Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.2 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹54.0 L+₹77,303.38 (1.45%)Rejected-AOC 14 4A KALI PRASAD C HAKRABORTY ST CAL KOLKATA 700003 | KOLKATA | WEST BENGAL | 700003 | L2 | Rejected-AOC REJECTED | |
| 3 | L3₹52.7 L−₹57,998.60 (1.09%)Rejected-Finance | L3 | Rejected-Finance NON-BONAFIDE | |
| 4 | Rejected-Technical | - | Rejected-Technical REJECTED | |
| 5 | Rejected-Technical | - | Rejected-Technical REJECTED |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
2 Oct 2020, 6:00 pmClosed
CWE
Commander Works Engineers (Sub) Military Engineer Services PO- Barrackpore Dist- 24 Pgns (N) Kolkata- 700120 (W.B)
MANNING AND OPERATION FOR CENTRAL AC PLANT AND VARIOUS WATER SUPPLY INSTALLATION AT MIL STN KANCHRAPARA AND OUTSOURCING OF METER READER UNDER GE BARRACKPORE
2020_MES_368308_2
CWE/BKP/17 OF 2020-2021
Open Tender
Miscellaneous Works
Item Rate
330 days
GE BARRACKPORE
CLASS C CATEGORY d v
5 documents required · 5 mandatory
₹1,000
GE BARRACKPORE
₹1.1 L
Yes
19 Nov 2020
8 Sept 2020
5 Oct 2020
8 Sept 2020
2 Oct 2020
18 Sept 2020
Amount
Providing services for manning and operation of machineries installed in centralized AC Plant installations at 15 WEU Kanchrapara with 01 Ref Mech (skilled) per shift of eight hours in three shifts per day comprising of compressor-03 Nos, Hot water generator with 02 Nos pump, Evaporator-03 Nos, Condensor pump-03 Nos, chiller pump-03 Nos, with microrocessor based control panel, stand by DG set as per directions given by the Engr-in-Charge. Note:- Time of Shifts (a) 0600 Hrs to 1400 Hrs (b) 1400 Hrs to 2200 Hrs (c) 2200 Hrs to 0600 Hrs
Providing services for manning and operation of machineries installed in water supply installation at Dharampore Pump House with One operator FGM (semi skilled) per shift of eight hours in three shifts per day. Service shall comprise of following: (a) Operation of Submersible pump/booster pump (b) Operation of stand by DG Set (c) Operation of chlorination system and water treatment system incll water filling to over head reservoir. (d) Supply of water to users through distribution line by operaion sluice valves complete all as specified and as directed by the Engr-in-Charge. Note:- Time of Shifts (a) 0600 Hrs to 1400 Hrs (b) 1400 Hrs to 2200 Hrs (c) 2200 Hrs to 0600 Hrs
All as per Srl Item No 2 here-in-before at Engr Regt Pump House
All as per Srl Item No 2 here-in-before at MAP Qtr Pump House
Providing 02 men (semi skilled) to take the meter reading work-services including the following:- (a) Noting and recording readings (using manual or reqd software) of elecronic meters of any type and any capacity located at the different consumers premises (commence wef 1st of each month) e.g. Md Accn of offrs, Single Accn of Offrs, Md Accn of JCos/OR, OTM, MES/Civ qtrs situated at Barrackpore and Kanchrapara Cantt. (b) Entering in users meter reading cards also entering in a separate register held with (Meter Reader Book) duly signed by the users of respective premises. (c) Feeding the recorded reading data to central computer and after processing/updating reading, preparing electric consumption reports/returns of each consumer as per reqd format and submitting the same to BSO, Sub-Div, GE Barrackpore (Barrackpore & Kanchrapara Area) upto 10th of each month or as directed by Engineer-in-Charge. (Note: The periodicity of billing shall be 10th of each month) (d) Testing and calibrating of all type of meters of any capacity complete all as directed by Engineer-in-Charge. (e) Duty of each shift per day per person of eight hours. Timing of duty 0900 Hrs to 1700 Hrs and as directed by Engineer-in-Charge.
Providing services for manning and operation of Sewage treatment plant 350 KLD at Dharampore area with One operator FGM (semi skilled) per shift of eight hours including operation of chlorination system, cleaning of Pump and all accessories installed at plant including sluice valves in two shift per day below complete all as specified and as directed by Engr-in-Charge. Notes No2:- Time of shifts:- (a) 0600 Hrs to 1400 Hrs (b) 1400 Hrs to 2200 Hrs
BUSINESS SYNDICATE
ROY CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .