Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
26 Apr 2021, 6:55 pmClosed
Executive Engineer Mech. irrig. Div. Baramulla
Mech. irrig. Div. Baramulla
Urgent repairs to 50 Hp, 980 rpm, 3-phase squirrel cage induction motor at lift irrigation scheme Gund-ibrahim.
2021_IFC_122671_3
eNIT 02 of 2021-22
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Pattan
Please refer Tender documents.
4 documents required · 4 mandatory
₹100
Yes
Executive Engineer Mech. irrig. Div. Baramulla
Exempted
Mech. irrig. Div. Baramulla
28 Apr 2021
19 Apr 2021
27 Apr 2021
19 Apr 2021
26 Apr 2021
19 Apr 2021
24 Apr 2021
Amount
1. Dismantling of motor from the respective base frame by opening of foundation bolts. The job includes dragging of 50-HP, 3-Phase Induction motor to loading site and shifting it to the workshop and unload it there. The job includes the shifting of motor back to site in a private vehicle after successful completion of whole job and testing on full load. 2. Dismantling of motor at workshop by way of disassembling the stator rotor assembly and assessing the damages. The job also includes extraction of damaged windings from the slots of stator. 3. Complete rewinding of stator coils as per sample of copper wire of standard size and quality. (i.e. 42 Kg) 4. Providing & fitting of insulating material in the slots of the stator including bamboo straps, latheride paper etc. 5. Varnishing of windings using good quality varnish the job includes heat treatment process using conventional method. 6. Providing and fitting of connection leads (06 no.) out of 19/0.064 PVC Cu cable including thimbling of all outgoing connection ends to motor. 7. Reassembling of the stator rotor assembly carefully without causing any damage to the windings. The job includes refitting of motor at site to ensure proper alignment with pump. 8. Deduct the cost of old scrap as 80% of the weight of copper winding at item no 03.( i.e. 33.6 kg)
M/S NEW BUHROO ELECTRICAL AND MECH ENGG WORKS
Asif Engineering Works
M/s SAJID ENGINEERING WORKS
M/s INFO ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .