| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.4 LAccepted-AOC MIG SECTOR 25A P D NAGAR UNNAO | UNNAO | UNNAO | UTTAR PRADESH | ₹10.4 L | 1 | Accepted-AOC Awarded |
| 2 | 2₹10.5 LRejected-AOC | ₹10.5 L | 2 | Rejected-AOC Not Awrded |
| 3 | 3₹11.8 LRejected-AOC | ₹11.8 L | 3 | Rejected-AOC Not Awrded |
| 4 | 4₹12.8 LRejected-AOC | ₹12.8 L | 4 | Rejected-AOC Not Awrded |
| 5 | 5₹15.0 LRejected-AOC | ₹15.0 L | 5 | Rejected-AOC Not Awrded |
Tender Value
₹15.4 L
EMD Value
₹16,000
Closing Date
22 Nov 2019, 5:00 pmClosed
S.E., E.T.C., Bareilly
Superintending Engineer Hydel Campus, Near L.I.C. Office Rampur Garden, Bareilly
Remodeling, Erection, Testing and Commissioning of Mulsifire System on 160MVA Transformer - I and II Installed in Place of 100MVA Transformer - I and II alongwith other associated Works at 220KV S.A.S. Sub Station Pilibhit under E.T.D. - II, Bareilly
2019_UPTCL_403653_1
Very Short Term E-Tender No. 61/W/ETC(B)/2019-20
Open Tender
Electrical Works
45 days
Pilibhit
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
A/c No 10897666087 IFSC SBIN0000615 S.B.I. Bly
₹16,000
18 Sept 2020
14 Nov 2019
23 Nov 2019
14 Nov 2019
22 Nov 2019
14 Nov 2019
14 Nov 2019 - 22 Nov 2019
Amount
Re-Modeling, Erection, Hydraulic Testing & Commissioning of Complete Mulsifire System on 160MVA 220/132KV Transformer - I & II Installed in Place of 100MVA 220/132KV Transformer - I & II alongwith other associated Works at 220KV S.A.S. Sub Station Pilibhit by Installation of High Velocity Automatic Water Spraying System including Laying, Fixing & Fitting of G.I. Pipe Lines complete with Elbows, Tees, Sockets, Flanges, Bends, Fire Nozzles of Required sizes, Q.B. Detector Assembly with Quartzoid Bulbs, Pressure Gauges, Pressure Switches, Deluge Valve etc. after due Cutting, Extending of Pipe Lines, Providing of Gaskets / Packing of Required sizes including Installation of 80 mm dia. G.I. Pipe Supports by due Construction of RCC Foundation with Grouting of Foundation Bolts, Providing & Fixing of Round Clamps on Support Pipes alongwith 2 Coats Painting of Water Pipe Lines in P.O. Red Colour, Air Pipe Lines in Sky Blue Colour, Pipe Supports in Black Colour and Earthing Strips in Bus Green Colour Synthetic Enamel Paint after applying of 1 Coat of Red Oxide Primer, with all Cost of Men, Materials, Misc. Consumables, T&Ps etc. Required for Satisfactory Completion of the Work as per Technical Specifications & Direction of the Supervising Engineer, as per Details below : (A) Mulsifire System on 160MVA Transformer - I : (1) Laying, Installation, Testing & Commissioning of Dismantled / Old G.I. Pipe Lines with Elbows, Tees, Sockets, Flanges, Bends, HV Nozzle, Q.B. Detector Assembly as per Details below : (a) 150 mm dia. Pipe Line
(b) 100 mm dia. Pipe Line
(c) 80 mm dia. Pipe Line
(d) 65 mm dia. Pipe Line
(e) 50 mm dia. Pipe Line
(f) 25 mm dia. Pipe Line
(g) Installation of High Voltage Fire Nozzle
(h) Installation of Q.B. Detector Assembly with Quartzoid Bulb
(2) Providing, Laying, Installation, Testing & Commissioning of new G.I. Pipe with Elbows, Tees, Sockets, Flanges, Bends as per Details below : (a) 150 mm dia. Pipe Line
(b) 100 mm dia. Pipe Line
(c) 80 mm dia. Pipe Line
(d) 65 mm dia. Pipe Line
(e) 50 mm dia. Pipe Line
(f) 25 mm dia. Pipe Line
(3) Providing & Installation of new High Velocity Fire Nozzle with Discharge 80 Lit. / min. and Cone Angle 600 to 1200.
(4) Providing & Installation of new Q.B. Detector Assembly with Quartzoid Bulb (Rating 3.5 to 5.0 Kg/cm2 with Yellow Liquid Filled Inside).
(5) Replacement of Damaged Pressure Gauge by new One.
(6) Replacement of Damaged Pressure Switch by new One.
(7) Replacement of Damaged Sluice Value by new One.
(8) Replacement of Damaged 150 NB Strainer by new One.
(9) Construction of RCC Foundation with Grouting of 4 No. Foundation Eye Bolts with Cement, Sand, Stone Ballast Mixture in the Ratio of 1:3:6 for Installation & Fixing of 80 mm dia. G.I. Pipe Support with Base Plate.
(10) Fabrication & Installation of Shade for Deluge Valve duly made of M.S. Angle Support Frame Structure with P.V.C. Roof and Required Concreting, Grouting, Painting etc.
(B) Mulsifire System on 160MVA Transformer - II : (1) Laying, Installation, Testing & Commissioning of Dismantled / Old G.I. Pipe Lines with Elbows, Tees, Sockets, Flanges, Bends, HV Nozzle, Q.B. Detector Assembly as per Details below : (a) 150 mm dia. Pipe Line
(b) 100 mm dia. Pipe Line
(c) 80 mm dia. Pipe Line
(d) 65 mm dia. Pipe Line
(e) 50 mm dia. Pipe Line
(f) 25 mm dia. Pipe Line
(g) Installation of High Voltage Fire Nozzle
(h) Installation of Q.B. Detector Assembly with Quartzoid Bulb
(2) Providing, Laying, Installation, Testing & Commissioning of new G.I. Pipe with Elbows, Tees, Sockets, Flanges, Bends as per Details below : (a) 150 mm dia. Pipe Line
(b) 100 mm dia. Pipe Line
(c) 80 mm dia. Pipe Line
(d) 65 mm dia. Pipe Line
(e) 50 mm dia. Pipe Line
(f) 25 mm dia. Pipe Line
(3) Providing & Installation of new High Velocity Fire Nozzle with Discharge 80 Lit. / min. and Cone Angle 600 to 1200.
(4) Providing & Installation of new Q.B. Detector Assembly with Quartzoid Bulb (Rating 3.5 to 5.0 Kg/cm2 with Yellow Liquid Filled Inside).
(5) Replacement of Damaged Pressure Gauge by new One.
(6) Replacement of Damaged Pressure Switch by new One.
(7) Replacement of Damaged Sluice Value by new One.
(8) Replacement of Damaged 150 NB Strainer by new One.
(9) Construction of RCC Foundation with Grouting of 4 No. Foundation Eye Bolts with Cement, Sand, Stone Ballast Mixture in the Ratio of 1:3:6 for Installation & Fixing of 80 mm dia. G.I. Pipe Support with Base Plate.
(10) Fabrication & Installation of Shade for Deluge Valve duly made of M.S. Angle Support Frame Structure with P.V.C. Roof and Required Concreting, Grouting, Painting etc.
Progressive Engineering.
M/S Shilpa Enterprises
Versha and Brothers
Lucknow Fire Engineers
Gupta Elect and Engg Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid