| 1 | L1₹3.0 LAccepted-AOC MANCHERATH HOUSE THRIKKANAPURAM | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.0 L+₹5,577.66 (1.88%)Accepted-AOC 1505 SUB TREASURY TIRUR | KANNUR | KERALA | 670612 | L2 | Accepted-AOC L2 |
| Sl No | Description | Qty | Unit | Abdulla C P L1 | SHAHIR P V L2 |
|---|---|---|---|---|---|
| 1.00Renovation of Pond | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1.92 | cum | 330.41 ₹634.39 Lowest | 330.41 ₹634.39 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.48 | cum | 7,286.51 ₹3,497.52 Lowest | 7,777 ₹3,732.96 |
| 1.00 | OD286251/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 32.77 | cum | 3,668.07 ₹1,20,220.99 Lowest | 3,668.07 ₹1,20,220.99 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 657 | kilogram | 103.26 ₹67,841.82 Lowest | 111 ₹72,927 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 6.24 | sqm | 1,015 ₹6,333.6 Lowest | 1,015 ₹6,333.6 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 25.2 | sqm | 354.69 ₹8,938.19 Lowest | 354.69 ₹8,938.19 Lowest |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.37 | cum | 9,152.05 ₹67,404.85 Lowest | 9,152.05 ₹67,404.85 Lowest |
| 1.01 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 7.56 | cum | 410 ₹3,099.6 Lowest | 444 ₹3,356.64 |
| 1.01 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 42.75 | sqm | 367.84 ₹15,725.16 Lowest | 367.84 ₹15,725.16 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,407
Closing Date
23 Oct 2025, 5:00 pmClosed
Assistant Engineer
O/O Assistant Engineer, LIDEW Section, Thavanur
Annual Plan-Thavanur GP Project No. 279/25-26 Renovation Of Erukulam -Pond Renovation Third Phase-General Civil Work
2025_LSGD_810732_1
10/AE/LIDEW/TVNR/TN/25-26
Open Tender
Civil Works - Others
Item Rate
Kadakassery
Please refer Tender documents.
7 documents required · 7 mandatory
₹655
Yes
₹7,407
Yes
17 Jan 2026
16 Oct 2025
25 Oct 2025
16 Oct 2025
23 Oct 2025
16 Oct 2025
Amount
Renovation of Pond
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
OD286251/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
OD286250/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
SHAHIR P V (BID ID -2398597)
Bidder Name
SHAHIR P V
Abdulla C P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1353395.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Tendernotice_2.pdf
PDF • 0.07 MB
Tendernotice_3.pdf
PDF • 0.07 MB
FOT279.pdf
Tender Documents • 0.24 MB
PA279.pdf
Tender Documents • 0.68 MB
Affidavit279.pdf
Tender Documents • 0.17 MB
BOQ_1353395.xls
BOQ • 0.30 MB
SBD279_merged.pdf
Tender Documents • 2.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .