| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹4.1 L+₹6,822.08 (1.71%)Rejected-Finance | ₹4.1 L+₹6,822.08 (1.71%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.2 L+₹24,419 (6.11%)Rejected-Finance | ₹4.2 L+₹24,419 (6.11%) | L3 | Rejected-Finance L3 |
| 4 | L4₹4.4 L+₹42,428 (10.6%)Rejected-Finance | ₹4.4 L+₹42,428 (10.6%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | NAZARUDEEN L3 | ORION ENGINEERS L4 | G SURESH L2 | CRYSTAL INFRATECH L1 |
|---|---|---|---|---|---|---|---|
| 1.00Working Charges | |||||||
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 8 | cum | 1,850 ₹14,800 | 900 ₹7,200 Lowest | 1,775.27 ₹14,202.16 | 2,030 ₹16,240 |
| 1.00 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 10 | cum | 320 ₹3,200 | 1,800 ₹18,000 | 307.73 ₹3,077.3 Lowest | 378 ₹3,780 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 18 | cum | 6,797 ₹1,22,346 | 980 ₹17,640 Lowest | 6,514.44 ₹1,17,259.92 | 7,989 ₹1,43,802 |
| 1.00 | 100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. | 235 | Disconnection | 1,005 ₹2,36,175 | 1,470 ₹3,45,450 | 963.18 ₹2,26,347.3 | 780 ₹1,83,300 Lowest |
| 1.00 | 100.98.1008:Engaging Coolie. | 60 | no | 796 ₹47,760 | 900 ₹54,000 | 763.29 ₹45,797.4 Lowest | 879 ₹52,740 |
Tender Value
₹5.9 L
EMD Value
₹14,735
Closing Date
3 Jun 2026, 5:00 pmClosed
Assistant Executive Engineer
W S subdivision Attingal
DEPOSITPothencode Grama Panchayath Permanent disconnection of existing public taps in various wards of Pothencode Panchayath Pipeline Work
2026_KWA_853140_1
WRDKWACESRTR26437/2025 26 1_1/1
Open Tender
Civil Works - Water Works
Item Rate
120 days
Attingal sub division
same
4 documents required · 4 mandatory
₹1,300
₹14,735
30 Jul 2026
26 May 2026
5 Jun 2026
26 May 2026
3 Jun 2026
26 May 2026
26 May 2026 - 3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Working Charges | |||||
| 1.001 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.002 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | - | cum | - | - |
| 1.003 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | 100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete. | - | Disconnection | - | - |
| 1.005 | 100.98.1008:Engaging Coolie. | - | no | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1441694.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.54 MB
BOQ_1441694.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .