Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | L1 | Accepted-AOC L1 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
13 Sept 2023, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P AND P) CD
Replacement of various Drive Motors in NP and Off site area, FACT CD.
2023_FACT_767998_1
04096/2023-2024/E28040
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM106A).
4 documents required · 4 mandatory
₹0
₹12,000
Yes
17 Oct 2023
22 Aug 2023
14 Sept 2023
22 Aug 2023
13 Sept 2023
22 Aug 2023
Replacement of various Drive Motors in NP & Off site area, FACT CD.
Replacement of Motor of dryer A or B in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of dryer A or B in NP plant. The tools and tackles shall be arranged. Foundation bolts of the existing motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of Motor of Product cooler A or B in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of Product cooler A or B in NP plant. The tools and tackles shall be arranged. Foundation bolts of the existing Product cooler motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of Motor of Granulator A or B in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of Granulator A or B in NP plant. The tools and tackles shall be arranged. Foundation bolts of the existing Granulator motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of Motor of vibrator screen, A or B stream in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of vibrator screen A or B stream in NP plant. The tools and tackles shall be arranged. Foundation bolts of the existing motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. The foundation / jack bolts shall be tightened properly.
Replacement of Motor of Scrubber Seal Tank (SS Tank), A or B stream in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of Scrubber Seal Tank (SS Tank), A or B stream in NP plant. The tools and tackles shall be arranged. Belt guard and belts shall be removed. Foundation bolts of the existing motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. The foundation / jack bolts shall be tightened properly. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of Motor of Reactor, A or B stream in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of Reactor, A or B stream in NP plant. The tools and tackles shall be arranged. Foundation bolts of the existing motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. The foundation / jack bolts shall be tightened properly. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of Motor of Fume Fan, Cooler Fan and Dryer Fan, A or B stream in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of Fume Fan, Cooler Fan and Dryer Fan, A or B stream in NP plant. The tools and tackles shall be arranged. Foundation bolts of the existing motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. The foundation / jack bolts shall be tightened properly. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of Motor of Phosphoric acid day tanks (A, B, C & D), in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of Phosphoric acid day tanks (A, B, C & D), in NP plant. The tools and tackles shall be arranged. Foundation bolts of the existing motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. The foundation / jack bolts shall be tightened properly. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of Motor of Crusher, A or B stream in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of Crusher, A or B stream in NP plant. The tools and tackles shall be arranged. Belt guard and belts shall be removed. Foundation bolts of the existing motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. The foundation / jack bolts shall be tightened properly. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of Motor of RC / DD/ Product Elevator in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of RC / DD/ Product Elevator in NP plant. The tools and tackles shall be arranged. Foundation bolts of the existing motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. The foundation / jack bolts shall be tightened properly. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of Motor of RC / SF Conveyor in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of RC / SF Conveyor in NP plant. The tools and tackles shall be arranged. Foundation bolts of the existing motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. The foundation / jack bolts shall be tightened properly. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of Motor of Scrubber Liquor Pumps and Slurry Pumps, A or B stream in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of Scrubber Liquor Pumps and Slurry Pumps, A or B stream in N P Plant. The tools and tackles shall be arranged. Foundation bolts of the existing motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. The foundation / jack bolts shall be tightened properly. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of Motor of DH Fan in N P Plant. Work involves: The required site arrangements shall be done for the replacement of motor of DH Fan in NP plant. The tools and tackles shall be arranged. Foundation bolts of the existing motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. The foundation / jack bolts shall be tightened properly. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of motor of various product conveyors in N P - Off site area. Work involves: The required site arrangements shall be done for the replacement of motor of product conveyors [ N1A / N2 A, N1B / N2B, N1C / N2C, N1D / N2D, N3, N4, N5, N6, N7 , N8, N9, N10, N11, N12, N13, N14, N15, N16, slat conveyors and lorry loading conveyors] in N P - Off site area. The tools and tackles shall be arranged. Foundation bolts of the existing gear box / motor shall be loosened / removed and lead / transported to mechanical / electrical work shop. The new / spare motor shall be transported to site. The gear box / motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. The foundation / jack bolts shall be tightened properly. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
Replacement of Motor of various equipments in N P - Off site area. Work involves: The required site arrangements shall be done for the replacement of motor of various equipments [ Cooling Water Pump, NH3 Transfer Pump, ammonia compressor / IAC at NH3 Handling, P2O5 transfer pumps, pit pump at acid terminal, Fume scrubber pumps, Glycol Coolant Pump and Dryer furnace fan, ASL pump, furnace oil pump, EOT Motors at NP Plant etc. ] in N P - Off site area. The tools and tackles shall be arranged. Foundation bolts of the existing motor shall be loosened / removed and lead / transported to electrical work shop. The new / spare motor shall be transported to site. The motor shall be kept in position and insert the foundation bolts, after cleaning the base plate. The foundation / jack bolts shall be tightened properly. Rigging assistance shall be provided for the coupling / decoupling and alignment of motor.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_807322.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .