FMS TENDER FOR DIBRUGARH OK
13437
1000408792
Limited Tender
Works
Guwahati Territory( R )
15 Sept 2023
1 Sept 2023
15 Sept 2023
1 Sept 2023
15 Sept 2023
1 Sept 2023
7 Sept 2023 - 7 Sept 2023
SCOPE CHECKLIST FOR FMS SERVICES
SCOPE FMS SERVICES AT COCO SITE | CC RO /CC-LFR | DC RO
S. NO | Maintenance Activity /Repairs | Duration | Monitoring | Maintenance Activity /Repairs | Duration | Monitoring | Maintenance Activity /Repairs | Duration | Monitoring
1 | Replacement of HRC/Kit Kat fuses, indicators, glass fuses in PDB(Including Cost of Material) .Removal of defective MCBs,DPs , electrical switches and replacement with new ones.As and when required | when required | BROMA | Replacement of HRC/Kit Kat fuses, indicators, glass fuses in PDB(Including Cost of Material) .Removal of defective MCBs,DPs , electrical switches and replacement with new ones.As and when required | when required | BROMA | Replacement of HRC/Kit Kat fuses, indicators, glass fuses in PDB(Including Cost of Material) .Removal of defective MCBs,DPs , electrical switches and replacement with new ones.As and when required | when required | BROMA
2 | Replacement of starters/LED drivers in RVI elements in forecourt signages / Airboy Canopy/Canopy/ Fascia and Sales Building, wherever applicable-Consumables to be supplied by Dealer. | when required | BROMA | Replacement of starters/LED drivers in RVI elements in forecourt signages / Airboy Canopy/Canopy/ Fascia and Sales Building, wherever applicable-Consumables to be supplied by Dealer. | when required | BROMA | Replacement of starters/LED drivers in RVI elements in forecourt signages / Airboy Canopy/Canopy/ Fascia and Sales Building, wherever applicable-Consumables to be supplied by Dealer. | when required | BROMA
3 | Arresting leaks in areas where product pipe lines are visible, union joints, flanges, flexible pipes , STP ends, check-Valves and Valves. Job includes all consumables such as seals, washers, O-rings, gaskets as applicable inclusive of materials & Pressure testing of pipeline. Pipeline & fitting cost shall be paid as per actual measurement. As and when required. | when required | BROMA | Arresting leaks in areas where product pipe lines are visible, union joints, flanges, flexible pipes , STP ends, check-Valves and Valves. Job includes all consumables such as seals, washers, O-rings, gaskets as applicable inclusive of materials & Pressure testing of pipeline. Pipeline & fitting cost shall be paid as per actual measurement. As and when required. | when required | BROMA | Arresting leaks in areas where product pipe lines are visible, union joints, flanges, flexible pipes , STP ends, check-Valves and Valves. Job includes all consumables such as seals, washers, O-rings, gaskets as applicable inclusive of materials & Pressure testing of pipeline. Pipeline & fitting cost shall be paid as per actual measurement. As and when required. | when required | BROMA
4 | Replacement of Shear Valve, MLD for STP-material to be supplied by BPCL. As and when required | when required | BROMA | Replacement of Shear Valve, MLD for STP-material to be supplied by BPCL. As and when required | when required | BROMA | Replacement of Shear Valve, MLD for STP-material to be supplied by BPCL. As and when required | when required | BROMA
5 | Removal of water from Under Ground tank using mechanically operated hand pump and as and when required by BPCL ensuring all saftey measures. | when required | BROMA | Removal of water from Under Ground tank using mechanically operated hand pump and as and when required by BPCL ensuring all saftey measures. | when required | BROMA | Removal of water from Under Ground tank using mechanically operated hand pump and as and when required by BPCL ensuring all saftey measures. | when required | BROMA
6 | Replacement of all hanging Hardware. Hanging Hardware to be supplied by BPCL. | when required | BROMA | Replacement of all hanging Hardware. Hanging Hardware to be supplied by BPCL. | when required | BROMA | Replacement of all hanging Hardware. Hanging Hardware to be supplied by BPCL. | when required | BROMA
7 | Air compressor : Contactor and over load relay failure.- Identification, removal and replacing with the new Contactor (For COCO/OSTS only ).Material is in scope of FMS vendor. | when required | BROMA
8 | STP - Replacement of Condenser / Relay Contractor / Check Valve Packing.Including FLP cable connection, specified earthing connections etc.Material is in scope of FMS vendor. | when required | BROMA | STP - Replacement of Condenser / Relay Contractor / Check Valve Packing.Including FLP cable connection, specified earthing connections etc.Material is in scope of FMS vendor. | when required | BROMA | STP - Replacement of Condenser / Relay Contractor / Check Valve Packing.Including FLP cable connection, specified earthing connections etc.Material is in scope of FMS vendor. | when required | BROMA
9 | UPS tripping & SERVO - Faulting identification & rectification on the output side of UPS distribution-As and when required .Repairing of UPS /SERVO - In any case no site should operate without UPS for more than 6 hrs & Servo for more than 24 hrs .Vendor has to arrange replacement during repairing of UPS / Servo .First time spares (only once in a year) for UPS/Servo will be given by BPCL provided UPS/SERVO is dysfunctional at the time of taking over the site by FMS vendor.All subsequent maintenance activity including repairing cost pertaining to UPS/SERVO to be taken care by FMS vendor only. Adequate standby inventory & spare to be maintained by FMS vendor meeting SLA conditions. | when required | BROMA | UPS tripping & SERVO - Faulting identification & rectification on the output side of UPS distribution-As and when required .Repairing of UPS /SERVO - In any case no site should operate without UPS for more than 6 hrs & Servo for more than 24 hrs .Vendor has to arrange replacement during repairing of UPS / Servo .First time spares (only once in a year) for UPS/Servo will be given by BPCL provided UPS/SERVO is dysfunctional at the time of taking over the site by FMS vendor.All subsequent maintenance activity including repairing cost pertaining to UPS/SERVO to be taken care by FMS vendor only. Adequate standby inventory & spare to be maintained by FMS vendor meeting SLA conditions. | when required | BROMA | UPS tripping & SERVO - Faulting identification & rectification on the output side of UPS distribution-As and when required .Repairing of UPS /SERVO - In any case no site should operate without UPS for more than 6 hrs & Servo for more than 24 hrs .Vendor has to arrange replacement during repairing of UPS / Servo .First time spares (only once in a year) for UPS/Servo will be given by BPCL provided UPS/SERVO is dysfunctional at the time of taking over the site by FMS vendor.All subsequent maintenance activity including repairing cost pertaining to UPS/SERVO to be taken care by FMS vendor only. Adequate standby inventory & spare to be maintained by FMS vendor meeting SLA conditions. | when required | BROMA
10 | Pre Monsoon Check & preventive activities to be performed at all RO's as per the enclosed checklist. | Once in a Year.(Minimum 25 % ROs to covered in each quarter.) | Checklist | Pre Monsoon Check & preventive activities to be performed at all RO's as per the enclosed checklist. | Once in a Year.(Minimum 25 % ROs to covered in each quarter.) | Checklist | Pre Monsoon Check & preventive activities to be performed at all RO's as per the enclosed checklist. | Once in a Year.(Minimum 25 % ROs to covered in each quarter.) | Checklist
11 | All the fill caps, dip caps, ATG riser cap at the RO to be checked for tightness & Locking arrangements and if found broken/damage to be replaced, incl. cost of material. | when required | BROMA | All the fill caps, dip caps, ATG riser cap at the RO to be checked for tightness & Locking arrangements and if found broken/damage to be replaced, incl. cost of material. | when required | BROMA | All the fill caps, dip caps, ATG riser cap at the RO to be checked for tightness & Locking arrangements and if found broken/damage to be replaced, incl. cost of material. | when required | BROMA
12 | Installation of BPCL supplied Battery for Online 2KVA/3KVA/5KVA UPS- Battery as per specification as and when required . FMS vendor will arrange to install Battery in UPS | when required | BROMA | Installation of BPCL supplied Battery for Online 2KVA/3KVA/5KVA UPS- Battery as per specification as and when required . FMS vendor will arrange to install Battery in UPS | when required | BROMA | Installation of BPCL supplied Battery for Online 2KVA/3KVA/5KVA UPS- Battery as per specification as and when required . FMS vendor will arrange to install Battery in UPS | when required | BROMA
13 | Basic health checkup of DG including Earthing , Neutral, changeover, cable connection check ( As per OEM standard ) ONLY for COCOs/OSTS. | when required | BROMA
14 | Painting of Toilets from inside , Repairs to WC seat covers, Reparing of Exhuast fan/Loose electrical connections/ Electrical switches. Repairing of toilet taps, downtake pvc pipes, for ONLY COCOs/OSTS./CC Ros.Replacement of Exhaust fan /sanitary-wares/Tiles/Taps/electrical switches will be extra on SOR basis. As per SBA standards. | As & when required | Checklist | Painting of Toilets from inside , Repairs to WC seat covers, Reparing of Exhuast fan/Loose electrical connections/ Electrical switches. Repairing of toilet taps, downtake pvc pipes, for ONLY COCOs/OSTS./CC Ros.Replacement of Exhaust fan /sanitary-wares/Tiles/Taps/electrical switches will be extra on SOR basis. As per SBA standards. | As & when required | Checklist
15 | Attending PDB ( Electrical Panel Board ) related issues such as Rectification of loose terminations, Identification of loose wiring/ Open JBs / Glands / Open Connectors , replacement of damaged conductors,Cleaning internally and making the same dust free (Once in Six months ) & repairs to same, incl. cost of material. Ensuring Proper electrical wiring in Sales Room building .electrical panel point .NO loose connections /loose wiring . Ensuring dry sand in the cable chamber below the electric panel including cost of material. | Twice in a year.(Minimum 50 % ROs to covered in each quarter) | Checklist | Attending PDB ( Electrical Panel Board ) related issues such as Rectification of loose terminations, Identification of loose wiring/ Open JBs / Glands / Open Connectors , replacement of damaged conductors,Cleaning internally and making the same dust free (Once in Six months ) & repairs to same, incl. cost of material. Ensuring Proper electrical wiring in Sales Room building .electrical panel point .NO loose connections /loose wiring . Ensuring dry sand in the cable chamber below the electric panel including cost of material. | Twice in a year.(Minimum 50 % ROs to covered in each quarter) | Checklist | Attending PDB ( Electrical Panel Board ) related issues such as Rectification of loose terminations, Identification of loose wiring/ Open JBs / Glands / Open Connectors , replacement of damaged conductors,Cleaning internally and making the same dust free (Once in Six months ) & repairs to same, incl. cost of material. Ensuring Proper electrical wiring in Sales Room building .electrical panel point .NO loose connections /loose wiring . Ensuring dry sand in the cable chamber below the electric panel including cost of material. | Twice in a year.(Minimum 50 % ROs to covered in each quarter) | Checklist
16 | Closing of cable conduits using PUF sealant (Including Material) | Once in Year.Minimum 25 % ROs to covered in each quarter. | Checklist | Closing of cable conduits using PUF sealant (Including Material) | Once in Year.Minimum 25 % ROs to covered in each quarter. | Checklist | Closing of cable conduits using PUF sealant (Including Material) | Once in Year.Minimum 25 % ROs to covered in each quarter. | Checklist
17 | Providing sealant and securing FLP glands in place wherever required Once in Six Month | Twice in a year.Minimum 50 % ROs to covered in each quarter. | Checklist | Providing sealant and securing FLP glands in place wherever required Once in Six Month | Twice in a year.Minimum 50 % ROs to covered in each quarter. | Checklist | Providing sealant and securing FLP glands in place wherever required Once in Six Month | Twice in a year.Minimum 50 % ROs to covered in each quarter. | Checklist
18 | Checking of T/L Decantation Earthing Point and Crocodile Clip and wire and Rectification Once in a year.Crocodile clip & wire must be changed once in a year .Cost of Material is in scope of FMS vendor. | Once in Year.Minimum 25 % ROs to covered in each quarter. | Checklist | Checking of T/L Decantation Earthing Point and Crocodile Clip and wire and Rectification Once in a year.Crocodile clip & wire must be changed once in a year .Cost of Material is in scope of FMS vendor. | Once in Year.Minimum 25 % ROs to covered in each quarter. | Checklist | Checking of T/L Decantation Earthing Point and Crocodile Clip and wire and Rectification Once in a year.Crocodile clip & wire must be changed once in a year .Cost of Material is in scope of FMS vendor. | Once in Year.Minimum 25 % ROs to covered in each quarter. | Checklist
19 | Painting vent pipes ,Dip Pipe, fill pipe and hoods as per the BPCL standards & color scheme - Synthetic Enamel 2 coats including one coat of primer and Replacing Vent pipe mesh once in a Year. Checking proper functioning of Vent Hood/ PV Valve including removal of silica gel trap as applicable and rectification if any required for proper functioning once in a year and 25 % Ros to be covered in each quarter. | Once in Year.Minimum 25 % ROs to covered in each quarter. | Checklist | Painting vent pipes ,Dip Pipe, fill pipe and hoods as per the BPCL standards & color scheme - Synthetic Enamel 2 coats including one coat of primer and Replacing Vent pipe mesh once in a Year. Checking proper functioning of Vent Hood/ PV Valve including removal of silica gel trap as applicable and rectification if any required for proper functioning once in a year and 25 % Ros to be covered in each quarter. | Once in Year.Minimum 25 % ROs to covered in each quarter. | Checklist | Painting vent pipes ,Dip Pipe, fill pipe and hoods as per the BPCL standards & color scheme - Synthetic Enamel 2 coats including one coat of primer and Replacing Vent pipe mesh once in a Year. Checking proper functioning of Vent Hood/ PV Valve including removal of silica gel trap as applicable and rectification if any required for proper functioning once in a year and 25 % Ros to be covered in each quarter. | Once in Year.Minimum 25 % ROs to covered in each quarter. | Checklist
20 | Painting of kerb walls of tank , D Block and Garden kerb wall ( Once a year ). Removal of all non standards stickers from sales block / pedestals / mpd’s / columns . | Once in a Year.Minimum 25 % of the Ros to be covered in each quarter | Checklist | Painting of kerb walls of tank , D Block and Garden kerb wall ( Once a year ). Removal of all non standards stickers from sales block / pedestals / mpd’s / columns . | Once in a Year.Minimum 25 % of the Ros to be covered in each quarter | Checklist | Painting of kerb walls of tank , D Block and Garden kerb wall ( Once a year ). Removal of all non standards stickers from sales block / pedestals / mpd’s / columns . | Once in a Year.Minimum 25 % of the Ros to be covered in each quarter | Checklist
21 | Painting Fire extinguishers /sand buckets and stand using approved color and paint including lettering "FIRE" ( COCO & OSTS Only ) | Once in a Year.Minimum25 % of the Ros to be covered in each quarter | Checklist
22 | Tank manhole chamber covers and frames painting. including removal rust 1 coat red oxide and 2 coats Painting of exposed pipelines/pipe fittings - including removal rust 1 coat of zinc phosphate primer or zinc choromate primer and 2 coats synthetic enamel both internally and externally .For All type of Ros. | Once in a Year.Minimum25 % of the Ros to be covered in each quarter | Checklist | Tank manhole chamber covers and frames painting. including removal rust 1 coat red oxide and 2 coats Painting of exposed pipelines/pipe fittings - including removal rust 1 coat of zinc phosphate primer or zinc choromate primer and 2 coats synthetic enamel both internally and externally .For All type of Ros. | Once in a Year.Minimum25 % of the Ros to be covered in each quarter | Checklist | Tank manhole chamber covers and frames painting. including removal rust 1 coat red oxide and 2 coats Painting of exposed pipelines/pipe fittings - including removal rust 1 coat of zinc phosphate primer or zinc choromate primer and 2 coats synthetic enamel both internally and externally .For All type of Ros. | Once in a Year.Minimum25 % of the Ros to be covered in each quarter | Checklist
23 | Painting of light poles using BPCL Standards colour and specifications ( As per SOR standard ) ( once in Year) | Once in a Year.Minimum25 % of the Ros to be covered in each quarter | Checklist | Painting of light poles using BPCL Standards colour and specifications ( As per SOR standard ) ( once in Year) | Once in a Year.Minimum25 % of the Ros to be covered in each quarter | Checklist | Painting of light poles using BPCL Standards colour and specifications ( As per SOR standard ) ( once in Year) | Once in a Year.Minimum25 % of the Ros to be covered in each quarter | Checklist
24 | Meggering of Earth corrections to earth terminations which will include replacement of rusted fasteners (Once in Six Month) along with Painting of Earth pits & writing reading on Chamber Plate to be done (Cost of painting and writing included in FMS Vendor Scope). In Situations like “earth pits are not visible “ earthing of all Electrical devices such as MPD , STP , AUTOMATION etc.. need to be checked and there record can be handed over to Dealer . Format will be provided from Territory end .Applying Cold galvanising spray and recharging of pits, meggering and marking resistance values on chamber covers with paint (Once in a Year) | Once in six months (Minimum 50 % ROs per Quarter) | Checklist | Meggering of Earth corrections to earth terminations which will include replacement of rusted fasteners (Once in Six Month) along with Painting of Earth pits & writing reading on Chamber Plate to be done (Cost of painting and writing included in FMS Vendor Scope). In Situations like “earth pits are not visible “ earthing of all Electrical devices such as MPD , STP , AUTOMATION etc.. need to be checked and there record can be handed over to Dealer . Format will be provided from Territory end .Applying Cold galvanising spray and recharging of pits, meggering and marking resistance values on chamber covers with paint (Once in a Year) | Once in six months (Minimum 50 % ROs per Quarter) | Checklist | Meggering of Earth corrections to earth terminations which will include replacement of rusted fasteners (Once in Six Month) along with Painting of Earth pits & writing reading on Chamber Plate to be done (Cost of painting and writing included in FMS Vendor Scope). In Situations like “earth pits are not visible “ earthing of all Electrical devices such as MPD , STP , AUTOMATION etc.. need to be checked and there record can be handed over to Dealer . Format will be provided from Territory end .Applying Cold galvanising spray and recharging of pits, meggering and marking resistance values on chamber covers with paint (Once in a Year) | Once in six months (Minimum 50 % ROs per Quarter) | Checklist
25 | Repairs to door / frames which will include replacement of hinges, locks and fixing of frames for Monoliths | As & when required | BROMA | Repairs to door / frames which will include replacement of hinges, locks and fixing of frames for Monoliths | As & when required | BROMA | Repairs to door / frames which will include replacement of hinges, locks and fixing of frames for Monoliths | As & when required | BROMA
26 | Hygiene check & sanitisation check of electrical equipments including automation IT rack , Electrical Panel, misc. earthing pits,VSAT, UPS , servo etc.This includes correction of loose wiring /re-terminations including all cost of material like cable tie/tray/connectors/ferruls etc .Removal of damaged electrical swithes, MCBs, DPs, Emergency swiches . | Once in a Year.Minimum25 % of the Ros to be covered in each quarter | Checklist | Hygiene check & sanitisation check of electrical equipments including automation IT rack , Electrical Panel, misc. earthing pits,VSAT, UPS , servo etc.This includes correction of loose wiring /re-terminations including all cost of material like cable tie/tray/connectors/ferruls etc .Removal of damaged electrical swithes, MCBs, DPs, Emergency swiches . | Once in a Year.Minimum25 % of the Ros to be covered in each quarter | Checklist | Hygiene check & sanitisation check of electrical equipments including automation IT rack , Electrical Panel, misc. earthing pits,VSAT, UPS , servo etc.This includes correction of loose wiring /re-terminations including all cost of material like cable tie/tray/connectors/ferruls etc .Removal of damaged electrical swithes, MCBs, DPs, Emergency swiches . | Once in a Year.Minimum25 % of the Ros to be covered in each quarter | Checklist
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
13437.zip
zip • 1.39 MB
BUDGETDOC_13437.xlsx
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .