Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-Finance 13 8 4 REVENUE WARD 13 THATHAIAH GUNTA TIRUPATI ANDHRA PRADESH 517501 | CHITTOOR | ANDHRA PRADESH | 517501 | ₹7.5 L | L1 | Accepted-Finance L1 Bidder |
| 2 | L2₹9.2 LRejected-Finance | ₹9.2 L | L2 | Rejected-Finance L2 Bidder |
| Sl No | Description | Qty | Unit | Gunje Chinna L2 | NIRMAAN PROJECTS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 15 | Cum | 300 ₹4,500 | 250 ₹3,750 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5 | Cum | 7,000 ₹35,000 | 5,000 ₹25,000 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5 | Cum | 8,000 ₹40,000 | 6,000 ₹30,000 Lowest |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 10 | Sqm | 842.5 ₹8,425 | 250 ₹2,500 Lowest |
| 5.00 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Stones supplied by AAI | 20 | Cum | 7,311.25 ₹1,46,225 | 3,000 ₹60,000 Lowest |
| 6.00 | Transportation of Random rubble stones from stack yard to different locations of the huts with in AAI boundary Tirupati operational area for construction of pedastal as per item no 6 above as per requirement and direction of EIC. | 20 | Cum | 5,000 ₹1,00,000 | 2,500 ₹50,000 Lowest |
| 7.00 | 20 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand) | 40 | Sqm | 450 ₹18,000 | 300 ₹12,000 Lowest |
| 8.00 | Finishing walls with textured exterior paint of required shade : New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm | 40 | Sqm | 223.6 ₹8,944 | 150 ₹6,000 Lowest |
| 9.00 | Lettering with black Japan/Synthetic enamel paint of approved brand and manufacture | 1,320 | per letter per cm height | 8 ₹10,560 | 5 ₹6,600 Lowest |
| 10.00 | Supply, fabrication, transportation, and installation of Bird Chaser Hut (4 ft × 4 ft × 8 ft) made of MS structure with MS CR corrugated sheet(1.2mm thick) panelling, insulated with 50 mm glass wool(density 32) on side and top, internal panelling with MDF board lining of 7.8mm thick, 18 mm cement fibre board flooring with 1mm vinyl carpet on top, one MS framed main door with MS corrugated sheet on outside and 4mm ACP/APP sheet on inside fitted with standard locks and handle, Powder-coated aluminium sliding window double shutter with 4mm glass and external monsoon shed( 2T sliding of size 3'x3' one no's and fixed glass window of size 3'x3' Two no's, concealed copper wiring with fittings (LED tube light-1 no's, 6A switch and socket-1no's, 16A switch and socket - 1 no's, Mainboard protected with MCB - 1no's, cabin fan-1 no's), primer and enamel painting, complete as per specifications and directions of Engineer-in-Charge. | 10 | Each | 54,600 ₹5,46,000 Lowest | 55,000 ₹5,50,000 |
Tender Value
₹8.7 L
EMD Value
₹26,225
Closing Date
1 Jul 2026, 6:00 pmClosed
AGM(E-C)
Airports Authority of India, Tirupati Airport
Construction of Bird scarer huts at Tirupati Airport
2026_AAI_279786_1
Construction of Bird Scarer Huts at Tirupati Airport
Open Tender
Civil Works
Item Rate
60 days
Tirrupati Airport
Please refer Tender documents.
14 documents required · 14 mandatory
₹1,180
₹26,225
17 Jul 2026
9 Jun 2026
3 Jul 2026
9 Jun 2026
1 Jul 2026
18 Jun 2026
9 Jun 2026 - 17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 15 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5 | Cum | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 10 | Sqm | - | - |
| 5 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Stones supplied by AAI | 20 | Cum | - | - |
| 6 | Transportation of Random rubble stones from stack yard to different locations of the huts with in AAI boundary Tirupati operational area for construction of pedastal as per item no 6 above as per requirement and direction of EIC. | 20 | Cum | - | - |
| 7 | 20 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand) | 40 | Sqm | - | - |
| 8 | Finishing walls with textured exterior paint of required shade : New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm | 40 | Sqm | - | - |
| 9 | Lettering with black Japan/Synthetic enamel paint of approved brand and manufacture | 1,320 | per letter per cm height | - | - |
| 10 | Supply, fabrication, transportation, and installation of Bird Chaser Hut (4 ft × 4 ft × 8 ft) made of MS structure with MS CR corrugated sheet(1.2mm thick) panelling, insulated with 50 mm glass wool(density 32) on side and top, internal panelling with MDF board lining of 7.8mm thick, 18 mm cement fibre board flooring with 1mm vinyl carpet on top, one MS framed main door with MS corrugated sheet on outside and 4mm ACP/APP sheet on inside fitted with standard locks and handle, Powder-coated aluminium sliding window double shutter with 4mm glass and external monsoon shed( 2T sliding of size 3'x3' one no's and fixed glass window of size 3'x3' Two no's, concealed copper wiring with fittings (LED tube light-1 no's, 6A switch and socket-1no's, 16A switch and socket - 1 no's, Mainboard protected with MCB - 1no's, cabin fan-1 no's), primer and enamel painting, complete as per specifications and directions of Engineer-in-Charge. | 10 | Each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
tenderdoc.pdf
Tender Documents • 5.41 MB
BOQ_327197.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].