| 1 | L1₹71.1 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹78.6 L+₹7.6 L (10.6%)Rejected-AOC KALADI GRAMA PANCHAYAT P O KADANCHERY 679 582 | MALAPPURAM | KERALA | 679582 | L2 | Rejected-AOC rejected |
Tender Value
₹81.2 L
EMD Value
₹50,000
Closing Date
5 Sept 2024, 11:00 amClosed
Executive Engineer
Executive Engineer PWD Buildings Division Civil station Malappuram
In this estimate, the Pile foundation, Pile load Test( Initial and Routine), Pile cap, and Grade beam works of the front selected portions are included
2024_PWD_688087_1
BL/DN/MPM/16/2024-25
Open Tender
Civil Works - Buildings
Item Rate
300 days
GUPS CHERUVAIKKARA MALAPPURAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
₹50,000
Yes
15 Oct 2024
29 Aug 2024
7 Sept 2024
29 Aug 2024
5 Sept 2024
29 Aug 2024
Amount
DETAILED ESTIMATE
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
OD98167/2024-2025:Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile above 100 tonne and upto 350 tonne capacity Initial test
OD98173/2024-2025:Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-30 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used . 600 mm dia pile
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.17.1:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5 m
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
OD98177/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge-All work up to plinth level. Details of cost for 1.00m3.
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
ECCR CONSTRUCTIONS AND DEVELOPERS PVT LTD
Bidder Name
ECCR CONSTRUCTIONS AND DEVELOPERS PVT LTD
KUTTIAMU K M
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1070776.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .