Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹84.8 L+₹26,106.80 (0.31%)Accepted-AOC CONSTRUCTION DIVISION 2 P W D AZAMGARH UTTAR PRADESH UP | ETAH | UTTAR PRADESH | 207001 | L2 | Accepted-AOC L2 |
Tender Value
₹85 L
EMD Value
₹1.7 L
Closing Date
25 Feb 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
Office Superintending Engineer 14th circle Irrigation work Azamgarh
Construction of V.R.B. At km 14.400, km. 33.300, km. 43.700 on Lalganj Dy. and V.R.B. At km. 1.080 on Tikargarh Dy.
2021_UPIDC_555464_1
04/SE/2020-21
Open Tender
Civil Construction Goods
Item Rate
540 days
Azamgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,400
₹1.7 L
Yes
20/02/2021
5 Nov 2021
17 Feb 2021
25 Feb 2021
17 Feb 2021
25 Feb 2021
17 Feb 2021
20 Feb 2021
90 days
Amount
Dismantaling of R. C.C including stacking or dismantled material within distance of 60 meters.
Dismantaling of B/W of pier, Abutement and Wing Wall including dismantled material within distance of 60 meters.
Dismantaling of C.C. of pier, Abutement and Wing wall including dismantled material within distance of 60 meters.
150mm dia deep boring with lowering cassing and extriction of pipe after completion of work
Earth work excavation in foundation with all type soil all lead and lift including refilling trench
C.C. 1:3:6 in foundation with stone grit 12.5 mm to 20 mm size and coarse sand with cost of material, labour and T&P
Centering and Shuttering with all labour, material and T&P etc.
Cutting,Bending & placing of Reinforcement Steel in position including cost of material,labour and T&P
Laying R.C.C. Work Slab 1:1.5:3 with course crushed aggregate 12.5 mm to 20 mm and course sand ,F.M.not less than 2.00 including all cost of material and labour and T&P etc.
Laying C.C. Work Slab 1:1.5:3 with course crushed aggregate 10 mm to 20 mm and course sand ,F.M.not less than 2.00 including all cost of material ,labour and T&P etc.
E/W in making ramp and canal section .
Dewatering charge
S/F P.V.C. pipe 50 mm dia, 0.50 m long for drainage spout.
Brick soling in ramp
arvind kumar yadav
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .