Loading…
Loading…
Tender Value
₹5.1 L
EMD Value
₹6,000
Closing Date
8 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Petlad Irrigation Division Petlad
Clearing the silt and jungle cutting from the various 4 sub minors canals of sinjiwada distributary including structure under juridiction of sinjiwada section
289276
22 of 2025-26
Open
Miscellaneous Works
Anand
7 documents required · 6 mandatory · 1 optional
₹900
Yes
Executive Engineer Petlad Irrigation Division Petlad
₹6,000
Yes
25 Mar 2026
25 Mar 2026
25 Mar 2026
8 Apr 2026
25 Mar 2026
Bill of Quantity
Memorandum showing items of works to be carried out
NAME OF Clearing the silt and Jungle Cutting from the various 4 sub minors canals of Sinjiwada
WORK : distributary including structure under juridiction of Sinjiwada section
estimate Total amount
estimate Total amount
I. d but accoarding to
Item of work Rs. in Unit
No. may be Rs. in words estimated
more or quantities
ITEM NO :- 1 Clearing the shrubs, like akadas,
weeds and other vegetables including depositing
the same outside and burning etc. complete
1 from canal bed, top and both slopes of the
banks, for canal with discharge.
(a) For Canals Below 20 Cusec
Hundred Seventy
ITEM NO :- 2 Clearing the silt from the
canal/drain bed by a digging the same to the
required bed level and gradient including
depositing the excavated earth regularly in spoil
2 bank for utilizing the same preparing the banks
after breaking clods as and where directed for
all leads and lifts.
(a) For Canals Below 20 Cusec. & 0 to 1.5 m
lift. Rs. One Hundred
2464.10 173.30 Seventy Three & CM
Thirty Paise Only
ITEM NO :- 3 Clearing the silt/debries from the
pipe culvert/syphon/syphon well under ground
pipe drain /box drain for drain/Canal by
3 digging the same including depositing the
excavated earth/debris etc. for all leads and lift
(A) For pipe culvert/Syphon (i) Above 900 mm
dia pipe Rs. Five Hundred
Rs. Five Lakh Nine Thousand Two Hundred Forty Eigth & Three paisa only.
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
payment shall be made.
Notes 2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.last column should be struck by the contractor under his
Notes 3 -GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-
10/2017CementConsumption/16/CDate:11/05/2017asstated in S.O.R. there fore in R.C.C. items where there is a change as per actual mix design the
costof difference of cement consumption have been deducted from the rate of original item at the rate of input (5483.37) rate mentioned in all the
Signeture of Contractor Deputy Executive Engineer
Sojitra Irrigation sub Division
Name of work :- Clearing the silt and jungle cutting from the various 4 sub minors canals of sinjiwada distributary including structure under juridiction of sinjiwada section
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cost L Cement Per Total Cement Steel per Total Steel Cost Bitumen Per Total Bitumen PoL Per Unit Total PoL cost Machinery Per Total Machinery Other Total Other TOTAL cost Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cost L Cement Per Total Cement Steel per Total Steel Cost Bitumen Per Total Bitumen PoL Per Unit Total PoL cost Machinery Per Total Machinery Other Total Other TOTAL cost Total Item Cost Total %
Estimated but according to estimated Per Unit a Unit Cost Unit Unit Cost Unit Cost Comodity Comodity Cost per Unit
Sr. may be more Rs. b Per Unit
ITEM NO :- 1 Clearing the shrubs, like
akadas, weeds and other vegetables
including depositing the same outside and
1 burning etc. complete from canal bed, top
and both slopes of the banks, for canal with
ITEM NO :- 2 Earth work in embankment
using selected soil, soft & hard murrum
excavated from approved borrow area /
village tanks etc. Including conveying,
2 spreading in uniform layers, breaking clods
and dressing to the designed canal section
etc. with lead upto 500 m and all lifts
(a) For Canals Below 20 Cusec. & 0 to 1.5 m
ITEM NO :- 3 Clearing the silt/debries from
the pipe culvert/syphon/syphon well under
ground pipe drain /box drain for
3 drain/Canal by digging the same including
depositing the excavated earth/debris etc.
for all leads and lift
(A) For pipe culvert/Syphon (i) Above 900 548.7 Rs. Five Rmt
Rs. Four Lac Fifty Eight Thousand Two Hundred Eighteen &
Ninety Three Paise Only
Signature of Contractor Deputy Executive Engineer
Sojitra Irrigation sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 22 of 2025-26 online.pdf
1 Front Page..pdf
2. Notice Inviting online Tender.pdf
3. New SBD 4 canal.pdf
5.- Other Spec. and Work site Condition.pdf
6-Itemwise Specification.pdf
9. BOQ.pdf
khass sarato.pdf
Download all tender documents and submit your bid