| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-AOC SHOP NO 1 154 1 G F BLDG KINARA WARD NO 2 SANGUEM GOA | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹25.3 L+₹6.9 L (37.3%)Rejected-Finance GOA GOA | SOUTH GOA | GOA | 403103 | L2 | Rejected-Finance 20 percent below |
| Sl No | Description | Qty | Unit | GOVIND BHIKU NADKERNY & ASSOCIATES L1 | Siddharth Shirodkar L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil, sand, clay, silt, gravel, moorum of all varieties,shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary or disintergrated rock, weathered, fissured/shattered decomposed rock and all such other materials either in full or in parts as the case may be adopting any appr. method or methods as may be convenient or permitted | 246.72 | Cum | 452.48 ₹1,11,635.87 | 450 ₹1,11,024 Lowest |
| 2.00 | Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving:
Upto 2.5 meters long pile | 355 | RM | 153.6 ₹54,528 Lowest | 235 ₹83,425 |
| 3.00 | Heading and pointing whole bally piles 150mm diameter including only rings, providing and fixing pile shoes, cutting of heads after driving and taking out rings removing cut off portions to departmental store as specified. | 142 | Each | 220.79 ₹31,352.18 Lowest | 335 ₹47,570 |
| 4.00 | Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured)
Upto 2.5 meters long pile | 355 | RM | 244 ₹86,620 Lowest | 370 ₹1,31,350 |
| 5.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 27.93 | Cum | 1,768.81 ₹49,402.86 Lowest | 2,500 ₹69,825 |
| 6.10 | Centering and shuttering including struttings, propping etc. and removal of formwork for:
Foundations, footings, bases for columns and mass concrete | 120.34 | Sqm | 325.6 ₹39,182.7 Lowest | 350 ₹42,119 |
| 6.20 | vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. | 73.02 | Sqm | 383.2 ₹27,981.26 Lowest | 400 ₹29,208 |
| 7.10 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:
All works upto plinth level | 102.41 | Cum | 5,448 ₹5,57,929.68 Lowest | 7,800 ₹7,98,798 |
| 7.20 | In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 36.11 | Cum | 5,943.19 ₹2,14,608.59 Lowest | 8,500 ₹3,06,935 |
| 8.00 | Laterite boulder masonry in cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate of 20 mm nominal size) in foundation. | 113.19 | Cum | 3,032.17 ₹3,43,211.32 Lowest | 4,200 ₹4,75,398 |
Tender Value
₹23.0 L
EMD Value
₹45,970
Closing Date
22 Jun 2024, 5:00 pmClosed
EEII, WRD
Aquem Baixo, Rawanfond
Construction of Protection wall for nallah near Dangafoll Creek adjacent to Sy. No. 122-9 in Carmona Village of Benaulim Constituency
2024_WRD_15871_1
WDII/TECH/F17/1e/2024-25/SN8
Open Tender
Miscellaneous Works
Item Rate
120 days
Rawanfond
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹45,970
13 Aug 2025
11 Jun 2024
24 Jun 2024
11 Jun 2024
22 Jun 2024
11 Jun 2024
Amount
Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil, sand, clay, silt, gravel, moorum of all varieties,shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary or disintergrated rock, weathered, fissured/shattered decomposed rock and all such other materials either in full or in parts as the case may be adopting any appr. method or methods as may be convenient or permitted
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: Upto 2.5 meters long pile
Heading and pointing whole bally piles 150mm diameter including only rings, providing and fixing pile shoes, cutting of heads after driving and taking out rings removing cut off portions to departmental store as specified.
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) Upto 2.5 meters long pile
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for: Foundations, footings, bases for columns and mass concrete
vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level
In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
Laterite boulder masonry in cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate of 20 mm nominal size) in foundation.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge 110mm Dia
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
Siddharth Shirodkar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .