| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | LI₹2.6 LAccepted-AOC ARACKAL H VARAPPETTY P O KOTHAMANGALAM 686691 | ERNAKULAM | KERALA | 686691 | LI | Accepted-AOC Lowest rate, hence accepted | |
| 2 | L2₹2.7 LRejected-AOC | L2 | Rejected-AOC Highest rate hence rejected |
Tender Value
₹2.7 L
EMD Value
₹6,694
Closing Date
17 Apr 2023, 5:00 pmClosed
Seeja KR
O/o Assistant Executive Engineer Electrical Wing (I) Sub division, Aluva
GENERAL-AMC 2022-23-Fully Comprehensive Annual Maintenance of Vazhakkulam East And Vazakkulam West LI Schemes under Electrical LI section Aluva
2023_Irrig_554000_7
PWD/BLDG/TR/10885/2022
Open Tender
Electrical Works
Item Rate
365 days
Aluva
Please refer Tender documents.
11 documents required · 11 mandatory
₹590
₹6,694
14 Jun 2023
31 Mar 2023
19 Apr 2023
31 Mar 2023
17 Apr 2023
31 Mar 2023
31 Mar 2023 - 17 Apr 2023
Amount
Overhauling
OD71703/2022-2023:Dismantling the 25 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD71704/2022-2023:Dismantling the 80 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD71689/2022-2023: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD71707/2022-2023:Lowering down and erecting 25 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD71706/2022-2023:Lowering down and erecting 80 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD71693/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD71694/2022-2023: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD71695/2022-2023:Supply and Installing 20 W LED Tube light.
OD120365/2022-2023: Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG or equivalent , suitable for motor / pump set as per the direction of departmental staff at site - Bearing No 6309 or its equivalent size
OD136916/2022-2023:Supply and fixing star delta timer 3-120 sec, 240-415V 50HZ AC,L&T make or Equivalent
OD136917/2022-2023:Supply and providing MN 2 (20-33 Amps) range or equivalent overload relay in place of damaged one
OD136918/2022-2023:Supply and fitting 40 A, 3 pole power Contactors , AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 1 NO/INC, L&T MNX 40 or equivalent suitable for 25 HP motor's fully automatic star delta starter
Periodical Maintenance
OD71710/2022-2023: Fully Comprehensive Annual Maintenance of 80 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD114821/2022-2023:Fully Comprehensive Annual Maintenance of 25 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD71678/2022-2023: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD71713/2022-2023:Lifting the 25HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD71714/2022-2023:Lifting the 80HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Overhauling
OD71687/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD71717/2022-2023:Dismantling the 25 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD97705/2022-2023:Dismantling the 75 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD71688/2022-2023: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD71720/2022-2023:Lowering down and erecting 25 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD97706/2022-2023:Lowering down and erecting 75 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD71682/2022-2023: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD71683/2022-2023:Supply and Installing 20 W LED Tube light.
OD137904/2022-2023:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG or equivalent , suitable for motor / pump set as per the direction of departmental staff at site - Bearing No 6316 or its equivalent size
OD225183/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
Periodical Maintenance
OD71676/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump,maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD71722/2022-2023:Fully Comprehensive Annual Maintenance of 25 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD97708/2022-2023: Fully Comprehensive Annual Maintenance of 75 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD71679/2022-2023: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD71724/2022-2023:Lifting the 25HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD97709/2022-2023:Lifting the 75HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
ALIYAR T K
Bidder Name
A. R Sivasankaran
ALIYAR T K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_841667.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .