| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC BELOW SLAUGHTER HOUSE KRISHNA NAGER SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹1.5 L Quoted ₹1.8 L | L1 | Accepted-AOC Accept |
| 2 | L2₹1.8 L+₹637 (0.36%)Rejected-AOC BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹1.8 L+₹637 (0.36%) | L2 | Rejected-AOC Reject |
| 3 | L3₹1.8 L+₹866 (0.49%)Rejected-AOC | ₹1.8 L+₹866 (0.49%) | L3 | Rejected-AOC Reject |
| 4 | L4₹1.8 L+₹1,594 (0.90%)Rejected-AOC | ₹1.8 L+₹1,594 (0.90%) | L4 | Rejected-AOC Reject |
| 5 | L5₹1.8 L+₹4,143 (2.35%)Rejected-AOC VILLAGE BHOOR PO JHANGI TEHSIL SANDHOL DISTRICT MANDI HP | SANDHOL | MANDI | HIMACHAL PRADESH | ₹1.8 L+₹4,143 (2.35%) | L5 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | ANISH RANA L3 | Sanskar Thakur L4 | Naveen Kumar L2 | Sunil Kumar L1 | Sukh Dev Singh L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of excavated earth upto a lead of 20 mtrs in Pick, jumper work as per direction and to the entire satisfaction of Engineer-in-Charge. | 6 | Cum | 320 ₹1,920 | 335 ₹2,010 | 320 ₹1,920 | 310 ₹1,860 Lowest | 480 ₹2,880 |
| 2.00 | Excavation in foundation, trenches etc. in earth work, lift up to 1.50 meters stacking the excavated soil not more than 3 meter clear from the edge of excavation and the rreturning the stacked soil in 15 cm layer, when required into plinth sides of foundation etc. consolidating eache deposit layer by ramming and watering and disposing of all surplus excavated earth as directed with in a lead of 20 meters as per direction and to the entire satisfaction of Engineer- in- charge up to leads and lifts. | 8.06 | Cum | 360 ₹2,901.6 | 380 ₹3,062.8 | 365 ₹2,941.9 | 355 ₹2,861.3 Lowest | 510 ₹4,110.6 |
| 3.00 | Providing and laying cement concrete 1:6:12 (1 cement :6 sand :12 graded stone agg. 40mm nominal size) curing complete excluding cost of form work in foundation and plinth in all lead and lifts as per direction and to the entire satisfaction of the Engineer-in-Charge. | 1.2 | Cum | 6,500 ₹7,800 Lowest | 7,175 ₹8,610 | 7,160 ₹8,592 | 7,150 ₹8,580 | 6,800 ₹8,160 |
| 4.00 | Providing form work of steel shuttering with steel plat as3.15mm thich welded with angle iron in frame 30x30x5mm so as to fair finish including centring, shuttering floor two seiling not exceeding 4 mtrs. And removal of the same for insiturein forced conerete and plain concrete work in:- | 29.3 | Sqmt | 380 ₹11,134 | 385 ₹11,280.5 | 370 ₹10,841 | 360 ₹10,548 | 340 ₹9,962 Lowest |
| 5.00 | Providing and laying cement concrete 1:5:10 (1 cement :5 sand : 10 graded stone aggregate 40mm nominal size) with 15% Plum and curing complete excluding cost of form work in retainin walls/breast walls, the size of plums shall usually by 150mm to 300mm as per HPPWD specification as per direction and to the entire satisfaction of Engineer-in-Charge. | 19.2 | Cum | 8,000 ₹1,53,600 | 7,975 ₹1,53,120 | 7,960 ₹1,52,832 | 7,950 ₹1,52,640 Lowest | 8,100 ₹1,55,520 |
Tender Value
₹2.1 L
EMD Value
₹4,150
Closing Date
30 Apr 2026, 5:00 pmClosed
Executive Engineer
JS Division Dharampur Bharari
Construction of retaining wall for protection of sector tank at Goart
2026_HPIPH_134940_1
773-822 Dated 22-04-2026
Open Tender
Civil Works
Item Rate
Dharampur
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
Executive Engineer
₹4,150
7 Jul 2026
22 Apr 2026
2 May 2026
22 Apr 2026
30 Apr 2026
22 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Cutting in earth work and disposal of excavated earth upto a lead of 20 mtrs in Pick, jumper work as per direction and to the entire satisfaction of Engineer-in-Charge. | - | Cum | - | - |
| - | Excavation in foundation, trenches etc. in earth work, lift up to 1.50 meters stacking the excavated soil not more than 3 meter clear from the edge of excavation and the rreturning the stacked soil in 15 cm layer, when required into plinth sides of foundation etc. consolidating eache deposit layer by ramming and watering and disposing of all surplus excavated earth as directed with in a lead of 20 meters as per direction and to the entire satisfaction of Engineer- in- charge up to leads and lifts. | - | Cum | - | - |
| - | Providing and laying cement concrete 1:6:12 (1 cement :6 sand :12 graded stone agg. 40mm nominal size) curing complete excluding cost of form work in foundation and plinth in all lead and lifts as per direction and to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
| - | Providing form work of steel shuttering with steel plat as3.15mm thich welded with angle iron in frame 30x30x5mm so as to fair finish including centring, shuttering floor two seiling not exceeding 4 mtrs. And removal of the same for insiturein forced conerete and plain concrete work in:- | 29.3 | Sqmt | - | - |
| - | Providing and laying cement concrete 1:5:10 (1 cement :5 sand : 10 graded stone aggregate 40mm nominal size) with 15% Plum and curing complete excluding cost of form work in retainin walls/breast walls, the size of plums shall usually by 150mm to 300mm as per HPPWD specification as per direction and to the entire satisfaction of Engineer-in-Charge. | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.67 MB
Form6.pdf
Tender Documents • 0.78 MB
Form8.pdf
Tender Documents • 1.25 MB
BOQ_199668.xls
BOQ • 0.27 MB
TC.pdf
Tender Documents • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .