Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC 307 D 211 B STREET MUNIRKA SOUTH WEST DELHI DELHI 110067 | NEW DELHI | DELHI | 110067 | ₹5.8 L | L1 | Accepted-AOC Technically qualified L1 Bidder |
| 2 | L2₹8.5 L+₹2.7 L (46.8%)Rejected-AOC | ₹8.5 L+₹2.7 L (46.8%) | L2 | Rejected-AOC Technically qualified L2 Bidder |
| 3 | L3₹11.5 L+₹5.7 L (97.9%)Rejected-AOC GROUND FLOOR AZAD NAGAR CHOWK ROORKEE HARIDWAR UTTARAKHAND 247667 UDYAM UK 06 0009016 | HARIDWAR | UTTARAKHAND | 247667 | ₹11.5 L+₹5.7 L (97.9%) | L3 | Rejected-AOC Technically qualified L3 Bidder |
| 4 | L4₹11.6 L+₹5.8 L (100.4%)Rejected-AOC | ₹11.6 L+₹5.8 L (100.4%) | L4 | Rejected-AOC Technically qualified L4 Bidder |
| 5 | L5₹13.1 L+₹7.3 L (126.7%)Rejected-AOC | ₹13.1 L+₹7.3 L (126.7%) | L5 | Rejected-AOC Technically qualified L5 Bidder |
Tender Value
Refer Docs
Closing Date
26 Oct 2023, 5:00 pmClosed
Deputy Registrar
Material Management, IIT Roorkee
Supply of Rooftop Solar PV System with inverter
2023_IITR_775782_1
2023240218/Solar/HRED/211
Open Limited
Miscellaneous Goods
Supply
IIT Roorkee
Please refer enquiry letter
5 documents required · 5 mandatory
₹0
Exempted
1 Dec 2023
11 Oct 2023
27 Oct 2023
11 Oct 2023
26 Oct 2023
17 Oct 2023
11 Oct 2023 - 16 Oct 2023
Amount
Rooftop Solar PV System with inverter
Go Solar Energy Solutions Pvt Ltd
Current Infraprojects Private Limited
creative power solution
Sutra Energies Pvt Ltd
Roshni solar consultancy
GKM Energy pvt Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_815503.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .