| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹16.1 CrAccepted-Finance UNIT NO 514 515 AND 516 5TH FLOOR SUNCITY SUCCESS TOWER GOLF COURSE EXTENSION ROAD SECTOR 65 GURGAON HARYANA | GURUGRAM | HARYANA | 122018 | ₹16.1 Cr | H1 | Accepted-Finance Accept |
| 2 | H2₹16.2 CrAccepted-Finance | ₹16.2 Cr | H2 | Accepted-Finance Accept |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically non-responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically non-responsive |
Tender Value
Refer Docs
EMD Value
₹35 L
Closing Date
15 Apr 2025, 3:00 pmClosed
Ankush Mehta
NHIDCL HQ
PMC work for Widening to 2L with PS and slope protection works from Km 0.000 to 52.100 ie Rangpo to Sevoke section of NH-10 in West Bengal
2025_NHIDC_854294_1
NHIDCL/HQ/NH-10/PMC/2025
Open Tender
Consultancy
Sevoke to Rangpo
Refer tender docs
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹35 L
NHIDCL HQ
28 Jul 2025
24 Mar 2025
16 Apr 2025
24 Mar 2025
15 Apr 2025
3 Apr 2025
24 Mar 2025 - 1 Apr 2025
1 Apr 2025
Amount
A. For Phase 1 & 2 (DPR and Pre-Construction Activities) I. Remuneration for Local Staff (including per diem allowance) (For Standalone Tunnel Project) Professional Staff
Team Leader cum Senior Tunnel Engineer 1 No.
Senior Bridge Engineer 1 No.
Highway cum pavement Engineer 1 No.
Material Engineer cum Geotechnical Engineer cum Geologist 1 No.
Senior Survey Engineer 1 No.
Road/ Traffic Safety Expert 1 No.
Environmental Specialist 1 No.
Quantity Surveyor cum Documentation Expert 1 No.
Land Acquisition Expert 1 No.
Utility Expert 1 No.
SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate)
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Professional-7
Support Staff (inclusive of per diem allowance)
Office Manager (1 No)
Office Boy (1 No)
Typist (1 No)
Night Watchman (1 No)
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 4000km/month run
Bolero or equivalent 4x4 vehicle (2 nos.)
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office/HQ. The quoted amount against remuneration should include Hotel Charges, travel costs etc. complete
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
Office rent (Fixed Costs)
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
Time period
Office Furniture and Equipment (Rental) :
Office Furniture and Equipment
Reports and Document Printing
Monthly report (3 copies per Month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with LA Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment Report & RAP
Final Environmental Assessment Report and RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP.
Final Bidding Documents
Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)
LA & Clearances II Report
IX. Survey and Investigation: A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile/ aerial LiDAR including Bathymetric LiDAR etc.
B. Investigation (Fixed Cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffice Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other Investigations/Surveys etc. as per site requirement
Sub-Soil Investigation (Boring)
Boring in all type of soils (other than hard rock)
Boring in hard rock
C. Network Survey and GPR
Network Survey of the existing Highways as a repository for civil works as per directions from Authority.
GPR Survey for detection of under ground utilities
X. Cost of Supply and Fixing Boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25, 1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/orconstruction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
XI. Land Acquisition Team including support staff and logistics/ transportation. A. Land Acquisition Team including support staff :
Ex-Land Revenue Inspector/ Officer or equivalent (1)
Ex-Kanoogo/Girdwar or equivalent (1)
Ex-Patwari or equivalent (1)
Typist (1)
B. Logistics for Land Acquisition Team
Computer including necessary peripherals (2)
Printers (2)
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km (1)
Estimate of Local Currency costs B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE) I. REMUNERATION FOR LOCAL PROFESSIONAL STAFF A. Professional Staff (Construction Period 30 months + DLP 60 months)
Team Leader cum Senior Highway Engineer 1 No.
Resident cum Highway Engineer 1 No.
Senior Bridge/ structural Engineer 1 No.
Senior Pavement Specialist 1 No.
Senior Quality cum Material Expert1 No.
Road / Traffic Safety Expert 1 No.
Geotechnical Engineer cum Geologist 1 No.
Sub-Professional Staff
Survey Engineer, 1 Nos.
Assistant Highway Engineer 2 Nos. (30 months x 2 + 60 months x1)
CAD Expert, 1 No.
Environmental Engineer, 1 Nos.
Assistant Bridge Engineer, 1 Nos.
Assistant Quality cum Material Engineer, 2 Nos. (2 x 30 months)
Electrical Engineer, 1 Nos.
HTMS/ Toll Expert , 1 No.
Quantity Surveyor, 1 Nos.
Horticulture cum Landscaping Expert, 1 Nos.
Lab Technician, 1 Nos.
Support Staff (inclusive of per diem allowance)
Office Manager (1 No)
Accountant cum Cashier (1 No)
Steno cum Computer Operator (1 No)
Office Boy (1 No)
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 4000km/month run
Vehicle (2400 cc & above and not more than 1 years old) during construction period ( 2 No.s for 30 month each)
Vehicle (2400 cc & above and not more than 1 years old) during DLP ( 1 No.)
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office/HQ. The quoted amount against remuneration should include Hotel Charges, travel costs etc. complete for 25 round trips to Employer HQ and 25 round trips to Employer RO Office
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
One Office of Minimum 200 sqm area shall be rented . The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete. The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. complete.
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
Time period
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
Time Period
Reports and Document Printing
Monthly reports
Half yearly Reports
Various other reports as provided in the Concession Agreement such as Completion Report
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
Surface defects detection and roughness measurement using Network Survey Vehicle (52.1 kms x 8 times)
Pavement strength measurement using FWD (52.1 kms x 4 times)
Bridge inspection using Mobile Bridge Inspection Unit (52.1 kms x 8 times)
Road signs inspection using Retro Reflectometer (52.1 kms x 8 times)
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
Voyants Solutions Private Limited (BID ID -3201817)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 11.27 MB
BOQ.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid