Tender Value
₹5.8 L
EMD Value
₹5,800
Closing Date
8 Nov 2023, 12:00 pmClosed
SE EWC
Bareilly
The work for system strengthening works of different 33/11 KV S/S and interpoling in 33 KV Line
2023_MVVNL_857806_1
39/EWC(B)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
Bareilly
As per tender document
3 documents required · 3 mandatory
₹1,180
SE EWC
₹5,800
16 Dec 2024
31 Oct 2023
8 Nov 2023
31 Oct 2023
8 Nov 2023
31 Oct 2023
Amount
(Part-A) 33KV CIRCUIT BREAKER WITH CONTROL PANEL REPLACEMENT OF 33/11KV SUBSTATION ALIGANJ BAREILLY, 33/11KV SUBSTATION BARSER BAREILLY, 33/11KV SUBSTATION SIROLI BAREILLY
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.
33 KV VCB 800A 750 MVA
33 KV CONTROL PANEL FOR SINGLE TRANSFORMER
M.S. Channel 125x65x6mm (13.1Kg/meter)
Nut bolt and Washer
Earthing of indoor & outdoor equipments of Sub-Station after proper welding of joints and painting of earth strip above soil with proper clamp etc. as per RESPO approved drawing & resistance of earthing should be not more than 2Ω as per details given below.
Making of triangular bridge by using MS electrode, GI strip 50x6mm and GI Pipe 40 mm dia with providing of well type pipe earthing upto 15 Mtr. depth below ground level including welding etc. by boaring process at T/F neutral, LA and newly erected structure including cost of GI pipe of size 40 mm dia 15 mtr. long of ISI mark.(all the required material will be supllied by the contractor).
Supply of GI strip of size 50x6mm for earthing of all newly erected structures and equipments in switchyard including cutting, fixing & proper welding with equipments. All LA will be seprately earth also as per RESPO norms. (All the required materials will be provided by firm.)
Installation of followig equipments on their respective structures including mechanical & electrical fixing after proper adjustment on their structure.
33 KV VCB 800A 750 MVA
33 KV CONTROL PANEL FOR SINGLE TRANSFORMER
Dismentaling of existing following damage equipments on their structure.
33 KV VCB 800A 750 MVA
33 KV CONTROL PANEL FOR SINGLE TRANSFORMER
Complete laying and termination of copper control cables from 10 MVA/5 MVA power T/F, 33 KV VCB, 33 KV CT in the out door switch yard to the existing transformer relay control panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings, including cost of testing of transformer, VCB, CT, relay pannel & proper relay settings as per requirement etc.
Control Cable 4x2.5 mm2
Control Cable 2x2.5 mm2
Erection & testing of single transformer control panel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand.
Repairing of existing 33KV VCB in switchyard including repalcement of all required accessories as coil,motor, intrruptor etc. All type of material should be provided by the firm.
Carriage of old scrap/dismentalled material from site to store center Bareilly
(B) INTERPOLING IN 33KV MIRZAPUR LINE IN 5KM LENGTH BAREILLY
Loading, unloading and safe carriage of the following materials from any Electricity Store Center (Bareilly, Badaun, Shahjahanpur, Pilibhit) of Electricity store division of Bareilly zone to site of work
PCC Pole 9.0 Mtr long.
S.T.Pole 11 Mtr long.
11 KV Cross Arm Channel V type
33 KV Pin insulator
33 KV Pin with nut
11 KV Disc insulator B&S type 7000 kg.
Disc fitting Dog/raccon 7000kg.
Stay set complete
Guarding angle 1.6
GI wire 8 swg
Holding clamp for ST/PCC pole
Earthing complete
Replacement of the following materials including fixing of all types of accessories as per RESSPO drawing.All types of clamps, nut, bolt washers would be provided by the contractor.
11 KV Cross Arm Channel V type
33 KV Pin insulator
33 KV Pin with nut
11 KV Disc insulator B&S type 7000 kg.
Disc fitting Dog/raccon 7000kg.
Installation of the following materials including fixing of all types of accessories as per RESSPO drawing.All types of clamps, nut, bolt washers would be provided by the contractor.
Stay set complete
Erection of the following supports including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing.All types of clamps, stone pad, nut, bolt washers would be provided by the contractor.
Single support of S.T pole 11 mtr long.
Single support of PCC Pole 9.0 Mtr long.
Erection/fixing for stay set with stay wire and clamp as per RESSPO drawing including binding, clamping, tightening, and nozzeling etc. complete in all respect including its grouting in ratio 1:4:8 before back filling of the pits as per RESSPO schedule. All clamps, nuts, bolts, cement. brick, ballast, sand etc would be provided by the contractor.
Concreting of supports in 1:4:8 ratio from bottom of pole to ground level and plinthing of supports upto 300mm above ground level by using cement ,brick ballast and sand in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing.All matrial would be provided by the contractor.
Earthing of each S.T Poles and PCC of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
Painting of following support with one coat of red oxide primer and two coats of aluminium white paint of ISI mark and top danger portion of each support must be painted by providing two coat of Post Office Red Paint (1.5mtr upper portion of support.) Paint and material would be given by contractor to complete of work.
Single pole structure of 11 mtr. ST Pole.
Fixing of danger board and G.I barbed wire on each pole including proper clamping. All material would be provided by firm.
Guarding of HT/LT/Telephone Line/ Road/River Crossing etc. by providing G.S Earth wire 7/16 SWG/GI wire No. 8/10 and making net with difference of 1.00 Mtr. Completely including fixing of channel/angle etc. with proper locking at each support as per RESSPO norms. All type nut &bolts, would be given by the contractor.
Carriage of old scrap/dismentalled material from site to store center Bareilly
M/S HINA ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .