| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 LAccepted-AOC | 1 | Accepted-AOC Vinod O Nair 445936.After negociation he is ready to do the work at estimate rate(443167.00).so the work is awarded to Vinod nair. | |
| 2 | 2₹4.5 L+₹2,491.45 (0.56%)Rejected-AOC | 2 | Rejected-AOC quoted bid is higher than the other.So rejected. |
Tender Value
Refer Docs
EMD Value
₹6,648
Closing Date
12 Feb 2021, 2:00 pmClosed
Assistant Executive Engineer
PWD ROADS SUB DIVISION ATTINGAL
.The proposal involve berm stregthening and restoration potion with GSB wetmix and 40mm CC. The amout paid used as centage charge and added GST on total remianing work .
2021_PWD_411982_1
PWD/2020-2021/18133/ATL
Open Tender
Civil Works - Roads
Item Rate
60 days
VARKALA
Please refer Tender documents.
7 documents required · 7 mandatory
₹980
Yes
₹6,648
Yes
26 Feb 2021
4 Feb 2021
15 Feb 2021
4 Feb 2021
12 Feb 2021
4 Feb 2021
Amount
work restoration
od19892/2020_2021 : Supplying and stacking 24mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
od19901/2020_2021 : Providing 40mm premixed chipping carpet over BT surface with departmental broken stones after thoroughly cleaning the base with wire brushes, brooms and appying a priming coat of hot bitumen @ 2.50 Kg/ 10 m2 and spreading the hot premix of 0.32 m3 of 24mm, 0.22 m3 of 12mm departmental metal mixed with 22.08 Kg of bitumen per 10m2, rolling to dense surface, then spreading the seat coat comprising 0.09m3 of 6mm metal mixed with 8.64 Kg of of bitumen per 10m2 and rolling again including cost of bitumen, fuel, hire charges machineries etc complete (Total usage of bitumen 33.22 Kg per 10 m2) (IRC 3.4.2)
55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.3 : Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
4.1.A.1 : Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 <br> Grading-I - Plant Mix MethodConstruction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
3.19.2 : Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.
3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.B : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork)
NAZARUDEEN
Bidder Name
NAZARUDEEN
VINODONAIR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_585379.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .