Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-Finance | L1 | Accepted-Finance Accepted Vide Resolution No.1/2 dtd.19-01-2022 of PUTHENCHIRA GP | |
| 2 | L2₹14.7 L+₹2,568.40 (0.18%)Accepted-Finance | L2 | Accepted-Finance Second bidder. Kept in abeyance till the execution of agmnt by the First Bidder |
Tender Value
₹14.7 L
EMD Value
₹36,650
Closing Date
11 Feb 2022, 11:00 amClosed
ASSISTANT ENGINEER, LID-EW SECTION, PUTHENCHIRA
ASSISTANT ENGINEER, LID-EW SECTION, PUTHENCHIRA
Civil Works
2022_LSGD_465102_2
006/2021-22
Open Tender
Civil Works - Others
Item Rate
180 days
PUTHENCHIRA GP
Please refer tender documents
5 documents required · 5 mandatory
₹2,500
Yes
₹36,650
Yes
14 Dec 2022
1 Feb 2022
14 Feb 2022
1 Feb 2022
11 Feb 2022
1 Feb 2022
Amount
CIVIL WORK
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.2 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
SARVAN
Bidder Name
SARVAN
sajeev kumar
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_676032.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .