work with EPC agencies shall be part of TOR.
2.0 DOCUMENTS COMPRISING THE RFP :
2.1 Consultants may request a clarification of any of the RFP documents up to the number of
days indicated in the Data Sheet before the proposal submission date. Any request for
clarification must be sent in writing by paper mail, cable, telex, facsimile, or electronic mail
to the Client's address indicated in the Data Sheet. The Client will respond by cable, telex,
facsimile, or electronic mail to such requests and will send copies of the response to all
invited consultants who intend to submit proposals.
2.2 At any time before the submission of proposals, the Client may, for any reason, whether at
its own initiative or in response to a clarification requested by an invited firm, modify the
RFP documents by amendment. Any amendment shall be issued in writing through
add enda. Addenda shall be sent by mail, cable, telex, facsimile, or electronic mail
to all invited consultants and will be binding on them. The Client may at its discretion
extend the d eadlin e for the submission of Proposals .
3.0 PREPARATION OF PROPOSALS:
3.1. Consultants are requested to submit a Proposal written in the language(s) specified in the
Technical Proposal:
Eligibility criteria are to be furnished in the format as per the “Eligibility Criteria for Consultancy
Services” furnished at the end of this section. The bid meeting the all the requirements as per
the eligibility criteria shall only be considered as responsive and for further evaluation including
opening of financial proposal.
3.2 In preparing the Technical Proposal, consultants are expected to examine the documents
comprising this RFP in detail. Material deficiencies in providing the information req uested
may result in rejection of a Proposal.
3.3 While preparing the Technical Proposal, consultants must give particular attention to th e
i) The experience of the consultant shall be limited to the proj ects for which th e
consulting firm has actually rendered the services individually or as a corporate
entity. In case of claiming an experience of consortium as one of the companies
within an association, the same shall be certified by client of the rank of
executive engineer or equivalent for the assignment carried out in recent past
and attested copy of th e same shall have to be furnished.
The assignment carried out by individual staff member or any associates prior
to joining the firm of consultant cannot be called as the experience of the firm but
ma y be referred to in the curriculum vita of staff proposed for the services.
ii) It is desirable that the majorities of the key professional staff proposed be
permanent employees of the firm or have an extended and stable working relation
iii) Proposed professional staff must have at least the experience indicated in the Data
Sheet / Eligibility Criteria, preferably under conditions similar to those prevailing in the
country of the Assignment.
iv) Alternative professional staff shall not be proposed and only one curriculum vitae
(CV) may be submitted for each position.
v) Reports to be issued by the consultants as part of this assignment must be in th e
language(s) specified in the Data Sheet. It is desirable that the firm's personnel have
a working knowledge of the client's national language.
3.4 The Technical proposal should provide the following information using the attached
Standard Forms (Section-3) :
i) Technical Proposal Submission form (Form 3A)
ii) A brief description of the firm's organization and an outline of recent experience
on assignments (Form 3B.1 and 3B.2) of a similar magnitude and nature. For each
assignment, the outline should indicate, inter alia, the profiles and names of the
staff provided, duration of the assignment, contract amount, and firm's
iii) A description of the methodology and work plan for performing the
assignment (Section 3C).
iv) The list of the proposed staff team by specialty, the tasks that would be assigned
to each staff team member, and their timing (Section 3D).
v) CVs recently signed by the proposed professional staff and the authorized
representative submitting the proposal (Section 3E). Key information should
includ e number of years working for the firm/entity, and degree of
responsibility held in various assignments for similar works.
vi) Any additional information requested in the Data Sheet.
3.5 The Technical Proposal shall not include any financial information.
Financial Proposal:
3.6 In preparing the Financial Proposal, consultants are expected to take into account
th e requirements and conditions of the RFP documents. The Financial Proposal should
follow Standard Forms (Section-6). It lists all costs associated with the Assignment,
including (a) remuneration for staff (foreign and local, in the field and at head
quarters), and (b) reimbursable such as subsistence (per diem, housing), transportation
(international and local, for mobilization and demobilization), services and equipment
(vehicles, office equipment, furniture, and supplies), office rent, insurance, printing of
documents, surveys; and training, if it is a major component of the assignment. If
appropriate, these costs should be broken down by activity and if appropriate into foreign
and local expenditures.
3.7 The Financial Proposal shall be inclusive of all the local and Govt. taxes (including
social security), duties, fees, levies, service tax and other impositions imposed under the
applicable law, on the consultants, the sub-consultants, and their personnel.
3.8 Consultants shall express the price of their services in the currency of Indian Rupee only.
3.9 Commissions and gratuities, if any, paid or to be paid by consultants and related to th e
Assignment will be borne by the consultant.
3.10 The Data Sheet indicates how long the proposals must remain valid after the submission
During the whole period, the consultant is expected to keep available the professional
staff proposed for the assignment. The Client will make its best effort to complete
negotiations within this period. If the Client wishes to extend the validity period of the bid
proposals, th e consultants who do not agree have the right not to extend the validity of
their bid proposals.
3.11 Your financial proposal shall be quoted as a firm and fixed prices up to the completion
of entire projects for specified pre- & post tendering services, Project Monitoring,
design, Drawings, QAP, verification, day to day construction supervision and
inspection of construction materials, This cost shall contain the details of costs together
with breakup as listed in the price bid.
The costs shall be given inclusive for the Three phases of work, i.e.
(a) Pre-tendering Services
Survey, study of existing situation, preparation of conceptual report, DPR, Technical
Sanctioned as well as Administrative approvals, Tender documents, evaluation of bidders,
bids, recommendations for bid etc.
(b) Post-tendering Services (After award to contract):
Services during Construction Phase: Contract Management, inspection of materials of
construction & supervision of construction including:
a) Pre-contract work
b) Checking and approval of detailed designs & (Engg.) drawings.
c) Over all 100 % supervision of Construction activities on day to day basis and
including certification of measurements and bills.
In due consideration of the pertaining descriptions of the Terms of Reference as included
in Section-4 and the Sample Draft Contract Agreement (Section-5) and of the following:
(c) Post-Tender Phase Services (Phase I & II activities)
b1) Services during Construction Phase (PMC Services during Construction Phase
including Contract Management, inspection of materials procured by contractor &
supervision of construction, etc.) (Phase I activity)
i) The Period for the Pre-contract work is assumed to study and understand
the documents as mention earlier and shall be used to ensure that all head
(branch) office and site staff to be involved fully understands
The Contract Agreement
The design and construction contract documentation
ii) The consultant will supervise the work on day-to-day basis, consultant has to deploy
resident supervisory staff till completion and commissioning of the work.
iii) Post Contract Work will be of duration of two weeks and shall be used to ensure:
The removal of all material, plant, equipment and staff from the site by the
contractor, agree with the Client and the contractor on all monies owed to
or by the contractor, including the remaining retention money, and release
all guarantees and securities in accordance with the provisions of the
construction contract.
After clearing and tidying up of the site by the contractor is complete, carry out
all work required to finalize the construction contract administratively.
i) Professional staff in head (branch) office:
The rates hereto shall be all inclusive per staff member and month, and cover
basic salary, social charges (incl. pension fund and similar payments), overheads
(incl. tax and insurance liabilities, sickness, holiday and bonus payments, charges
for support staff office and backstopping, etc.) consultant's fees and any other
accountable and variables.
ii) Professional staff on site
The rates hereto shall be all-inclusive per staff member and month, and cover
salaries, social charges, overheads, fees, etc. as above; charges for travel of staff
from home base to site and field allowances for boarding and lodging, etc. shall
also be covered.
iii) Transportation
The rates hereto shall be all-inclusive per vehicle type per month and cover
rent/depreciation, running and maintenance, driver’s wages, charges and
allowances, consumables and any other accountable and variables.
4.0 SUBMISSION, RECEIPT, AND OPENING OF PROPOSALS:
4.1 The original Proposal (Technical Proposal and Financial Proposal; shall be prepared in
indelible ink. It shall contain no inter-lineation or overwriting, except as necessary to
correct errors made by the firm itself. Any such corrections must be initialed by the person
or persons who sign(s) the Proposals.
4.2 An authorized representative of the firm initials all pages of the Proposal.
Th e representative's authorization is confirmed by a written power of attorney
accompanying th e proposals.
4.3 For each proposal, the Consultants should prepare the number of copies indicated in the
Data Sheet. Each Technical Proposal and Financial Proposal should be marked "Original"
or "Cop y" as appropriate. If there are any discrepancies between the original and the
copies of th e Proposal, the original governs.
4.4 The original and all copies of the Technical Proposal shall be placed in a sealed
envelop e clearly marked "Technical Proposal", and the original and all copies of Both
envelopes shall be placed into an outer sealed envelope bearing the submission address
and other information indicated in the Data Sheet and clearly marked, "DO NOT OPEN,
EXCEPT IN PRESENCE OF THE EVALUATION COMMITTEE". (Submit financial- price proposal
4.5 The completed Technical Proposal must be delivered at the submission address on or
before the time and date stated in the Data Sheet.
5.0 PROPOSAL EVALUATION :
A two-stage procedure will be adopted in evaluating the offers.
i. Technical evaluation: This will be carried out prior to opening any Financial Offer;
ii. Financial evaluation: The price proposal of only responsive offer will be open ed.
From the time the bids are opened to the time the contract is awarded, any effort made by the
firm to influence the Client in the Client's proposal evaluation, proposal comparison or contract
award decisions may result in the rejection of the consultant's proposal.
EVALUATION OF TECHNICAL PROPOSALS:
5.1 The evaluation by the Client will carry out the evaluation applying the evaluation criteria as specified
under “Eligibility Criteria for PMC Services” as furnished at the end of this section.
In assessing the qualification and competence of the personnel, general qualifications
(education, experience, position held, time with firm) suitability to perform the particular
assignment an d language/regional experiences will be rated. Proposed staff inputs in excess of
those required to carry out the assignment u n d e r t he Terms of Reference, a s included in
Section-4 and the Sample Draft Contract Agreement (Section-5), will not be awarded extra
technical points.
OPENING AND EVALUATION OF FINANCIAL PROPOSALS; RANKING
5.1 After the evaluation of quality is completed, The Client shall notify the successful consultants that
they have secured the minimum qualifying mark, indicating the date and time set for opening the
Financial Proposals.
5.2 The Financial Proposals shall be opened publicly in the presence of the consultants'
representatives who choose to attend. The name of the consultant, the quality scores, and the
proposed prices shall opened online and recorded when the Financial Proposals are opened.
5.3 The evaluation committee will determine whether the Financial proposals are complete, (i.e.,
whether they have costed all items of the corresponding Technical proposals, if not, the Client
will cost them and add their cost to the initial price), correct any computational errors, and convert
prices in various currencies to the single currency specified in the Data Sheet. The official
selling rates used, to be provided by the source indicated in the Data Sheet, will be those in effect
on the date indicated in th e Data Sheet.
5.4 Please note that the bidders are required to pay Tender Fee in the form of a Demand Draft
issued by any Nationalized Bank only and having branch in PATDI and “Bid Security (EMD)” in the
form of a Bank FDR of 1 year issued by any Nationalized Bank only and having branch in PATDI The
Demand Draft and Bank FDR should be in favor of Chief Officer, PATDI Nagarpalika”.
6.0 NEGOTIATIONS :
Prior to the expiration period of offer validity, Client will notify the successful consultant whose
offer is lowest. Negotiations normally take from two to five days. The aim is to reach
agreement on all points, and initiate a draft contract by the conclusion of negotiations.
6.1 Negotiations will be held at the address indicated in the Data Sheet. The aim is to reach
agreement on all points and sign a contract.
6.2 Negotiations will include a discussion of the Technical Proposal, the proposed methodology (work
plan), staffing and any suggestions made by the firm to improve the Terms of Reference.
The Client and firm will then work out agreed final Terms of Reference, staffing, and bar
charts indicating activities, staff, periods in the field and in the home office, staff-
months, logistics, and reporting. The agreed work plan and final Terms of Reference
will then be incorporated in the "Description of Services" and form part of the
contract. Special attention will be paid to optimizing the required outputs from the
firm within the available budget and to clearly defining the inputs required from the Client
to ensure satisfactory implementation of the Assignment.
6.3 The financial negotiations will include a clarification of the firm's tax liability in the
Client's country (if any), and the manner in which it will be reflected in the contract; and
will reflect the agreed technical modifications in the cost of the services. Unless there
are exceptional reasons, the financial negotiations will involve neither the remuneration
rates for staff (no breakdown of fees) nor other proposed unit rates.
6.4 Having selected the firm on the basis of, among other things, an evaluation of proposed
key professional staff and experience in relevant area of work, the Client expects to
negotiate a contract on the basis of the experts named in the Proposal. Before contract
negotiations, the Client will require assurances that the experts will be actually available.
The Client will not consider substitutions during contract negotiations unless both parties
agree that undue delay in the selection process makes such substitution unavoidable or
that such changes are critical to meet the objectives of the assignment. If this is not the
case and if it is established that key staff were offered in the proposal without confirming
their availability, the firm may b e disqualified.
6.5 The negotiations will conclude with a review of the draft form of the contract. To
complete negotiations the Client and the firm will initial the agreed contract. If
negotiations fail, the Client will invite the firm that received the second highest score to
contract negotiations.
7.0 AWARD OF CONTRACT :
7.1 The contract will be awarded after successful negotiations with successful lowest
bidder consultant. After negotiations are completed, the Client will promptly notify other
consultants on the shortlist (online), that they were unsuccessful and return the
EMD and those consultants, who did not pass the technical evaluation (after their
application for the same).However the Nagarpalika reserves the right, to reject any
tender without assigning reason to bidder. The Chief Officer also reserves the right to
curtail scope of work of the consultant w.r.t. payment schedule etc.
7.2 The firm is expected to commence the Assignment on the date and at the location specified in the
Information relating to evaluation of proposals and recommendations concerning awards shall not
b e disclosed to the consultants who submitted the proposals or to other persons not officially
concerned with the process, until the winning firm has been notified that it has been awarded the
1.1 The name of the Client is : PATDI Nagarpalika.
The method of selection is : Cost-Based Selection after PQ
The Guidelines is : As mentioned in this RFP.
1.2 A technical and a Financial Proposals are requested: Yes
The main objectives and description of the Assignment are:
The broad role of the Project Management Consultant shall be to act on behalf of
Nagarpalika to monitor the specified works / projects on behalf of client and th e
responsibilities shall include:
Post-tender Phase Services
Service during construction Phase
1. Pre-Contract work
2. Review and approval of Detailed Design/QAP & engineering drawings and
documents including all types of civil engineering work.
3. Quality Assurance, day to day construction supervision and Progress Monitoring;
4. Various material tests like-cement, steel, aggregates, mortar, concrete cubes in
witness and recommendation.
5. Scrutinize and certify payment of running bills, recommendation and preparations
of excess extra item, extension of time limit and other contractual matters.
6. Monitoring Tests on Completion;
Service during post-construction Phase
7. Monitoring performance Standards on periodic basis during two years defect liability
1.3 The Assignment is phased: Yes
The role of PMC will be in Three phases. The review and approval of designs shall run parallel to
the construction works;
Activities for pre construction
Activities during construction
Post construction activities
(All the civil / mechanical /Electrical, general arrangement drawings, shall be prepared and
submitted by the EPC contractor, & the consultant shall have to carry out detail design
verification and recommendation for approvals w.r.t. tender stipulations and specifications.)
1.4 A pre proposal conference will be held: As mention in detail tender notice
1.5 The Client will provide the following inputs/assistance: Refer to Clause 8.0 in Terms of Reference.
1.6 The Client envisages the need for continuity for downstream work: No
1.7 The clauses on fraud and corruption in the contract are: Sub-clauses 2.9.1(g) of G.C.C.
2.1 Clarifications may be requested - seven days before the submission date.
The address for requesting clarifications is;
PATDI Nagarpalika
PATDI , Dist. SURENDRANAGAR
3.1 Proposals should be submitted in the language(s): English.
3.2 i) Short-listed firm / entity may associate with other short-listed firm: No
ii) Joint venture: Not allowed
iii) The estimated number of professional staff months required for the assignment shall be filled
in to the described format.
iv) The minimum required experience of proposed key staff is: As per eligibility Criteria
v) Reports which are part of the assignment must be written in the language(s): English.
3.3 I) Training is an important feature of this Assignment: No
II) Additional Information in the technical proposal includes: NIL
III) Age of site persons: not more than 58 years
IV) Majority of key professional staff to be permanent employees of the consultants: Majority of
the key professional staff shall be in permanent employment of bidder or should b e associated
with the firm on a long term basis. Employment / Association of minimum one year or more to
be treated as permanent employee.
1.4 Taxes: Consultants are requested to consult tax consultants for details.
4.5 The consultants to state costs in Indian Rupees.
5.1 Consultants must submit its technical proposal in CD-ROM with one hard copy (in original) along
proposal shall be submitted in online format only.
5.2 The proposal submission address is: (hard copies)
CHIEF OFFICER PATDI Nagarpalika
PATDI , Dist. SURENDRANAGAR
5.3 Proposals must be submitted not later than the following date and
time: As mentioned in Advertisement/Tend er notice d etails.
5.4 The address to bring information to the Client is
CHIEF OFFICER PATDI
Nagarpalika PATDI
Dist. SURENDRANAGAR
5.5 Mode of Submission:
Technical Proposal: By registered post or through Speed Post only
Financial Proposal: Online only
ELEGIBILITY CRITERIA FOR PMC SERVICES
The following criteria shall be fulfilled by the bidder as a minimum to qualify for further evaluation
and opening of their price proposal:
1. The consultant/firm is an Indian Commercial entity and having registration/empanelment in
GUDM and must be in existence since last ten years or more on last date of submission. The Consultant
/ firm must submit attested copy of registration/empanelment with State Government Department in
appropriate class.
(a) Copy of Office Establishment proof
(b) List of Equipment
(c) Copy of empanelment letter
(d) Copy of PAN card
(e) Copy of PF Certificate
(f) Copy of G.S.T. Certificate
(g) Copy of Professional Tax Registration
2. Experience in Key Activities:
a) Consultant/firm should have experience of having successfully completed Similar work in
Nagarpalika DPR Approval and supervision work with bill verification.
b) Copy of Form-3A duly signs with govt. authority of below listed projects.
- The Bidder must have completed Single Underground drainage work or water supply project amounting Rs.
Crore or more as a DPR/ PMC Work.
- The Bidder must have completed Single any kind of Building projects with infrastructure amounting Rs.
Crore or more as a DPR/ PMC Work.
c) Attested Copy of original certificates in support of above requirements shall be enclosed in hard copy
for verification, certified by the respective employer or his authorized representative, not below the
rank of an Executive Engineer or equivalent. Original Certificates of the same shall be produced for
verification on demand by employer. In case of any of the above works being carried out in joint venture
or association, the same shall be certified by client only not below the rank of an Executive Engineer
or equivalent and the certificate in this regards from other JV partner is not acceptable.
B) Financial Criteria:
1. The Consultant/Firm shall have average annual financial turnover during last Five financial years
C) Key Staff Technical Capability – Qualification & Competence
The consultancy firm shall have key staff having qualification and experience/competence as under as
Staff Details Min. Qualification No. of Person
Team Leader B.E. (Civil) 15
Civil Engineer B.E. (Civil) 5
Architect B.Arch 3
Jr. Civil Engineers D.C.E. or higher 5
Mechanical Engineer B.E. (Mech.) 5
Electrical Engineer B.E. (Elect.) 5
CV of above staff along with required certificates / documents in proof of above will be submitted b y
consultant / firm along with his offer.
For evaluation purpose majority of the key professional staff shall be in permanent employment of
bidder or should be associated with the firm on a long term basis. Employment / Association of
minimum on e year or more to be treated as permanent employee.
Note: Bidders shall fulfill all the above criteria for qualification and further evaluation & opening of
their price proposal.
SPECIAL INSTRUCTIONS
2.1 Submission of Proposal:
Your proposal shall be submitted in Two parts, viz.
Technical proposal for qualification
Financial Proposal i.e. Price Bid.
Each in the form of one CD-ROM, with one hard copy in compliance with these instructions. Each
of the two documents shall be sealed and super scribed in a separate envelope. All the sealed and
super scribed envelopes shall be placed in a bigger envelope which will also be sealed and super
scribed and marked as under:
............ (Name of works)........... Consultant Technical / Financial Proposal.
Do not open until......... (Last date for receipt of proposals)
Any proposal not suitably sealed and/or marked is liable to be rejected
DOWNLOAD OF TENDER DOCUMENT: -
The tender document for these work are available only in Electronic format which can be
download free of cost by the bidder.
2.2 Mobilization Advance: No any mobilization advance will be paid
TECHNICAL PROPOSAL - STANDARD FORMS
3A : Technical Proposal submission form.
3B : Firm's references.
3C : Description of the methodology and work plan for performing
the assignment.
3D : Team composition and task assignments.
3E : Format of Curriculum Vitae of Proposed professional staff.
3A TECHNICAL PROPOSAL SUBMISSION FORM
(Location, Date)
From :(Name of Firm) To : (Name & Address of Client)
Ladies/Gentlemen:
Subject: Appointment of Consultant for Project Management Consultancy Works of various types of Civil
Engineering Works in PATDI Nagarpalika Area
We, the undersigned, offer to provide the consulting services for the above in accordance with your
Requ est for Proposal dated (Date), and our proposal. We are hereby submitting our Proposal which
includes this Technical Proposal, and Financial Proposal sealed under a separate envelope. If negotiations
are held durin g the period of validity of the proposal, i.e. before ( Date) we undertake to negotiate
on the basis of th e proposed staff. Our proposal is binding upon us and subject to the modifications
resulting from contract negotiations.
Our Financial Responsibility : Any loss or suppose to loss to Nagarpalika due to any controversy and/or any
ambiguity in our design, scrutiny w.r.t. norms specifications, stipulations etc. mentioned in Main tender
documents(prepared by the consultant),and in our supervision activity, the Nagarpalika is free to recover such
losses from us at any stage of main work contract execution to end of O&M period.
We understand you are not bound to accept any proposal you receive.
Authorized Signature :
Name and Title of Signatory :
3B.1 - FIRM'S REFERENCES
Relevant Services* carried out in the Last Ten Years
That Best Illustrate Qualifications
(Up to 5 numbers of project may be given)
Using the format below, provide information on each reference assignment for which your
firm/entity, either individually as a corporate entity or as one of the companies within an
association, was legally contracted.
Assignment Name : Country :
Location within country : Professional Staff Provided by Your
Firm/Entity (profiles) :
Name of Client : No. of staff :
Address : No. of Staff -Months; duration of assignment :
Start Date (Month/Year) : Completion Approx. Value of services:
Name of Associated Consultants, if any : No. of Months of professional Staff, provided by
Associated Consultants :
Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed :
Narrative Description of Project :
Description of Actual Services* Provided by Your Staff :
* Description of Services shall also include the experience in preparing Tender Documents and
havin g provided services for review and approval of detailed design and engineering drawings/documents
for water supply project and same plant must be in successful operation.
3B.2 - FIRM'S REFERENCES
Relevant Services* carried out in the Last Seven Years
That Best Illustrate Qualifications
(Up to 5 numbers of project may be given)
Using the format below, provide information on each reference assignment for which your
firm/entity, either individually as a corporate entity or as one of the companies within an
association, was legally contracted.
Assignment Name : Country :
Location within country : Professional Staff Provided by Your
Firm/Entity (profiles) :
Name of Client : No. of staff :
Address : No. of Staff -Months; duration of assignment :
Start Date (Month/Year) : Completion Date Approx. Value of services:
Name of Associated Consultants, if any : No. of Months of professional Staff,
provided by Associated Consultants :
Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions performed :
Narrative Description of Project :
Description of Actual Services* Provided by Your Staff :
* Description of Services shall also include the experience of having provided Project
Management Consultancy Services including quality assurance for water supply project and same
plant must be in successful operation.
3C DESCRIPTION OF THE METHODOLOGY AND WORK PLAN FOR PERFORMING
3D COMPOSITION OF THE TEAM PERSONNEL, AND TASK(S) OF EACH TEAM MEMBER
Name of Professional Position Qualification No. of Years Task Employment
Offered of Relevant Assigned Status (regular
Experience / Part Time /
A Key Personnel
B Support Staff
1. Bidder to mention list of team members for each project component [i.e. Post-Tender
(which includes providing services during construction & post-construction phase) Services]
separately and required manpower shall be assigned as per requirement and work stage.
2. The personnel with required qualification and experience forms the minimum basis of
man power to be deployed for this assignment and consultant may suggest additional key or
support staff to meet the obligations under this work assignment.
3E FORMAT FOR CURRICULA VITAE TO BE SUBMITTED
WITH TECHNICAL PROPOSAL
1 Proposed Position :
3 Date of Birth :
4 Nationality :
(The years in which various
qualifications were obtained must be
6 Other Training :
7 Languages and Degrees of :
8 Membership of Professional :
9 Countries/State of work Experience :
1 Employment Record : (Starting with present position. List in reversed order
0 employment held)
Dates : From to
Position Held and Description of :
1 Detailed Tasks Assigned (List of : Work Undertaken Which Best Illustrates Capability To
1 tasks one by one and support each task Handle The Tasks Pertaining To The Proposed
by project experience on the right hand Position
: (List project names, locations, years, positions held,
i.e. supervision engineer, site inspector, etc. with
exact duties rendered and time spent on each project)
1 Certification : I, the undersigned, certify that, to the best of my
2 knowledge and belief, this bio-data correctly
describe myself, my qualifications and my
I/We understand that any willful misleading statement described herein may lead to
disqualification.
Signature Of Consultant Signature Of Named Person
Date Of Signing Date Of Signing
TERMS OF REFERENCE
The consultant shall provide consultancy services for project monitoring including Survey, study of
existing situation, DPR, Tender docu ments, evaluation of bidders, bids, recommendations for bid
etc. Study of tender review and approval of design and detailed engineering documents during
construction phase, supervision of construction and inspection of Materials for the various type of
work as per the terms set forth herein. The works will be under taken up by the Nagarpalika and
funds for the various government scheme.
1) Post-tendering Services (After award to contract):
Services during Construction Phase: Contract Management, inspection of materials &
supervision of construction including:
a) Pre-contract work
b) Checking and approval of detailed designs & drawings.
c) Inspection of materials
d) Over all supervision of Construction activities on day to day basis and including
certification of measurement and bills.
2) Services during Post Construction Phase: Periodical supervision for Defect correction period of
The scope of work is divided in to three phases as under:
a) Post-Tender Phase Services (Phase I & II activities)
b1) Services during Construction Phase (Contract Management, inspection of materials
& supervision of construction, etc.) (Phase I activity)
i) The Period for the Pre-contract work is assumed at two weeks and shall be used to
ensure that all head (branch) office and site staff to be involved fully understands
The Contract Agreement
The design and construction contract documentation
The activities, tasks required under the proposal & position.
ii) The project management period is in months as mentioned earlier including pre-
contract work, which includes the consultant’s mobilization period. Bidders shall base
their pricing on this duration but take into account the various items in the construction
contract (e.g. work schedule and bill of quantities), which may affect the need for
reduced/increased staff input during particular stages of works' execution.
As the magnitude of the work is huge, to supervise the work on day-to-day basis,
consultant has to deploy resident supervisory staff till completion and commissioning of
iii) Post Contract Work will be of duration of two weeks and shall be used to ensure:
The removal of all material, plant, equipment and staff from the site by the
contractor, agree with the Client and the contractor on all monies owed to or by
the contractor, including the remaining retention money, and release all guarantees
and securities in accordance with the provisions of the construction contract.
After clearing and tidying up of the site by the contractor is complete, carry out all
work required to finalize the construction contract administratively.
b2) Services during Post-Construction Phase (Phase II activity)
i) The “Defects Correction Supervision” will be start from the date of issue of the certificate
of substantial completion to the contractor. During this period, permanent presence of
your staff on site is not necessary. The bidder shall depute their staff at site once in a
month for supervision. Consultant’s Team Leader or Environment Engineer or other such
Senior Staff (having experi ence of more than 10 years) shall visit site at least once
in two months. Required observation report shall be submitted to BNP within one
week from the date of site visit.
The project as a whole is monitored by the Nagarpalika. For the purpose of the works
implementation, the project management including design verification, supervision of construction &
inspection of materials, machinery & equipments shall be the scope of the proj ect monitoring
consultant appointed under this contract and funds will be managed by the Nagarpalika.
2) WORKS SUBJECT OF THE CONSULTANCY SERVICE:
The project aims development and provides facilities to public. The proj ects would benefit a
population of urban area of Nagarpalika.
3) APPOINTMENT OF PROJECT ENGINEER :
The Nagarpalika proposes to invite the proposals and would award the tender for the
constru ction, operation and maintenance of the Project to the Contractor (being a single agency or
a consortium selected for the assignment).
The Contractor consortium shall be the same for construction. However for facilitating contract
administration.
The PMC shall appoint reputable firms of engineers, having adequate experience in
construction projects which shall act as the Project Engineer for the purposes of providing pre-
tender services and post-tender services including proj ect monitoring, supervision, inspection,
maintenance of contract and determining and ensuring compliance with the Technical
Requirements, the Performance Standards, monitoring the progress and certification of
measurements and payments during the contract period and in post-construction phase providing
periodic supervision services during two years defect liability period.
4) PROJECT ENGINEER'S SCOPE OF WORK :
There are two basic agreements which govern the work of the Project Engineer after the
work is awarded to contractor after completion of pre-tendering work by BNP / PMC/TPI service
The Construction agreement between the BNP and the Contractor.
The duties and responsibilities of the Project Engineer flow from the above two
agreements between the parties, but the primary agreement governing the Project Engineer
shall be th e Construction agreement. The role of Project Engineer will be in three phases;
Services during Pre-construction phase …as described earlier
Services during Construction Phase
Services during Post Construction Phase (Defects correction supervision)
All the civil / mechanical/electrical general arrangement drawings, shall be pr epared and
submitted by the contractor, & the consultant shall have to carry out detail design verification and
recommendation for approval within five days but in some complicate cases within ten to twelve days.
5) PROJECT ENGINEER'S GENERAL DUTIES :
The broad role of the Project Engineer and his team shall be to act as the Client's representative
for: Survey, study of existing network, population fore casting preparation of conceptual report,
DPR, Tender documents, evaluation of bidders, bids, recommendations for bid etc.
1. Study of survey feasibility, DPR, detail estimate, tender document, invitation of
tender, financial and technical evaluation of bid and final recommendation; carrying out
surveys and soil Investigation by DPR consultant and by the contractor of the proposed
2. Pre-contract work including understanding of The Contract Agreement The design and
construction contract documentation The activities, tasks required under the proposal &
position. The particular procedures and ways of interaction with the Employer and th e
3. Check of survey & setting out;
4. Checking and approval of detailed designs & drawings, QAPs / documents of the project
work submitted by contractor including for various type works.
5. Inspection of materials.
6. Over all supervision of Construction activities on day to day basis and including
certification of measurements and bills, quality Assurance and Progress monitoring.
7. Measurements, scheduling and certification; will monitor all the material test reports
in witness with recommendations
8. Monitoring during trial run and successful commissioning of projects
9. Consultant has to submit their all the correspond ence/reports in printed/typed copy only
10 Will Review the claims/Extra items and submit report to client as and when require. The
scope of work is divided in to three phases as under:
a) Post-Tender Phase Services (Phase I & II activities)
b1) Services during Construction Phase (Contract Management, inspection of materials
& supervision of construction, etc.) (Phase II activity)
i) The Period for the Pre-contract work is assumed at two weeks and shall be used to
ensure that all head (branch) office and site staff to be involved fully understands
The Contract Agreement
The design and construction contract documentation
The activities, tasks required under the proposal & position.
The particular procedures and ways of interaction with the Employer and the contractor
ii) During the project management period including pre-contract work, which includes
the consultant’s mobilization period. Bidders shall base their pricing on this duration but
take into account the various items in the construction contract ( e.g. work schedule
and bill of quantities), which may affect the need for reduced/increased staff input
during particular stages of works' execution.
As the magnitude of the work is large, to supervise the work on day-to-day basis,
consultant has to deploy resident supervisory staff till completion and commissioning of
b2) Services during Post-Construction Phase (Phase II activity)
i) The “Defects Correction Supervision” will be start from the date of issue of the
certificate of substantial completion to the contractor.
The Project Engineer shall, during the pre construction period, inspect the project site at intervals
in order to determine the progress of mobilization. The Project Engineer shall monitor the
progress of surveys and setting out, review, design verification of the construction drawings
submitted by the contractor and the extent of compliance with the Technical Requirements
and the Performance Standards stipulated for the Facility, as well as conformity to the
Contractor's proposals.
The Proj ect Engineer shall, during the construction period, be available on a continuous basis at
th e project site in order to supervise, inspect, monitor and certify the works, and
conformity with Technical Requirements and the Performance Standards stipulated for the
Facility. The Proj ect Engineer shall also monitor the progress of setting out, and review the
construction drawings and as- built-drawings submitted by the contractor. The Project Engineer
shall also perform functions of certification of payments, adherence to project programme,
and reporting. The Proj ect Engin eer shall be responsible to generate the data/reports
required to be submitted to Nagarpalika on a periodic basis as required in the contract
agreement and also give opinion for contractual matter viz; excess, extra items, extension of time
limit and other contractual matter.
The Project Engineer shall, during the defects liability period, inspect the Project Site at intervals
of one month in order to monitor technical performance of the Project. Consultant’s Team
Leader or Environment Engineer or other such Senior Staff (having experience of more than
years) shall visit site at least once in three months. He shall also be available "On-Call" at
reimbursable basis in case of additional visits if desired by client.
The Project Engineer shall report to the Client at very frequent intervals, on a daily, weekly,
and monthly basis, such details as are mutually agreed between the Client and Project Engineer.
Apart from period reports, the Project Engineer shall intimate the Client in writing of any
deviations from the Technical Requirements and Performance Standards.
It is reiterated that the contract is a EPC one, the Client binds the contractor only on
The measurements and reviews do not constitute approval rights as between the Client and
the contractor, but in so far as the Project Engineer is concerned, he shall ensure that a
complete internal record of the work is available. The Project Engineer shall ensure that his
inspections do not impede the design, construction and operation and maintenance of the
The Project Engineer shall be required to exercise:-
i) Study of survey, feasibility, DPR, detail estimate, tender document, invitation of tender,
financial and technical evaluation of bid and final recommendation; carrying out
surveys and soil Investigation by DPR consultant and by the contractor of the
proposed project.
ii) Detailed checking of Structural design submitted by th e contractor.
iii) Appoint necessary staff to carry out day-to-day 100 % site supervision with assuring that
tested/certified materials are used.
iv) Certify the measurements, and dimension control.
v) Witness the testing and inspection of materials of construction at lab. ,at site or
at anywhere in India for brought out goods, Electro/Mech. Items etc.
vi) To liaison and approach with Govt., Semi-Govt.& other departments on behalf
of Nagarpalika for necessary permissions required for thes e work/project including
preparations of replies, papers, documents, drawings, etc. what so ever necessary. Any
fees and charges levied by such departments will be borne by client (BNP).
6) REPORTING AND CO-ORDINATION :
The Project Engineer (and his staff) shall report only to the Client's representative. The
Proj ect Engineer shall not exercise any direct control over the contractor, but shall report to
the Client's representative who shall be the sole point of contact with the Contractor. The Client
may also have senior and supervisory staff if required at site. The contracts also provide for a
Project Engineer to supervise the contract agreement. Similarly the Lenders may appoint a
Lender's engineer. Th e Project Engineer shall co-ordinate with all such persons for the
fulfillment of obligations, but shall report solely to the Client's representative.
7) PROJECT TEAM :
The Consultant would be required to form a multi disciplinary Project Team for this
assignment, from the areas given b elow;
(a) Building Work Expert
(b) Road & Bridge Work Expert.
(c) All types of civil work expert
The Consultant Team should also have multi-disciplinary skills with various experiences in
monitoring of such project and the Environmental Management Plan.
8) ASSISTANCE FROM BNP :
BNP would help in co-coordinating site visits and also any clarifications sought by
Consultants, before the Proposals are submitted.
The Consultants would be assisted by BNP in obtaining relevant information from the authorities
as well extend co-operation on following areas:
a) Exchange of data and information related to the study.
b) Day-to-day interactions and monitoring of activities to enable active project management.
Issue letters of authority to consultants to facilitate activities related to Assignments and
collection of data from State Government Departments and other agencies.
9) PHASING OF AND LOCATION FOR CONSULTANCY SERVICES:
The Consultancy services are to be rendered in following three phases together with the locations:
a) Pre-Tender work : Office/site, as appropriate
b) Services during Construction Phase i.e.
Contract Management, Construction
Supervision, quality assurance, inspection of
Bought-out items, etc. : Site / At vendor’s premises
Material testing any where in
Pre- & Post-Construction work : Office/site, as appropriate
c) Defects Correction Supervision : Site
10) PROCEDURES AND AUTHORITY LEVEL:
The Consultant shall carry out the Services as defined in Clause 5 & Clause 11 of these Terms
of Reference or as otherwise required for efficient works' execution, while acting in the capacity
of the "Representative of the Client" according to the intentions of the "Conditions of
Contract"(Pertaining to the Scope of Work to be decided on mutual Consent), which form
part of "The Request for Proposal” documents for works execution and are available for review
at the BNP. The "Conditions of Contract" clarifies in detail, the duties and authorities of
the Project Engineer and of his representative, to whom the Project Engineer may delegate
duties and authorities as required. Principally, the Project Engineer have to carry out the day-
to-day qualitative and supervision of works execution and construction contract administration
on behalf of the Client following the laid down procedures.
The powers vested in the Project Engineer there to under the terms and conditions of this
Contract are subject to limitations as stipulated in the above said "Conditions of Contract" in
resp ect of taking major steps in construction contract administration notably referring to.
approving assignment and sub-contracting
issuing a notice to commence
certifying additional costs and payments
determining extensions of time
issuing a certificate of substantial completion
issuing a defects correction certificate
11) SCOPE OF WORK:
In the capacity of Project Engineer, the Consultant shall carry out duties and authorities
which include, without being limited to them, the following functions and tasks by phase of
work in addition to the scope of work mentioned in clause 5 of this TOR and in various
clauses. On completion of pre-tender services and award of work to contractor, the following
work and tasks by phase of work shall be carried our by project engineer during construction
11.1 Pre-Contract work:
i) Read and understand the concept of the details of the works and of the Services from the
various documents prepared by or on behalf of the Client.
ii) Inspect all existing surveys, mapping and other site data to determine and identify additional work
as required to provide the contractor with sufficient information to execute the works with no
claims or time extension.
iii) Jointly with the Client, develop formats for reporting and recording.
iv) Mobilize all staff and other requirements well in time to carry out the services.
11.2 Contract Management, Construction supervision and inspection of materials / machineries
& equipments Contract Management
i) Within the powers granted to the Project Engineer, administer the construction contract on
behalf of the client.
ii) Work closely with the client, to assist him to carry out his obligations under the construction
contract in order that the contractor is not hampered in any way in carrying out his duties.
iii) Ensure that the contractor carries out the works in accordance with the construction contract
and assist the contractor therewith, all to enable the contractor to fully carry out his obligations
within the tender total or such other sum as may become payable to him under the
provisions of his contract and within the scheduled time for completion.
iv) Liaise between the Client and the contractor to ensure good communication between all
parties such that disputes do not arise and that any such disputes are settled reasonably and
amicably and assist in any adjudication.
v) Keep accurate records of all site activities and operations and those required elsewhere for
efficient works execution from the contractor and others under the construction contract,
including but not restricted to
o Correspondence between client, Consultant and contractor as well as between them
and third parties.
o Minutes of scheduled meetings
o daily, weekly and monthly report from the Engineer's representative and the site inspectors
o Instructions, variation orders, approval forms, etc.
o Level and survey books, including checks on setting out and completed work.
o Work records, such as measurement, level, dimension, As built drgs and material delivery notes.
o Progress Reports based on Prima Vera or M.S. Project software
o To prepare & submit Monthly progress report with photographs in soft &hard copy
o Charts and drawings
o test data and laboratory reports
o plant and labour returns
o day work records
o financial records, including interim statements plus supporting particulars and certificates
o Administrative records concerning leave, sickness, accidents, etc.
o Where applicable as submitted and as corrected, if necessary.
Review and Approval:
Verification and Authentication of Designs, Construction Drawings & Documents, vendor
documents for bought-out items for designs/documents submitted by the contractor.
Study of contract documents for civil, mechanical and electrical works.
Inspection of Test Plan (ITP) prepared by the contractor / Vendors.
Review of quality assurance plan.
Welding procedure, testing procedure etc. prepared by the contractor.
Checking and inspecting Factory / field laboratories provided by Vendor / contractor to
conduct laboratory tests.
Test certificates / reports of materials to be used for finished product for use in construction
and installation.
Supervision of construction:
i) Supervise the mobilization of the contractor, his staff, plant, equipment etc. and his provisions
for storage and other operating areas, paying particular attention to land made available for
the construction of the works, including rights-of-way and way leaves.
ii) Provide the contractor with points, lines and levels of reference, as made available by the Client or
otherwise established, and check the contractor’s setting out his shall include the accurate
locations and levels of all structures, the lines and levels of pipelines and the locations of
accesses, stora ge areas, working areas, way leaves etc.
iii) Check all construction materials and equipment arriving on site to ensure that they are
in compliance with the lists of supplies submitted by the contractor and meet the requirements of
the specification and the applicable standards’ ensure that all materials handing and storage
is in accordance with the manufacturers’ recommendations. Advise to the contractor for
safety measures & epidemics.
iv) Monitor and inspect the contractor’s methods of construction for permanent and temporary
works, including false work, checking of centering & scaffolding, reinforcement and supervision of
concret e & other civil work, as well as materials and equipment installation, workmanship
and other site operations in regard of compliance with the requirements of the
specification, the applicable standards and the manufacturer’s recommendations, with all
due attention being given to adherence to safety codes, labour laws, either laws, bye-laws
and regulations and avoidance of public nuisance.
v) Prepared and Issue to the contractor from time to time, as and when necessary, such
further drawings, specification and instructions as required under the construction contract to
enable th e contractor to complete his obligations under his contract in a timely manner.
vi) Direct and witness from time to time such tests regarding construction materials and equipment
and workmanship as required under the construction contract to be executed by the
contractor or elsewhere and instruct the contractor to undertake corrective action in case of
non-compliance with the specification or the applicable standards.
vii) Supervise the contractor’s detailed investigations and testing of existing facilities, if any, in regard
of compliance with the plan of action and decide on the basis of the results of the testing on
wheth er the said facilities are sufficiently sound to be incorporated in the permanent works
Winton adversely effecting later operation and functioning.
viii) In the event of technical problems arising on site, assist the contractor in overcoming them in
the interest of the Client. Within the tender total or such other sum as may become payable
to the contractor under the provisions of his contract and within the scheduled time for
ix) Agree with the contractor on the breakdowns of any provisional sums provided for in the bill
of quantities of the construction contract and issue instructions as regards the extent to and
the manner in which the provisional sums will be expended.
x) Issue instructions to carry out work on a day-work basis as and when necessary.
xi) Upon having obtained approval of the client, issue variation orders or order extension of time
as required under the construction contract.
Supervision of construction including commissioning and testing of entire
Review of the documents:
o Study of contract documents for Civil / Mechanical and Electrical work.
o Inspection test plan prepared by the contractor for Civil, Mechanical and Electrical works.
o Material test certificates for cement, reinforcement and major bulk materials.
o Al check test reports laboratory as well as internal for the materials convert, mortar etc.
Site Supervi sion of construction:
o Ensuring setting up of field laboratories
o Contractors internal test on materials, concrete, mortar etc.
o All types of civil, mechanical and Electrical works
o Dimensions, reinforcement, concreting in foundation for major civil works.
o Shuttering, plumb, dimensions, concreting etc. in sub structure including vertical wall,
ring beams, tie beams, columns, slab etc as per approved inspection test plan.
The items listed in scope of works are major items covered under the construction
The miscellaneous items and any other major items remained in the lists but required for
the successful implementation of the project shall also form the part of scope of work under this
Measurement, Valuation, Certification Settlement of claims and financial control
i) Monthly or otherwise periodically measure the permanent works and value them in accordance
with the methods of measurement and notes on pricing as well as the unit rates of the bill of
quantities as included in the construction contract.
ii) Receive the contractor's monthly statement and upon verification against the measurement
and valuation as above, certify the statements or correct them as required under the
construction contract and forward them to the Client for paymen t.
iii) Keep accurate records to maintain an effective cost control system in order that the cost of
works execution remains within the approved amount of contract during the period of the
execution of th e works, the estimate of the total costs shall be continuously updated and the
Client kept informed of his financial commitments and when he shall be required to make
iv) Keep accurate records of all variations made and all Claims forwarded by the contractor,
together with the reasons thereof, which may affect the sum becoming payable to the contractor
under th e provisions of his contract; claims shall be verified skillfully, but fairly interpreting the
provisions of the construction contract and shall only be agreed upon when truly justified.
iv) Upon agreement with the contractor on outstanding work still to be carried out by him during the
defects correction period and upon having obtained approval of the Client thereto, issue at th e
appropriate time the certificate of substantial completion and certify for erase the portion of th e
retention money related thereto.
11.3 Defects Correction Supervision:
i) Make periodic site visits to ensure that any outstanding work agreed upon with the
contractor before the issue of the certificate of substantial completion is properly carried out.
ii) In the event of any defect and whenever required, visit the site, ensure that repairs are
properly carried out.
v) On the occasion of site visits as above and / or request of the Client, supervise performance of
the operators and report to the Client in case of shortcomings, including recommending on
corrective actions.
vi) At the end of the def ects correction period and when all outstanding work is completed
and all repairs are carried out satisfactorily, issue the defects corrections certificate in
accordance with th e provisions of the construction contract.
11.4 Post Contract Work:
i) On removal of all material, plant, equipment and staff from the site by the contractor, agree with
the Client and the contractor on all monies owed to or by the contractor, including the
remaining retention money, and release all guarantees and securities in accordance with the
provisions of the construction contract.
i) After clearing and tidying up of the site by the contractor is complete, carry out all work required
to finalize the construction contract administratively.
12: Responsibility of consultant
Any type of loss and/or burden to BNP, due to poor performance and /or lack of proper scrutiny of
the type, what so ever, by the consultant, leads to financial implication to the consultant.
STANDARD FORM OF CONTRACT
CONTRACT FOR CONSULTANT'S SERVICES
[Name of Client]
[Name of Consultants]
CONTENTS PAGE NO.
I FORM OF CONTRACT
II GENERAL CONDITIONS OF CONTRACT
1. General Provisions
1.1 Definitions
1.2 Law Governing the Contract
1.6 Authorized Represen tatives
1.7 Taxes and Duties
2. Commencement, Completion, Modification, and
Termination of Contract.
2.1 Effectiveness of Contract
2.2 Commencement of Services
2.3 Expiration of Contract
2.4 Modification
2.5 Force Majeure
2.5.1 Definition
2.5.2 No Breach of Contract
2.5.3 Extension of Time
2.6 Termination
2.6.1 By the Client
2.6.2 By the Consultants
2.6.3 Payment upon Termination
3. Obligations of the Consultants
3.2 Conflict of Interest
3.2.1 Consultants Not to Benefit from
Commissions, Discounts, etc.
3.2.2 Consultants and Affiliates Not to Be
Otherwise Interested in Project
3.2.3 Prohibition of Conflicting Activities
3.4 Insurance to Be Taken Out by the Consultants
3.5 Consultants’ Actions Requiring Client's Prior
3.6 Reporting Obligations
3.7 Documents Prepared by the Consultants to be
the Property of the Clien t.
4. Consultants’ Personnel
4.1 Description of Personnel
4.2 Removal and / or Replacement of Personn el
5. Obligations of the Client
5.1 Assistance and Exemptions
5.2 Change in the Applicable Law
5.3 Services and Facilities
6. Payments to the Consultants
6.1 Lamp sum Remuneration
6.2 Contract Price
6.3 Payment for Additional Services
6.4 Terms and Conditions of Payment
6.5 Interest on Delayed Payments
7. Settlement of Disputes
7.1 Amicable Settl ement
7.2 Dispute Settlement
III SPECIAS CONDITIONS OF CONTRACT
Appendix - A Description of the Services
Appendix - B Reporting Requirements
Appendix - C Key Personnel and Sub-Consultants
Appendix - D Breakdown of Contract Price in Foreign
Appendix - E Breakdown of Contract Price in Local
Appendix - F Services and Facilities Provided by Client.
Appendix - G Form of Bank Guarantee for Advance
Payment.(Not Applicable)
I. FORM OF CONTRACT
Appointment of Consultant for providing complete Project Management Consultancy Servic es
including preparation of DPR, DTP, Verif ication of design, Drawings, QAP etc. of various types of
Civil Engineering W orks for PATDI Nagarpalika
Lump Sum Re muneration
This CONTRACT (hereinafter called the "Contract") is made the _ day of the month of
_ _ , 2026 between, on the one hand, _ (hereinafter called the "Client") and, on the oth er
hand, _ (hereinafter called the "Consultants").
[* Note : If the consultants consist of more than one entity, the above should be partially amended to
read as follows :
"..... (hereinafter called the "Client") and, on the other hand, a joint venture consisting of the
following entities, each of which will be jointly and severally liable to the Client for all the Consultant's
obligation under this Contract, _ and _ _ _ (hereinafter called the
namely, _ "Consultants")"].
(a) The Client has requested the Consultants to provide certain consulting services as defined in the
General Conditions of Contract attached to this Contract (hereinafter called the "Services");
(b) The Consultants, having represented to the Client that they have the required professional skills,
a nd personnel and technical resources, have agreed to provide the Services on the terms and
conditions set forth in this contract ;
(c) The Client has received funds from the GoI , GoG and self contribution of ULB.
(d) NOW THEREFORE the parties hereto hereby agree as follows :
1. The following documents attached hereto shall be deemed to form an integral part of this contract :
(a) The General Conditions of Contract (hereinafter called "GC") ;
(b) The Special Conditions of Contract (hereinafter called "SC") ;
(c) The Terms of referen ce
(d) The bid documents
(e) The following Appendices :
[ Note : If any of these appendices are not used, the words "Not Used" should be inserted
below next to the title of the Appendix on the sheet attached hereto carrying the title of that
Appendix -A : Description of the Services _ _
Appendix - B : Reporting Requiremen ts _ _
Appendix - C : Key Personnel and Sub-consultants _ _ _
Appendix - D : Breakdown of Contract Price in Foreign Currency _ _
Appendix - E : Breakdown of Contract Price in Local Currency _
Appendix - F : Services and Facilities Provided by the Client _
Appendix - G : Form of Guarantee for Performance Security Deposit __(N.A) _ _
Appendix - H : Form of Guarantee for Mobilization Advance Payments (N.A)_ _
2. The mutual rights and obligations of the Client and the Consultants shall be as set forth in
the Contract, in particular :
(a) The Consultants shall carry out the Services in accordance with the provisions of
the contract; and
(b) The Client shall make payments to the Consultants in accordance with the provisions of
IN WITNESS WHEREOF, the Parties hereto have caused this contract to be signed in their
resp ective names as of the day and year first above written.
FOR AND ON BEHALF OF [NAME OF CLIENT]
(Authorized Representative).
FOR AND ON BEHALF OF [NAME OF CONSU LTANT]
(Authorized Representative)
[ Note : If the Consultants consist of more than one entity, all of these entities should appear
as signatories, e.g., in the following manner ;]
FOR AND ON BEHALF OF EACH OF
THE MEMBERS OF THE CONSULTANTS [Name of Member ]
(Authorized Representative) [Name of Member]
(Authorized Representative)
II. GENERAL CONDITIONS OF CONTRACT
1. GENERAL PROVISIONS:
1.1 Definitions ;
Unless the context otherwise requires, the following terms whenever used in this Contract have
the following meanings;
(a) "Applicable Law" means the laws and any other instruments having the force of law in
Gujarat as they may be issued and in force from time to time ;
(b) "Contract" means the Contract signed by the Parties, to which these General Conditions
of Contract (GC) are attached, together with all the documents listed in Clause 1 of such
signed Contract ;
(c) "Contract Price" means the price to be paid for the performance of the Services,
in accordance with Clause-6;
(d) "Foreign Currency" means any currency other than the Indian currency;
(e) "GC" mean these General Conditions of Contract.
(f) "Government" means the Government of Gujarat & Government of India.
(g) "Local currency" means the Indian Rupees.
(h) "Member", in case the Consultants consist of a joint venture of more than one entity,
means any of these entities, and "Members" means all of these entities; "Member
in charge" means the entity specified in the SC to act on their behalf in exercising all
the Consultant's rights and obligations towards the Client under this contract ;
(i) "Party" means the Client or the Consultants, as the case may be, and Parties means both
(j) "Personnel" means persons hired by the consultants or by any Sub-consultant as employees
and assigned to the performance of the Services or any part thereof ;
(k) "SC" means the Special Conditions of Contract by which these General Conditions
of Contract may be amended or supplemented ;
(l) "Services" means the work to be performed by the Consultants pursuant to this Contract
as described in Appendix-A; and
(m) "Sub-consultant" means any entity to which the Consultants subcontract any part of
the Services in accordance with the provisions of Clauses 3.5 and 4./scope of work
1.2 Nothing contained herein shall be construed as establishing a relation of master and servant or
of principal and agent as between the Employer and the Consultants. The Consultants, subject
to this contract, have complete charge of personal and Sub-consultants, if any, performing the
Services and shall be fully responsible for the Services performed by them or on their behalf
1.3 Law Governing the Contract;
This contract, its meaning and interpretation, and the relation between the parties shall be
govern ed by the Applicable Law.
This Contract has been executed in the language specified in the SC, which shall be the binding
and controlling language for all matters relating to the meaning or interpretation of this contract.
The headings shall not limit, alter or affect the meaning of this Contract.
1.6.1. Any notice, request or consent made pursuant to this contract shall be in writing and shall
be deemed to have been made when delivered in person to an authorized representative of the
party to whom the communication is addressed, or when sent by registered mail, telex,
telegram or facsimile to such party at the address specified in the SC.
1.6.2. Notices will be deemed to be effective as specified in the SC.
1.6.3. A Party may change its address for notice hereunder by giving the other party notice of such
change pursuant to the provisions listed in the SC with respect to Clause GC 1.6.2.
The Services shall be performed at such locations as are specified in Appendix-A and, where
the location of a particular task is not so specified, at such locations, whether in the jurisdiction
of BNP or elsewhere, as the client may approve.
1.8 Authority of Member in Charge:
In case the Consultants consist of a joint venture of more than one entity, the members
h ereby authorize the entity specified in the SC to act on their behalf in exercising all the
Consultants' rights and obligations towards the Employer under this Contract, including without
limitation the receiving of instructions and payments from the Employer.
1.9 Authorized Represen tatives:
Any action required or permitted to be taken, and any document required or p ermitted to
b e executed, under this contract by the Client or the Consultants may be taken or executed
by th e officials specified in the SC.
1.10 Taxes and Duties:
Unless otherwise specified in the SC, the Consultants, sub-consultants and their personnel shall
pay such taxes, duties, fees and other impositions as may be levi ed under the applicable law, the
amount of which is deemed to have been included in the Contract Price.
2. COMMENCEMENT, C O MP LETION, MODIFICATION AND TERMINATION OF CONTRACT.
2.1 Effectiveness of Contract :
This Contract shall come into effect on the date the Contract is signed by both Parties or such
oth er later date as may be stated in the SC.
2.2 Termination of Contract for Failure to Become Effective
If this contract has not become effective within such time period after the date of the
contract signed by the Parties as shall be specified in the SC, either Party may, by not less than four
(4) weeks' written notice to the other Party, declare this Contract to be null and void, and in the
event of such a declaration by either Party, neither party shall have any claim against the other
Party with resp ect hereto.
2.3 Commencement of Services:
The consultants shall begin carrying out the Services within ten (10) days after the date the
Contract becomes effective, or at such other date as may be specified in the SC.
2.4 Expiration of Contract:
Unless terminated earlier pursuant to Clause 2.6, this contract shall terminate at the end of
such time period after the Effective Date as is specified in the SC.
2.5 Entire Agreement:
This contract contains all covenants, stipulations and provisions agreed by the parties. No agent
or representative of either Party has authority to make, and the parties shall not be bound or be
liable for, any statement, representation, promise or agreement not set forth herein.
2.6 Modification :
Modification of the terms and conditions of this Contract, including any modification of the
scope of the Services or of the Contract Price, may only be made by written agreement
between the parties and shall not be effective until the consent of the competent authority is
2.7 Force Majeure ;
For the purposes of this contract, "Force Majeure" means an event which is beyond
the reasonable control of a Party, and which makes a Party's performance of its
obligations under the Contract impossible or so impractical as to be considered
impossible under th e circumstances.
2.7.2 No Breach of Contract:
The failure of a Party to fulfill any of its obligations under the contract shall not
be considered to be a breach of, or default under this Contract insofar as such inability
arises from an event of Force Majored, provided that the Party affected by such an
event (a) has taken all reasonable precautions, due care and reasonable alternative
measures in order to carry out the terms and conditions of this contract, and (b) has
informed the other Party as soon as possible about the occurrence of such an event.
2.7.3. Measures to be taken
a) A Party affected by an event of Force Majeure shall take all reasonable measures to
remove such Party's inability to fulfill its obligations hereunder with a minimum
b) A party affected by an event of Force Majeure shall notify the other party of
such event as soon as possible, and in any event not later than fourteen (14)
days falling the occurrence and such events, providing evidence of the nature and
cause of such event, and shall similarly give notice of the restoration of normal
conditions as soon as possible.
c) The parties shall take all reasonable measures to minimize the consequences of
any event of Force Majeur e.
2.7.4. Extension of Time:
Any period within which a Party shall, pursuant to this Contract, complete any action or
task, shall be extended for a period equal to the time during which such Party was
unable to perform such action as a result of Force Majeure.
Not later than thirty (30) days after the Consultants, as the result of an event of Force
Majeure, have become unable to perform a material portion of the Services, the Parties shall
consult with each other with a view to agreeing on appropriate measures to be taken in the
2.8 Suspension:
The Employer may, by written notice of suspension to the Consultants, suspend all payments to
the Consultants hereunder if the Consultants fail to perform any of their obligations under this
Contract, including the carrying out of the Services, provided that such notice of suspension (i)
shall specify th e nature of the failure, and (ii) shall request the Consultants to remedy such failure
within a period not exceeding fifteen (15) days after receipt by the Consultants of such notice of
2.9 Termination:
2.9.1. By the Client:
The Client may terminate this Contract, by not less than thirty (30) day's written notice
of termination to the Consultants, to be given after the occurrence of any of the
events specified in paragraphs (a) through (d) of this Clause 2.9.1 and sixty (60) days' in
the case of the event referred to in (e) :
(a) If the Consultants do not remedy a failure in the performance of their
obligations under the Contract, within fifteen (15) days of receipt after being
notified or within such further period as the Client may have subsequently
approved in writing ;
(b) If the Consultants become (of, if the Consultants consist of more than one
entity, if any of their members becomes) insolvent or bankrupt or enter into any
agreements with their creditors for relief of debt or take advantage of any law for
the benefit of debtors or go into liquidation or receivership whether compulsory
(c) if the Consultants fail to comply with any final decision reached as a result of dispute
proceedings pursuant to Clause GC.8
(d) if the Consultants submit to the Employer a statement which has a material
effects on the rights, obligations or interests of the Employer and which the
Consultants know to be false.
(e) If, as the result of Force Majeure, the Consultants are unable to perform a material
portion of the Services for a period of not less than sixty (60) days; or
(f) If the Employer, in its sole discretion and for any reason whatsoever, decides
to terminate this Contract.
(g) If the consultant, in the judgment of the Client has engaged in corrupt or
fraudulent practices in competing for or in executing the Contract.
For the purpose of this clause:
"Corrupt practice" means the offering, giving, receiving or soliciting of anything
of value to influence the action of a public official in the selection process or in
contract execution.
"fraudulent practice" means a misrepresentation of facts in order to
influence a selection process or the execution of a contract to the detriment
of the Borrower, and includes collusive practice among consultant (Prior to or
after submission of proposals) designed to establish prices at artificial non
competitive levels and to deprive the Borrower of the benefits of free and open
2.9.2. By the Consultants:
The Consultants may terminate this contract, by not less than sixty (60) days written
notice to the Client, such notice to be given after the occurrence of any of the events
specified in paragraphs (a) and (b) of this clause 2.9.2.
(a) if the Employer is in material breach of its obligations pursuant to this Contract
and has not remedied the same within one hundred twenty (120) days (or such
longer period as the Consultants may have subsequently approved in writing)
without any justifiable reason following the receipt by the Employer of the
Consultants notice specifying such breach;
(b) If, as the result of Force Majeure, the Consultants are unable to perform a material
portion of the Services for a period of not less than one hundred fifty (150) days,
(c) if the Employer fails to comply with any final decision reached as a result
of arbitration pursuant to Clause GC.8 hereof.
2.9.3. Cessation of Rights and Obligations
Upon termination of this contract pursuant to Clause GC 2.2 or GC 2.9 hereof, or
upon expiration of this contract pursuant to Clause GC 2.4 hereof, all rights and obligations
of th e Parties hereunder shall cease, except;
i) Such rights and obligations as may have accrued on the date of termination or expiration.
ii) The obligations of confidentiality set forth in Clause GC 3.3 hereof;
iii) The Consultants' obligation to permit inspection, copying and auditing of their accounts
and records set forth in Clause GC 3.6 (ii) hereof; and
iv) Any right which a Party may have under the Applicable Law.
2.9.4. Cessation of Services
Upon termination of this Contract by notice of either Party to the other pursuant to
Clause GC 2.9.1 or GC 2.9.2. hereof, the Consultants shall, immediately upon dispatch or
receipt of such notice, take all necessary steps to bring the Services to a close in a prompt
and orderly manner and shall make every reasonable effort to keep expenditures for
this purpose to a minimum. With respect to documents prepared by the Consultants
and equipment and materials furnished by the Employer, the Consultants shall
proceed as provided, respectively, by Clauses GC 3.9 or GC 3.10 hereof.
2.9.5. Payment upon Termination;
Upon termination of this Contract pursuant to Clause 2.9.1 or 2.9.2, the Client shall make
the following payments to the Consultants incase no implications realized due to
fault at consultant side;
(a) remuneration pursuant to Clause 6 for services satisfactorily performed prior to
the effective date of termination ;
(b) Reimbursable expenditures pursuant to Clause GC 6 hereof for expenditures
actually incurred prior to the effective date of termination, and
(c) except in the case of termination pursuant to paragraphs (a) and (d) Clause
2.9.1, reimbursement of any reasonable cost incident to the prompt and
orderly termination of the Contract.
2.9.6. Disputes about Events of Termination
If either party disputes whether an event specified in paragraphs (a) through (c) of Clause
2.9.1 or in Clause GC 2.9.2. hereof has occurred, such Party may, within forty-five (45)
days after receipt of notice of termination from the other Party, refer the matter to
dispute settlement pursuant to Clause GC 8 hereof.
3. OBLIGATIONS OF THE CONSULANTS:
3.1.1 Standard of performance
The Consultants shall perform the Services and carry out their obligations
hereund er with all due diligence, efficiency and economy, in accordance
with generally accepted professional techniques and practices, and shall
observe sound management practices, and employ appropriate advanced
technology and saf e methods. The Consultants shall always act, in respect of any
matter relating to this contract or to the Services, as faithful advisers to the
Client, and shall at all times support and safeguard the Client's legitimate interests
in any dealings with sub- consultants or third parties.
3.1.2 Law Governing Services:
The Consultants shall perform the Services in accordance with the Applicable
Law and shall take all practicable steps to ensure that any Sub-consultants, as well
as th e personnel of the Consultants and any Sub-consultants, comply with the
Applicable Law.
3.1.3 If the performance of the consultant found poor, financial implication imposed
3.2 Conflict of Interests:
3.2.1 Consultants Not to Benefit from Commissions, Discounts, etc.
The remuneration of the Consultants pursuant to Clause 6 shall constitute th e
Consultant's sole remuneration in connection with this Contract or the Services,
and the Consultants shall not accept for their own benefit any trade
commission, discount or similar payment in connection with activities pursuant
to this contract or to the Services or in the discharge of their obligations under
the Contract, and the Consultants shall use their best efforts to ensure that the
Personnel, any Sub- consultants, and agents of either of them, similarly shall
not receive any such additional remuneration.
3.2.3 Consultants and Affiliates Not to Be Otherwise Interested in Project:
The Consultants agree that, during the term of this contract and after
its termination, the Consultants and their affiliates, as well as any sub-
consultant and any of its affiliates, shall be disqualified from providing goods,
works or services (other than the Services and any continuation thereof) for any
project resulting from or closely related to the Services.
3.2.4. Prohibition of Conflicting Activities:
Neither the Consultants nor their Sub-consultants nor the Personnel shall
engage, either directly or indirectly, in any of the following activities.
(a) during the term of this Contract, any business or professional activities in
the Government's country which would conflict with the activities assigned to
them under this contract ; or
(b) After the termination of this contract, such other activities as may be specified in
The Consultants, their Sub-consultants, and the Personnel of either of them shall not,
either during the term or within two (2) years after the expiration of this Contract,
disclose any proprietary or confidential information relating to the Project, the Services,
this Contract, or the Client's business or operations without the prior written consent of
3.4 Liability of the Consultants
Subject to additional provisions, if any, set forth in the SC, the Consultants' liability
under this Contract shall be as provided by the Applicable Law.(also see- special
conditions of contract)
3.5 Insurance to be taken out by the Consultants:
The Consultants(a) shall take out and maintain, and shall cause any Sub-Consultants to
tak e out and maintain, at their (or the Sub-Consultant's, as the case may be) own
cost but on terms and conditions approved by the Client, insurance against the
risks, and for the coverage, as shall be specified in the SC; and (b) at the Client's
request, shall provide evidence to the Client showing that such insurance has been
taken out and maintained and that the current premiums have been paid.
3.6 Accounting, Inspection and Auditing
The Consultants (i) shall keep accurate and systematic accounts and records in respect of
the Services, hereunder, in accordance with internationally accepted accounting
principles and in such form and detail as will clearly identify all relevant time charges
and cost, and th e bases thereof (including such bases as may be specifically referred in
the SC), (ii) shall permit the Employer or its designated representative periodically,
and up to one year from the expiration or termination of this Contract, to inspect the
same and make copies thereof as well as to have them audited by auditors appointed by
3.7 Consultant's Actions Requiring Client's Prior Approval:
The Consultants shall obtain the Client's prior approval in writing before taking any of
the following actions;
(a) entering into a subcontract for the performance of any part of the Services,
(b) appointing such members of the Personnel not listed by name in Appendix C
("Key Personnel and Sub-Consultants"), and
(c) any other action that may be specified in the SC.
3.8 Reporting obligations:
The consultants shall submit to the Client the reports and documents specified in Appendix B
in the form, in the numbers, and within the periods set forth in the said Appendix.
3.9 Documents Prepared by the consultants to be the Property of the Client:
All plans, drawings, specifications, designs, reports and other documents and software
submitted by the Consultants in accordance with Clause 3.6 shall become and remain the
property of the Client, and the Consultants shall, not later than upon termination or
expiration of this Contract, deliver all such documents and software to the Client, togeth er
with a detailed inventory thereof. The Consultants may retain a copy of such documents
and software. Restrictions about the future use of these documents, if any, shall be
specified in the SC.
4.0 CONSULTANTS' PERSONNEL:
The Consultants shall employ and provide such qualified and experienced personnel and
sub-consultants as are required to carry out the Services.
4.2 Description of Personnel:
a) The titles, agreed job descriptions, minimum qualifications and estimated period
of engagement in the carrying out of the Services of the Consultants' Key
Personnel are described in Appendix C. If any of the Key Personnel has already
been approved by the Employer his/her name is listed as well.
b) If required to comply with the provisions of clause GCC 3.1.1. hereof,
adjustments with respect to the estimated periods of engagement of Key
Personnel set forth in Appendix C may be made by the Consultants by written
notice to the Employer, provided (i) that such adjustments shall not alter the
originally estimated period of engagement of any individual by more than 10%
or one week, whichever is larger, and (ii) that the aggregate of such adjustments
shall not cause payments under this contract to exceed the ceilings set forth in
Clause GC 6.1. (b) of this contract. Any other such adjustments shall not be
made without the Employer's written approval.
c) If additional work is required beyond the scope of the Services specified in Appendix
A,/scope of work etc, the estimated periods of engagement of Key Personnel
set forth in Appendix C may be increased by agreement in writing
between the Employer and the Consultants, provided that any such increase
shall not, except as otherwise agreed, cause payments under this Contract to
exceed the ceilings set forth in Clause GC 6.1 (b) of this Contract.
4.3 Approval of personnel
The Key Personnel and sub-consultants listed by titl e as well as by name in Appendix C
as hereby approved by the Employer. In respect of other Key Personnel which the
Consultants propose to use in carrying out the Services, the Consultants shall submit to
the employer for review and approval a copy of their biographical data and (in the case of
Key personnel to be used within the country of the Government).
4.4 Working Hours, Overtime, leave etc.
a) Working hours and holidays for key personnel are set forth in Appendix C hereto.
To account for travel time, foreign personnel carrying out Services inside India
shall be deemed to have commenced (or finished) work in respect of the
Services such number of days before their arrival (or after their departure from).
b) The key personnel shall not be entitled to be paid for overtime nor to take paid
sick leave or vacation leave except as specified in Appendix C hereto, and
except as specified in such Appendix, the Consultants n' remuneration shall
be deemed to cover these items. All leave to be allowed to the Personnel is
included in the staff- months of service set forth in Appendix C. Any taking of
leave by personnel shall be subject to the prior approval by the Consultants who
shall ensure that absence for leave purposes will not delay the progress and
adequate supervision of the Services.
4.5 Removal and/or Replacement of Personnel:
(a) Except as the Client may otherwise agree, no changes shall be made in the
Key Personnel. If, for any reason beyond the reasonable control of the
Consultants, it becomes necessary to replace any of the Key Personnel, the
consultants shall forth with provide as a replacement a person of equivalent or
better qualifications.
(b) If the Employer finds that any of the Personnel have (i) committed
serious misconduct or has been charged with having committed a criminal
action, or (ii) have reasonable cause to be dissatisfied with the
performance of any of the personnel, then the Consultants shall, at the
Employer's written request sp ecifying the grounds therefore, forthwith
provide as a replacement a person with qualifications and experience
acceptable to the Emplo yer.
(c) Any of the personnel provided as a replacement under Clauses (a) and (b) above,
the rate of remuneration applicable to such person as well as any
reimbursable expenditure (including expenditures due to the number of eligible
dependents) the consultants may wish to claim as a result of such replacement,
shall be subject to the prior written approval by the Employer. Except as the
Employer may otherwise agree, (i) the Consultants shall bear all additional travel
and other costs arising out of or incidental to any removal and / or replacement,
and (ii) the remuneration to b e paid for any of the personnel provided as a
replacement shall not exceed the remuneration which would have been payable
to the personnel replaced.
4.6 Resident Project Manager.
If required by the SC, the Consultants shall ensure that all times during the
Consultan ts' performance of the Services in India a resident project manager,
acceptable to the Employer, shall take charge of the performance of such Services.
5. OBLIGATIONS OF THE EMPLOYER:
5.1 Assistance and Exemptions :
Unless otherwise specified in the SC, the Employer shall use its best efforts to ensure
that the BNP shall:
a) Assist the consultants, sub-consultants and personnel with such
available documents as shall be necessary to enable the consultants, sub-
consultants or personnel to perform the services.
b) Assist for the personnel and, if appropriate, their eligible dependents to be
provided promptly with all necessary entry documents required for their stay in
d) Issue to officials, agents and representatives of the BNP all such instructions as
may be necessary or appropriate for the prompt and effective implementation
of the services.
e) Assist the consultants and the personnel and any sub-consultants employed by
the consultants for the services from any requirement to register or obtain an y
permit to practice their profession or to establish themselves either
individually or as a corporate entity according to the Applicable Law.
f) grant to the consultants, any sub-consultant and the personnel of either of
them th e privilege, pursuant to the Applicable Law, of bringing into
Government's cou ntry reasonable amounts of foreign currency for the
purpose of the services or for the personnel use of the personnel and their
dependents and of withdrawing any such amounts as may be earned herein by
the personnel in the execution of the services; and
g) Provide to the consultants, sub-consultants and personnel any such other
assistance as may be specified in the SC.
5.2 Access to Land
The Employer warrants that the consultants shall have, free of charge, unimpeded access
to all land in the BNP's limit in respect of which access is required for the performance of
the services. The Employer will be responsible for any damage to such land or any
prop erty thereon resulting from such access and will indemnify the consultants and
each of the personnel in respect of liability for any such damage, unless such damage is
caused by th e default or negligence of the consultants or any sub-consultant or the
personnel of either of them.
5.3. Changes in the Applicable Law.
If, after the date of this contract, there is any change in the Applicable Law with respect
to taxes and duties which increase or decreases the cost or reimbursable expenses
incurred by the consultants in performing the services, then the remuneration and
reimbursable expenses otherwise payable to the consultants under this contract shall
be increased or decreased accordingly by agreement between the parties hereto, and
corresponding adjustments shall be made to the ceiling amounts specified in Clause GC
5.4. Services, Facilities and Property of the Employer
The Employer shall make available to the Consultant and the personnel, for the purposes
of the services and free of any charge, the services, facilities and property described
in Appendix E at the times and in the manner specified in said Appendix E, provided that if
such services, facilities and property shall not be made available to the consultants as an
when so specified, the parties shall agree on (i) any time extension that it may be
appropriate to grant to the consultants for the performance of the services, (ii) the
manner in which the consultants shall procure any such services, facilities and property
from other sources, and (iii) the additional payments, if any, to be made to the
consultants as a result thereof pursuant to Clause GC 6.1.(c) hereinafter.
In consideration of the services performed by the consultants under this contract,
the employer shall make to the consultants such payments and in such manner as is
provided by Clause GC 6 of this Contract.
5.6 Counterpart Personn el
a) If so provided in Appendix E hereto, the Emplo yer shall make available to the consultants,
as and when provided in such Appendix E, and free of charge, such counterpart personnel
to be selected by the Employer, with the Consultants' advice, as shall be specified
in such Appendix E. Counterpart personnel shall work under the exclusive
direction of th e Consultants. If any member of the counterpart personnel fails to
perform adequately any work assigned to him by the consultants which is consistent
with the position occupied by such member, the consultant may request the
replacement of such member, and th e employer shall not unreasonably refuse to act
upon such requ est.
6. PAYMENTS TO THE CONSULTANTS:
6.1 Lump Sum Remuneration :
The Consultant's total remuneration shall not exceed the Contract Price and shall be a
fixed lump sum including all staff costs, sub-consultants' costs, printing, communications,
travel, accommodation, and the like, and all other costs incurred by the Consultant in
carrying out the Services described in Appendix A.
6.2 Contract Price :
(a) The price payable in local currency is set forth in the SC.
6.4 Terms and Conditions of Payment :
Payments will be made to the account of the Consultants and according to the
payment schedule stated in the SC. Unless otherwise stated in the SC, the payment
shall be made as per the provisions shown in breakup of payments Any other payment
shall be made aft er the conditions listed in the SC for such payment have been met,
and the Consultants have submitted an invoice to the Client specifying the amount due.
6.5 Interest on Delayed Payments :
The Client shall make all sincere efforts for timely payments preferably within forty five
(45) days. However, in no case interest shall be paid to the Consultants for the delay in
7.0 FAIRNESS AND GOOD FAITH
7.1. Good Faith
The Parties undertake to act in good faith with respect to each other's rights under this contract and
to adopt all reasonable measures to ensure the realization of the objectives of this contract.
7.2 Delays: The Final DTP should be submitted within the period of 90 days from the date of LOI.
If the services are impeded or delayed by the consultant without any force majeure
reason the client shall derive a power to impose a penalty at the rate of 0.1% of contract value
per day of delay, subject to a maximum of 10% of the total value of contract.
8.0 SETTLEMENT OF DISPUTES:
8.1 Amicable Settlement
Where notice of dissatisfaction has given under Sub-Clause the parties shall attempt to settle
such dispute amicably before the commencement of arbitration under Cl.8.2 Provided that unless the
parties agree otherwise, arbitration may be recommenced on or after the fifty-sixth day after the day
on which notice of dissatisfaction was given, even if no attempt at amicable settlement has been
8.2 Disputes shall be settled in accordance with the following provisions:
Any dispute arise between consultant and execution department shall be tabled before
Th e commissioner of Nagarpalika and the final decision with respect to such dispute
delivered by the commissioner shall be abide to both the parties without any further
arbitration for such dispute.
8.3. All Arbitration Proceedings under this agreement shall be held at
SURENDRANAGAR Jurisdiction
III. SPECIAL CONDITIONS OF CONTRACT
Number of Amendments of, and Supplements to, GC Clause* Clauses in the General Conditions of Contract.
1.0 The Language is : English
1.1 The Addresses are :
Employer : PATDI Nagarpalika
At. PATDI Dist. SURENDRANAGAR.
Attention : Engineer
1.2 Notice will be deemed to be effective as follows:
a) In the case of personal delivery or registered mail, on delivery,
b) In the case of telegrams, 24 hours following confirmed transmission, and
c) In the case of facsimiles, 24 hours following confirmed transmission.
1.3 The Authorized Representatives are :
For the Client : Engineer,
For the Consultant:
* Clauses in brackets are optional; all notes should be deleted in final text.
1.4 Taxes & Duties (ALL TYPE OF TAXES SHALL BE BEAR BY CONSULTANT FROM THEIR QUATED RATES)
1.4.1 For domestic consultants/p ersonnel and foreign consultants/personnel who are
perman ent residents in India.
The consultants and his personnel shall pay/bear all types of taxes, duties; fees, levies and
oth er impositions levied under the existing, amended or enacted laws during life of this
contract and the client shall perform such duties in regard to the deduction of such tax as may be
lawfully imposed.
1.4.3 For foreign Consultants/perso nnel:(Foreign Consultants are not invited)
The client warrants that the client shall pay on behalf of the consultants and the Personnel
any taxes, duties, fees, levies and other impositions imposed, under the Applicable Law,
on the consultants and the Personnel in respect of:
(a) any payments made to the Consultants, Sub-consultants, and the Personnel of either
of them (other than Indian nationals or foreign nationals now permanently residing in
India), in connection with the carrying out of the Services;
(b) any equipment, materials and supplies brought into India by the Consultants or
Sub- consultants for the purpose of carrying out the Services and which, after having been
bou ght into such territories, will be subsequently withdrawn there from by them ;
(c) any equipment imported for the purpose of carrying out the Services and paid for
out of funds provided by the client and which is treated as property of the client ;
(d) any property brought into India by the Consultants, any Sub-consultants, and the
Personnel of either of them (other than Indian national or permanent residents of India),
or the eligible dependents of such personnel for their personal use and which will
subsequently b e withdrawn there from by them upon their respective departure from
India, provided that ;
(1) the consultants, sub-consultants and Personnel, and their eligible dependents,
shall follow the usual customs procedure of the Government in importing
property into India; and
(2) If the consultants, Sub-consultants or personnel, or their eligible dependents, do
not withdraw but dispose of any property in India upon which customs duties and
taxes have been exempted, the consultants, Sub-consultants or Personnel, as
the case may be,
i) shall bear such customs duties and taxes in conformity with the
regulations of the Government. or
ii) shall reimburse them to the client if they were paid by the client at the
time the property in question was brought into the Government's
2. Commencement of Contract
2.1 The date on which this Contract shall come into effect is : from the LOI is issued or as
mentioned earlier in Section 2. Cl -3.11
2.3 The date for commencement of services shall be from the date of receipt of Letter of Acceptance
or issue of work order and shall be phased as under:
2.3.2 The duration of contract for providing PMC services during construction phase shall be
the period of EPC contracts + Two Weeks for post-construction work and shall
commence from the date of award to work to contractor
2.3.3 The duration of contract for providing services during post-construction phase shall be
for defect liability period/O & M period from the date of commencement of O&M
after completion of construction phase of EPC contract and shall commence from the
date of start of O&M contract of EPC contractor.
2.4 The period shall be the period of services to be provided in various phases as under:
a) Service during construction phase i.e. construction of EPC Contract including pre-
construction work plus two weeks for post-construction work.
b) Service during post-construction phase i.e. periodic supervision services during defect liability /
O & M period of EPC contract.
3.4 Limitation of the Consultant's liability towards the Employer.
a) Except in case of gross negligence or willful misconduct, on the part of the Consultants
or on the party of any person or firm acting on behalf of the consultants in carrying
out th e services, the consultants, with respect to damage caused by the
consultants to their Employer's prior existing property, shall not be liable to the
b) This limitation of liability shall not affect the consultants' liability, if any, for damage to
Third parties caused by the consultants or any person or firm acting on behalf of the
consultants in carrying out the services.
3.5 The risks and the coverage shall be;
1) Third Party motor vehicle liability insurance as required under Motor Vehicles Act, 1988, in
respect of motor vehicles operated in India by the Consultants or their Personnel or any Sub-
consultants or their Personnel, for the period of Consultancy;
2) Third Party liability insurance, with a minimum coverage for Rs. 7 lacs for the period of
3) Employer's liability and worker's compensation insurance in respect of the Personnel of the
consultants and of any sub-consultant, in accordance with the relevant provisions of the
Applicable Law, as well as, with respect to such Personnel, any such life, health, accident,
travel or other insurance as may be appropriate;
4) Professional liability insurance, with a minimum coverage of equal to total contract value for
this consultancy; and
5) Insurance against loss of or damage to (i) equipment purchased in whole or in part with
funds provided under this Contract, (ii) the Consultant's property used in the performance of
the Services, and (iii) any documents prepared by the Consultants in the performance of the
3.7.c. The other sections are :
(i) Taking any action under a civil works contract designating the Consultants
as "Engineer" for which action, pursuant to such civil works contract, the
written approval of "Employer" is required.
3.9 The Consultants shall not use these documents for purposes unrelated to this
Contract without the prior written approval of the Client.
4.6. The person designated as Team Leader in Appendix C, shall serve in that capacity
as specified in GCC Clause
6.1.b. The ceiling in local currency is the standard fee prescribed in the Appendix D
6.2.(a) (ii) Price adjustments are set further in Appendix D
6.2.(b)(i)(1) It is understood (i) that the remuneration rates shall cover (A) such salaries and
allowances as the Consultants shall have agreed to pay to the Personnel as well as
factors for social charges and overhead, and (B) the cost of backstopping by home
office staff not included in the personnel listed in Appendix C, and (C) the Consultants'
fee, (ii) that bonuses or oth er means of profit-sharing shall not be allowed as an
element of overhead, and (iii) that any rates specified for persons not yet appointed
shall be provisional and shall be subject to revision, with the written approval of
the Employer, once the applicable salaries and allowances are known.
(2) Remuneration for periods of less than one month shall be calculated on an hourly basis
for actual time spent in the Consultants' home office and directly attributable to the
Services (one hour being equivalent to 1/240 of a month) and on a calendar day basis for
time spent away from home office (one day being equivalent to 1/30 of a month)
6.2.(b)(ii) The rates for local Personnel are set forth in Appendix D in the case of payment is fixed
as per month basis
6.3.(b)(i) Remuneration for local Personnel shall be paid in local currency.
6.5 The paymen t to the consultant will be made regularly by BNP. However no interest will
be paid for delay in payment.
7.0 Approved documents(by consultant) of the contractor for the execution of work which
lead to Any losses and/or liquidated damages to Nagarpalika due to controversy and/or
any ambiguity in norms, specifications, stipulations etc. w.r.t. Main tender documents,
deficiency in the design of the consultant, BNP will recover such losses from the
consultant at any stage of main work contract execution as well as the same are also
recoverable from the project monitoring consultant and/or TPI agency, if they makes
any fault in performance of their duties till their final bill plus one year.
8.0 Submission of final tenders later than stipulated time, penalty will be imposed at the rate
of 0.1 percentage per day of contract value up to maximum limit of 10 percent of
contract value.
9.0 The PMC agency cannot take any objection if any of the item and/or payment break up
work is dropped by SNP without clarifying any reason, In such a case respective item/
percentage break up price stand void.
10.0 The consultant must establish one office at PATDI.
11.0 PMC agency has to take technically as well as Administrative approvals from the concern
12.0 Nagarpalika may appoint more than one consultant, Empanelment of consultant will be
formed, the bidders have to give consent to work with the rates of lowest bid. The final
decision will be on Nagarpalika.
13.0 The time limit of the service will be 12 months but if Nagarpalika wants to work with the
same consultant, the further renewal contract may be done by Nagarpalika, following the
legal procedures.
Authorized person of consultant
Engineer Chief Officer President
PATDI nagarpalika PATDI nagarpalika PATDI nagarpalika
Appendix - A Description of the Services (Based on TOR)
(Give detailed descriptions of the Services to be provided; dates for completion of various tasks, place
of performance for different tasks; specific tasks to be approved by Client etc.)
Reporting Requirements
(list format, frequency and contents of reports ; persons to receive them, dates of submission, number
of copies, etc. If no reports are to be submitted, state here "Not applicable")
Key Personnel and Sub-consultants
(Refer Clause 4.1 of the Contract)
List under : C-1 Titles (and names, if already available), detailed job descriptions and minimum
qualifications and experience of Personnel to be assigned to work in India, and
staff-months for each.
C-3 List of approved Sub-consultants (if already available): same information with
respect to their Personnel as in C-1 .
C-4 Same information as C-1 for Key Local Personnel.
Note: Key staff and other personnel including support staff details shall be as per eligibility
criteria and Standard form 3D of Technical Proposal in Section
Breakdown of Contract Price in Foreign Currency
Breakdown of Contract Price in Local Currency
Services and Facilities Provided by the Client
(Not Applicable)
PROFORMA OF BANK GUARANTEE FOR PERFORMANCE SECURITY DEPOSIT
(On non-judicial paper of appropriate value)
To: _ _ _ _ _ _ _ (name of Employer)
_ _ _ _ _ (address of Employer)
WHEREAS _ _ _ _(name and address of Contractor) (hereinafter called “the
Contractor”) has undertaken, in pursuance of Contract No. _ dated _ _to
execute _ _ _ _ (name of Contract and brief description of Works) (hereinaft er
called “the Contract”);
AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall
furnish you with a Bank Guarantee by a recognized bank for the sum specified therein as
security for compliance with his obligations in accordance with the Contract;
AND WHEREAS we have agreed to give the Contractor such as Bank
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to you, on
the Contractor, up to a total of _ _ _ _
(amount of Guarantee) _ _ _ _ _(amount in words), such sum
being payable in the types and proportions- of currencies in which the Contract Price is payable,
and we undertake to pay you, upon your first written demand and without cavil or argument, any
sums within the limits of _ _ _ _ (amount of Guarantee) as aforesaid
without your needing to prove or to show grounds or reasons for your demand for the sum
sp ecified therein.
We hereby waive the necessity of your demanding the said debt from the Contractor
presenting us with the
We further agree that no change or addition to or other modification of the terms of the Contract
or of the Works to be performed there under or of any of the Contract documents which may be
mad e between you and the Contractor shall in any way release us from any liability under this
guarantee, and we hereby waive notice of any such change, addition or modification.
This guarantee shall be valid until a date 28 days from the date of issue of the Taking-
SIGNATURE AND SEAL OF THE GUARANTOR
Name of Bank _ _ _ _
Appendix – H (No t Ap plicable)
PROFORMA OF BANK GUARANTEE
(FOR MOBILISATION PAYMENT)
PATDI NAGARPALIKA – PATDI
MILE STONE DATES
1 LAST DATE FOR TENDER DOWNLOADING & As Above mentioned
ONLINE SUBMISSION
2 LAST DATE OF PHYSICAL SUBMISSION As Above mentioned
3 DATE OF OPENING OF TECHNICAL BID As Above mentioned
4 DATE OF OPENING OF PRICE BID As Above mentioned
5 TENDER FEE : Rs. 1500/-
CHIEF OFFICER PATDI
PATDI NAGARPALIKA – PATDI
SECTION – 6: FINANCIAL PROPOSAL - STANDARD FORMS
COST SUMMARY SCHEDULE
BIDDERS ARE REQUIRED TO FILL UP ALL BLANK SPACES IN THIS OFFER FORM
The Chief Officer PATDI
Nagarpalika PATDI
District SURENDRANAGAR
Sub: Appointment of Consultant for providing complete Project Management
Consultancy Services including preparation of DPR, DTP, Verification of design,
Drawings, QAP etc. of various types of Civil Engineering Works for PATDI
1. Having visited the site and examined the Offer Documents, Conditions of Contract,
Addenda/Amendments to the above, for the CONSULTANCY SERVICES OF THE ABOVE WORK,
we the undersigned offer our consultancy services from the date of commissioning including
defects liability period as given in Conditions of Contract and in conformity with the
Schedules, Annexure, Bidding Documents, including Addenda Nos. _(insert
numbers) for Lump sum fixed price mention in the summary cost. Our financial proposal
shall be fixed and firm binding upon us subject to the modifications resulting from
contract negotiations up to expiration of the validity period of the proposal. The amount
of consultancy services is inclusive of all the taxes duties, etc.
2. We undertake, if our Offer is accepted, to complete and deliver the Works in
accordance with the Contract within duration (as per NIT), exclusive of monsoons, from
the date of receipt of work order issued to us by you. We will observe the laws applicable to
perform the services.
3. We agree to abide by this Offer for a period of 180 days from the date of opening the same
and it shall remain binding upon us and may be accepted at any time before the expiry of
4. In the event of our Offer being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract thereto annexed but until such agreement
is prepared this Offer together with your written acceptance thereof shall constitute a
binding Contract between us.
5. We understand that you are not bound to accept the lowest or any Offer you ma y
Dated this day of…………2026
In the capacity of
Company Seal _ ___________
Duly authorized to sign Bid for and on behalf of
(Fill in block capitals)
PATDI NAGARPALIKA – PATDI
1. The Offer is lump sum offer for providing consultancy services for pre-tendering services,
post-tendering services during construction phase including project monitoring including
design review, Construction Supervision and Inspection of Material(partial), Machinery and
equipment for various project and during post-construction phase for providing periodic
supervision services during defect liability period as per TOR & scope of work.
2. The bidder shall quote his firm and fixed lump sum price for the entire work under this
Contract, defined in more details in various sections of this Offer document.
3. The rates and prices shall be submitted in the formats given in the enclosed Price
Schedules. Rates and prices received in any other formats will be rejected and the Bids will
be disqualified.
project work. Prices quoted in Schedule only will be considered for price evaluation & shall
form a part of the Contract Agreement.
5. Each item is to be individually priced online and the amounts shall be added up to arrive at
except where the item description requires the item to be priced on "as applicable” basis. The
item shall not be priced if it is “not applicable” to the bidder’s design, in which case the
bidder shall add the words “NOT APPLICABLE”. The wording in the item description is for
subject matter guidance only; clause references are indicative only and all other relevant
clauses shall also be referred to. The prices shall allow for all the works covered under the
Offer and all liabilities and contractual obligations whether separately specified or not. Items
against which no prices are quoted shall not be separately paid for and the bidder shall be
deemed to have covered the cost of execution of such items (according to the requirements
of the Offer document) in the prices quoted for other items.
satisfactory working of the system as specified, will not be separately paid for by the Employer
when executed and shall be deemed to be already covered by other items and rates listed in
the price sheets and Lump sum prices quoted in Schedule.
7. Interim payment will be made as per break up given in the Price document.
Schedules shall be the basis to work out a schedule of Interim payments during
construction with the successful bidder.
9. The consultant shall be deemed to have allowed in his price for provision, maintenance and
final removal of all temporary works of whatsoever nature required for the consultancy
services for the proper execution of works. The rates shall also be deemed to include any
works and setting out that may be required to be carried out for laying out of all the works
10. Prices shall be written in ink and shall be entered in figures and in words. Where there is
a discrepancy between the unit rates and the amount entered, the latter shall govern.
Specifications and other sections of these Offer documents and these documents are
to be taken as mutually explanatory of one another.
12. Prices quoted by the consultant shall be firm for the entire period of Contract without any
13. The consultant shall interpret the data furnished and carry out any additional survey work,
or investigation work required at his own cost.
The consultant should acquaint himself with the site conditions including the access to
PATDI NAGARPALIKA – PATDI
FORM OF FINANCIAL PROPOSAL
Sr. Rates Offered in %(Percentage)
Description of services
No. in % in Words
Site Survey, Preparation and submission of DPR
with details plan and estimate.
Technical and Administrative sanction from
2. govt. department and Preparation Draft
Tender Papers, Bid Evaluation, Site handover
Day-to-day supervision, Inspection of Materials,
3. Measurement Record, Bill Certification etc.
complete up to completion of work.
Authorized person of consultant
ENGINEER PATDI CHIEF OFFICER PATDI PRESIDENT PATDI
NAGARPALIKA PATDI NAGARPALIKA PATDI NAGARPALIKA PATDI
PATDI NAGARPALIKA – PATDI
DISTRICT - SURENDRANAGAR
BREAK UP OF PAYMENT SCHEDULE
Sr. No. Particulars Percentage to be released of total amount
Sr. No. Particulars Percentage to be released of total amount
D-1 After Submission of DPR to Nagarpalika 90% of quoted price in item no.
D-2 After Site Handover to Contractor 90% of quoted price in item no.
D-3 As per Preparation of Contractor’s Bill 90% of quoted price in item no.
Remaining Payment released after Issue of Completion certificate
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
PMC TENDER.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .