Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A S M SECTOR NEAR HOTEL ASODA ASHWIN NAGAR CIDCO NASHIK 422009 | NASHIK | NASHIK | MAHARASHTRA | 422009 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical all document are Not clear doc. |
Updated dates
Tender Value
₹78.4 Cr
EMD Value
₹78 L
Closing Date
13 May 2026, 5:00 pmClosed
Executive Engineer Public Works Division Sangamner
Office of the Executive Engineer Public Works Division Sangamner
Improvements to Sangamner Wadgaon (SH-50) to Nilwande (SH-65) to Kauthe Kamaleshwar to NH-160D (MDR-10) Road Tal.Sangamner Dist.Ahilyanagar (Part SH-50 Km. 115/400 to 121/700, SH-65 Km 68/900 to 72/100, MDR-10 Km 0/00 to 10/500, Total Project Length-
2026_PWR_1300434_1
PWD SGM/ Notice No.02 for 2026-2027-1
Open Tender
Consultancy
Tal.Sangamner
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹78 L
Chief Engineer P.W.Region,Nashik
29 May 2026
6 May 2026
15 May 2026
6 May 2026
13 May 2026
6 May 2026
8 May 2026
Cost Estimate for Authority Engineer
Authority Engineer Packages AE Grp 5
Number of Packages 8
Number of Roads 8
Districts covered Nashik, Ahemadnagar
EPC packages included
Man Months Have been considered as below
Man-months per person Total Man-months
Particulars Number of Key persons Construction Period DLP Total
Key Professional Staff
Team Leader & Senior Highway Engineer 1 30 3
Resident Highway Engineer 3 30 1
Bridge/Structural Engineer 2 3 0
Highway Design Engineer 2 12 0
Bridge Design Engineer 1 3 0
Geotechnical Engineer 1 4 0
Senior Pavement Expert 2 12 0
Senior Quality cum Material Expert 0 30 0
Road safety Expert 2 12 3
Environmental Expert cum Climate Change Expert 0 1 0
Social Expert Cum R&R Implementation Officer 0 1 0
Contract Expert Cum Legal Expert 1 2 0
Sub-professional Staff
Assistant Highway Engineers 8 30 60
Survey Engineer 8 30 0
CAD Expert 2 15 0
Assistant Bridge Engineer 4 30 0
Environmental cum Safety Officer 0 1 0
Social Officer cum R&R Implementation Assistant 0 2 0
Assistant Quality cum Material Engineer 0 30 0
Quantity Surveyor 30 0
Electrical Engineer 2 6 0
Horticulture and Landscaping Expert 0 3 0
Surveyors 0 30 0
Laboratory Technician 0 30 0
Assistant Resettlement officer 0 1 0
Office Manager 1 30 60
Office Assistant 2 30 60
APPENDIX C-3 : BREAKDOWN OF LOCAL CURRENCY COSTS
I.REMUNERATION FOR LOCAL PROFESSIONAL STAFF
For project length more than100 km
No. Position Name Construction Period 24 months + DLP 60 months
Rate No. of man- Amount
Professional Staff
1 Team Leader cum Senior Highway Engineer TBN 200000 36
2 Resident cum Highway Engineer TBN 160000 96
3 Bridge/Structural Engineer TBN 150000 36
4 Senior Pavement Specialist TBN 140000 24
5 Senior Quality cum Material Expert TBN 140000 24
6 Road Safety Expert TBN 150000 20
Sub-professional
1 Survey Engineer TBN 90000 56
2 Assistant Highway Engineer TBN 90000 120
3 CAD Expert TBN 50000 20
4 Environmental Engineer TBN 95000 6
5 Assistant Bridge Engineer TBN 95000 48
6 Assistant Quality cum Material Engineer TBN 95000 72
7 Electrical Engineer TBN 90000 14
8 HTMS/Toll Expert TBN 90000 4
9 Quantity Surveyor TBN 95000 24
10 Horticulture cum Landscaping Expert TBN 95000 54
Cost Estimate for Authority Engineer
APPENDIX C-2 : SUMMARY OF COSTS
Sr. No. Description Amount
I Remuneration for Local Professional Staff
II Supporting Staff
III Transportation
IV Duty Travel to Site
VI Office Supplies, Utilities and Communication
VII Office Furniture and Equipment
VIII Reports and Document Printing
IX Training costs
X Contingencies 1000000
XII Goods and Services Tax Payable in India
Total Costs (Including Tax)
Note: Payments will be made as per stipulations of the Conditions of Contract.
I. Remuneration working
Sr. No. Position Number of persons Construction Period 12 months + DLP 60 months
Name Rate Construction period DLP No. of man-months* per person Construction period DLP Total Number of Man-months Amount
A B C D E F G H = F + G I = F x C J = G K L
Professional Staff
1 Team Leader & Senior Highway Engineer
Resident cum Highway Engineer 1
Bridge/Structural Engineer 1
4 Senior Pavement Expert 1
5 Senior Quality cum Material Expert 1
6 Road safety Expert 1
Sub-professional
1 Survey Engineer 1 TBN 96 10
2 Highway Design Engineer 1 TBN 12 0
3 Assistant Highway Engineers 1 TBN 96 10
4 CAD Expert 1 TBN 12 0
5 Environment Engineer 1 TBN 12 0
6 Bridge Design Engineer 1 TBN 12 0
7 Assistant Bridge Engineer 1 TBN 24 2
8 Assistant Quality cum Material Engineer 1 TBN 144 12
9 Electrical Engineer 1 TBN 144 12
10 Water Supply & Drain Engineer for Utility Shifting 1 TBN 5 0
11 Quantity Surveyor 1 TBN 5 0
TBN = To Be Named
*The man-month against each key personnel/sub – professional shall be same as specified in Enclosure A of TOR.
II. Support Staff
No. Position Name Staff Months Billing Amount
1 Office Manager TBN 72
2 Accountant cum Cashier TBN 72
3 Steno cum Computer Operator TBN 72
4 Office Boy TBN 72
Note : Billing rates as indicated above shall be increased in accordance of clause 6.2(a) Special Conditions of Contract for the personnel of all categories namely (i) key Personnel; (ii) sub-Professional personnel and (iii) Support staff. The increase as above shall be payable only on the remuneration part of Key Personnel, Sub-Professional Personnel and support staff. However, for evaluation of Bid proposals, the quoted initial rate shall be multiplied by the total time input for each position on this contract, i.e. without considering the increase in the billing rates
III. Transportation (Fixed rate on rental basis)
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
S.No Description of Vehicles Qty. (No. of vehicle-month) Total Period Rate / Vehicle- Month
During Construction Period During Development and O&M Period
1 Innova/Scorpio or equipment 1 12 0
2 Indica or equivalent 1 10 12
IV. Duty Travel to Site (Fixed Costs) (For all Lengths of projects) : Professional and Sub-Professional Staff
Trips Number of Trips Rate* Amount
*Rate quoted includes Hotel charges, travel cost etc. complete.
V. Office Rent (Fixed Costs)– Minimum 200 sqm area of office shall be rented.
(For project Length >100 km)
The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete.
Office Number of months Rate/month Amount
The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete.
VI. Office Supplies, Utilities and Communication (Fixed Costs)
No Item Months - Construction Months - O&M Monthly Rate for Construction Monthly Rate for O&M Amount in Rs.
1 Office Supplies 12 24
2 Drafting Supplies 12 24
3 Computer Running Costs 12 24
4 Domestic and International Communication 12 24
VII. Office Furniture and Equipment (Rental)
Nos of Months Rate/month Amount
VIII. Reports and Document Printing
No. Description No. of Reports No. of Copies per Report Total Nos. of copies Rate per Copy Amount
1 Monthly Report 45 4
Half Yearly Report 8 4
Various Other Report 5 4
IX. Contingencies
A fixed amount of Indian Rupees TEN LAKHS shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval form the Competent Authority in PWD.
As per GR dated 21.05.2019
Maximum per day rates
Sr No. Various Experts If the appointment is for more than 30 days in an Financial year If the appointment is for maximum 15 days in an Financial year
1 Team Leader 7500 10000
2 Highway Expert 5000 7500
3 Pavement Expert 5000 7500
4 Traffic Expert / Transport Planner 5000 7500
5 Bridge Expert 6000 9000
6 Geo technical / Foundation Engineer 5000 7500
7 Tunnel Engineer / Expert 5000 7500
8 Bridge Rehabilitation Expert 7500 9000
9 Structural Audit & Repairs Methodology Expert 7500 9000
10 Highway Designer 5000 7500
11 Bridge Structural Designer 5000 7500
12 Building Structural Designer 5000 7500
13 Quality & Material Engineer 5000 7500
14 Environment Expert 5000 7500
15 Feasibility / Cash Flow Expert 5000 7500
16 Social Impact & R& R Expert 5000 7500
17 Road Safety expert 5000 7500
18 Quantity Engineer 4000 6000
19 Architect 5000 7500
20 Interior Decorator 4000 6000
21 Landscape Expert 5000 7500
22 Senior Surveyor 3000 4000
23 Senior AutoCAD Draftsman 2000 2500
24 Traffic Survey Expert 3000 4000
25 Computer / Hardware Expert 2000 3000
26 Site Supervisor 1500 2000
27 Document Expert (English / Marathi) 1500 2000
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
boq.xls
Other Document • 0.10 MB
RFP01.pdf
Tender Documents • 5.09 MB
Download all tender documents and submit your bid