Tender Value
₹4.4 Cr
EMD Value
₹4.4 L
Closing Date
12 Feb 2026, 6:00 pmClosed
Superintending Engineer, Project Implementation Unit, Health & Family Welfare Department.
Upgradation of MOT and Semi MOT at GMERS General Hospital Vadnagar Dist: - Mehsana.
271755
2025-26/138/02
Open
Civil Works
Gandhinagar
1 document required · 1 mandatory
₹6,000
PIU-General Fund A/c 11-114
₹4.4 L
31 Jan 2026
31 Jan 2026
31 Jan 2026
12 Feb 2026
31 Jan 2026
Name of work :-
Upgradation of MOT and Semi MOT at GMERS General Hospital Vadnagar Dist: - Mehsana.
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Supply, Installation, Testing and Commissioning of Pre Fabricated Modular Operation Theater
Panels (Walls and Ceiling) made out Polyurethane foam injected at 40 Kg/m3 sandwiched
between 0.8 mm thick GP/SP sheet on front side and 0.5 mm GP/SP/PPGI sheet on back-side.
The inner surface walls be fixed to the bricks wall with essential support. There will be
minimum possible cavity/gap in between solid and steel walls and will be variable to suit the
architects lay out for the flush mounting of the equipments. The wall and ceiling panels must
comply with necessary provision of to JIS Z 2801/ISO 22196, BS EN 1363-1:2020, EN 1363-
2:1999, EN 1364-1:2015, DIN 52210-2:1984-08, DIN 4102-1, Class A2. Any Third-party Rupees Six Thousand
1 1276.00 compliance certificate mandatory. Panel should be covered with protective sheath of 300 d.f.t 6550.00 Sq Mtrs.
Five Hundred Fifty Only
Anti-bacterial Paint having undergone Washability/Water resistance Test JIS K 5663.7.12,
permeability test less than 200 unit of permeability, Anti-bacterial effect against
staphyloccoccus aureus, Escherichia coli (via HALO test) and safety and causative agents such
as formaldehyde, toluene, xylene, paradichlorobenzene etc. Third party (NABL approved Lab)
certification for EGP and thickness test certificate to be submitted at time of supply.
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Supply, Installation, Testing and Commissioning of Ceiling Filtration System - The ceiling
filtration system in the surgical theatre should ensure a unidirectional distribution of sterile air,
covering all areas affected by the airflow. It should consist of a laminar flow system
incorporated within a frame made from thick extruded aluminum profiles, complete with a
sealed gasket to prevent leaks. The system should incorporate "H 14" class HEPA filters
positioned in the ceiling plenum. These filters should achieve an MPPS average efficiency
greater than 99.95% and a 3-micron DOP efficiency greater than 99.99%. The filters should
also be designed to handle a final pressure drop of no more than 600 Pa, operate at a maximum
temperature of 60 degrees Celsius, and function effectively within a relative humidity range of
40-50%. The filtration ceiling system should be capable of maintaining a constant airflow
velocity of 0.25 m/s at the diffuser. This should be accomplished through the use of a diffuser
or flow equalizer that ensures uniform and constant air distribution over the entire surface area. Rupees Three Lakh
2 7.00 The structure holding the filtration system, including the filter frames and top plenum, should 390000.00 Nos.
Ninety Thousand Only
be made from either aluminum or stainless steel. The system should be CE/UL certified and
designed to achieve an ISO 14644/1 classification of ISO 5, with a bacteriological class of B
(5 CFU/m3) and particle decontamination kinetics CP of 5 minutes. After installation, the
system's performance should be validated by a third-party government-approved environmental
lab to ensure compliance with specified standards. A positive pressure should be maintained
inside the operating theatre to prevent contamination from external air sources. The supplier
should provide test certificates for the HEPA filters and the laminar airflow systems from the
original manufacturers. Furthermore, the size of the laminar airflow system should be a
minimum of 8 feet by 8 feet. Finally, the entire system should meet CE/BIS certification
standards, ensuring it adheres to both European and Indian safety and performance regulations.
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
The flooring within the surgical theatre should consist of a minimum of2 mm thick antistatic
seamless PVC, ensuring durability and safety. This floor should be smooth, non-slip, and made
from an impervious material with sufficient conductivity to dissipate static electricity
effectively, yet not so conductive as to risk electric shock to personnel. The PVC used should
be of very high quality, particularly designed for electrostatic charge dissipation, and should not
be less than 2 mm in thickness. The installation process should utilize continuous rolls, and
joints should be seamlessly welded using special PVC thermal welding units with welding bars
of the same color to ensure uniformity and prevent contamination. The sheets should be highly
durable, capable of resisting shocks, indentations, and scratches. The conductive material
should be uniformly impregnated within the PVC as grains to enhance its antistatic properties.
Additionally, the flooring should be inert to body fluids, chemicals, and disinfectants, and
remain unaffected by temperature variations typical within an operating theatre. It should
efficiently discharge electric charges up to 2 kV, and the electrical resistance (point to ground)
Rupees Four Thousand
3 454.00 should be maintained within 2.5x10^4 to 5x10^6 ohms, ensuring no buildup of electrical 4250.00 Sq Mtrs.
charge beyond 100 volts. Floor installation should be performed by skilled workers from Two Hundred Fifty Only
accredited agencies authorized by the PVC sheet supplier. The installation should include a
conductive copper grid beneath the PVC sheet, supported by liquid epoxy compounds to create
a uniform and level surface. Copper strips should be made visible by grinding and not project
more than 0.5mm above the floor level to prevent damage to the PVC sheet, with one earthing
lead brought out from every 150 sq.ft area and attached to the main earthing strip/ground. The
flooring should also be mechanically shockproof, scratchproof, flame retardant, and
antimicrobial. Corners of the flooring should be uniformly curved, and a concealed cove-
former (aluminium) should overlap the wall panel to a height of approximately 25mm and be
sealed perfectly and uniformly. Before laying the PVC, suitable self-leveling compounds
should be used to prevent any undulations within the operating theatre. The final surface should
be non-corrosive to biological fluids and detergents, with a color that is uniform, pleasant, and
matching with the ambience as approved by the respective consignee.
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
The door to the surgical theatre should be a hermetically sealed, single sliding door measuring
2.1 meters in height and 1.5 meters in width. The door should be equipped with a controller
capable of being operated by elbow switches, foot switches, and a touchless sensor, providing
multiple, accessible control options. The track for the door should be made from stainless steel
or aluminum, with the running surface for the top rollers angled appropriately to minimize
resistance and facilitate smoother movement. The door leaf should be suspended using high-
quality hard plastic rollers with double bearings at the top. These rollers should run under the
stainless steel or aluminum track to ensure smooth and noiseless operation. The opening and
closing mechanisms of the door should be controlled by a microprocessor for precise
electromechanical movement. The material of the door should be either SMS or HPL, with a
color that matches the interior design. The door should be designed to be strong yet lightweight
for ease of use. In case the automatic mechanism fails, the door should still be able to open and
close effortlessly manually. The handle of the door should be made from stainless steel with a
matte finish and equipped with a high-quality cylindrical or ESPg lock for security. The door Rupees Two Lakh Ninety
leaf should incorporate a high-quality synthetic rubber gasket with long durability to ensure Five Thousand Only
hermetic sealing and maintain a 99.99% air tightness at a minimum pressure of 75Pa. The floor
on either side of the door should be perfectly level, with a maximum permissible difference of
+1mm, to avoid any tripping hazards or unsealed gaps. The overall thickness of the finished
door should range from 30-60mm, with the inner part of the door filled with CFC-free
polyurethane foam, approximately 48mm thick, sealed airtight to block any microbial ingress.
The door and its controls should comply with IEE regulations, utilizing DC brushless or PMDC
motors that are effectively isolated from mains power to ensure safety and reliability.
Additionally, the door should include a vision window measuring 300mm x 300mm, featuring
double-glazed panels that are hermetically sealed to maintain the integrity of the seal. The
movement of the door should be as quiet as possible, and the time to start moving after
receiving a signal should be adjustable between 0.5 to 20 seconds.The door controller should
be CE marked, BIS certified, or IEC 60601 certified to meet international and national safety
standards. A test certificate for the hermetically sealed door frame should be included in the pre-
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Supply, Installation, Testing and Commissioning of Membrane-Type Operation Switch and
Communication Controller - The Operation Switch and Comms Controller should encompass
all necessary controls to ensure the proper operation and monitoring of equipment and services
in the operating room (OR). Positioned for optimal visibility in the surgeon's line of sight and
the OT staff, the wall-mounted membrane-buttons should be easily accessible to the nurse for
operation and assistance. In addition to hosting a digital clock and elapsed time indicator, the
panel should feature a medical gas alarm, clearly indicating high and low gas pressures for each
gas service, including vacuum, supported by an audible alarm. The Operation Switch and
Comms Controller should also provide an alarm mute option for fault annunciation, with
pressure sensors strategically located near isolation valves. Controls for general lighting, Rupees One Lakh Ninety
5 7.00 including ON/OFF and dimming, organized in groups for uniform illumination, should be 195000.00 Nos.
Five Thousand Only
present. Furthermore, the panel should facilitate control over operating lights (major and
satellite) and camera functions (on/off and intensity). A hands-free telephone set with memory
should be conveniently situated, and temperature and humidity controls for the room, linked to
the AHU (+/5%) using NO/NC or Chilled Water/Hot Water Actuator Control Valve
(whichever is applicable), should be adjustable from the Operation Switch and Comms
Controller. Real-time indicators, such as a digital room pressure indicator and HEPA filter bank
differential pressure indicator, are essential for monitoring and maintaining a safe and
controlled environment in the operating room. Telephone with Alpha-numeric keyboard is
required with Speed-dialing option
Hatch boxes should be provided in each operating theater to facilitate the safe and efficient
removal of waste materials to the dirty linen area or adjacent corridor. Each hatch box should
be equipped with two doors, operated electrically or motorized, designed such that only one
door can be opened at a time to prevent cross-contamination. UV lighting should be installed to Rupees One Lakh Fifteen
6 7.00 ensure sterilization and should remain on when both doors are closed, automatically turning off 115000.00 Nos.
when either door is opened. Indicators should be provided on both sides of the operating
theater to monitor the door open/close status. The material of the hatch box should also be
SS304 grade stainless steel, with a minimum size of 600mm x 600mm.
In each operating theater, an operating list board should be installed. It should be made of
ceramic with magnetic properties and should be flush with the wall to maintain cleanliness and
ease of use. LED type flat panel X-ray viewing panels should be provided, complying with
relevant electrical safety codes, and mounted flush with the wall to prevent dust accumulation
and microbial growth. The body should be made of extruded aluminum, powder-coated with a
Rupees Twenty Eight
7 7.00 bacteria-resistant and disinfectant-resistant finish. The diffuser on the front panel should 28500.00 Thousand Five Hundred Nos.
provide a uniformly lit screen, and dimming controls should be easily accessible. Additionally, Only
a proper spring-loaded film clip with rollers should be included to securely hold and easily
remove films without causing scratches.
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
LED type flat panel X-ray viewing panel should be supplied. This should comply with relevant
electrical safely codes. This should be a 2-panel viewing screen. Mounting should be flush with
the wall to avoid dust accumulation and growth or organisms between wall and panel. Body
should be of extruded aluminium powder coated black with bacteria resistant and disinfectant Rupees Forty One
8 7.00 resistant finish. The diffuser on the front panel should be a uniformly lit screen. Dimming 41500.00 Thousand Five Hundred Nos.
electronic control should be enclosed at the bottom of the cabinet. Proper spring-loaded film Only
clip with rollers should be provided to hold the films firmly and to remove the film without
Supply, Installation, Testing and Commissioning of Double-Bay Scrub Sink - The scrub station
should be compact, designed for use in the OT complex, and facilitate pre-procedural
scrubbing. It should be made from heavy gauge type 304 stainless steel with a minimum
thickness of 1.5mm and feature seamless welded construction polished to a satin finish. The
scrub sink should have a front access panel for easy maintenance of water control valves, waste Rupees One Lakh Twenty
9 5.00 connections, stoppers, and strainers. Hands-free operation should be enabled through infrared 126000.00 Nos.
Six Thousand Only
sensors with programmable adjustments. Thermostatic mixing valve control should maintain
constant water temperature and be located behind the access panel. Timing should be
adjustable to meet individual usage requirements, and units should have reduced anti-splash
fronts. An additional knee/foot-operated switch should also be provided for enhanced
Supply, Installation, Testing and Commissioning of Storage Units - Storage units should be
constructed with same material, as wall and ceiling panels. The shelves, made of glass and,
should be removable for cleaning. The unit should be divided into two or more parts, each with Rupees Eighty Five
individual glass doors equipped with a high-quality locking system. The overall size of the Thousand Only
storage unit should be approximately 200 cm (H) x 120 cm (W) x 35 cm (D).
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Supply, Installation, Testing and Commissioning of Peripheral Lighting - To enhance the
operational environment of each operating theatre, peripheral lighting and clean room
luminaries should be installed, with a minimum of eight units per theatre. These lights should
offer an intensity of at least 500 Lux and be housed in highly specular anodized aluminum with
an optical antiglare system to minimize visual fatigue and glare. Each peripheral light should
measure 2' x 1'. The covers for these luminaries should be constructed from highly resistant,
disinfectant-proof laminated safety glass or acrylic, featuring a stylish, fine-grained surface that
complements the clean and sterile environment of the operating theatre. The body of the
luminaries should be made from sheet steel, perfectly powder-coated to resist contamination
and facilitate easy cleaning, and should be ready for connection either as individual units or
within a series circuit. This setup should include digital electronic control gear utilizing Rupees Twelve
multilamp technology to optimize energy efficiency and light output. The installation of these Thousand Only
luminaries should ensure that the recess frames are gas tight. Each fitting should be flush with
the ceiling and designed to be removable from either the top or bottom for ease of maintenance.
It is crucial that the light fittings are uniformly and aesthetically distributed across the ceiling to
provide consistent illumination throughout the OT, without interfering with visibility during
procedures such as green mode endoscopy. Furthermore, the peripheral lighting system should
conform to IP65 or IP54 international protection ratings, ensuring that the fixtures are dust tight
and protected against water ingress, suitable for the demanding conditions of an operating
Control equipment for both general lighting and light dimming functionalities should be
centralized within the theatre control panel, allowing for precise adjustments to meet varying Rupees Eighty Five
12 4.00 procedural requirements and enhance the functionality and flexibility of the lighting system in 85000.00 Nos.
the operating theatre.
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Supply, Installation, Testing and Commissioning of Electrical Wiring inside OT - Power
distribution within each Operating Theatre (OT) should be handled via distribution boards
located locally to each theatre using Fire Resistance Low Smoke Wiring, layed in PVC
conduits of reputed brand. The sub mains power to these panels should be provided by the
general electrical contractor, and all distribution services within the departments should run
from these panels. The power distribution unit should hold certifications such as EN, CE, FDA,
IEC, and BIS to ensure compliance with international safety and performance standards. Each
wall of the MOT should have a minimum of two hybrid switch sockets (6/16A) on each wall, in
compliance with IEC standards. Light fittings within the clinical areas should be recessed LED
types equipped with control gear and sealed in accordance with the IP54 standard. This
standard ensures that the fittings are protected against limited dust ingress and water spray from
all directions, suitable for clinical environments. All equipment should be fully and
permanently labeled to clearly identify and describe the function, operation, and voltage of the
Rupees Two Lakh Ninety
13 7.00 apparatus concerned. Upon completion of the electrical installation, tests should be carried out 299000.00 job
Nine Thousand Only
in accordance with the relevant sections of local wiring regulations, with results duly recorded.
Each OT should have a distribution board (DBs) installed, with suitable wiring. A separate
enclosure should house all high-voltage equipment to ensure safety and isolation. The remote
cabinet should contain operating lamp transformers, mains failure relays, UPS, electrical
distribution equipment, and circuit protection equipment for all circuits within the operating
theatre. All internal wiring within the DBs should terminate in connectors equipped with
screws and clamp springs. Connections should be of the clip-on type mounted on a rail
approved by CE/IEC/BIS standards and labeled with indelible proprietary labels. All internal
circuits should be protected by individual fuses or miniature circuit breakers to ensure safety
and manage potential electrical faults effectively.
AIR HENDALING UNIT Make:KrVelocity: Not More Then 8 to 10 mt/second. , Canvass
Connection-Heavy duty, non partical shreding,Fire Retardentuger,Nikotra only , Type:
PLUG,Drirect Driven,Dynamically Balanced Selection of fan-Should run comfortably at 50 HZ
at rated capecity. Motor Make:Siemence,B.B,Crompton,ABB , Type:TEFC, IP:55, Foot
Mounted, VFD compitable and I2 generation Safety: Motor should have interlocked with
AHU Motor door/excess/Fire DamperType-TWO TIRE, Floor Mounted , Inner const.:0.6mm Rupees Twelve Lakh
plain G.I , Outer const.:0.8 mm G.I. Pre coated / Powder coated Thickness of Insulation:
14 7.00 1225000.00 Twenty Five Thousand job
25mm,PUF injected having density 40 to 42 kg/m3. ,Colour:As approved by CLIENT
CONDENSING UNIT : Only
Condensing unit for AHU with all assesories and instalation (Copper pipie provide 3 mtr Only
Extra will charged extra) consider 1200 sqfeet insulation and ducting
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Double Dome OT Light with Ceiling mounted Double Dome LED OT lights having following
features and enclosed technical specifications, having Mobile App Connectivity, Battery
Backup -Light intensity Ec - 160 000 & 160 000 lux, - Light intensity adjustment - 10 – 100%
(using Digital Capacitive Touch (Fully Remote Controlled) - Color temperature Tc (with
adjustment) -3800 – 4800 K -Light field diameter d10 at Ec - 100 - 150 mm -Working range -
m -Color rendering index 93Ra - Focusing Preset: Adjustable - LED Average life - 50000- Rupees Three Lakh
60000 hrs - Diameter of Light - not less than 650 mm per dome - Power Consumption - not Ninety Thousand Only
more than 120W OT Light should be BIS marked; manufacturer should have CDSCO License
for this product under Class A, Compliant to IEC standards such as IEC60601-
1:2005+A2:2020, IEC 60601-2-41:201 (Relevant Test Certificates to be submitted with Bid)
Clause-wise Technical Compliance to be
Single-arm surgery/anesthesia pendant designed for Operating Theatres should feature a
compact, modular configuration to meet the precise requirements of hospitals, enabling
customization to suit specific operational needs of both Operating Theatres and Intensive Care
Units. It should be equipped with robust ceiling support capable of mounting a selection of
arms. The extension arm, pivotal for functionality, should allow horizontal movement with a
radius of 800-900mm and provide a level rotation ranging from 0 to 330/340 degrees, with
both the extension arm and terminal box designed to rotate together and independently for
maximum versatility. The pendant should support a net loading capacity of min. 100 kg,
accommodating a variety of medical instruments and devices securely. For medical and
electrical services, it should offer configurations that include at least two oxygen outlets, two
vacuum outlets, one medical air, one medical air at 7 bar, and an optional nitrous oxide outlet
(In-scope of MGPS vendor) Additionally, there should be six main sockets, each capable of
supporting 5 to 15 amps, conforming to universal standards to facilitate the operation of Rupees Two Lakh Eighty
16 7.00 various medical and electronic devices. In terms of materials and construction, the pendant 284000.00 Nos.
Four Thousand Only
should be crafted from high-strength aluminum alloy with a sealed design to enhance durability
and maintain sterile conditions. The arm itself should be made from high-density aluminum
alloy extrusion, ensuring both strength and reliability. Installation of the pendant should be
ceiling-mounted to provide a reliable and firm setup, optimizing space usage in the Operating
Theatre or ICU while seamlessly integrating with existing medical systems for managing
medical gas, electrical services, data communication, and equipment. Additionally, the pendant
should include practical features such as a stainless steel IV pole and a ward vacuum unit clamp
to further enhance its utility in a medical setting. With a net weight of approximately 105 kg,
accessible by the equipment carrier, the pendant should be robust yet manageable, ensuring it
meets the rigorous demands of modern medical environments.
Providing and fixing UPS (10KVA) Of Good Quality as directed by engineer incharge Rupees Three Lakh
17 7.00 375000.00 Seventy Five Thousand job
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Medical Gas Pipe Line Of Required dia for OT oxygen , Vaccum , Air.. Etc reuired Point(from
existing line ) as directed by engineer incharge from Outer Nearest Passage to OT Pendant Rupees Three Lakh Forty
18 7.00 Rate Including , Alarm , Valve (for all line) , Point ,Flowmeter and Probe . if alredy then no 345000.00 job
Five Thousand Only
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimat In Figures In Words according to
but 3 4 5 6 estimated
Comprehensiv Maintenance of OT as per prevailing standards and Specifications as directed by Rupees Sixty Five
19 7.00 Engineer in Charge For Modular OT for 1st Year 65900.00 Thousand Nine Hundred Nos.
Comprehensiv Maintenance of OT as per prevailing standards and as directed by Engineer in Rupees Seventy Two
20 7.00 Charge For Modular OT for 2nd Year 72490.00 Thousand Four Hundred Nos.
Comprehensiv Maintenance of OT as per prevailing standards and as directed by Engineer in Rupees Seventy Nine
21 7.00 Charge For Modular OT for 3rd Year 79739.00 Thousand Seven Nos.
Hundred Thirty Nine Only
Rupees Four Crore Thirty Five Lakh Eighty Thousand Two Hundred Three Only
(A) Total Tender Amount
(B) % of above / Below on Tendered Amount
(C) Net Tendered Amount (A-B)
*(please strike out whichever is not applicable)
Note-1 All works shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
Note-2 All the columns in Schedule-B should be filled in ink and the total of the entries in the last column should be struck by the contractor under this signature.
Note-3 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and hold good for work under all conditions, site, moisture, weather etc.
Note-4 Serviceable material available (If any) after Demolishing / Deismentalling any item should be hand over to concered PIU site engineer in charge as per instruction.
Note-5 Credit Value for Dismantling building shall be recovered from first RA bill. Amount for the same shall be considered fixed (Rate shall not be above / below)
Signature of Contractor Deputy Executive Engineer Executive Engineer
PIU, Vadnagar PIU, Mahesana
Signature of the Contractor.
Deputy Executive Engineer Executive Engineer
PIU Sub Division PIU Division,
Vadnagar Mehsana
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01-Make List-4171-06-10-2017.pdf
02-Make List - Civil Items-05-02-2020.pdf
19-Special Conditions-07-02-2025.pdf
Building-Specification.pdf
Ele-List of Approved Products-FINAL.pdf
GRs and Conditions-11-06-24.pdf
Insurance Clause-03-11-2025.pdf
Standard Specification for Electrical Work.pdf
Final Draft PQ for OT.pdf
Make List Dt-15-10-25-6680.pdf
SBD (1).pdf
SC-B Club- Qty.pdf
Special Condition Schedule-C.pdf
Specification.pdf
Tender Details-138-02.pdf