Renovation of Bank of Baroda Building at Port Louis, Mauritius
NBCC/CPG/BOB/MAURITIUS/2021/295~EWf6c07eeb980caacb87792ea2
NBCC/CPG/BOB/MAURITIUS/2021/295
Open Tender-Global
Civil Works General
NBCC Bhawan
₹11,800
Exempted
8 Sept 2021
14 Jul 2021
8 Sept 2021
14 Jul 2021
8 Sept 2021
Addendum 01 along with BOQ
Name of Work: Renovation of Bank of Baroda Building at Port Louis, Mauritius
Name of The Bidder
S. No. FINAL SUMMARY BILL NO AMOUNT IN MUR
VOLUME 1 - CONDITIONS OF CONTRACT AND P&G
1 General Requirement and Preliminaries (civil) BILL NO. 1 -
2 General Requirement and Preliminaries (MEP) BILL NO. 2 -
VOLUME 2 - BILLS OF QUANTITIES
3 Builders Work Including External Works & Provisional Sums BILL NO. 3 24,19,160.00
4 Mechanical, Electrical & Plumbing Works BoQ BILL NO. 4 27,19,000.00
SUB-TOTAL 51,38,160.00
ADD : VALUE ADDED TAX AT 15% 7,70,724.00
TOTAL - TENDER (INCL. VAT) 59,08,884.00
FINAL SUMMARY FS
NBCC (India) Limited
Office of ED (CPG), NBCC Bhawan, Lodhi Road, New Delhi -110003 (INDIA)
Quoting Sheet for the Bidder (Bill No. 01)
NIT No.: NBCC/CPG/BOB/MAURITIUS/2021/295
Name of Work: Renovation of Bank of Baroda Building at Port Louis, Mauritius
General Requirement and Preliminaries (civil)
Name of The Bidder
Item Description Unit Quantity Rate Amount in MUR
I PRELIMINARY PARTICULARS
1 Abbreviations
A In these documents the following abbreviations shall have the meanings assigned to them respectively LS 1 -
BS : British Standard
NF : ‘Normes Francaise’
CP ; British Standard Code of Practice
Cu m or m3 : Cubic metre
Sq m or m2: Square metre
Lin m or m : Linear metre
KN : Kilonewton
(m/s): Measured separately elsewhere in these Bills of Quantities
n.e: Not exceeding
dia. : Diameter
150-300mm (or similar expression) : It is implied that the dimensions are exceeding the first figure
stated and not exceeding the second figure stated
As described: Shall mean as described in the Contract and/or in these Bills of Quantities and/or in the
Approved, Directed or selected: The approval, direction and selection of the Engineer or discretion of
A All quantities and dimensions in the Bills of Quantities, Specifications and the Drawings are given in the LS 1 -
“System International D'Unites" (S.I Units).
II PROJECT PARTICULARS
1 Location of the Works
A The site of the Works is located at the Bank of Baroda Office Building, Sir William Newton Street, Port LS 1 -
Louisas shown on the Master Plan.
2 General description of the Works
A The works comprise the renovation works to the Bank of Baroda building including refurbishment to LS 1 -
Ground Floor and Levels 1, 2 and 3 rd Floors (partial refurbishment) & 4th FLoor, the complete front
façade, remedial works to sides and rearfaçade and related finishes including all MEP services as
identified on the tender drawings.
3 Preliminary Investigation
A The Contractor is advised to visit the site before submitting his tender and ascertain the nature of the LS 1 -
ground and subsoil to be excavated, the contours thereof and acquaint himself with local conditions, site
conditions, site restrictions, working space available, means of access, limitations and restrictions to
access, risk of damage to adjacent properties, roads, etc., the full extent and character of the
operations, the facilities for obtaining the articles or materials for the works, the supply of labour and
other matters affecting the execution of the Contract generally, as no claim whatsoever on the grounds
of want of knowledge in such respect will be allowed.
4 GENERAL SPECIFICATION AND OTHER DOCUMENTS
4.1.1 A The General Specifications are included in Section 4.0 of the Tender documents. Where the General LS 1 -
Specifications contain clauses related to any of the following General Requirements, these Bills of
Quantities refer to those clauses in the General Specifications.
B The Contract Bills have been prepared in accordance with the Standard System of Measuring Building
Work Sixth Edition Rev 2 – 2013 as published by the Association of South African Quantity Surveyors, as
may be amended by the special requirements of these Bills of Quantities.
C These principles of measurement must be accepted and will be strictly adhered to for the adjustment
of any variations and for remeasurement as necessary.
D All references to methods or principles or clarification of measurement in the “Specifications – Section
4.2 to 4.4 shall be deemed to have been deleted.
E The drawings which were used in the preparation of these Bills of Quantities are listed in the Section
5.0 to these Bills.
F In order to assist Tenderers, certain drawings are issued with the Bills of Quantities. They are
conceptual layout drawings illustrating only the broad scope of the work to be done. The drawings do not
purport to show the exact details of the work and no claims in this connection will be entertained.
G The Contractor will be deemed to have examined these drawings and to have ascertained their details
5 Nature of Project
A The Contractor is advised that the nature of this contract is that the refurbishment works shall be LS 1 -
undertaken per floor and that the banking facilities shall remain open throughout the duration of the
renovation works. A preliminary sequencing of the works is included under Annexure J. The Contractor
shall take cognisance of this in his programme of works and provide for all temporary measures to
allow for the safety of the staff and customers alike. Secure and dedicated access shall be provided
both inside the building and on public roads and pavements. Access to the Bank must remain
unhindered at all times. Daily meetings will need to be held with the Bank Manager to ensure smooth
Banking Operations.
6 Bills of Quantities
6.1 A. No unauthorised alteration in any of these Bills of Quantities is to be made by the tendering LS 1 -
Contractor. Should any alteration, amendment, note or addition be made, it will not be recognised but
the reading as printed will be adhered to.
B. In the case of the Contractor leaving unpriced any of the items in these Bills of Quantities, he will be
deemed to have considered that the rates of the remaining items are sufficient to enable him to perform
the services and obligations described in the items not priced without extra charge.
C. The Contractor is advised that the quantities, sizes, etc., contained in these Bills of Quantities should
not be used for the purpose of ordering materials without checking from the working drawings or from
site, as no claim will be entertained for costs incurred in over-or-under-ordering of materials.
6.2 D. All prices or rates inserted in these Bills of Quantities are to be fully inclusive prices or rates for the LS 1 -
finished work described under the respective items and/or drawings, unless otherwise stated or unless
there is a separate item for extra labour, cutting or waste and are to include for all materials, making,
conveying, cartage, carriage and delivery, unloading, storing, unpacking, hoisting or conveying, setting,
fixing, and building into position and labour of every description, cutting and waste, templates, patterns
and models, plant, temporary works, return of packings, taxes, levies, custom duties, surcharges,
establishment charges, overheads, costs of all nature, and all obligations arising out of the Conditions of
Contract, the provisions of Materials and Workmanship bills, the provisions of the Preliminaries bills and
the execution of the relevant work. Prices for plant, temporary works, services and other items provided
shall include for the supply, maintenance, fuel, operating costs and subsequent removal and making
good as necessary.
6.3 E The prices for all items shall where applicable include for all small quantities, short lengths and LS 1 -
F Where items are described as "Fix only" this shall be deemed to mean unloading on site, storing,
unpacking, distributing to the required position on site, assembling and fixing, and returning packing
cases to consignor if required.
G The Contractor shall be held solely responsible for and shall, at his own expense, rectify any errors
arising out of incorrect interpretation of the Drawings, Specifications, Bills of Quantities or instructions.
H The Contractor shall note that no claims whatsoever will be allowed in respect of errors or omissions in
pricing due to brevity of descriptions of items in the Bills of Quantities which are fully described when
read in conjunction with the relevant requirements of the Bill of General requirements and
Specifications and/or the Conditions of Contract and / or drawings.
I All fourth and fifth level descriptions of items (i.e. description associated with units and quantities)
shall be deemed to be read in conjunction with their respective first, second and third level general
headings and all levels of descriptions and headings are to be taken as mutually explanatory of one
7 Shop Drawings
7.1 A The term "shop drawings" shall mean drawings, diagrams, schedules, performance charts, brochures, LS 1 -
operating manuals and other data which are prepared by the Contractor or any Subcontractor,
manufacturer or supplier and which illustrate some portion of the Works.
B The Contractor shall prepare, at his own expense, and shall submit two hard copies of shop drawings of
all fabricated work, working or setting out drawings, shop details and schedules to the Engineer for
approval by the Engineer and such work shall not be executed by the Contractor until approved.
C The Contractor shall present a complete schedule showing submission dates, for all trades and the
scheduled dates, for approval of all drawings. The Contractor shall note that the Engineer and the
relative Consulting Engineer require two weeks for checking from the date of the receipt of all shop
D All submissions shall be on dates as indicated in the above schedule and sufficiently in advance as no
claim for extension of the Time for Completion will be granted to the Contractor by reason of his failure
in this respect.
7.2 E The Contractor shall submit two hard copies of catalogues and data for approval. The Contractor shall LS 1 -
check all submissions for conformity with the contract drawings and specifications and correct any
errors, omissions or deviations before forwarding to the Engineer.
F The Engineer's approval of any document or drawing does not in any way vary his contractual
obligations and liabilities to the owner or any other party, nor does it vary the contractual obligations
and liabilities of the party submitting such document or drawing for approval.
G Corrections of shop drawings by the Engineer shall not change the scope of Works. Should any such
correction constitute a change of scope of Works, the Contractor shall notify the Engineer in writing
within not more than seven (7) calendar days of such change and shall not proceed with the fabrication
until so authorised by the Engineer.
8 Provisional Sums
A The words “Provisional Sums”, applied in the Bills of Quantities to works which are required to be LS 1 -
carried out by a Nominated Subcontractor or to Goods or Materials which are required to be obtained
from a Nominated Supplier and shall mean, unless otherwise stated in the said Bills of Quantities the net
sum paid to the Nominated Subcontractor or Supplier after deducting all trade) or other discounts for
such goods. Such sums do not include the Contractor's profit and overhead charges, fixing or
8.1 Generally LS 1 -
A Where materials or goods are supplied by a nominated Supplier or nominated Subcontractor, the
Supplier or Subcontractor shall be made responsible for any loss, damage or breakage and shall replace
lost or damaged materials or goods at his own expense until ownership passes to the Contractor or the
Employer from which the Contractor will be responsible.
B The Contractor will be required to sign a receipt for all P.C. articles at the time of taking delivery
thereof, as having received them in good order and condition. He will take delivery in Port Louis or as
otherwise directed, and will be required to load, transport to site, offload and provide safe storage and
thereafter be responsible for any loss or damage and for replacement of any such loss or damage with
materials to the satisfaction of the Engineer, at his own cost and expense.
C The Contractor shall also ensure that all nominated Subcontractors and nominated Suppliers warrant
with the Contractor that any such materials or goods and any subcontract works conform to the quality
and standard specified.
D Where the work of Subcontractors or Suppliers is subject to approval of drawings, details, calculations,
etc., the Contractor shall take all necessary steps to ensure that they are submitted for approval in good
time, so that there will be no delay in the execution of the Works.
9 Profit and Attendance
A The Contractor's attendance on Subcontractors shall be deemed to include arranging with any Authority, LS 1 -
public undertakings, nominated Subcontractors and nominated Suppliers at the time for commencement
of their work on the site or manufacture and delivery of their goods and materials as appropriate,
obtaining from them particulars of holes, mortices, chases, recesses, fixings and the like and supplying
them with all dimensions and other information required for the proper execution of the Works. Before
accepting any estimate in respect of materials or goods to be delivered by a nominated Supplier or in
respect of work to be executed by a nominated Subcontractor, the Contractor must ensure that the
conditions of the estimate conform with the conditions of the main contract and that the materials or
goods can be delivered or work can be executed so as not to conflict with the Contractor's work
B The Contractor shall allow in the item of Profit and Attendance following Provisional Sums and P.C. Sums LS 1 -
for work to be executed by nominated Subcontractors for his profit, overhead costs, charges and the like
and all attendances which shall be deemed to include the use the Contractor's temporary roads, pavings
and paths, standing scaffolding, standing power operated hoisting plant, the provision of temporary
lighting, power and water supplies, including for testing, clearing away rubbish, provision of space for
the subcontractor's offices and for storage of his plant or materials and the use of messrooms, sanitary
accommodation and welfare facilities, telephones and other amenities and shall also in addition be
deemed to include any special attendances as required by the Subcontractor such as special scaffolding,
the provision of temporary access roads and hardstandings in connection with heavy items of work,
plants or equipment, unloading, storing, hoisting, distributing, placing in position items of significant
weight and/or size, the provision of covered storage and accommodation including lighting and power
thereto, power supplies, maintenance of specific temperature or humidity levels and the like.
C The Contractor shall give due consideration to the period of the Contract when the nominated LS 1 -
Subcontractor's work will be carried out and if the Contractor should strike any scaffolding before
ascertaining whether it is required by any Subcontractor, he must re-erect it is so required at his own
D The Contractor shall allow in the item of profit following Provisional Sums and P.C. sums for materials or LS 1 -
goods to be supplied by nominated Suppliers for his Profit, overhead costs, charges and the like and for
unloading, storing, hoisting, distributing and placing in position the goods or materials, collecting from
Port-Louis or at the place directed, conveying the goods or materials to the site and /or of any special
packing or similar requirements.
D In this connection the following definition shall apply " unloading, storing and hoisting" shall include for LS 1 -
unloading all plant and materials, placing in suitably protected stores at varying levels, distributing and
depositing in positions convenient as required for execution of the work.
E The Contractor shall place all orders with Nominated Suppliers of goods or materials from overseas LS 1 -
timeously and shall be responsible for the importation, clearance and delivery to site of such goods or
materials. The Contractor shall apply for all the necessary permits and exemption from duty certificates
(if applicable) for such goods and materials. All costs, charges and the like incurred due to the
Contractor's failure to clear any goods or materials timeously shall be borne by the Contractor.
F The Contractor shall also impose the same obligations as on the part of the Contractor to be performed LS 1 -
onto his NominatedSubcontractors in respect of any supplies from overseas.
G The attendance to be provided by the Contractor for nominated Subcontractors or Direct Contractors are LS 1 -
summarized in the table below:-
G.0 Nominated/Direct Contractor Attendance Direct Direct
for Contractorsw Contractorsw
Nominated ith no ith % fee
Subcontracto attendance payable
G1 Programming the works A NA A
G2 Procurement scheduling A NA A
G3 Obtaining shop drawings and particulars of any builder’s work i.e. holes, chases etc A NA A
G4 Dimensional coordination, supply of drawings/information to allow them to execute the works A NA A
G5 Use of temporary roads/paths A A A
G6 Standing scaffolding A NA A
G7 Standing hoisting plant A NA A
G8 Temporary lighting A A A
G9 Power and water A A A
G10 Fuel oil for testing and commissioning A NA A
G11 Testing A NA A
G12 Clearing away rubbish A A A
G13 Space for offices A NA A
G14 Space for storage of plant, tools and materials A NA A
G15 Use of messrooms A A A
G16 Sanitary accommodation and welfare facilities A A A
G17 Use of telephones and other amenities A NA A
G18 Special scaffolding A NA A
G19 Temporary hard standings for heavy plant and equipment A NA A
G20 Unloading, storing, hoisting, distributing, placing in position items of significant weight and size A NA A
G21 Covered storage and accommodation including lighting and power A A A
G22 Power supplies for testing and commissioning A A A
G23 Maintenance of specific temperature and humidity levels A A A
G24 Co-ordinate the work of and provide “attendance” as necessary all to the satisfaction of the Engineer A NA A
G25 Extending Insurance A A A
G26 Performance Bond A NA NA
G27 Advance Payment A NA NA
G28 Contractual Responsibility for Performance A NA NA
G29 Costs in connection with “attendance” (as described for Nominated Subcontractors) (Pages 6 and 7) A NA A
G30 Subcontract agreement A NA NA
G31 Access to the works A A A
G32 Making good after on basis of agreed rates A A A
G33 Cleaning the whole of the works A A A
The Tenderer may not change this schedule. Any qualifications must be priced in the tender. NOTE:
A: Applicable; NA: Not applicable
10 DIRECT WORKS
10.1 Employer's Direct Contractors
A The Employer will employ his own direct Contractors to execute any special or other works whether LS 1 -
contained in this Contract or not concurrently with the work being executed under this Contract. The
Contractor shall not be entitled to any percentage, profit or discount on the value of any work executed
by "Direct Contractors" but shall nevertheless allow these direct Contractors and the Employer's
employees to have access to the Works, allocate reasonable space in the building for the storage of their
materials, tools and equipment, and co-ordinate the work of and provide attendance upon direct
Contractors as necessary, all to the satisfaction of the Engineer. The Contractor shall provide all
necessary facilities such as water and power supply on the site, and shall not in any way hinder or
prevent the execution of their work.
B The Contractor is to allow herein for any costs in connection with attendance (as described for LS 1 -
nominated Subcontractors) upon such Direct Contractors etc., and for the use of the facilities stated
above and no additional claim will be entertained due to the presence on the Works of such direct
Contractors. Should the Contractor be required to make good after such direct Contractors or for any
builder's work the Contractor will be paid on the basis of rates previously agreed in accordance with the
C The following is a list of works which is not included in the current scope of work/ which will be carried LS 1 -
out by the Employer but not limited to the following:
1. Fixed and Loose Furniture, Carpeting, Blinds and Soft Furnishings
3. Any other installations carried out in the normal course of his business
11 obligations and restrictions imposed by the employer
11.1 Site Boundaries LS 1 -
1. The Site shall be defined by the boundaries shown on Architect’s drawing and survey plans.
2. The Engineer may order the Contractor to place additional marker posts to clarify or to close the
Site boundary before commencing work in any area. - Not Applicable
3. The Contractor is to allow for maintenance only and removal thereafter of atemporary hoarding
placed by another package contractor.
12 Access to Site
A The access to the site will be as identified on site plans or as agreed with the Employer/Project LS 1 -
B The Contractor shall take all reasonable precautions to prevent workpeople, including those employed LS 1 -
by subcontractors from trespassing on adjoining owner’s property or any part of the site not affected by
C The Contractor shall allow for forming any temporary crossovers, strong-shore support for unobstructed LS 1 -
access and other Works necessary for entry to the site, obtaining any way-leaves required any
subsequently clearing away and making good all works disturbed or damaged.Any costs relating to
municipal requirements for the rental / diversion etc of public pavements, any liaison with the
municipality, police fees etc shall be for the Contractor’s account.
D The Contractor is advised to visit the site and fully acquaint himself as to the nature, extent and LS 1 -
practically of the works, he shall include in his tender for any costs in respect of availability or lack of
access, working space, storage accommodation, the nature of the ground, the proximity of adjoining
structures and roads, the local regulations regarding the obstruction of public highways and any other
limitations imposed by the site and its surrounding. The Contractor will also be required to maintain the
access roads in good conditions for the duration of the contract.
E After taking possession of the site and before commencing work, the Contractor shall check the actual LS 1 -
level against those shown on the drawings and in the event of any discrepancy, shall immediately notify
F The Contractor is to agree the points of across and egress with the Engineer and all Authorities LS 1 -
concerned and is to include here or in his prices for building any temporary access roads, crossings, cross
overs, slip ways or other means of gaining access to site and for the removal and reinstatement of any
fences, etc. and make good and reinstate to the entire satisfaction of the Engineer all works disturbed.
The Contractor is informed that access to the Works shall be restricted to within the site boundaries and
that unhindered and safe access for pedestrians shall be provided at all times to the nearby beaches so
as to prevent the unhindered operation of all adjoining businesses and he shall include here or in his
prices for compliance therewith.
13 Site Conditions and Working space
A The Contractor is advised that working space on site is restricted to the site boundaries of the works. He LS 1 -
shall erect temporary fencing at the site boundary and he shall not encroach beyond such defined
boundaries or areas of operation. The Contractor shall take special care not to disturb or hinder the flow
of all traffic in any way whatsoever and shall allow for the unimpeded flow and operation of traffic
whether vehicular or pedestrian, failing which he may be liable for any costs or any loss or damages
incurred as a result thereof. He shall allow here or in his rates for the costs of the necessary measures
that such restrictions may entail.
14 Site to be tidy
A The site shall be maintained in a neat, tidy and healthy condition and the Contractor shall remove all LS 1 -
surplus spoil, waste and unwanted materials, debris and other litter from the site from day to day or as
directed by the Engineer.
15 Working Hours
A The Contractor must comply with the working hour restrictions as set out in the appendix to tender. LS 1 -
16 Trees to be preserved
A The Contractor shall allow for protecting trees in areas of construction as directed by the Engineer. He LS 1 -
shall include in his tender for any costs in respect of the necessary precaution to be taken. – Not
17 Environmental Conditions
A Since the Works are being carried out in ecologically sensitive areas that will be susceptible to external LS 1 -
impacts, the Contractor is to allow for all protection and mitigation measures to ensure that the
environment is not negatively affected by any activity whatsoever. The Contactor will ensure that the
laws and regulations of the Republic of Mauritius are respected.
A The Contractor is to prepare and submit to the Engineer within Fourteen (14) days from the issue of the LS 1 -
Letter of Acceptance two copies of the Programme. The submission of any drawings and samples for
approval shall be in accordance with that Programme allowing sufficient time for consideration,
comment and modification before approval, so that manufacture and installation are not delayed.
B The Contractor shall comply with the following Project Milestones: LS 1 -
Ground Floor : As per clients requirements
First Floor : As per clients requirements
Second Floor : As per clients requirements
Third Floor : As per clients requirements
Fourth Floor: As per clients requirements
External Façade (Front) : As per clients requirements
External Façade (Sides) : As per clients requirements
External Façade (Rear) : As per clients requirements
C The Programme shall include the planned monthly rates of progress between the programmed date for LS 1 -
commencement and completion for all items of work for various stages of construction including dates
by which major drawings requiring approval will be submitted. The Programme shall be in the form of a
time and progress chart or a critical path network and shall also show a weekly schedule of labour and
plant resources to be employed for each item of work of the Programme.
D The Programme must also take into account the requirements of all major Subcontractors (façade works, LS 1 -
MEP, Alucobond, granite, Aluminium, etc) , and persons employed or engaged upon the Works. The
Contractor shall also submit short term monthly or weekly programmes as when required by the
E The Programme shall reflect the agreed completion date of the Works as set out in the Contract and LS 1 -
shall indicate anticipated starting and completion dates for the various trades and Sub-contracts and the
various sections of the Works.
F The Contractor shall ensure that the work is carried out and controlled in such a way that the Contract is LS 1 -
completed by the completion date. Where Acceleration measures are required by the Engineer to make
up for delays for which the Contractor is entitled to an extension of time for Completion as certified by
the Engineer in terms of Clause 8.4 hereof, then such measures are to be approved by the Engineer
before the execution thereof. In the event that delays occur for which the Contractor would not become
entitled to an extension of time for Completion in terms of Clause 8.4 hereof, the Contractor shall take
all necessary steps to ensure that the Contract is completed timeously including the provision by him of
additional resources, plant, labour, etc., and the working of overtime and by all other adequate and
proper means and methods.
19 Mode of Procedure
A The Contractor shall allow at tender stage whatever costs and charges he may consider necessary to LS 1 -
meet the stipulated date for any out-of-sequence working, inconvenience and all additional costs
whatsoever arising therefrom.
B Should it appear, in the Engineer’s opinion, that work in any area is not being executed in accordance LS 1 -
with programme requirements, the Contractor shall provide additional manpower and resources and shall
work additional overtime and do everything else required to bring the work back onto programme to the
satisfaction of the Engineer.
C Notwithstanding anything to the contrary contained herein, the Engineer shall at all times, reserve the LS 1 -
right to direct the order in which the various parts of the Contract must be executed. The Contractor
shall give priority to any individual section or portion of the Works which, in the opinion of the Engineer,
requires to be expedited and no claim for extras in this connection will be entertained.
D The Contractor shall liaise and agree with the Engineer upon the following obligations which will have no LS 1 -
additional cost or any time implications on the Contract.
1. All details and construction phasing of the Works. Staged access and handovers are required in
accordance with the key milestone dates stated in the Programme established by the Employer which
will regulate the Works.
2. The sequence and co-ordination of the Works and co-ordination and liaison with all Contractors,
and their Subcontractors
3. The Contract commencement and completion of the various zones as defined.
4. Should the Contractor for any reason whatsoever cause delay to the Works, the Contractor shall be
held responsible for all costs incurred in making up such delay, including inter alia the cost of
acceleration by the Contractor and/or any other Contractors and such costs shall be deducted from any
monies due or that may become due to the Contractor.
E It is an express condition of this Contract that the Contractor is deemed to be fully aware and LS 1 -
acknowledge that his Tender is sufficient to cover all costs arising as a result of the following facts
concerning the project :
1. The renovation works shall take place while the bank is still operational.
2. The Contractor will be required to continuously adjust his team size and working hours to meet the
needs and availability of areas of work, the Employer’s requirements and the Construction Schedule.
3. The Contractor will be required to accelerate the carrying out, or to alter the sequence or timing of
any work to be executed under the provisions of this Contract as instructed by the Engineer at no
additional cost.
20 Contractor designed structure
A All Contractor design items shall be designed within an agreed period of time and the Contractor shall be LS 1 -
bound to submit all necessary information and calculations as required by the parties and consultants.
21 Key Dates - Sectional Completion
A Tenderers are advised that the Employer will take possession of the Works progressively over the LS 1 -
Contract period for the purpose of installing furniture, softs, curtains and the like, for carrying out
special installations and systems. This will take place during the period between Sectional Completion
and Works Completion dates.
B The Contractor shall complete and hand over the various sections of the works so that the agreed LS 1 -
sectional completion dates are achieved.
C The terms “complete and hand over” used in clause 16C shall mean that the state of the works at the LS 1 -
various dates indicated shall be not less advanced than:
1. All internal finishes complete
2. Power available and lighting complete
3. Plumbing and drainage complete
4. Premises lockable and secure
5. Air conditioning ducting installed and blown out and ventilation running
6. Smoke detection complete
7. Shop fitting complete
8. Telephone installation complete
9. Continuous access to area
D After progressive occupation by the Employer, the Contractor shall carry out the balance of his work in LS 1 -
such a manner as will least interfere with the activities of Employer’s workmen, staff, Direct Contractors
and specialists who must be allowed free access at all times and for whom the Contractor must maintain
all services and facilities.
22 Pre-Completion Inspections
A As a condition precedent to the issue of the taking-over certificate, the contractor shall, when the works LS 1 -
appear to be complete, request the Engineer or his delegated assistants to carry out a joint pre-
completion inspection of the works or any part of the works, as the case may be. Such request must be
in writing and must be issued at least 7 days prior to the commencement of the inspection. All
inspections during the pre-completion inspection shall be signed off by the engineer or his delegated
assistants as a record of such inspection having been carried out.
B After the pre-completion inspections, the engineer shall either issue to the contractor the taking-over LS 1 -
certificate in accordance with the conditions of contract or give instructions to the contractor specifying
the work, plant and/or materials which do not comply with the contract in any respect to be made good,
remedied or reconstructed by the contractor before the application of such certificate.
C The contractor is required to programme the pre-completion inspection of the works (including all LS 1 -
subcontractors’ works) to commence at least six weeks before the expiry of the time for completion to
ensure that the works can be inspected by the engineer and any work, goods or materials specified in
the said directions made good, remedied or reconstructed to the satisfaction of the engineer.
D For the avoidance of doubt, nothing stated in the foregoing paragraphs and in the item on pre- LS 1 -
completion inspections under programme charts and returns set out elsewhere in this pricing section,
and clause 9.5 of the conditions of contract shall:-
(1) Change the contractual obligations of the employer;
a) In relation to the time for completion;
b) As to a reasonable time for giving or receiving further information;
(2) For affording possession of the site; or
(3) Alter or advance;
a) The obligations of the engineer and the employer under the contract’ or
b) The time for completion
23 Schedule of Information Required
23.1 A The Contractor shall within 15 days of instruction to commence, submit a proposed “Schedule of LS 1 -
Information Required” indicating latest dates by which instructions, drawings and other information are
required from the Engineer including instructions in connection with the nomination of suppliers and
subcontractors to enable him to comply with the programme.
B The schedule shall be related to the Programme of Works and shall not contain any requirements
which are in the opinion of the Engineer unreasonable or premature and shall be updated as necessary
during the construction period”.
24 Damage to existing work
A The Contractor shall provide for taking all necessary precautions, protect any works liable to be LS 1 -
damaged as directed by the Employer’s representative and he shall be held entirely responsible for the
costs of making good any damage caused to complete works as a result of his operations.
25 Protection of streams, canals and stormwater drains
A The Contractor shall provide for taking all precautions to ensure the efficient protection of all streams, LS 1 -
canals and stormwater drains against pollution arising out of or by reasons of the execution of the Works.
26 Protection of existing buildings / structures
A The Contractor shall provide for taking all necessary precautions to ensure the stability adjacent LS 1 -
buildings and to protect all existing buildings / structures during the course of the works.
27 Area of operations
27.1 A The Contractor shall provide for taking reasonable precautions to prevent workpeople, including those LS 1 -
employed by Subcontractors from encroaching or trespassing upon any part of the site or premises which
are not affected by the Works and from trespassing upon adjoining and existing owner's property except
where permission be granted to facilitate the carrying out of the Works.
B The Contractor shall be required to limit the construction activity, temporary buildings, storage or
equipment and materials etc. within the boundaries of the area allocated to him.
28 Materials or objects of value found on site
A Any materials or objects of value such as buried relics and the like, including sand or gravel found on LS 1 -
site when excavating are to remain the property of the Employer under this Contract and shall only be
sold or removed as the Engineer shall direct and access shall be allowed to any authorised person
instructed to remove same.
29 Compliance with Statutory / Public Authorities
A The Contractor shall comply with all terms and conditions imposed by the Statutory Authorities and any LS 1 -
other authorities for this project, and shall allow herein for all costs in compliance thereof inc. all fees
relating to Municipal / Mauritius Police Force requirements apart from BLUP Fees (borne by Employer)
30 Variation Meetings
30.1 A. Variation meetings shall be held on a monthly basis or at such intervals as may be directed by the LS 1 -
Employer Personnel (Quantity Surveyor) to monitor and agree on the financial effects of Variations
ordered in the Works. The Contractor (including any nominated Subcontractors as appropriate) shall
attend the variation meetings.
B. "The Contractor shall be required to submit at each variation meeting an updated financial status
report on the Variations, categorised under the following headings:
(1) Variations issued to date
(2) Anticipated Variations
(3) Variations pending receipt of drawings and details
(4) Variations pending cost submission
(5) Variation costs pending agreement
(6) Agreed Variations"
C. Each Variation cost claim submitted by the Contractor shall be supported with complete details of all
measurements, rates and prices including copies of the relevant drawings with the varied work clearly
marked out and/or identified, together with any documents or calculations whether relating to the
Contractor’s own work or that of the nominated Subcontractors as may be necessary. The Quantity
Surveyor may request the Contractor to furnish such additional measurements, calculations, drawings,
documentary substantiation or other information to enable the Variation cost to be assessed and agreed,
and the Contractor shall within 14 days comply with such request.
31 Setting Out And Checking of the Works
31.1 A The Contractor shall employ a professionally qualified surveyor to set out the works and shall provide, LS 1 -
maintain, protect and reinstate reference pegs and marks as required by the Engineer for the duration of
B The Contractor shall provide the Engineer with six (6) copies of certified survey plans and one
intermediate print in paper prints and CD-Roms in AutoCAD format bearing all relevant information of
the setting out of each section of the Works within fourteen days from the date of commencement of
work on that section.
C As soon as the structural works for each floor are completed, the surveyor shall check all vertical
structural members such as walls and columns for plumb.
D Six (6) sets of the surveyor’s report and field readings showing the deviation from vertical or structural
members shall be submitted to the Engineer as and when completed.
E At completion of the Contract, the Contractor shall execute a confirmatory survey of the setting out of
the Works (inclusive of any underground services) and provide six (6) copies of certified survey plans in
paper prints and CD-Roms in AutoCAD format to the Engineer.
F The Contractor shall ensure that no damage is caused to the surrounding structures and neighbouring
32 Product / Workmanship Indemnities and Warranties
A The product and workmanship indemnities and their respective warranty periods for the Works to be LS 1 -
provided by the Contractor are as follows:-
(a) Anti-Termite Treatment Works (10 years)
(b) Waterproofing Membrane to Flat and Sloping Roofs Works (10 years)
(c) Sheet Steel Roofing (10 Years)
(d) Shingle/Slate Roofing system (10 Years)
(e) Waterproofing / Water tightness of shower areas Terrace and Roof Areas Works (10 years)
(f) Waterproofing / Water tightness of Swimming Pool, Balancing Tanks, Pools And Water Features
Works (10 years)
(g) Waterproofing / Water tightness of All Internal Wet Areas Works (10 years)
(h) Floor Hardener to Cart Service, Sub-station / Transformer & Stabiliser/HV Panel/LV Panel Rooms
and Genset Room Works (5 years).
(i) Aluminium and Alucobond powder coating (10 years)
B Where the Contractor is a private limited or limited company, the indemnities shall be executed under LS 1 -
seal and the affixation of the common seal must be witnessed by two company directors or a company
director and the company secretary.
C Prior to the Completion of the Contract, the Contractor shall submit to the Employer the said indemnities LS 1 -
and warranties which shall be in a format to be approved by the Engineer.
D When submitting the indemnities and warranties, the Contractor shall be required to provide, and shall LS 1 -
cause the Subcontractor and/or Specialists to provide, a copy of the Board of Directors’ resolution
confirming that
E (a) the signatories are the respective company directors or a company director and the company LS 1 -
secretary of the Contractor and the Subcontractor as the case may be, and
(b) they are authorised to execute the indemnities and warranties and witness the affixing of the
33 CONTRACTOR’S ADMINISTRATIVE ARRANGEMENTS
A Safety on site LS 1 -
The Contractor shall take all necessary steps to ensure that the site is run in an orderly manner and
that safety precautions are enforced to avoid accidents to the personnel of the Contractor and to
other parties working on site and take all necessary measures for the safety of the public and
34 Fire Safety Measures and Precautions
A The Contractor shall take as a minimum, the following fire safety measures and precautions at all times. LS 1 -
(a) No smoking shall be entertained on site unless in designated, approved locations by the fire officer.
(b) Fire extinguishers and fire buckets, painted red, should be provided at all fire hazardous locations.
Extinguishers should be inspected, serviced and maintained in accordance with manufacturer’s
instructions. The inspections should be evidenced by notations on the tag attached to the extinguisher.
Dry Powder and CO2 Fire extinguishers will be preferred and should be mounted (One metre high) on
walls and shall be visible.
(c) The Contractor shall ensure that enough water is available at site to extinguish any type of fires on
site. Water, in ample amounts and under adequate pressure, distributed through diesel/petrol pumps,
should always be available for firefighting. The pumps must be serviced regularly.
(d) The Contractor shall provide diesel/petrol floating pumps and ensure that they are tested on regular
basis and that adequate fuel reserve is maintained.
(e) Adequate lengths of hoses must be available to reach all the areas on the site.
(f) The Contractor shall remove fire hazard materials from the site.
(g) LPG cylinders are not to be used in project area.
(h) Flammable liquids, lubricants etc. should be handled and transported in safe containers and drums
which are to be kept tightly capped.
(i) Petrol or other flammable liquids with a flash point below 100 degree F should not be used for
cleaning purposes
(j) All electric installations should be properly earthed. Repairs should not be made on electrical
circuits until the circuit has been de-energized.
(k) The Contractor shall follow precautions to be taken at the time of using welding machine and
electrical hand tools and ensure that the fire extinguishers are kept with all welding machines and
electrical requirements.
(l) Wet sack cloths are to be spread around to arrest sparks flying around when using equipment that
generate sparks and hot liquids (Lead Caulking).
(m) The Contractor shall display proper evacuation plan and meeting point
(n) The Contractor shall keep educating workers and engineers of contractor for safety measures. Do
fire drills and use of extinguishers for guards and have trained and accredited fire officer present at site
at all times. Provide fire safety training to all person on site and keep an attendance record of people
who attend safety meetings.
(o) The Contractor shall display the contact numbers of head of departments, engineering and security
control for emergency contact.
(p) All fire extinguishers to be mounted on the wall at 1 metre height and shall be painted in red. A fire
extinguisher checklist shall be maintained on site and shall show the frequency of service required.
(q) Sirens or other suitable fire alarms arrangements should be made on all projects. Warning signs
should be posted at all locations having fire hazards.
35 Site Management Costs
A The Contractor shall provide for the following: LS 1 -
a) Defined firefighting policy and system
b) List of firefighting equipment and specific location at site
c) Maintenance record of firefighting equipment
d) Identifiable and sufficient number of trained staff on site to administer firefighting systems and
e) Qualified firefighting watchmen on site at all times
f) Fire drills and meetings held at regular intervals and minutes circulated to all parties
B The Contractor shall provide for all on and off site management costs. LS 1 -
The Contractor shall constantly keep upon the Works on a full time basis, the following key site
(1) a competent and experienced contract manager who shall be overall in charge of the Works
(2) a qualified and competent structural engineer with past experience in structural works which are
similar to the Works.
(3) a qualified and competent mechanical and electrical engineer who shall act as the coordinator
for all Mechanical and Electrical works in this project. The Engineer shall be fully experienced in the
type of works to be carried out in this Contract. He shall organise and coordinate on the Contractor’s
behalf all Mechanical and Electrical aspects of the Works.
(4) a general foreman who shall be continuously in charge of the execution and maintenance of the
Works throughout the currency of the Contract.
(5) adequate assistant foremen, site supervisors and all necessary “back-up” staff who are skilled,
competent and experienced in their respective callings.
(6) Finishing foreman at finishing stages
C The Contractor shall provide an organisation chart showing the full and detailed list of his site LS 1 -
supervisory staff for the project, including all CVs’, for the approval of the Engineer. Such list shall
include all relevant details of each staff member including his functions, position, duties, qualification,
experience, age and length of employment with the Contractor. The provision of such organisation chart
and the Engineer’s approval thereof shall not limit the Contractor’s responsibilities and obligations in
respect of adequate staffing at the Site. In the event additional staff is considered necessary to
properly and effectively supervise the execution of the Works, the Contractor shall provide such
additional staff at no extra cost to the Employer.
36 Site Meetings
A A The Contractor must hold such meetings as are necessary for the proper management of the Contract LS 1 -
and the Engineer may call progress meetings from time to time. The Contractor must arrange for
Subcontractors to attend such meetings when required and should allow here for all expenses of his own
attendance and for the provision of suitable accommodation.
B The Contractor shall hold meetings with his Subcontractors and Suppliers in order to monitor their
progress and to discuss and co-ordinate all aspects of the Contract.
37 Safeguarding the Works
A The Contractor shall safeguard the Works, materials and plant against damage or theft including LS 1 -
providing all necessary watching and lighting for the security of the Works and the protection of the
public and for the prevention of unauthorised access to adjoining and existing property from the site and
shall provide facilities for any security guard employed.
38 Transport for workpeople
A The Contractor shall provide for all expenses in connection with transport of workpeople to and from the LS 1 -
site and around the site including travelling expenses and fares.
39 Labour on-costs
A The Contractor shall provide for all costs in respect of all workpeople but not limited to the following: LS 1 -
(a) National Pension Contributions, training levy and contribution to Employee's welfare fund / Portable
Retirement Gratuity Fund as per Worker Right Act 2019, Act 20 of 2019 (PRGF)
(b) Disbursements under the Sick Payments Scheme
(c) Annual and Public Holidays
(d) Travelling time, subsistence expenses and fares and all other like costs
(e) Non-productive time and other expenses in connection with overtime.
(f) Shutdown on account of cyclone warnings or adverse weather conditions
g) Incentive and bonus payments
(h) Severance pay and obligations and workmen's compensation insurance
(i) End of year bonus
(j) Protective clothing and equipment
(k) Any requirements with regards to the Worker Right Act 2019, Act 20 of 2019 and subsequent
(l) Any other disbursements arising from employment of labour, including complying with the provisions
of Employment’s' regulations
A No payment will be made for any overtime incurred for the purpose of maintaining progress and for LS 1 -
ensuring completion within the Contract period.
41 CONSTRUCTIONAL PLANT
A A "Plant LS 1 -
The Contractor shall provide all plant and equipment necessary for the proper execution of the
Works both mechanical plant and vehicles and non-mechanical plant and tools, including: -
(a) small plant and tools
(b) cranes and lifting plant
(c) site transport
(d) plant and equipment for all other trades."
B The Contractor shall allow for altering, adapting and maintaining all such plant as necessary and at
or before completion clear away same from the building and site and make good all work disturbed.
42 Scaffolding
A A The Contractor shall provide all necessary scaffolding for the safe, proper and efficient execution and LS 1 -
completion of the Works by all trades including that required by Subcontractors whether nominated or
B All scaffolding must be properly fitted with double layer shade cloth for site safety and for the
prevention of dust pollution and shall be maintained at all times.
43 EMPLOYER’S FACILITIES
A Site signboard LS 1 -
B The Contractor is required to provide and erect one site signboard for the marketing of the project; LS 1 -
however the Contractor should provide whatever signage is required to allow labour and materials
informed access to and from the site, the location and design of which needs to be agreed with the
Employer/Project Manager.
C The Contractor shall allow for obtaining all necessary consents or licences from the Local Authority and LS 1 -
on completion of the Works dismantle, clear away and make good.
44 CONTRACTOR’S FACILITIES
44.1 Contractor's use of buildings
A The Contractor will not be permitted to use any part of the new buildings when constructed for LS 1 -
messrooms, offices or other accommodation for workpeople employed on the site.
44.2 Use of existing services
A The Contractor will not be permitted to make connection to the existing water or electricity supply or LS 1 -
any other existing services.
44.3 Water for the Works
A The Employer shall provide clean fresh water for use at one point (Refer to Master Site Logistic Plan LS 1 -
attached ). The Contractor shall connect from the dedicated point to his Site Establishment. The
Contractor shall facilitate the application to the authorities and shall provide for all connections,
temporary storage, distribution pipes, pumps and plumbing etc and shall remove the same and make
good surfaces disturbed to the satisfaction of the Engineer. The Contractor is to provide in his tender the
water requirement and consumption for this section of the Works. The Contractor is also to provide up to
2months supply of water in such case that temporary water supply is delayed.
44.4 Lighting and power for the Works
44.4.1 A The Employer shall provide power for the Works at one point. (Refer to Master Site Logistic Plan LS 1 -
attached). The Contractor shall connect from the dedicated point to his Site Establishment. The
Contractor shall facilitate the application to the authorities and shall provide for all connections,
switchgears, fuses, distribution boards and all necessary arrangements and equipment for the
distribution around the site. The Contractor shall alter, adapt, remove and make good on completion and
make good surfaces disturbed to the satisfaction of the Engineer.
B The Contractor is to provide in his tender the electrical requirement and consumption for this section
of the Works. A separate meter shall be installed at the Contractor’s cost and all expenses paid for by
the Contractor.
C The Contractor shall provide for a Temporary Generator in his price should power not be available at
any point in time.
44.5 Sewage Treatment
A The Contractor shall provide proper drainage and sewer connections for use on the Works and pay all LS 1 -
charges in connection therewith and provide all necessary tanks, pumps, lifting stations, grease traps,
oil connection tanks etc. to ensure that water is treated and/or removed in accordance with
Environmental norms.
44.6 Temporary roads
A The Contractor shall use access to the site as directed by the Engineer and shall provide and maintain all LS 1 -
necessary temporary roads, hardstandings, crossings, footways and the like on site. (Refer to Master Site
Logistic Plan attached)
B Any damage done to existing site conditions by the Contractor, or his Subcontractors must be reinstated LS 1 -
and made good to the satisfaction of the Engineer, at the Contractor's own expense.
44.7 Temporary accommodation
A All temporary offices are to be of good design and standard approved by the Engineer and are to be sited LS 1 -
in locations agreed with the Engineer. The temporary offices shall have one large boardroom adequate
for site meetings. (Refer to Master Site Logistic Plan Attached)
B The Contractor shall provide adequate temporary sheds, offices, and other accommodation required for LS 1 -
the works to be executed under this Contract including all necessary on-site and off-site storage and
provide lighting, equipment and attendance.
C The Contractor shall provide temporary sanitary accommodation, messroom and other welfare facilities LS 1 -
for all the workpeople employed under this Contract including Subcontractors and persons employed or
engaged by the Employer and provide lighting equipment and attendance. Such accommodation shall be
to the approval of the Engineer and shall be of a standard and size suitable for the number of work
people employed.
44.8 Temporary telephone
A The Contractor shall allow for the provision of a temporary telephone service for the Contractor's own LS 1 -
use and that of Subcontractors and pay all charges and expenses. The Contractor should make his own
arrangement for the recovery of the cost of any calls made by Subcontractors or others.
44.9 Temporary fencing, screens, etc.
A The Contractor shall provide all additional necessary temporary fencing, hoarding, screens, fans, LS 1 -
planked footways, guardrails, gantries and the like to seal off the site and for the protection of the
public and the occupants of adjoining premises, for the security of the site and for meeting the
requirements of any local or statutory authority, law or regulations and to the satisfaction of the
Engineer. Provide all necessary lighting to same at night and for removing and making good any damage
resulting there from on completion. The contractor shall submit a plan showing proposed fencing line.
44.10 Daily Diary
A The Contractor shall keep a daily diary which inter alia , shall provide a record of inclement weather, on- LS 1 -
site labour complement of the Contractor and all Subcontractors, deliveries, delays, plant and
equipment details and the like in a format approved by and to the entire satisfaction of the Engineer.
The diary shall be available for inspection by the professional team when required and the Contractor
shall provide the Engineer with copies of such records.
B The Contractor shall provide on a daily basis labour record per trade / category LS 1 -
44.11 Storm Water Drainage
A The Contractor shall provide for the collection of storm water off the temporary roads, cart paths, LS 1 -
pathways and the like within the site and allow for temporary collection, and disposal of these
accordingly all to Environmental guidelines. All cost incurred in that respect shall be the Contractor’s
responsibilities.
44.12 Rodents and Pests
A The Contractor shall ensure that proper Rodent and Pest control measures are undertaken, at his own LS 1 -
cost, and ensure that proliferation of these are properly controlled and monitored during the works.
B The contractor shall ensure that proper measures are undertaken at his own cost to prevent the LS 1 -
formation of stagnant pools of water and undertake mosquito fogging once a week.
45 SUNDRY AND GENERAL ITEMS
45.1 Protecting the Works
A From the beginning to the completion of the Works, they shall be under the entire care and control of LS 1 -
the Contractor and he shall allow for covering up and protecting all work liable to damage including the
provision of temporary roofs, gutters, drains, etc., if necessary, and he shall case-up, cover, or in other
suitable way protect all finished work liable to injury, to the satisfaction of the Engineer, until
completion of the Contract.
B The Contractor shall be entirely responsible for the security of all the works, stores, materials, plant, LS 1 -
personnel, etc., both his own, and Subcontractors’ ‘and shall provide necessary watching, lighting,
barriers, hoardings and other precautions necessary to ensure the security and the protection of the
public. He shall take all possible precautions to prevent any nuisance, inconvenience or injury to the
holder or occupiers of surrounding properties and shall at all times keep all paths and roads affected by
the Works in a safe and clear state and shall use proper precautions to ensure the safety of all wheeled
traffic and pedestrians.
C The Contractor will be held entirely responsible for the adequacy of the covering up protection afforded LS 1 -
against damage by adverse weather or otherwise and he shall make good any such damage at his own
expense. He shall suspend all operations during such weather conditions, which in the opinion of the
Engineer would be detrimental to the works.
46 Protection of public and private drains and Services
A The Contractor shall protect, uphold and maintain all existing public and private live drainage, water, LS 1 -
and other mains or ducts, power services, overhead cables etc., whether on or off the site, during the
execution of the Works.
B Before commencing the Works the Contractor must ascertain from the various public and private owners LS 1 -
or statutory authorities the position of all known drains and services etc., and in the event of damage to
same caused by the Works, he must arrange for such damage to be made good at his own expense or pay
any charges or costs in connection therewith.
47 Traffic regulations
A The Contractor shall allow for complying with any police regulations, or requirements concerning LS 1 -
pedestrian or vehicular traffic control, site access and egress, safety precautions and other matters
affecting the Works.
48 Statutes and Government regulations
48.1 A The Contractor shall provide for all costs incurred by complying with all safety, Health and Welfare LS 1 -
Acts etc., and other current statutes, Regulations and Industrial Agreements applicable to the
construction industry.
B The Contractor will be required to satisfy the Engineer at regular intervals that all necessary
precautions have been and are being taken to secure the health, safety and welfare of all persons upon
the site (whether in his employment or otherwise) and to protect all persons against risks to health or
safety arising out of or in connection the activities of persons at work on the site of the Works and will
be required to introduce such safety measures as the Engineer may determine are necessary to comply
with regulations currently in force.
C Nothing in these clauses shall be constructed as in any way relieving the Contractor of his obligations
at law to comply with current legislation.
49 Maintenance of roads and services
A The Contractor shall maintain public and private roads, footpaths, kerbs, etc., and keep the approaches LS 1 -
to the site clear of mud, other debris and the like. The Contractor is to make good any damage caused
by his own or any Subcontractor's or Supplier's transport at his own expense or pay all costs and charges
in connection therewith. The Employer has established wheel washing facilities free of charge. (Refer to
Master Site Logistic Plan attached)
B The Contractor shall protect, uphold, and maintain all pipes, sewers, water mains, overhead cables and LS 1 -
services etc. during the execution of the work and is to make good any damage caused or pay any costs
and charges in connection therewith.
50 Removing rubbish and cleaning the works
A The Contractor shall provide for removing all protective casings and coverings and removing all rubbish LS 1 -
from the site as it accumulates from day to day and from time to time and, on completion, clean the
buildings inside and out, including thoroughly cleaning all floors and pavings, easing and adjusting all
doors, ventilators, casements etc., cutting out all cracks and blisters in plasterwork and repairing,
removing stains and touching up paintwork or polished work, oiling and adjusting all ironmongery,
window fittings etc., cutting out broken glass and replacing with new, cleaning all glass inside and out
and leaving the whole of the Works clean and tidy to the satisfaction of the Engineer on completion.
51 Temporary Use of Equipment
A No equipment which is a part of the permanent installation, shall be operated or used, during the course LS 1 -
of construction without the written permission of the Engineer.
52 Testing Charges
A The Contractor shall allow herein for all costs incurred in connection with the provision of tests of all LS 1 -
materials, tests for any section of the works and the whole of the Works upon completion as required by
the Engineer, the production and provision of samples of materials, workmanship and the like as
required by the Engineer.
53 Advertisements and notices
A No advertisements will be permitted on the fencing, hoardings or any other part of the Works and LS 1 -
Contractor shall not erect or allow any other persons to erect any sign, notice, display or advertisement
of any kind on any part of the site buildings or hoardings, unless authorised in writing by the Engineer
and he shall remove any such unauthorised advertisement immediately he is called upon to do so.
A The Contractor shall allow herein for all costs incurred in connection with the provision of samples and LS 1 -
mock-ups of any material, workmanship or building components. The Engineer shall have the right to
reject any materials or workmanship not in conformity with the approved samples.
B Samples shall be physical examples to illustrate materials, equipment or workmanship, and to establish LS 1 -
standards by which the works may be judged. Such samples, after approval, will be retained by the
Engineer for a period sufficient to ascertain that the relevant component is actually provided as per such
A The Contractor shall take all proper precautions for the prevention of nuisance, inconvenience etc. to LS 1 -
adjoining property or persons and shall allow for the work to be carried out at such times and in such
order as not to cause any nuisance or inconvenience.
56 Opening up of work
A The Contractor shall, at the request of the Engineer within such time as the Engineer shall name, open LS 1 -
for inspection any work covered up; and should the Contractor refuse or neglect to comply, the Employer
may employ workmen other than those employed by the Contractor to open up the same. If the said work
has been covered up in contravention of the Engineer’s instructions, the expenses of opening and
covering it up against, whether done by the Contractor or by the Engineer shall be borne by and be
recoverable from the Contractor or may be deducted from any monies due to the Contractor. Provided
always that in the case foundations or of any other urgent work so opened up and requiring immediate
attention the Engineer shall within a reasonable time after receipt of notice from the Contractor that
the work has been so opened, make or cause to be made the inspection thereof.
57 Saving Clause
A If any clause, stipulation or provision contained in any contract document shall be wholly or partially LS 1 -
repeated in the same document or contained in these conditions or in the Contract Agreement and also
on the Drawings, the Engineer may at his option adopt either of such clauses, stipulations or provisions.
58.1 A If the Contractor considers that he will be unable to obtain materials for any item or items described in LS 1 -
these Bills or in time to obtain such materials in the specified sizes, he is to report this in writing to the
Engineer before the closing date for tenders and obtain the Engineer’s written directives in connection
therewith. If the Tenderer fails to do this, his tender will be taken as firm for all items described in the
Bills of Quantities and he will suit the programme for the Works or to be responsible for supplying such
materials timeously to meet the programme for the Works.
B The Contractor shall be responsible to reconcile supply-only items and advise the Engineer and
Quantity Surveyor, should the initially ordered quantities be insufficient. Any additional order shall be
mutually agreed with the quantity surveyor. Should the Contractor fail to do so within reasonable time,
the cost of bringing such materials to site to meet the programme requirement should be entirely at the
Contractor’s expense. The quantities should include all such wastages and attic stock required to meet
the project requirement.
C The Contractor shall immediately upon receipt of materials from the Suppliers, hand over the attic
stock to the Engineer to a location, on site, to be advised by the Engineer.
59 Contractor to do everything necessary
A The Contractor shall allow opposite this item or in the prices/rates throughout these Bills of Quantities LS 1 -
for working all overtime, weekends, public holiday etc., and for doing everything necessary to complete
the Works and the individual sections thereof by the stipulated dates.
60 Checking of drawings
A Upon receipt of detail drawings for any work, the Contractor shall, before putting that work in hand, LS 1 -
ascertain that the dimensions given on the detail drawings correspond with the dimensions of any work
already built and which governs the sizes of any work for which details are not issued. In the event of
the detail drawings not agreeing with the Works already built, the discrepancy shall be brought to the
Engineer’s attention and the detail drawings shall be returned at once for alteration.
61 Figured Dimensions
A All dimensions will be figured on the drawings or may be calculated from figured dimensions and are LS 1 -
always to be followed. No dimensions shall be obtained by scaling. Dimensions where possible are to be
taken from the building.
B The Contractor shall check all dimensions on any drawings before putting any work in hand. LS 1 -
62 Builder's work
A The Contractor is to obtain all necessary particulars from all Subcontractors as to recesses, chases, LS 1 -
sleeves, etc., required so that they may be correctly built in, in the first place. If the Contractor fails to
do this, the cost of any alterations or cutting will fall upon him.
63 Co-ordination
A The Contractor shall co-ordinate the work of all Subcontractors’ tradesmen, workmen and others LS 1 -
engaged on the Works and shall liaise and co-ordinate with all parties to ensure the smooth and orderly
progress of construction, the closest co-operation between all the parties concerned and the timeous
completion of the Contract.
B The Contractor shall liaise with all suppliers and manufacturers to ensure the timeous delivery of all LS 1 -
materials required for the Works.
64 Maintenance Manuals
A The Contractor shall obtain and hand over to the Engineer on Time Completion of the Works any LS 1 -
operating and maintenance instruction manuals, data or instructions required by the Engineer or
provided by Manufacturers, Suppliers or Subcontractors.
65 Ordering of materials
A Delay in the delivery of materials or in obtaining of the necessary permits, certificate, licences by the LS 1 -
Contractor shall not justify any extension of time.
B Should the Contractor consider that he will be unable to obtain materials including imported materials, LS 1 -
for any item or items described in the Bills of Quantities or to obtain such materials in time to suit the
programme of the Works or to obtain such material in the specified sizes or the stated specification, he
is to report this in writing to the Engineer before the closing date for tenders and shall obtain the
Engineer written directives in connection therewith. If the Contractor fails to do this his tender will be
taken as firm for all items described in the Bills of Quantities and he will be responsible for supplying
such materials timeously to meet the programme for the Works.
66 Quality Control and Quality Assurance Procedures
A In compliance with Clause 4.9 of the General Conditions, the Contractor shall be required to implement LS 1 -
strict quality control and quality assurance procedures for the Works.
67 Definitions
67.1 The following definitions are applicable:
A (a) Quality Assurance is the organised evaluation of quality control systems and their implementation to LS 1 -
provide increased, confidence in the quality of a product or service.
(b) Quality Control is the implementation of a set of techniques to provide increased confidence that
the desired quality is being maintained.
B The Contractor shall submit a comprehensive QUALITY CONTROL proposals with the tender submission. LS 1 -
The QUALITY CONTROL SYSTEMS shall be drawn up to meet the requirements set out herein and
incorporating all additional requirements and controls the Contractor considers necessary for effective
control and assurance of a high quality of workmanship.
C The Contractor shall provide dedicated and experienced staff capable of implementing the proposed LS 1 -
QUALITY CONTROL SYSTEM.
D The Engineer shall comment on the QUALITY CONTROL SYSTEM within thirty (30) days of award of the LS 1 -
tender outlining additions or amendments considered necessary for acceptance of the QUALITY CONTROL
SYSTEM. The Contractor shall meet with the Engineer and amend the contents of the QUALITY CONTROL
SYSTEM according to the Engineer’s comments. Amendments to the system shall be made within seven
(8) days of the Engineer’s comments.
E The Contractor will not be able to proceed with any work on the Project until written approval of the LS 1 -
system has been issued by the Engineer.
F The acceptance of the QUALITY CONTROL SYSTEM by the Engineer does not supersede or negate any LS 1 -
other quality control conditions stipulated elsewhere in the contract documentation and in the instance
of contradiction of requirements being identified specific requirements shall override general
requirements. Acceptance of the system by the Engineer shall not in any way supersede, negate or alter
the intent, content or interpretation of the specifications or conditions of the contract specified
elsewhere in the contract documentation. Acceptance of the system by the Engineer does not in any
way relieve the Contractor of his responsibility to satisfy the conditions of contract and to achieve the
specified standards. The QUALITY CONTROL SYSTEM is an audit procedure and does not necessarily
describe the Contractor’s total responsibility in terms of quality control.
G The Engineer may from time to time call for the QUALITY CONTROL data sheets for random checking of: LS 1 -
> the manner in which the system is being administrated,
> the technical acceptability of the contents of the sheets, and
> the effectiveness of the system in controlling the attainment of the required end product
H If the system is found to be inadequate or ineffective, the Engineer will have the right to declare the LS 1 -
system or parts thereof as being areas of “non-performance”. In the event of the Engineer instructing
the Contractor by an Engineer instruction of an area of “non-performance” the following options may be
implemented by the Engineer at no additional cost to the Employer and without any claim for delays.
I The structure of approvals may be altered necessitating the signature of QUALITY CONTROL data sheets LS 1 -
by designated members of the professional team before work of a particular nature and/or in a
particular area can proceed through the various check stages of the system.
J The structure of the system may be altered by extending the detail of checking required by the system LS 1 -
and/or the frequency at which check sheets have to be produced.
K The geographical boundaries of a typical checking operation may be altered thereby requiring the LS 1 -
Contractor to perform more comprehensive checks on smaller portions of work.
L The Contractor shall react immediately to an instruction by the Engineer regarding any alteration to the LS 1 -
procedure of the system. On receipt of a Site Instruction on any “non-performance” from the Engineer
the Contractor shall not proceed with any of the affected work until acceptance of the revised
procedures has been obtained from the Engineer.
M Once the Engineer is satisfied that the revised QUALITY CONTROL procedures are effective, the LS 1 -
Contractor will be informed by means of an official Engineer’s Instruction of the extent to which the
system may revert back to the principle of “Management by Exception”. It is envisaged that the system
should generally operate on such a basis and providing the results are satisfactory, the Contractor is not
expected to attain approval of counter-signature of every QUALITY CONTROL data sheet.
N In instances where up front inspection is an industry norm (e.g. inspection of reinforcing by the LS 1 -
structural Engineer) or where the specification demands such inspection, the Contractor must take this
into account when compiling the QUALITY CONTROL SYSTEM.
O It is envisaged that “Samples” shall be extensively used to define the accepted standards of LS 1 -
workmanship and materials to be used. A lockable sample room with shelving must be provided by the
Contractor to accommodate all loose samples for the duration of the project. The Contractor shall also
prepare and maintain a register of all samples indicating numbers, dates and specification references,
approval and relevant documents.
68 Site records and samples
68.1 A The Contractor shall allow for keeping and providing records of all site levels, observations, site tests LS 1 -
and laboratory tests on materials or sections of the work as directed.
B The Contractor shall allow for all samples, site observations, site tests, laboratory tests and analyses as
C The Contractor shall allow for providing reports site diaries and returns as directed.
D The Contractor shall allow for providing samples of all Engineering components as directed.
69 Progress Photographs
69.1 A The Contractor shall provide for colour photographs to show the Works in progress and at each LS 1 -
completed Project Milestones for the relevant buildings.
B Locations of the photographs to be taken shall be agreed with the Engineer. Each photograph shall be
marked with the description of the photograph and location from which it was taken. Progress
photographs to be taken from same location and angle to enable assessment of progress monthly.
C The ownership and copyright of all photographs shall be vested in the Employer and are not to be used
without his permission under any circumstances. Prints shall be handed over to the Engineer monthly.
D The Contractor shall allow for providing samples of all Engineering components as directed.
70 Bending Schedules
A The Contractor shall compile for the Consulting Engineer’s acceptance Reinforcement Bending Schedules LS 1 -
in a prescribed format taken off the Consulting Engineer’s drawings. The Contractor should note that the
time required by the Consulting Engineer for checking and accepting completed schedules shall be three
weeks and that incorrect or incomplete submissions will be rejected.
TOTAL OF BILL NO 01 C/F TO MAIN SUMMARY -
NBCC (India) Limited
Office of ED (CPG), NBCC Bhawan, Lodhi Road, New Delhi -110003 (INDIA)
Quoting Sheet for the Bidder (Bill No. 02)
NIT No.: NBCC/CPG/BOB/MAURITIUS/2021/295
Name of Work: Renovation of Bank of Baroda Building at Port Louis, Mauritius
General Requirement and Preliminaries (MEP)
Name of The Bidder
Item Description Unit Quantity Rate Amount in MUR
I MECHANICAL, ELECTRICAL, WET SERVICESAND OTHER SERVICE INSTALLATIONS LS 1 -
1.0 Testing, Commissioning and Operating of Plant
1.1 A In order that the inspections and tests may be carried out in a through and logical LS 1 -
manner, the Contractor shall prepare an itemised check list against which the installation
is to be inspected and tested. The checklist shall be submitted to the Employer’s
Personnel / Engineer for approval prior to the commencement of the tests.
B The checklist shall be completed and certified to the effect that the quality of
installation meets all the requirements of the specifications. Itemised check lists and test
certificates shall be endorsed and submitted as and when completed, to the Employer’s
Personnel / Engineer who might afterwards carry out spot checks at his own discretion
C The Employer’s Personnel / Engineer may also decide to witness performance tests
being carried out by the Contractor. They should then be informed of the intention of
carrying out such tests at least one week in advance.
D The Employer’s Personnel / Engineer shall at the appropriate time arrange to carry out
acceptance tests on the completed installation or part thereof. If faults and defects are
upon verification discovered in the installation a list of these shortcomings shall be given
to the Contractor who shall forthwith rectify them and issue a further test certificate
endorsed RE-TEST. Subsequent inspections after the second one which may have to be
made by the Employer’s Personnel/ Engineer for the same shortcomings shall be at the
expense of the Contractor. Any list issued to the Contractor, in connection with
shortcomings in the installation shall not be regarded as final, but only as assistance given
to the Contractor.
1.2 E The Contractor shall submit full testing and commissioning procedures for each LS 1 0
component and for the entire system.
E.1 "The following will be included:-
a) Checking of all safety features of equipment by simulation of overload and abnormal
b) Setting of protective devices to stop operation of equipment at overload or
abnormal conditions.;
F Checking of performance of equipment and systems by simulation through the range of
maximum to minimum operating conditions. Relevant parameters recording of each area
shall be made and witnessed by the Employer’s Personnel / Engineer.
G The Contractor shall also log as part of his commissioning the current measurable
parameters at all required points, to demonstrate that the systems are performing
according to the relevant Standards and Design Parameters. To that effect, all the
necessary instrumentation and sensing points will have been built-in, to generate
simultaneous recordings where this is deemed necessary by the Employer’s Personnel /
1.3 H All tests shall be recorded in a field test report for insertion in the operating and LS 1 0
maintenance manual. Values of voltage and amps shall be recorded and marked on
instruments as appropriate.
I The Contractor shall provide all labour, supervision and equipment required for testing,
commissioning and operating the plant. The Employer may assign operating personnel as
observers, but such observation time shall not be counted as instruction time. The
Contractor shall provide fuel oil for the testing and commissioning of the generators.
J The Contractor’s operator(s) shall be fully conversant with the operation and
experienced in running similar INSTALLATION. The Subcontractor shall train the
Employer’s operator(s) to enable them to be responsible for and capable of operating the
K The Contractor shall have made due allowance for payment of all services and utilities
that are required for his tests.
L The Employer’s Personnel/ Engineer reserves the right to obtain the services of an
outside firm specializing in such work if, in his opinion, the Contractor/Subcontractor
does not properly, or in the available time, carry out these duties.
2.1 A The Contractor shall carry out all works using the appropriate tools. He shall also LS 1 -
provide any specialized tool, which in the opinion of the Employer’s Personnel / Engineer
is necessary for carrying out the work properly.
B All tools shall be in perfect condition and safe for operation by the workmen, to the
satisfaction of the Consultant.
C Tools shall be equipped with protecting guards as necessary and working helmets,
gloves, masks, protective goggles and the like shall be provided for the safety of the
working personnel.
D Connection of electric tools to the power supply shall be by means of proper flexible
cable with an earth conductor where required using proper unbreakable plugs and
E Extension leads where necessary shall be by means of tough flexible cables of suitable
size for the load to be served and shall be connected to the source of supply through
connection units with compression glands or through heavy duty plugs and sockets as
F Power supply shall be taken from proper site distribution boards provided indoors or
suitably conditioned to withstand adverse atmospheric conditions when provided
G Each tool or equipment shall be served through independent connecting units and shall
be protected against accidental electrocution and short circuits by suitable human safety
units of the appropriate rating and sensitivity such as Residual Current Circuit Breakers.
H Irrespective of such protection, an efficient earth connection shall be provided.
I Site distribution systems and cables shall always be in perfect condition over the entire
period of the Contract, and any accidental damage to a cable, shall be efficiently
repaired without delay.
3 Testing Instruments
3.1 A The Contractor shall provide all the necessary testing gear for carrying out all LS 1 -
verifications and tests over the entire Contract period and after the completion of the
B The testing instrument shall be made available whenever required and at short notice,
to the Employer’s Personnel /Engineer.
4 Site Communication System
4.1 A The Contractor shall make available on site to the Employer’s Personnel/ Engineer as LS 1 -
and when requested, a pair of portable radio communicating sets (walky-talkies) or other
appropriate communicating device.
B The sets shall be light and handy and in perfect working condition and shall provide
communicating possibility over the entire Site and/or throughout the Buildings.
C The sets shall be used at the discretion of the Employer’s Personnel / Engineer over the
contract period but more precisely over the pre-commissioning periods and when carrying
out inspections. After the handing over and during the defects liability period, the sets
shall be made available at short notice as requested by the Employer’s Personnel /
Engineer as above.
5 Practical Completion of Service Installation Work
A Practical Completion of the service installation works will occur after the following LS 1 -
procedure has been certified by the Employer’s Personnel / Engineer as having been
carried-out in accordance with the specifications:-
1. Physical completion has been reported to the Employer’s Personnel / Engineer by the
Contractor, and all defects make good and the Employer’s Personnel / Engineer has given
approval for “start-up”.
2. “Start-up” has taken place.
3. Commissioning and testing has taken place as specified and test results have been
witnessed (where required), recorded and approved by the Employer’s Personnel /
4. Three sets of “as built” drawings, on plastic foil and on CD have been furnished to the
Employer’s Personnel / Engineer at the time of the Sectional Taking Over. These shall
comprise the “Shop Drawings” as specified above embodying all modifications made
during construction, and further system diagrams indicating the intended functioning,
capacity data and control functioning of all systems. For these latter drawings, the
Contractor may, if he so desires, obtain plastic negative of the System diagrams for
updating if required.
5. The specified five copies of indexed loose leaf manuals containing complete
Operating and Maintenance Instructions have been furnished to the Engineer for all
6. The Contract works shall be completed to the entire satisfaction of the Employer’s
Personnel / Engineer and all unused materials, tools, plant, equipment, temporary
buildings which are not the property of the Client, shall be removed from the site which
shall be cleaned of all rubbish and waste materials and delivered up clean and tidy on or
before the scheduled date of completion but not later than 15 days from the certified
date of completion.
6 Final Completion of the Service Installation Works
A The works shall be considered to have been completed to its Final State only after the LS 1 -
following will have been Ascertained, Recorded or Certified by the Employer’s Personnel
/ Engineer or other Representative of the Employer:
1. When so reported formally by the Contractor.
2. When start-up, Testing and Commissioning of the entire works will have fully taken
place as per specifications and test results and certificates will have been formally issued
to the Employer’s Personnel / Engineer in compliance with the specifications and the
relevant Safety Regulations as applicable to the Works.
3. When all snags or defects either identified by the Architect / Engineer or by the
Contractor himself as part of his contractual obligations, will have been attended to,
corrected and completed to the full satisfaction of the Employer’s Personnel / Engineer.
4. When all the sets of Operating/Maintenance/Owners Manuals (where applicable) and
As-Built Drawings/Negatives/Sepias, will have been handed over to the Consultant who
will have prior to such handing over, satisfied himself that such documentation is in full
compliance with the requirements of the Contract.
5. When the Employer’s Personnel / Engineer will have issued a Final Completion as
deemed opportune and appropriate by him, after being fully satisfied that the Contract
has been totally fulfilled and completed as per the specifications and the Contract
6. When all unused materials, tools, plant, equipment, temporary buildings which are
not the property of the Client, will have been removed from the site, which shall have
been cleaned of all rubbish and waste materials and left in a clean and tidy state, on or
before the scheduled Final Date of Completion, but not later than 15 days after the
formal handing over to the Client.
7 Record Documentation
7.1 A The Contractor shall supply to the Employer’s Personnel / Engineer, as a pre-requisite LS 1 -
to the start-up of preliminary handing-over visits comprehensive record documents
already approved by the Employer’s Personnel / Engineer. The Contractor is advised that
great importance will be placed upon quality, accuracy, clarity and completeness of the
record documents and upon their being made available promptly.
B The Contractor shall demonstrate from time to time, as required by the Employer’s
Personnel / Engineer throughout the execution of the works that adequate and accurate
records are being kept such as will ensure the ultimate completeness and accuracy of the
record documents and that the record documents are themselves being progressively
compiles as the work on site proceeds.
C The Contractor shall maintain on site a complete set of progress drawings to indicate
the progress and extent of the installation works.
D These drawings shall be up-dated on a weekly basis and shall be available for inspection
by the Employer’s Personnel / Engineer at all times.
E Progress drawings shall be up-dated to indicate complete services works prior to the
covering-up of services by ceiling tiles, ceiling panels, access covers, duct doors, etc.
F Record documents shall comprise the following, all as described in this Specification:-
a) Operating and Maintenance Manuals
b) As-built drawings
8 Plantroom Instructions
A Diagrams and Drawings under frame and glass, shall be provided in each plantroom and LS 1 -
shall show in large scale complete outlines of the corresponding system or service with all
devices and components correctly located and identified with piping and wiring diagrams
and layouts clearly and neatly drawn. Full Operating Instructions of the Plants and
Systems shall also be included.
B The diagrams shall state, where applicable, the normal, maximum and minimum LS 1 -
instrument readings, the control points, scale settings, true settings, differential bands,
throttling ranges, time delay and overload settings (actual and scale) and other relevant
variable and adjustable items to permit checking and adjusting of each instrument,
control and motor function.
9 Operating and Maintenance Manuals
A Four weeks before the date of the preliminary handing-over visits the Contractor shall LS 1 -
hand over a draft copy of each operating and maintenance manual to the Employer’s
Personnel / Engineer for comment.
B The draft copy of each manual shall conform to the required format required by this LS 1 -
specification to enable all relevant comments to be made by the Employer’s Personnel /
C Four copies of the final approved manual are to be provided at each Sectional Taking LS 1 -
Over. Three of these copies shall be passed to the employer’s maintenance department,
who after receiving the manual shall be trained in the operation and maintenance of the
plant by the Contractor.
D The manual shall be arranged as follows:- LS 1 -
Part I: Systems
This part shall be sub-divided into the different services shown on the diagrams and
drawings as detailed in the system’s description and specifications and forming part of
The following check list shall be used for indexing and sequencing of the relevant
A. Description Information
1 Function or service
2 Classification and Coding
4 Performance characteristics
5 Principal components
6 Distribution arrangements
7 Schematic diagram
8 Control diagram
9 Equipment data
(a) Manufacturer and model
(b) Size and rating
(c) Pressure, speed and temperature limitations
B. Operating Procedures
1 Starting and stopping procedure.
2 Emergency Shutdown procedure.
3 Abnormal or emergency operating procedures
4 Means and procedures for making safe dangerous plant
5 Operational precautions on known hazards
6 Instructions on fault finding and malfunction or equipment failure control sequences for
all systems installed.
7 Adjustment and regulation
8 Logs and records
PART II: Equipment
This part shall be sub-divided as detailed in the specification. The following check list
shall be used in indexing and sequencing the manufacturer’s information and results of
final test data.
A. Descriptive Literature
1 Catalogue cuts, brochures or shop drawings
2 Dimensional drawings and ‘As-built’ Drawings
3 Materials of construction
4 Parts of designation
B. Operating Characteristics
1 Performance tables, charts or curves and marked operating point or points
2 Pressure, temperature and speed limitations
3 Safety devices and settings
C. Operating Instructions
1 Pre-start checklists
2 Start-up procedure
3 Inspection during operation
4 Adjustment and regulation
6 Detection signals
D. Inspection Instruction and Procedures
1 Normal and abnormal temperatures, pressure and speed limits.
2 Schedule and manner of operation
3 Detection signals
E. Maintenance and Instructions and Procedures
1 Schedule of routine maintenance, including detail to frequency of inspection,
examinations, test and maintenance to keep equipment in a safe and efficient working
order. Guidance shall be given on the nature of deterioration and defects to be looked
2 Procedure for dismantling and re-assembly, replacements, adjustments, calibration,
part testing, identification list, special tools, test equipment & auxiliary services, hazards
and precautions to be taken and fault finding routines.
3 Trouble shooting charts.
F. General Parts Lists
The schedules shall locate and detail the design and actual operating conditions, detail
the replaceable assemblies. Sufficient information shall be provided to identify each
item, together with the source of supply, ratings, dimensions and appropriate standards.
Equipment schedules shall include the name and address of the manufacturer, reference
number, name and address of supplier, order number, date of purchase. A separate parts
list shall be provided for each item detailed in the equipment schedule.
1 Essential spares to be stored by building owner.
2 Spares stored by Contractor
H. Supplier Data
I. Maintenance and Service Contracts
J. Site Test Reports
K. Record Drawings and Test Certificates
L. Emergency Measures
If necessary, due to the number of drawings, which have to be included in the manual,
each drawing shall be photographically reduced in size to suit the manual. The drawings
shall be as detailed earlier.
E The manual shall conform to the following minimum standards:- LS 1 -
(a) The covers shall be substantial, of adequate size, distinctive and of sufficient
strength to protect the contents for the life of the installation. The method of binding
shall give a permanent anchorage along the left hand side whilst allowing the text to be
flat without damage to the spine.
(b) The manuals shall be prepared on approved typeface on top quality A4 suitable for
direct insertion into the manuals.
(c) The front cover and where appropriate the spine, shall have the following
information clearly displayed in permanent lettering:-
(i) Name of logotype of the Client.
(ii) Name of the building and details of the services included in the manual.
(iii) A volume number where the manual runs to more than one.
(d) The title page shall contain the following:-
(i) Title of the building.
(ii) Services referred to in the manual
(iii) Full name and address of the Client.
(iv) The author’s reference number of the manual.
(v) Date of completion and date of hand-over of the services to the Client.
(vi) Date of issue.
(vii) Name and address of manual author.
(e) The preliminary pages should contain:-
(i) Full name, address and telephone number of the Engineer.
(ii) Full name, address and telephone number of the Contractor and all
Subcontractors.
(iii) Any limitations on the use of the manual.
(iv) Record of amendments to the manual.
(v) Contents list.
(vi) Description of how to use the manual.
(vii) List of all supplementary documents.
(f) Each section of the manual shall be divided by a stiff divider of the same size as the
holder. The divider shall be labelled to identify the section of the manual, which is
(g) All pages comprising the manual shall be subsequently numbered according to each
section (i.e.: Part I, Section A, B, Part II, Section A, B, C etc…)
10 Routine Maintenance & Inspection Service if applicable
10.1 A The annual premium to be claimed for carrying out routing inspection and service, shall LS 1 -
be as provided in the Tender.
B The proposed scheme should be in the form of broken down list of proposed
interventions with corresponding rates in such a way that the Client may if desired omit
certain operations or alter the frequency of intervention.
C During adjudication of tenders, due consideration shall have been given to the
maintenance facilities offered and to the spares and service organization of the
Contractor on which full particulars must have been provided.
D The Contract shall be renewable at the end of that period for consecutive periods of 12
months at the discretion of the Client and any increase in the premium shall be mutually
agreed between both parties, it being understood that such increase shall have to be fully
justified by the Contractor and shall be calculated from initial quoted rates.
11 As-built Drawings
A A.1 Four weeks (minimum) before the start-up of preliminary handing-over visits, the LS 1 -
Contractor shall hand over a draft copy of every as-built drawing to the Engineer for
comment. All progress drawings shall be submitted together with the draft as-built
A.2 Preliminary prints of ‘As-Built’ Drawings shall be submitted to the Engineer who shall
endeavour to establish the correctness of the drawings. However, verification of ‘As-
built’ Drawings by the Engineer shall not relieve Contractor of his responsibility for any
deviation from reality, which may be discovered at a later date, even after the
Maintenance Warranty and Defects Liability Period.
A.3 He may be requested at any time to make the necessary corrections and all expenses
incurred to do so shall be at his charge. He may also be liable at common law for any
prejudice or inconvenience that such error may have been caused to the Employer ,
Employer’s Personnel / Engineer. Whenever possible a transparent copy of the Architect
or Engineer’s drawing shall be used for the preparation of an ‘As-built’ Drawing and the
Engineer shall supply the required transparency against payment at prevailing cost. If ‘As-
built’ variations cannot be clearly shown thereon, it shall then be the Contractor’s
B Draft as-built drawings in this context refers to as-built drawings that have been prepared LS 1 -
on the basis of the progress drawings but which shall be complete in all instances
including reference numbers except for such modifications as may be found necessary
during commissioning/acceptance tests, hand-over procedures, etc.
C Final draft as-built drawings shall be handed-over to the Engineer for comments within LS 1 -
fourteen days of successful acceptance tests/handover procedures, etc. These drawings
shall incorporate any modifications found necessary.
D In addition, and complementary to the draft as-built drawings, the Contractor shall LS 1 -
provide the following of each drawing within a calendar month of the contract
completion date:-
(a) 1 set of CD for CAD reproduction and worked through the latest AutoCAD Version.
E As-built drawings shall show to the approval of the Engineer the work as completed and LS 1 -
shall record the following (as applicable):-
(i) The location, including level if buried, of public service connections provided
within the contract, whether installed by the Subcontractor or the appropriate Authority,
together with the points of origin and termination, size and materials of pipes, line
pressure, flow and other relevant information.
(ii) The layout, location and extent of all piped services showing pipe sizes, together
with all valves for regulation, isolation and other purposes, drain cocks, test points,
gauges, flow or pressure switches and other instruments.
(iii) Location, identity, size and details of all apparatus and controls equipment
served by, or associated with, each of the various services.
(iv) The location and identity of each room including space housing plant, machinery
(v) All necessary sections, elevations, isometrics and schematics of the plant spaces.
(vi) Control and wiring diagrams shall be provided incorporating details of each
instrument and equipment item and written description of the sequence of operation of
each system. All diagrams shall include full details of internal panel wiring and
connections to field mounted items.
(vii) Layout, location and extent of Electrical switchgear, distribution boards, cables and
termination points.
(viii) Detailed general arrangements of all switchgears, riser cupboards, service
trenches, transformer chambers, generator rooms and other plant or apparatus, including
the location, identity, manufacturer, size and rating of each apparatus
(ix) Shop and As-Built Drawings from Manufacturers, Suppliers and Other Subcontractors if
related to the Contract, shall also be supplied.
F The as-built drawings as described shall be drawn out in ink on best quality tracing paper LS 1 -
on the international A series sizes. All lettering shall be in ink with all titles, headings,
etc. stencilled in height not less than 5mm; all other lettering shall be stencilled.
G Each record drawing shall show the following information:- LS 1 -
(a) The name of the contract, and where appropriate, the zone and floor designation.
(b) Description of drawing, drawing number and scale.
(c) Name and address of the Contractor and the engineer.
H The completed drawings shall be signed by the Contractor as as-built drawings, and shall LS 1 -
be submitted to the Engineer at the same time as the operating and maintenance manual
is handed over for comment.
I Each as-built drawing shall include the words “As-built Drawing” in 18mm stencilled upper LS 1 -
case lettering in the bottom right corner adjacent to the title block.
12 Training of Personnel
12.1 A The tendered shall allow for the training of the Client’s personnel until the point where LS 1 -
they will be fully conversant with the installation
B The Contractor shall be responsible to plan the training scheme, in consultation with
C The period of liability of the Contractor on any portion of the installation, shall be
governed by any Defects Liability period or Guarantee applicable to the INSTALLATION
and equipment, whichever is later.
13 Liability for Installation and Maintenance of Equipment & Associated Components
Supplied by the Employer
13.1 A When the Employer decides to order any piece of equipment or component of LS 1 -
installation from any source of his choice and in direct relation with the Contract Works
covered by the Contract and to entrust the installation of such equipment or component
to the Contractor, the latter which shall be deemed to be a Specialist in the field, shall
unless otherwise instructed, be responsible for taking delivery of the equipment and
installing same in full accordance with the instructions of the Supplier/Manufacturer,
taking all the recommended precautions for the proper and safe operation of such
equipment or component.
B The Contractor shall therefore be responsible of the commissioning of the equipment or
component with the assistance of a Technical representative of the
Supplier/Manufacturer, as considered necessary by the Client or appointed Consultant,
and of the handing over of such equipment or component in perfect condition of
operation and appearance and to the entire satisfaction of the Client or Engineer.
C The Contractor shall subsequently be responsible of providing Post Contract
Maintenance & Repair service on equipment supplied by the Client/Employer and of
liaising with the relevant Supplier/Manufacturer for any technical information or for
obtaining parts to carry out any repair.
13.2 D When any Contract or Post Contract intervention of the Contractor was to fall under LS 1 -
the normal or any extended terms of the Guarantee of the Supplier/Manufacturer as may
have been established at time of order by the Client, the Contractor shall carry out any
repair or making good intervention as instructed by the Client or Service Engineer and the
cost of such repair shall be at the charge of the Client who shall take the necessary steps
to recover such costs from the Supplier/Manufacturer.
E However, the Contractor shall make good at his own expense within the Contract or
Post Contract liability period, and following written or verbal instructions from the Client
or Consultant, any fault, defect, shrinkage or other which may appear, arising in the
opinion of the Engineer, from the negligence, lack of expertise and incompetence of the
Contractor or from the use of bad quality installation materials or from bad workmanship,
not in accordance with the Supplier’s/Manufacturer’s instructions or not complying to the
drawings, contract documents and approved standards or instructions of the Service
13.3 F In case of default of the Contractor to fulfil his obligations under the terms of this LS 1 -
clause, the Employer may employ or pay other persons to amend and make good such
defects, faults or damage and all expenses consequent thereon and incidental thereto
shall be borne by the Subcontractor and shall be recoverable from him by the Employer or
may be deducted by the Employer from any monies due to that may become due to the
Contractor, the whole without prejudice to the rights of the Employer at Common Law.
G The period of liability of the Contractor on any portion of the installation, shall be
governed by any Defects Liability period or Guarantee applicable to the INSTALLATION
and equipment, whichever is later.
14 Duties and Powers of the Employer’s Personnel / Engineer
A Employer’s Personnel / Engineer’s Duties LS 1 -
The Engineer shall have the duties assigned to him by the Employer in accordance with
the conditions of engagement submitted by the Employer’s Personnel / Engineer and
accepted by the Employer or as otherwise specified in a correspondence between the
Engineer and the Employer.
If the Employer’s Personnel / Engineer was to provide Services beyond the Scope of his
duties as agreed with the Employer and if this was due to the Contractor default to
comply to the terms of his Contract, the latter shall be liable to reimburse the Employer
any costs incurred by the Employer’s Personnel / Engineer for providing such additional
services as for example:-
(a) Extended attendance on site due to delay for completion of the works within the
Contract period.
(b) The cost of producing Shop/Working drawings and Engineering details, which should
normally have been produced by within the Contractor within the terms of the Contract.
(c) The cost of any Technical and Engineering assistance provide due to the absence of
the necessary expertise within the Contractor's organization.
The Employer’s Personnel / Engineer reserves the right to submit a claim for such
expenses after giving the Contractor early notice in writing of his intention to do so with
copy to the Employer. Such notice shall be addressed at least 90 days before putting-up
the claim and the Contractor shall be at liberty to submit objections, if any, to such
If the Employer’s Personnel / Engineer consider that such objections are not receivable
and if after expressing same in writing to the Contractor, the latter maintains his
objections, the Engineer shall be at liberty to apply to the Employer for the settlement of
his claim and the corresponding amount shall be deductible from the Contract Sum at the
Employer's discretion.
2. Employer’s Personnel / Engineer's Powers
Unless otherwise specified, all instructions to the Subcontractor shall be given by the
Employer’s Personnel who shall have all the powers stated elsewhere in the Contract.
3. Employer’s Personnel / Engineer's Decisions
The Contractor shall proceed with the works in accordance with decisions, instructions
given by the Employer’s Personnel / Engineer in accordance with the conditions of the
Contract, provided always that:-
(a) If the Contractor shall, without undue delay after being given a decision,
instruction or order otherwise than in writing, require it to be confirmed in writing, such
decision, instruction or order shall not be effective until written confirmation thereof
has been received by the Contractor.
(b) If the Contractor shall by written notice to the Engineer within 7 days
after receiving any decision, instruction of the Employer’s Personnel / Engineer in writing
or written confirmation thereof, intimate that he disputes or questions the decision,
instruction , giving his reasons for so doing, either party to the contract shall be at liberty
to refer the matter to Arbitration, but such intimation shall not relieve the
Contractor of his obligation to proceed with the Works in accordance with the decision,
instruction or order in respect of which the intimation has been given to
him. The Contractor shall be at liberty in any such arbitration to rely on reasons
additional to the reasons stated in the said intimation.
4. Responsibility of the Employer’s Personnel / Engineer
The Engineer shall be responsible for the inspection of the Works and for making sure
that the installation generally complies with the specifications of the Contract. It is not
the responsibility of the Employer’s Personnel / Engineer to instruct the Contractor on
how to perform any part of his work.
The Engineer shall carry out inspections periodically at the frequency and time that he
may judge necessary to satisfy himself that the Works are executed generally in
accordance with his designs and otherwise in accordance with good Engineering Practice.
Such inspections are not meant to detect all possible errors, deviations or defects that
may have been made by the Contractor or caused by his default or lack of supervision,
and inspection or approval of any part of the installation by the Employer’s Personnel /
Engineer, does not relieve the Contractor of his obligations to comply with the Conditions
of the Contract and from his liability at Common Law.
Inspection and approval of any part of the installation does not therefore relieve the
Contractor from his obligation to remedy or correct any defect, deviation or error that
may be discovered subsequently, when instructions shall be given to him by the
Employer’s Personnel / Engineer to that effect.
5. Employer’s Personnel / Engineer's
The duties of the Engineer's representative are to watch and inspect the works and to
test and examine any materials to be used or workmanship employed in connection with
the works. He shall have no authority to relieve the Contractor of any of his duties or
obligations under the Contract, nor, except as expressly provided hereunder, to order any
work involving delay or any extra payment by the Employer nor to make any variation of
or in the Works.
The Employer’s Personnel may from time to time in writing delegate to the Engineer any
of the powers and authorities vested in the Employer’s Personnel and shall furnish to the
Contractor a copy of such written delegations of powers and authorities. Any written
instruction or written approval given by the Engineer's representative to the Contractor
within the terms of such delegation (but not otherwise) shall bind the Contractor and the
Employer as though it has been given by the Employer’s Personnel / Engineer provided
always as follows:-
(a) Failure of the Employer’s Personnel / Engineer's to disapprove any work or
materials shall not prejudice the power of the Engineer thereafter to
disapprove such work or materials and to order the pulling down, removal or breaking up
(b) If the Contractor shall be dissatisfied by reason of any decision of the
Engineer he shall be entitled to refer the matter to the Employer’s Personnel who
shall thereupon confirm, reverse or vary such decision
6. Supervision, Control and Inspection
The Contactor shall extend to the Employer’s Personnel / Engineer or any person
authorised by him all facilities for access to the Works and to the site and to all
workshops of the Subcontractor or other places where Works or portions of Contract
Works are being carried out or prepared in as part with the Contract.
The Contactor shall provide every assistance in or for obtaining the right to such access
and shall provide all labour, materials and equipment required for testing, measuring the
Contract works, and for weighing proving or testing the efficiency of any portion or
portions of the completed Contract works.
The Contractor shall keep the Employer’s Personnel / Engineer informed of the progress
of the Works and shall submit periodic reports as and when requested by the Employer’s
Personnel / Engineer and in the form specified.
8. Ownership of Drawings and Contract Documents
All drawings, tracings and other documents issued by the Employer’s Personnel / Engineer
for carrying out the Contract Works shall only be used for the purpose of the Contract
and for no other use, and shall not be divulged to people not concerned with the
Contract nor shall they be copied without the authorization of the Employer’s Personnel /
Engineer. They shall be carefully preserved in good condition and shall be kept at the
disposal of the Architect / Engineer.
The Employer’s Personnel / Engineer reserves the right to request return of all
documents and drawings to him should he consider that these have been misused or that
unethical use have been made of same.
He also reserves the right to take the appropriate legal measures to protect such rights.
1. Allow for providing reports site diaries and returns as directed.
2. Allow for providing progress photographs as directed.
15 Builder’s work
A The Contractor is to provide all necessary particulars as to recesses, chases, sleeves, etc., LS 1 -
required so that they may be correctly built in, in the first place. If the Contractor fails
to do this, the cost of any alterations or cutting will fall upon him.
16 Maintenance Manuals
A The Contractor shall obtain and hand over to the Engineer on taking over of the works LS 1 -
any operating and maintenance instruction manuals, data or instructions required by the
Engineer or provided by Manufacturers, Suppliers or Subcontractors.
TOTAL OF BILL NO. 02 C/F TO MAIN SUMMARY
NBCC (India) Limited
Office of ED (CPG), NBCC Bhawan, Lodhi Road, New Delhi -110003 (INDIA)
Quoting Sheet for the Bidder
NIT No.: NBCC/CPG/BOB/MAURITIUS/2021/295
Name of Work: Renovation of Bank of Baroda Building at Port Louis, Mauritius
Builders Work Including External Works & Provisional Sums
Name of The Bidder
ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT IN MUR
3.1 BILL No. 3.1 - DEMOLITION AND MAKING GOOD
ALL REMEASURABLE
The tenderer is referred to the MLC Preambles (Eleventh Edition) which is to be
read in conjunction with these bills of quantities.
SUPPLEMENTARY PREAMBLES
For Preambles see Interior Designer's, Architect's and Engineer's specifications.
Tender Drawings
Refer to Architect's and Engineer's drawing registers.
Bills of quantities description
The description of the items in this document is to be read in conjunction with
the drawings and is intended as a means of locating and identifying the element
only and are not intended as full descriptions and specifications of these items.
Quantities contained in these Bills of Quantities are indicative only and shall be
assessed on site. Tenderer shall allow for all costs in connection with the various
items taking full cognisance of the drawings, specifications and the Bills of
Quantities descriptions.
Prices shall include for everything necessary to complete the works and shall
include for all labour, materials, supervision, propping, underpinning, additional
scaffolding, cartage, etc., necessary to effect a high standard of finished
1. All demolished materials to be carted away off site unless stated otherwise
and shall be deemed to include loading of debris onto trucks directly from the
working area or, alternatively, from stock piles situated on the building site.2.
All existing stones to be carefully taken off and store on a suitable location on
site to be later re-used3. All existing doors and windows / timber truss unless
otherwise described below shall get the approval of the Employer before carting
away4. Asbestos removal by others - Contractor to provide adequate protection
to exposed areas where asbestos has been removed5. Contractors are to refer
to Architects notes on drawings and any sample to be approved prior to start of
works 6. Contractors to carry out existing underground survey
DEMOLITIONS, ETC.
Existing concrete steps at first floor
1.0 Demolish existing concrete building steps including carefully remove handrail m² 3.00 -
and balustrade (to be handed to client) including grubbing of foundations / Steps
/ floors / columns/ beams / roof / rainwater pipes / electrical / telephone
wiring / lights / switches / paver / stone plinth / waterproofing etc. all
complete including preparing and making good all exposed concrete and block
work surfaces including cutting of visible reinforcement. Contractor to allow for
all necessary propping / support work all complete and in accordance with
Engineer's requirement and Architect Specification
2.0 Demolish existing concrete column of 600mm diameter 6,000 m high at main No 1.00 -
entrance area including grubbing of foundations / Steps / floors / columns/
beams / roof / rainwater pipes / electrical / telephone wiring / lights / switches
/ paver / stone plinth / waterproofing etc. all complete including preparing and
making good all exposed concrete and block work surfaces including cutting of
visible reinforcement. Contractor to allow for all necessary propping / support
work all complete and in accordance with Engineer's requirement and Architect
External concrete fins
3.0 Demolish existing concrete fins or overall size 1,112mm x 100mm thick on South m 360.00 -
elevation and make good existing surfaces including the treatment of any
exposed reinforcement bars with adequate products all as per approved
methodology from the structural engineer Drawing No. 2020/BOB/O4-001 and as
per Structural Engineer's . Contractor to allow for all necessary propping /
support work all complete and in accordance with Engineer's requirement and
Architect Specification
4.0 Make good existing concrete fins on North Elevation by removing any m 293.00 -
delaminated concrete including all necessary treatment of any exposed
reinforcement with adequate products. Gaps at exposed reinforcement areas to
be filled with an approved structural sealant all as per approved methodology
from the structural engineer. Contractor to allow for all necessary propping /
support work all complete and in accordance with Engineer's requirement and
Architect Specification
Existing metal staircase at first floor
5.0 Demolish existing metal staircase overall size 9,000mm x 1,200mm wide No 1.00 -
consisting of 48Nos. steps circular on plan at first floor including carefully
remove handrail and balustrade. Contractor to allow for the carting away of the
metail staircase and all necessary propping / support work all complete and in
accordance with Engineer's requirement and Architect Specification.
Metal balustrade at Second Floor
6.0 Carefully remove existing gms balustrade 1,100mm high overall to receive new m 25.00 -
frameless glass balustrade (e/m).
Block work etc. to Ground, First, Second, Third & Fourth Floors
7.0 Demolish existing reinforced concrete / Block wall / Lintels & Jambs all m² 375.00 -
complete including preparing and making good all exposed concrete and block
work surfaces including cutting of visible reinforcement.Contractor to allow for
all necessary propping / support work all complete and in accordance with
Engineer's requirement and Architect Specification.
Windows and Doors to Ground, First, Second, Third & Fourth Floors.
1. All items described in below section are for doors / windows which were not
included in above demolition (General Demolitions) and are to be priced
8.0 Carefully remove existing aluminium entrance doors including glazing of overall No 5.00 -
size 3,000 x 2,400mm high all complete including preparing and making good all
exposed concrete and block work surfaces including cutting of visible
reinforcement. Contractor to allow for all necessary propping / support work all
complete and in accordance with Engineer's requirement and Architect
9.0 Carefully remove existing metal windows of various sizes including glazing m² 413.00 -
including preparing and making good all exposed concrete and block work
surfaces including cutting of visible reinforcement. Contractor to allow for all
necessary propping / support work all complete as per Structural Engineer's
approval and in accordance with Engineer's requirement and Architect
10.0 Demolish existing concrete slab to form staircase opening including the cleaning Item 1.00 -
and making good all exposed concrete and block work surfaces including cutting
of visible reinforcement. Contractor to allow for all necessary propping /
support work at 600mm c/c all complete and in accordance with Engineer's
requirement and as per Strucural Engineer's Drawing No. 2020/BOB/O3-003
Archive room including CIS roof coverings at Third Floor
11.0 Demolish archive room in existing reinforced concrete / Block wall / Lintels & m² 62.00 -
Jambs all complete including preparing and making good all exposed concrete
and block work surfaces including cutting of visible reinforcement and the
treatment of any exposed reinforcement all as per Structural engineer's
approval. Rate to include the removal of existing roof sheeting complete with all
fittings and fixations. Contractor to allow for carting away and all necessary
propping / support work all complete and in accordance with Engineer's
requirement and Architect Specification.
12.0 Remove existing drywall partition overall size 2,600mm high. Prepare and make m² 1,181.00 -
good all exposed concrete and block work surfaces, internal plaster finish to
match and to be flush with existing finish to receive 3 coats of internal pastel
paint finish (e/m) and to receive new gypsum partitions all as per Architect's
drawings and approval.
Floor Tiles to Ground, First, Second, Third & Fourth
13.0 Remove existing floor tiling including skirting, hack off existing screed, prepare m² 1,631.00 -
and make good surfaces to receive new floor finish (e/m) all as per Structural
Engineer's and Architects requirements.
14.0 Remove existing floor tiling to main staircase including skirting, hack off existing m² 130.00 -
screed, prepare and make good surfaces to receive new floor finish (e/m) all as
per Structural Engineer's and Architects requirements.
Wall Finishes to Ground, First, Second, Third & Fourth
15.0 Remove existing mosaic wall tiles hack off existing screed, prepare and make m² 70.00 -
good surfaces to receive new wall finish (e/m) all as per Structural Engineer's
and Architects requirements.
16.0 Remove existing wallpaper to wall and column surfaces and prepare and make m² 209.00 -
good surfaces to receive new wall finish (e/m) all as per Structural Engineer's
and Architects requirements.
Existing Sanitary Wares
17.0 WC including cistern No 9.00 -
18.0 Wash hand basin and mixer No 6.00 -
19.0 Urinal No 4.00 -
Screed at Seventh Floor
20.0 Remove and hack off existing screed, prepare and make good surfaces to receive m² 300.00 -
new waterproof screed (e/m) all as per Structural Engineer's and Architects
3.2 BILL NO. 3.2 - FOUNDATIONS
ALL PROVISIONAL
For Preambles see MLC Standard Preambles (Eleventh Edition)
Rate for masonry blockwall shall include for wall ties
EXCAVATION, FILLING, ETC OTHER THAN BULK
Excavating in any material including existing concrete surface, rock, starting
from stripped level, trenches to receive footings
1.0 Not exceeding 1.5m deep m³ 12.00 -
Risk of Collapse of Excavations
2.0 Risk of collapse to side of trenches / bases n.e 1.5m deep Item 1.00 -
Excavated material
3.0 Removing surplus from site m³ 12.00 -
230 Micron approved polyethene waterproof sheeting sealed with normal
4.0 Under foundations (measured net) m² 8.00 -
CONCRETE, FORMWORK AND REINFORCEMENT
Plain in-situ concrete, designed mix Grade 15 N/mm², 40 mm aggregate, as
5.0 50mm thick blinding layer under footings, bases and the like m³ 0.20 -
Reinforced in-situ concrete designed mix Grade 30 N/mm², 20mm aggregate
vibrated, as described in
6.0 Foundations in trenches and bases, cast against formwork m³ 2.00 -
Reinforcement bars to MS 10/BS 4449 hot rolled plain round mild steel, as
Bases, footings and the like
7.0 Bars of various diameter kg 40.00 -
Reinforcement bars to MS 10/BS 4449 hot rolled deformed high yield steel
bars, as described
Bases, footings and the like
8.0 Bars of various diameters kg 360.00 -
Formwork in Class 2 finish, strutting at / from any level and including rebates
or groove formers, n.e 300mm high
9.0 Sides of footings, bases n.e. 300mm high m 12.00 -
25mm thick flexcell expansion joint in slips between joints of vertical
concrete to be filled with backing cord and polysulphide sealant
10.0 25mm thick vertically between surfaces m² 6.00 -
Dowelling of reinforcement bars sealed with Epidermix T372 n.e 100mm
11.0 to existing structures No 30.00 -
3.3 BILL NO. 3.3 - CONCRETE, FORMWORK & REINFORCEMENT
For Preambles see MLC Standard Preambles (1ST Edition)
The costs of making, storing and testing of concrete test cubes as required
under clause 7 "Tests" of SABS 1200 G, or local equivalent standards to
Engineer's approval shall include the cost of providing cube moulds necessary
for the purpose, for testing costs and for submitting reports on the tests to the
architect. The testing shall be undertaken by an independent firm or institution
nominated by the contractor to the approval of the Engineer.
Description of formwork shall be deemed to include use and waste only (except
where described as "left in" or "permanent"), for fitting together in the required
forms, wedging, plumbing and fixing to true angles and surfaces as necessary to
ensure easy release during stripping and for reconditioning as necessary before
The vertical strutting shall be carried down to such construction as is
sufficiently strong to afford the required support without damage and shall
remain in position until the newly constructed work is able to support itself.
Formworks to soffits of solid etc shall be deemed to be slabs not exceeding
250mm thick unless otherwise described
Formwork to sides of bases, pile caps, ground beams, etc will only be measured
where it is prescribed by the engineer for design reasons. Formwork
necessitated by irregularity or collapse of excavated faces will not be measured
and the cost thereof shall be deemed to be included in the allowance for
taking the risk of collapse of the sides of the excavations, provision for which is
made in "Earthworks"
Prices shall include for everything necessary to complete the works and shall
include for all labour, materials, supervision, propping, additional scaffolding,
cartage, etc., necessary to effect a high standard of finished product.
Reinforced in-situ concrete designed mix Grade 30 N/mm², 20mm aggregate
vibrated, as described in
1.0 Columns m³ 11.00 -
2.0 Upstand to receive stainless steel channel for glass balustrade m³ 0.40 -
4.0 Concrete Fins m³ 34.00 -
5.0 Cills, Jambs and the like m³ 3.00 -
Reinforcement bars to MS 10/BS 4449 hot rolled plain round mild steel, as
Bases, footings and the like
6.0 Bars of various diameter kg 988.00 -
Reinforcement bars to MS 10/BS 4449 hot rolled deformed high yield steel
bars, as described
Bases, footings and the like
7.0 Bars of various diameters kg 8,892.00 -
Formwork in Class 2 finish, strutting at / from any level and including rebates
or groove formers, n.e 300mm high
8.0 Sides of columns m² 196.00 -
9.0 Extra over to form 50mm x 80mm rebate to receive stainless steel channel m 26.00 -
elsewhere measured
10.0 Sides of new concrete fins m² 370.00 -
Dowelling of reinforcement bars sealed with Epidermix T372 n.e 100mm
11.0 to existing structures No 2,420.00 -
3.4 BILL No. 3.4 - MASONRY
ALL PROVISIONAL
For Preambles see MLC Standard Preambles (1ST Edition)
SUPPLEMENTARY PREAMBLES
For Preambles see Interior Designer's, Architect's and Engineer's specifications.
Rate for masonry blockwall shall include for wall ties as per engineer's
EXTERNAL BLOCKWALL
Hollow concrete blocks to BS 6073, minimum average compressive strength
3.5 N/mm², in cement mortar (1:3), as described in
INTERNAL BLOCKWALL
Hollow concrete blocks to BS 6073, minimum average compressive strength
3.5 N/mm², in cement mortar (1:3), as described in
3.5 BILL NO. 3.5 - WATERPROOFING
For Preambles see MLC Standard Preambles (1ST Edition)
Waterproofing of roofs, water retaining structures, internal wet areas, etc. shall
be laid under a ten-year guarantee. Waterproofing to roofs shall be laid to even
falls to outlets, etc. with necessary ridges, hips and valleys. Descriptions of
sheet or membrane waterproofing shall be deemed to include additional labour
to turn-ups and turn-downs.
ROOF WATERPROOFING AND FLASHINGS
Supply and lay liquid- applied polyurethane waterproofing membrane
mariseal 250 or approved equivalent with all necessary sealants, primers &
fabrics strictly to specialist's recommendations. waterproofing to be laid on
25mm minimum screed thickness laid to fall towards outlet all in accordance
with manufacturer's specifications (ten year guarantee to be given) measured
Smooth trowelled screeded roofs of
1.0 Concrete roofs m² 436.00 -
2.0 Turnups m² 29.00 -
3.6 BILL NO. 3.6 - PLASTERWORK
For Preambles see MLC Standard Preambles (Eleventh Edition)
Measurement methodology
Cement and sand screed (1:3) to receive waterproofing (m/s)
Works to falls and cross-falls to flat concrete roofs
1.0 65mm thick average laid to falls and cross falls to sloping roofs m² 182.00 -
2.0 Extra over to form triangular fillet - 75 x 75mm m 192.00 -
INTERNAL FLOOR FINISHES
Cement and sand (1:3) bedding to receive porcelain/ceramic tiles (m/s)
3.0 Floors laid level m² 1,561.00 -
4.0 Shower Areas m² 84.00 -
5.0 Extra over for powerfloat finish m² 316.00 -
EXTERNAL FLOOR FINISHES
Cement and sand (1:3) bedding to receive ceramic tiles (m/s)
6.0 Balconies & Terraces m² 88.00 -
INTERNAL PLASTER
Cement and sand (1:3) rendering as described with a steel trowelled to a
smooth finish to Architect's specification and approval
7.0 Walls inclusive of flush columns and beams, reveals, returns and the like m² 616.00 -
Cement and sand (1:3) backing coat with wood floated finish to receive wall
8.0 Walls, returns, reveals and the like m² 520.00 -
EXTERNAL PLASTER
Cement and sand (1:3) smooth rendering as described with a wood float and
sponge textured finish to Architect's specification and approval
9.0 Walls inclusive of flush columns and beams, reveals, returns and the like m² 40.00 -
10.0 Reinforced concrete fins m² 370.00 -
3.7 BILL NO. 3.7 - PAINTING
For Preambles see MLC Standard Preambles (1ST Edition)
Strip off any lose, chalking and peeling paint, sand down and clean existing
wall surfaces, prepare and apply one sealer coat and two full coats PVA anti
fungicidal emulsion paint (satin finish), colour to Architect's approval to
textured surfaces of
1.0 Walls, reveals and the like m² 3,487.00 -
EXISTING WALL SURFACES
Strip off any lose, chalking and peeling paint, sand down and clean existing
wall surfaces and prepare and apply one coat Polycolor wall primer water
based acrylic primer on the existing wall surfaces followed by 2 coats of
Polycolor, matt emulsion high quality copolymer acrylic paint or equal and
approved all to Architect's approval and as per shedule of finishes drawing no
NP/19/26/PD SCH1 R3
2.0 Existing Wall Areas (all wall areas) m² 1,123.00 -
EXISTING CEILING SURFACES
Strip off any lose, chalking and peeling paint, sand down and clean existing
wall surfaces and prepare and apply one coat Polycolor wall primer water
based acrylic primer on the existing wall surfaces followed by 2 coats of
Polycolor, matt emulsion high quality copolymer acrylic paint or equal and
approved all to Architect's approval and as per shedule of finishes drawing no
NP/19/26/PD SCH1 R3
3.0 to Sofits m² 579.00 -
NEW WALLS, BEAMS, COLUMNS AND THE LIKE
Prepare and apply one coat Polycolor wall primer water based acrylic primer
on the new surfaces followed by 2 coats of Polycolor, matt emulsion high
quality copolymer acrylic paint or equal and approved all to Architect's
approval and as per shedule of finishes drawing no NP/19/26/PD SCH1 R3
4.0 Existing Wall Areas (all wall areas) m² 87.00 -
Wall finishes to partitions as per ID specification manual
Feature wall paint / Graphic wall (WF-02)
VINYL WALLPAPER FINISH
Supply and install Vinyl graphic print wall covering full height upto ceiling level
as per future Architect specification and approval all as per Architects Drawing
5.0 to dry wall partitions m² 1,071.00 -
3.8 BILL NO. 3.8 - RAINWATER INSTALLATIONS
For Preambles see MLC Standard Preambles (Eleventh Edition)
PVC rainwater pipework cast in concrete or fixed on surface with and
including standard brackets, plugged to concrete or blockwall
1.0 110mm diameter pvc pressure pipe m 260.00 -
2.0 Extra over for bends No 18.00 -
3.0 Extra over for shoe No 18.00 -
4.0 Extra over for rodding eye No 18.00 -
5.0 PVC outlet or equal approved, of nominal bore pipe size 110mm fitted to 110mm No 9.00 -
diameter downpipe (m/s)
3.9 BILL NO. 3.9 - TILING
For Preambles see MLC Standard Preambles (Eleventh Edition)
Unless described otherwise, description of tiling shall include for porcelain,
ceramic, slate, marble and mosaic tiles in various sizes.
Measurement methodology
The quantity splits are as follows: A - Ground Floor B - First Floor C - Second
Floor D - Third Floor E - Fourth Floor
Supply and lay "Restile flamed pebbles collection" floor tiles of size 600x
600x 10 mm as per the Architect's schedule of finishes (SCH1.0R3), including
supply of cement mortar, adhesive ,pointing materials all square and raking
cutting, waste and cleaning off on completion, all applied in strict
accordance with the manufacturers' recommendation, sizes and pattern as
laid out in the Architect's Floor Pattern Plans NP/19/26/PD- 04.0, 04.1, 04.2,
04.3, 04.4 R1 TILING LAYOUT
Supply and lay "Restile Makers Collection Flamed Iconic" floor tiles of size
600x 600x 10 mm as per the Architect's schedule of finishes (SCH1.0R3),
including supply of cement mortar, adhesive ,pointing materials all square
and raking cutting, waste and cleaning off on completion, all applied in strict
accordance with the manufacturers' recommendation, sizes and pattern as
laid out in the Architect's Floor Pattern Plans NP/19/26/PD- 04.0, 04.1, 04.2,
04.3, 04.4 R1 TILING LAYOUT
Supply and lay "Restile Step up collection Pebbles" floor tiles of size 1200x
300x 12 mm as per the Architect's schedule of finishes (SCH1.0R3), including
supply of cement mortar, adhesive ,pointing materials all square and raking
cutting, waste and cleaning off on completion, all applied in strict
accordance with the manufacturers' recommendation, sizes and pattern as
laid out in the Architect's Floor Pattern Plans NP/19/26/PD- 04.0, 04.1, 04.2,
04.3, 04.4 R1 TILING LAYOUT
3.0 Main entrance and steps m² 33.00 -
Supply and lay "Restile Colours Collection Nero" Wall tiles (W1) of size 600x
600x 10 mm as per the Architect's schedule of finishes (SCH1.0R3), including
supply of cement mortar, adhesive ,pointing materials all square and raking
cutting, waste and cleaning off on completion, all applied in strict
accordance with the manufacturers' recommendation, sizes and pattern as
laid out in the Architect's Floor Pattern Plans NP/19/26/PD/ -07.7, -07.8,-
4.0 Walls, returns, reveals and the like m² 194.00 -
Supply and lay "Restile Colours Collection Terracotta" Wall tiles (W2) of size
300x 600x 10 mm as per the Architect's schedule of finishes (SCH1.0R3),
including supply of cement mortar, adhesive ,pointing materials all square
and raking cutting, waste and cleaning off on completion, all applied in strict
accordance with the manufacturers' recommendation, sizes and pattern as
laid out in the Architect's Floor Pattern Plans NP/19/26/PD/ -07.7, -07.8,-
5.0 Walls, returns, reveals and the like m² 43.00 -
Supply and lay "Restile Colours Collection Steel Grey" Wall tiles (W3) of size
600x 600x 10 mm as per the Architect's schedule of finishes (SCH1.0R3),
including supply of cement mortar, adhesive ,pointing materials all square
and raking cutting, waste and cleaning off on completion, all applied in strict
accordance with the manufacturers' recommendation, sizes and pattern as
laid out in the Architect's Floor Pattern Plans NP/19/26/PD/ -07.7, -07.8,-
6.0 Walls, returns, reveals and the like m² 194.00 -
Supply and lay "Restile Chip Collection MIST" tiles of size 600x 600x 10 mm
as per the Architect's schedule of finishes (SCH1.0R3), including supply of
cement mortar, adhesive ,pointing materials all square and raking cutting,
waste and cleaning off on completion, all applied in strict accordance with
the manufacturers' recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD- 04.0, 04.1, 04.2, 04.3, 04.4 R1
Supply and lay "Restile Step up Collection Step-up ABACUS" floor tiles of size
1520x 315x 12 mm as per the Architect's schedule of finishes (SCH1.0R3),
including supply of cement mortar, adhesive ,pointing materials all square
and raking cutting, waste and cleaning off on completion, all applied in strict
accordance with the manufacturers' recommendation, sizes and pattern as
laid out in the Architect's Floor Pattern Plans NP/19/26/PD- 04.0, 04.1, 04.2,
04.3, 04.4 R1 TILING LAYOUT
8.0 Staircases m² 98.00 -
Supply and lay "Restile Step up Collection Riser C Step-up ABACUS " floor
tiles of size 1520x 640x 10 mm as per the Architect's schedule of finishes
(SCH1.0R3), including supply of cement mortar, adhesive ,pointing materials
all square and raking cutting, waste and cleaning off on completion, all
applied in strict accordance with the manufacturers' recommendation, sizes
and pattern as laid out in the Architect's Floor Pattern Plans NP/19/26/PD-
Supply and lay "Restile Colour Collection Steel Grey" floor tiles of size 600x
600x 10 mm as per the Architect's schedule of finishes (SCH1.0R3), including
supply of cement mortar, adhesive ,pointing materials all square and raking
cutting, waste and cleaning off on completion, all applied in strict
accordance with the manufacturers' recommendation, sizes and pattern as
laid out in the Architect's Floor Pattern Plans NP/19/26/PD- 04.0, 04.1, 04.2,
04.3, 04.4 R1 TILING LAYOUT
10.0 Toilet Floors m² 84.00 -
Supply and lay 20 mm Polished Granite tiles (Colour : Chima Pink) as per the
Architect's schedule of finishes (SCH1.0R3), including supply of cement
mortar, adhesive ,pointing materials all square and raking cutting, waste
and cleaning off on completion, all applied in strict accordance with the
manufacturers' recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD- 04.0, 04.1, 04.2, 04.3, 04.4 R1
11.0 On floors m² 584.00 -
Supply and lay 20 mm non porous, Polished Granite Colombo Guparama as
per the Architect's schedule of finishes , including supply of cement mortar,
adhesive ,pointing materials all square and raking cutting, waste and
cleaning off on completion, all applied in strict accordance with the
manufacturers' recommendation, sizes and pattern as laid out in the
Architect's Floor Pattern Plans NP/19/26/PD- 04.0, 04.1, 04.2, 04.3, 04.4 R1
12.0 Walls, returns, reveals and the like m² 87.00 -
Supply and lay 20 mm Polished Granite tiles (Colour : Chima Pink) as per the
Architect's schedule of finishes (SCH1.0R3), including supply of cement
mortar, adhesive ,pointing materials all square and raking cutting, waste
and cleaning off on completion, all applied in strict accordance with the
manufacturers' recommendation, sizes and pattern as laid out in the
Architect's specification
13.0 To counter tops m² 9.00 -
14.0 Splashbacks m 21.00 -
SKIRTINGS, ETC.
Supply and fix "Restile Chip Collection MIST' skirting tile to match floor tiles
finishes, all as per architect Specifications
15.0 Cut tile skirting 100mm high m 652.00 -
Supply and fix "Restile Step up Collection Step-up ABACUS" skirting tile to
match floor tiles finishes, all as per architect Specifications
16.0 Cut tile skirting 100mm high m 77.00 -
Supply and fix 100 mm high Granite Skirting tiles (Colour : Chima Pink) to
match granite finishes, all as per architect Specifications
17.0 Cut tile skirting 100mm high m 243.00 -
3.10 BILL NO 3.10 - FALSE CEILINGS
ALL PROVISIONAL
SUPPLEMENTARY PREAMBLES
The tenderer is referred to the MLC Preambles (Eleventh Edition) which is to be
read in conjunction with these bills of quantities.
SUSPENDED CEILING TILES
Supply and fix Calcium Silicate Ceiling Tile of size 600 x 600 mm x6mm thick
, all as per Manufacturer's Specifications and as per Architect's specifications
and Drawing no. NP/ 19/26/PD 05.0, 05.1, 05.2, 05.3, 05.4 R1 FALSE CEILING
1.0 Ceilings not exceeding 1m below concrete soffits m² 1,391.00 -
2.0 Bulkhead m 410.00 -
3.0 Shadowline m 427.00 -
FALSE CEILING SUNDRIES
4.0 Extra over Access Trap No 24.00 -
3.11 BILL NO 3.11 - PARTITION - SUPPLY & INSTALL
For Preambles see MLC Standard Preambles (Eleventh Edition)
Note 1: Sizes of partitions to be measured on site prior to manufacture Note 2:
All fixings to be concealed. Note 3: Supplier to provide detailed shopdrawings
on fixing for approval before start. Note 4: Supplier to provide all necessary
samples and insulation materials together with all specifications for approval.
Note 5: This BOQ has been prepared taking into consideration the details
provided by the Architect. However contractors can propose alternative
methods to achieve the desired finish. This will be submitted to Interior Designer
for approval Note 6: All Dry Wall Partitions including studs design shall be to
Interior Designer's approval. Note 7: All Ironmongeries shall be as per Architect's
specification or equal approved. Note 8: Aluminium Framed Laminated Glazed
Partitions and Aluminium Framed Laminated Double Glazed Partitions shall have
finish colour to Interior Designer later choice and approval. Note 9: All fibre
cement board partitioning should be rendered with waterproofing treatment as
eted installation or part thereof. If faults and defects are upon verification
discovered in the installation a list of these shortcomings shall be given to the
Contractor who shall forthwith rectify them and issue a further test certificate
endorsed RE-TEST. Subsequent inspections after the second one which may have
to be made by the Employer’s Pers
Aluminium Metal Stud Gypsum Board Drywall to Ground, First, Second, Third,
80mm thick drywall standard system "Aluminium metal stud" gypsum board
partitions to match false ceiling height consisting of fire sealant fixation to
specialist recommendation, gyproc fire stop, isovaer cavitybatt insulation of
with both sides cladded with one layer of 12.7mm gypsum board skimmed at
all joints and to receive paint / vinyl (elsewhere measured) fixed to false
ceilings, floor, curtain wall, blockwork and partition walls all as per
contractor's design including all connection to walls, corners, uprights and T
connections all as per Architects Drawing Nos NP/19/26/PD 06.5 R1,
1.0 PW1 overall size 6,788mm x 2,600 including cutouts for FRD01 & FRD03, door No 1.00 -
frame and door elsewhere measured. Skimmed gypsum surfaces to receive vinyl
finish elsewhere measured all as per architects drawings and approval.
2.0 PW2 overall size 6,788mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
3.0 PW3 overall size 1,315mm x 2,600 including cutout for APD07, door frame and No 1.00 -
door elsewhere measured. Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and approval.
4.0 PW5 overall size 4,919mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
5.0 PW6 overall size 1,800mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
6.0 PW 7 overall size 4,120mm x 2,600 including cutout for AD02, door frame and No 1.00 -
door elsewhere measured. rate to include for fixed glazed panel overall size
2,355 x 1,200 including frame. Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and approval.
7.0 PW 9 overall size 4,980mm x 2,600 including cutout for AD02, door frame and No 1.00 -
door elsewhere measured. Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and approval.
8.0 PW 10 overall size 5,919mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
9.0 PW 11 overall size 1,900mm x 2,600 including cutout for AD02, door frame and No 1.00 -
door elsewhere measured. rate to include for fixed glazed panel overall size
2,355 x 1,200 including frame. Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and approval.
10.0 PW 12 overall size 8,406mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
11.0 PW 14 overall size 5,919mm x 2,600 including fixed opening 5,615mm x 1,200. No 1.00 -
Skimmed gypsum surfaces to receive vinyl finish elsewhere measured all as per
architects drawings and approval.
12.0 PW 15 overall size 5,278mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
13.0 PW 16 overall size 1,965mm x 2,600 including cutout for APD07, door frame and No 1.00 -
door elsewhere measured. Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and approval.
14.0 PW 20 overall size 12,980mm x 2,600 including cutout for AD02, door frame and No 1.00 -
door elsewhere measured. Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and approval.
15.0 PW 21 overall size 4,615mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
16.0 PW 24 overall size 5,915mm x 2,600 including cutout for APD04, door frame and No 1.00 -
door elsewhere measured. Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and approval.
17.0 PW 25 overall size 5,105mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
18.0 PW 26 overall size 6,580mm x 2,600 including cutout for 2Nos. APD07.1, door No 1.00 -
frame and door elsewhere measured. Rate to include for fixed glazed panel
overall size 2,300 x 1,200 including frame. Skimmed gypsum surfaces to receive
vinyl finish elsewhere measured all as per architects drawings and approval.
19.0 PW 27 overall size 2,170mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
20.0 PW 29 overall size 2,819mm x 2,600 including cutout for 1Nos. AD01, door frame No 1.00 -
and door elsewhere measured. Rate to include for fixed glazed panel overall size
1,719 x 1,200 including frame. Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and approval.
21.0 PW 30 overall size 6,405mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
22.0 PW 31 overall size 2,919mm x 2,600 including cutout for 1Nos. AD01, door frame No 1.00 -
and door elsewhere measured. Rate to include for fixed glazed panel overall size
1,719 x 1,200 including frame. Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and approval.
23.0 PW 33 overall size 5,411mm x 2,600 including cutout for 1Nos. APD07.1, door No 1.00 -
frame and door elsewhere measured. Skimmed gypsum surfaces to receive vinyl
finish elsewhere measured all as per architects drawings and approval.
24.0 PW 34 overall size 3,000mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
25.0 PW 35 overall size 1,591mm x 2,600 including cutout for 1Nos. APD07, door No 1.00 -
frame and door elsewhere measured. Skimmed gypsum surfaces to receive vinyl
finish elsewhere measured all as per architects drawings and approval.
26.0 PW 36 overall size 2,872mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
27.0 PW 37 overall size 5,491mm x 2,600 including cutout for 1Nos. APD07, door No 1.00 -
frame and door elsewhere measured. Skimmed gypsum surfaces to receive vinyl
finish elsewhere measured all as per architects drawings and approval.
28.0 PW 38 overall size 3,780mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
29.0 PW 39 overall size 7,900mm x 2,600 including cutout for 1Nos. APD08, door No 1.00 -
frame and door elsewhere measured. Skimmed gypsum surfaces to receive vinyl
finish elsewhere measured all as per architects drawings and approval.
30.0 PW 40 overall size 1,700mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
31.0 PW 41 overall size 2,035mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
32.0 PW 42 overall size 4,035mm x 2,600 including cutout for 1Nos. APD04, door No 1.00 -
frame and door elsewhere measured. Skimmed gypsum surfaces to receive vinyl
finish elsewhere measured all as per architects drawings and approval.
33.0 PW 44 overall size 1,598mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
34.0 PW 45 overall size 2,400mm x 2,600 including cutout for 1Nos. APD03, door No 1.00 -
frame and door elsewhere measured. Skimmed gypsum surfaces to receive vinyl
finish elsewhere measured all as per architects drawings and approval.
35.0 PW 46 overall size 5,014mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
36.0 PW 47 overall size 4,315mm x 2,600 including cutout for 1Nos. AD01, door frame No 1.00 -
and door elsewhere measured. Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and approval.
37.0 PW 48 overall size 5,050mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
38.0 PW 49 overall size 4,950mm x 2,600 including cutout for 1Nos. AD01, door frame No 1.00 -
and door elsewhere measured. Rate to include for fixed glazed panel overall size
3,850 x 1,200 including frame. Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and approval.
39.0 PW 50 overall size 4,535mm x 2,600 including cutout for 1Nos. AD02, door frame No 1.00 -
and door elsewhere measured. Rate to include for 2 Nos fixed glazed panel
overall size 1,200 x 1,200 including frame. Skimmed gypsum surfaces to receive
vinyl finish elsewhere measured all as per architects drawings and approval.
40.0 PW 52 overall size 6,150mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
41.0 PW 53 overall size 2,030mm x 2,600 including cutout for 1Nos. AD01, door frame No 1.00 -
and door elsewhere measured. Rate to include for 1 Nos fixed glazed panel
overall size 1,030 x 1,200 including frame. Skimmed gypsum surfaces to receive
vinyl finish elsewhere measured all as per architects drawings and approval.
42.0 PW 54 overall size 3,080mm x 2,600 including 1 No fixed glazed panel overall No 1.00 -
size 2,880 x 1,200 including frame. Skimmed gypsum surfaces to receive vinyl
finish elsewhere measured all as per architects drawings and approval.
43.0 PW 55 overall size 2,775mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
44.0 PW 59 overall size 1,000mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
45.0 PW 60 overall size 5,302mm x 2,600 including cutout for 1Nos. AD02, door frame No 1.00 -
and door elsewhere measured. Skimmed gypsum surfaces to receive vinyl finish
elsewhere measured all as per architects drawings and approval.
46.0 PW 61 overall size 4,665mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
47.0 PW 62 overall size 3,052mm x 2,600 including cutout for 1Nos. AD01, door frame No 1.00 -
and door elsewhere measured. Rate to include for 1 Nos fixed glazed panel
overall size 1,952 x 1,200 including frame. Skimmed gypsum surfaces to receive
vinyl finish elsewhere measured all as per architects drawings and approval.
48.0 PW 63 overall size 2,249mm x 2,600 including 1 No fixed glazed panel overall No 1.00 -
size 2,049 x 1,200 including frame. Skimmed gypsum surfaces to receive vinyl
finish elsewhere measured all as per architects drawings and approval.
49.0 PW 64 overall size 3,628mm x 2,600 including cutout for 1Nos. AD01, door frame No 1.00 -
and door elsewhere measured. Rate to include for 1 Nos fixed glazed panel
overall size 2,528 x 1,200 including frame. Skimmed gypsum surfaces to receive
vinyl finish elsewhere measured all as per architects drawings and approval.
50.0 PW 65 overall size 4,370mm x 2,600. Skimmed gypsum surfaces to receive vinyl No 1.00 -
finish elsewhere measured all as per architects drawings and approval.
Framed Aluminium Single Glazed Laminated Partitioning to Ground, First,
Second, Third, Fourth Floors
80 mm wide Partitions with overall height of 3,720mm comprising of
laminated glass, single glazed framed aluminium partition 2700mm high fixed
to concrete ceilings and floor all as per contractor's design including all
connection to walls, corners, uprights and T connections and as per
Architect's specifications, approval and Architects Drawing Nos NP/19/26/PD
51.0 PW 4 overall size 4,370mm x 2,600 comprising of 4 nos. fixed panels of equal No 1.00 -
size in clear float glass and frosted glass all as per Architect's drawings and
approval. Door APD 05 is measured elsewhere.
52.0 PW 8 overall size 7,340mm x 2,600 comprising of 6 Nos. fixed panels of equal No 1.00 -
size in clear float glass and frosted glass all as per Architect's drawings and
approval. Door AD 02 is measured elsewhere.
53.0 PW 13 overall size 6,020mm x 2,600 comprising of 4 Nos. fixed panels of equal No 1.00 -
size in clear float glass and frosted glass all as per Architect's drawings and
approval. 2 Nos Door AD 02 is measured elsewhere.
54.0 PW 17 overall size 1,442mm x 2,600 comprising of 1 Nos. fixed panel in clear No 1.00 -
float glass and all as per Architect's drawings and approval. 1 Nos Door AD 02 is
measured elsewhere.
55.0 PW 18 overall size 6,250mm x 2,600 comprising of 7 Nos. top fixed equal panels No 1.00 -
in clear float glass 300mm & 950mm high and 7Nos bottom fixed panels in
frosted glass 950mm high all as per Architect's drawings and approval.
56.0 PW 19 overall size 3,124mm x 2,600 comprising of 2 Nos. fixed panel in clear No 1.00 -
float glass and all as per Architect's drawings and approval. 1 Nos Door AD 02 is
measured elsewhere.
57.0 PW 22 overall size 3,124mm x 2,600 comprising of 4 Nos. fixed panel with top No 1.00 -
glazing in clear float glass 950mm & 300mm high and bottom glazing in frosted
glass 950mm high and all as per Architect's drawings and approval. 1 Nos Door AD
02 is measured elsewhere.
58.0 PW 23 overall size 15,444mm x 2,600 comprising of 14 Nos. fixed panel with top No 1.00 -
glazing in clear float glass 950mm & 300mm high and bottom glazing in frosted
glass 950mm high and all as per Architect's drawings and approval. 2 Nos Door AD
02 is measured elsewhere.
59.0 PW 28 overall size 2,853mm x 2,600 comprising of 2 Nos. fixed panel with top No 1.00 -
glazing in clear float glass 950mm & 300mm high and bottom glazing in frosted
glass 950mm high and all as per Architect's drawings and approval. 1 Nos Door AD
02 is measured elsewhere.
60.0 PW 32 overall size 2,919mm x 2,600 comprising of 2 Nos. fixed panel with top No 1.00 -
glazing in clear float glass 950mm & 300mm high and bottom glazing in frosted
glass 950mm high and all as per Architect's drawings and approval. 1 Nos Door AD
02 is measured elsewhere.
61.0 PW 43 overall size 11,030mm x 2,600 comprising of 9 Nos. fixed panel with top No 1.00 -
glazing in clear float glass 300mm & 950mm high and bottom glazing in frosted
glass 950mm high and all as per Architect's drawings and approval. 3 Nos Door AD
02 are measured elsewhere.
62.0 PW 51 overall size 3,110mm x 2,600 comprising of 9 Nos. fixed panel with top No 1.00 -
glazing in clear float glass 300mm & 950mm high and bottom glazing in frosted
glass 950mm high and all as per Architect's drawings and approval. 2 Nos Door AD
02 are measured elsewhere.
63.0 PW 56 overall size 3,102mm x 2,600 comprising of 3 Nos. equal fixed panel with No 1.00 -
top glazing in clear float glass 300mm & 950mm high and bottom glazing in
frosted glass 950mm high and all as per Architect's drawings and approval.
64.0 PW 57 overall size 2,425mm x 2,600 comprising of 3 Nos. equal fixed panel with No 1.00 -
top glazing in clear float glass 300mm & 950mm high and bottom glazing in
frosted glass 950mm high and all as per Architect's drawings and approval.
65.0 PW 58 overall size 1,424mm x 2,600 comprising of 1 Nos. fixed panel with top No 1.00 -
glazing in clear float glass 300mm & 950mm high and bottom glazing in frosted
glass 950mm high and all as per Architect's drawings and approval. 1 No Door AD
02 is measured elsewhere.
66.0 PW 66 overall size 3,708mm x 2,600 comprising of 3 Nos. fixed panel with top No 1.00 -
glazing in clear float glass 300mm & 950mm high and bottom glazing in frosted
glass 950mm high and all as per Architect's drawings and approval. 1 No Door AD
02 is measured elsewhere.
3.12 BILL NO 3.12 - DESIGN, SUPPLY & INSTALL VENETIAN BLINDS
For Preambles see MLC Standard Preambles (Eleventh Edition)
Note 1: Sizes of fixed openings to receive venetian blinds to be measured on site
prior to manufacture Note 2: All fixings to be concealed. Note 3: Supplier to
provide detailed shopdrawings on fixing for approval before start. Note 4:
Supplier to provide all necessary samples and insulation materials together with
all specifications for approval. Note 5: This BOQ has been prepared taking into
consideration the details provided by the Architect. However contractors can
propose alternative methods to achieve the desired finish. This will be
submitted to Interior Designer for approval Note 6: Shop drawings are to be
submitted to Architect for approval.
Design, supply and install IDECO venetian blinds manually operated blinds in
aluminium alloy 6011 of 7-15 microns thickness with one coat paint film
finish. Slats size shall be 50mm wide with a headrail of size 28x20mm all as
per architect schedule of finishes NP / 19 / 26 / PD SCH1 R4 and approval all
to specialist future details.
1.0 Aluminium Venetian blinds to fixed openings m² 420.00 -
3.13 BILL No. 3.13 - DESIGN, SUPPLY AND INSTALLATION OF ALUMINIUM OPENINGS
ALL REMEASURABLE
The following aluminium openings shall be manufactured and installed to
Contractor's design. All openings shall be in approved aluminium extruded
sections to BS Standards to Contractor's design including laminated glass
thickness suitable to resist cyclonic wind speeds of over 280 km/hr including all
necessary mullions, transomes, beadings, glazing beads and the like. Sections
shall be powder coated finish to BS 6496, RAL 7035S, unless otherwise described,
colour to be "Gris Desert", coating to be 60 microns minimum thickness and
guaranteed for 10 years. Perimeter of opening to be pointed with matching
silicone mastic all round internally and externally, all joints to be made weather
tight with neoprene gaskets, etc. as specified by specialist and fixing within
concrete or reveals. Openings to be fitted with all the ironmongery items
including approved handles, cylinder locks, stainless steel heavy duty hinges,
heavy duty flush bolts, and / or friction hinges to both sides of openings, with
aluminium packing,eted installation or part thereof. If faults and defects are
upon verification discovered in the installation a list of these shortcomings shall
be given to the Contractor who
Shop drawings and design calculations are to be submitted to Architect and
Engineer for approval, all aluminium shall be designed, fabricated and installed
in accordance with British Standard Code of Practice CP 118; thickness of glass
shall not be as per openings schedule but to Contractor's design to withstand
windloads as required by the Engineer in accordance with BS 6262.
Design of sections, fittings and general assembly to be to Architect's approval
and as per Architect's schedule of aluminium openings.
1. Opening sizes to be measured on site prior to manufacturing. Contractor to
check all left hand and right hand opening configuration prior to ordering any
door frames and locks
2. All aluminium frames including glazing and fixing to concrete / steel frame
shall be designed to withstand wind pressure resulting from the following:- (i)
Design to CP3 Chapter V, Part 2, Code of Basic Data for the Design of
Buildings Wind Loads As per Engineers specifications
3. The Contractor shall submit complete detailed calculations to justify the
proposed profiles, fixing screws (diameters, length, spacing, etc.) and glazing
thickness accompanied with shop drawings for the approval of the Architect
4. The Contractor shall on completion of the works submit a certificate as per
enclosed format
5. All pull handles to aluminium openings shall be included in the prices and
samples to be approved by Architect
6. The top flush bolts to fixed leaf doors shall be extra length to be useable.
7. The Contractor shall confirm in his tender that he will comply with clauses 2
to 6 above and that he will make, at his own costs, all necessary changes to his
design / drawings which may be required in order to make his design / drawings
comply with the requirements of British Codes of Practice
8. The contractor shall indemnify the client, engineer and architect for the
design of the shop front and confirm such in writing in their tender submission.
Supply and installation the following in powder coated aluminium/louvered
windows all as per Architect drawings and Architects Schedule of Openings
Drawing Numbers NP/19/26/PD/SCH 4.0 R2 & NP/19/26/PD/SCH 4.1 R1 and
Schedule of Ironmongeries Drawing No NP/19/26/PD/SCH 5.0R1
Powder coated aluminium frame and glass window
1.0 Powder coated aluminium frame and glass window overall size 500mm x 500mm No 17.00 -
with laminated milky glass with a min thickness of 6.0mm
2.0 Powder coated aluminium frame and glass window overall size 700mm x No 25.00 -
1,800mm with laminated milky glass with a min thickness of 8.0mm
3.0 Powder coated aluminium frame and glass window overall size 1,700mm x No 5.00 -
2,200mm with laminated clear float glass with a min thickness of 8.0mm
4.0 Powder coated aluminium frame and glass window overall size 1,840mm x No 2.00 -
2,200mm with laminated clear float glass with a min thickness of 8.0mm
5.0 Powder coated aluminium frame and glass window overall size 2,575mm x No 10.00 -
1,390mm with laminated clear float glass with a min thickness of 8.0mm
6.0 Powder coated aluminium frame and glass window overall size 2,810mm x No 25.00 -
1,390mm with laminated clear float glass with a min thickness of 8.0mm
7.0 Powder coated aluminium frame and glass window overall size 1,510mm x No 2.00 -
2,750mm with laminated clear float glass with a min thickness of 8.0mm
8.0 Powder coated aluminium frame and glass window overall size 1,700mm x No 2.00 -
2,750mm with laminated clear float glass with a min thickness of 8.0mm
9.0 Powder coated aluminium frame and glass window overall size 3,900mm x No 2.00 -
2,750mm with laminated clear float glass with a min thickness of 8.0mm
10.0 Powder coated aluminium frame and glass window overall size 2,695mm x No 2.00 -
250mm with laminated clear float glass with a min thickness of 8.0mm
11.0 Powder coated aluminium frame and glass window overall size 2,730mm x No 5.00 -
250mm with laminated clear float glass with a min thickness of 8.0mm
12.0 Powder coated aluminium anti-theft louvred window overall size 1,000mm x No 8.00 -
1,940mm with laminated clear float glass with a min thickness of 6.0mm
13.0 Powder coated aluminium frame and glass window overall size 5,495mm x No 2.00 -
995mm with laminated clear float glass with a min thickness of 8.0mm
14.0 Powder coated aluminium frame and glass window overall size 8,640mm x No 1.00 -
995mm with laminated clear float glass with a min thickness of 8.0mm
15.0 Powder coated aluminium frame and glass window overall size 580mm x No 6.00 -
2,200mm with laminated clear float glass with a min thickness of 8.0mm
16.0 Powder coated aluminium frame and glass window overall size 900mm x No 32.00 -
2,200mm with laminated clear float glass with a min thickness of 8.0mm
17.0 Powder coated aluminium frame and glass window overall size 1,390mm x No 1.00 -
1,700mm with laminated milky glass with a min thickness of 8.0mm
18.0 Powder coated aluminium frame and glass window overall size 2,060mm x No 1.00 -
1,800mm with laminated clear float glass with a min thickness of 8.0mm
19.0 Powder coated aluminium frame and glass window overall size 865mm x No 2.00 -
1,700mm with laminated milky glass with a min thickness of 8.0mm
20.0 Powder coated aluminium frame and glass window overall size 3,000mm x No 1.00 -
2,750mm with laminated clear float glass with a min thickness of 8.0mm
21.0 Powder coated aluminium frame and glass window overall size 1,750mm x No 2.00 -
2,200mm with laminated clear float glass with a min thickness of 8.0m
22.0 Powder coated aluminium frame and glass window overall size 1,510mm x No 1.00 -
1,665mm with laminated clear float glass with a min thickness of 8.0mm
23.0 Powder coated aluminium frame and glass window overall size 1,100mm x No 1.00 -
1,000mm with laminated clear float glass with a min thickness of 8.0mm
24.0 Powder coated aluminium frame and glass window overall size 1,400mm x No 1.00 -
1,000mm with laminated clear float glass with a min thickness of 8.0mm
Supply and installation the following in powder coated aluminium/louvered
doors, roller shutters all as per Architect drawings and Architects Schedule
of Openings Drawing Numbers NP/19/26/PD/SCH 3.0 R1 & NP/19/26/PD/SCH
3.1 R1 and Schedule of Ironmongeries Drawing No NP/19/26/PD/SCH 5.0R1
Powder coated aluminium frame doors
25.0 Powder coated aluminium frame door overall size 800mm x 2,100mm with full No 8.00 -
glazing in laminated clear float glass with a min thickness of 8.0mm with 60mm x
60mm sand blasted motifs complete with minimum 5 Nos. Heavy duty hinges, 1
No. heavy duty door closer, door lock and handles
26.0 Powder coated aluminium frame door overall size 900mm x 2,100mm with full No 24.00 -
glazing in laminated clear float glass with a min thickness of 8.0mm with 60mm x
60mm sand blasted motifs complete with minimum 5 Nos. Heavy duty hinges, 1
No. heavy duty door closer, door lock and handles
27.0 Powder coated aluminium frame double door overall size 1,700mm x 2,200mm No 1.00 -
with full glazing in laminated clear float glass with a min thickness of 8.0mm
with 60mm x 60mm sand blasted motifs complete with minimum 5 Nos. Heavy
duty hinges per door leaf, 2 Nos. heavy duty door closer , door lock and handles
28.0 Powder coated aluminium frame double door with fixed panels overall size No 1.00 -
3,000mm x 2,750mm. Double swing door shall be 1,800 x 2,100mm full glazed in
laminated clear float glass with a min thickness of 8.0mm with 60mm x 60mm
sand blasted motifs complete with minimum 4 Nos. Heavy duty hinges per door
leaf, 2 Nos. heavy duty door closer, door lock and handles
29.0 Powder coated aluminium frame door with aluminium panelling overall size No 18.00 -
800mm x 2,100mm complete with minimum 4 Nos. Heavy duty hinges, door lock
30.0 Powder coated aluminium frame door with aluminium panelling overall size No 8.00 -
900mm x 2,100mm complete with minimum 4 Nos. Heavy duty hinges, door lock
31.0 Powder coated aluminium frame door overall size 900mm x 2,100mm with No 1.00 -
aluminium panelling and rectangular viewing panel 650mm x 950mm in clear
float glass with thickness 8.0mm complete with minimum 5 Nos. Heavy duty
hinges, 1 No, heavy duty door closer, door lock and handles
32.0 Powder coated aluminium frame door with aluminium panelling overall size No 1.00 -
1,000mm x 2,100mm complete with horizontal grab bar, minimum 5 Nos. Heavy
duty hinges, 1 No. heavy duty door closer, door lock and handles
33.0 Powder coated aluminium frame door overall size 1,000mm x 2,100mm with No 4.00 -
aluminium panelling and rectangular viewing panel 300mm x 750mm in clear
float glass with thickness 8.0mm complete with minimum 5 Nos. Heavy duty
hinges, 1 No, heavy duty door closer, door lock and handles
34.0 Powder coated aluminium frame door overall size 900mm x 2,100mm with No 2.00 -
aluminium panelling and rectangular viewing panel 300mm x 750mm in clear
float glass with thickness 8.0mm complete with minimum 5 Nos. Heavy duty
hinges, 1 No, heavy duty door closer, door lock and handles
35.0 Powder coated aluminium frame double door overall size 1,800mm x 2,100mm No 1.00 -
with aluminium panelling and 2Nos. rectangular viewing panel 300mm x 750mm
in clear float glass with thickness 8.0mm complete with minimum 4 Nos. Heavy
duty hinges, 2 No, heavy duty door closers, door lock and handles
Motorised aluminium roller shutters
36.0 Aluminium roller shutter, of overall structural size 1,700mm wide x 2,200mm No 1.00 -
high, with heavy duty opening mechanism, to Architect's approval and
manufacturer's specifications and details.
37.0 Extra over for motorisation of roller shutter including 2No. key switch operation No 1.00 -
located internally and externally close to the opening. Roller Shutter motor to
have manual override function with crank operations, including obstacle
detection and wall switch operations, all as per Architect's and manufacturer's
specifications.
38.0 Aluminium roller shutter, of overall structural size 3,900mm wide x 2,400mm No 1.00 -
high, with heavy duty opening mechanism, to Architect's approval and
manufacturer's specifications and details.
39.0 Extra over for motorisation of roller shutter including 2No. key switch operation No 1.00 -
located internally and externally close to the opening. Roller Shutter motor to
have manual override function with crank operations, including obstacle
detection and wall switch operations, all as per Architect's and manufacturer's
specifications.
40.0 Aluminium roller shutter, of overall structural size 3,000mm wide x 3,100mm No 1.00 -
high, with heavy duty opening mechanism, to Architect's approval and
manufacturer's specifications and details.
41.0 Extra over for motorisation of roller shutter including 2No. key switch operation No 1.00 -
located internally and externally close to the opening. Roller Shutter motor to
have manual override function with crank operations, including obstacle
detection and wall switch operations, all as per Architect's and manufacturer's
specifications.
3.14 BILL NO. 3.14 - DESIGN, SUPPLY & INSTALL: GLAZED BALUSTRADE
THE FOLLOWING TO ZONE A
The tenderer is referred to the MLC Preambles (Eleventh Edition) which is to be
read in conjunction with these bills of quantities.
Glazed balustrades should include for design, supply and installation of the glass
and aluminium parts including bends, corners, stop ends, ramps, knees,
aluminium U channels, spacers and embedded into RC concrete. Rates should
also include for all stainless steel connection pieces (e.g. pins, plates, bolts,
nuts, shoes, brackets, spacers, rails, etc) required for fixing.
Tender Drawings
Tenderers are referred to the Architects drawings listed in Tender Document
accompanying these bills of quantities for tendering purposes.
The Tenderer is in addition advised to inspect the drawings issued with this
enquiry and to satisfy themselves as to the nature and requirements of the
Design Requirements
The tenderers are advised to inspect the drawings issued with this enquiry in
order to satisfy themselves as to the nature and scope of this installation. For
further information on design requirements please contact Achitect Studio and
for further information on the structural engineer requirements please contact
Arup. Tenderers shall allow for all costs in their rates to satisfy the above
requirements as no extras shall be entertained due to the Tenderers failure to
The successful Tenderer shall provide full shop drawings including all sections
and fixing details for approval by the Architect/Engineer prior to commencing
All rates for glazing shall include for all labours in raking, cutting, curved cutting
and polished and bevelled edges.
Note 1: Sizes to be measured on site prior to manufacture. Note 2: It should be
cyclone resistant (external ones).Note 3: Prices should also include for all
galvanised mild steel connection pieces (e.g. pins, plates, bolts, nuts, shoes,
etc.), U channels required for fixing.Note 4: The contractor has to specify the
glass thickness deemed to fit the purpose as per the Architect's specifications.
The thickness given is for indication purposes only.Note 5: Stainless steel to be
austenitic, non-magnetic, using either grade (1.4301) or grade (1.4401).
GLASS BALUSTRADE WITH STAINLESS STEEL HANDRAIL
Design, supply and installation of ArmourLam toughened laminated safety
glass balustrade with polished edges including 60mm diameter stainless steel
handrail, 20mm gap in between glass panels fixed to Stainless steel channel
on concrete upstand as per blow-up detail A. Rate to include for the fixing of
stainless steel channel 100mm deep, 25 x 20 x 100mm neoprene setting
blocks at 750mm centres and 10mm silicon topping and rubber gasket on
each side all as per Architect's Approval and Architect's drawing number
New Glass balustrade at Second Floor
1.0 Horizontal Glass Balustrade of overall clear height of 1,100mm high including 60 m 19.00 -
mm diameter stainless steel handrail.
2.0 Horizontal Glass Balustrade circular on plan of overall clear height of 1,100mm m 7.00 -
high including 60 mm diameter stainless steel handrail.
Note: Dimensions need to be adjusted in relation to floor.
Contractor to specify glass thickness :...........mm
3.15 BILL NO. 3.15 - SUPPLY AND INSTALLATION OF GMS FIRE DOORS
For Preambles see MLC Standard Preambles (Eleventh Edition)
SUPPLEMENTARY PREAMBLES
Supply and install the following fire doors and frames with Contractor's designed
mortised and tennoned connections complete with frames, subframes,
architraves as necessary, thresholds, silicone jointing, battens, quadrants, jamb
linings, plinth blocks and the like in f-sizes fixing with brass screws,
countersinking and pellating including sanding down and finishes as approved by
the Interior Designer.
Prices shall include for everything necessary to complete the works and shall
include for all labour, materials, supervision, scaffolding, cartage, etc.,
necessary to effect a high standard of finished product.
Note 1: This BOQ must be priced together with the door opening schedule
Drawing No NP/19/26/PDSCH3.1R1 and Schedule of Ironmongeries Drawing No
NP/19/26/PD/SCH 5.0 R1. No claim will be entertained for failure to do so.Note
2: Openings sizes to be measured on site prior to manufacture.Note 3:
Contractor to check all left hand and right hand opening configuration prior to
manufacture.Note 4: Contractor to provide detailed shopdrawings on fixing
before approval and start.Note 5: Contractor to provide all necessary samples
for approval.Note 6: Contractor to consult Architect's drawings to make sure all
the finishes in description and drawings are well understood and priced.Note 7:
Fire door certification to be provided for all fire rated doors in schedule.Note 8:
All Fire doors shall have a minimum fire resistance of 60 minutes, unless
otherwise specified. All fire doors shall be fitted with an automatic self closing
device. Where a self closing device is considered a hindrance to the normal use
of the building,eted installation or part thereof. If faults and defects are upon
verification discovered in the installation a list of these shortcomings shall be
given to the Contractor who shall forthwith rectify them and issue a further test
certificate endorsed RE-TEST. Subsequent inspections after the second one
which may have to be made by the Employer’s Personnel/ Engineer for the same
The following to Ground, First, Second, Third & Fourth Floors
1.0 Supply and install GMS fire rated single door including door frame with 60 No 4.00 -
minutes integrity properties and complete with 350mm x 600mm viewing panel
in laminated clear float glass 8mm thick, intumescent seals to suit structural
opening size 900 x 2,100mm high including cold smoke seal to resist passage of
smoke and fire, complete with all fire door signs, ironmongeries all as per
Schedule of Ironmongeries Drawing No NP/19/26/PD/SCH 5.0 R1; colour to
Architect's approval and all as per Architect's drawing number
NP/19/26/PDSCH3.1R1
2.0 Supply and install GMS fire rated single door including door frame with 60 No 2.00 -
minutes integrity properties and complete with 350mm x 600mm viewing panel
in laminated clear float glass 8mm thick, intumescent seals to suit structural
opening size 1,000 x 2,100mm high including cold smoke seal to resist passage of
smoke and fire, complete with all fire door signs, ironmongeries all as per
Schedule of Ironmongeries Drawing No NP/19/26/PD/SCH 5.0 R1; colour to
Architect's approval and all as per Architect's drawing number
NP/19/26/PDSCH3.1R1
3.0 Supply and install GMS fire rated single door including door frame with 60 No 1.00 -
minutes integrity properties and complete with intumescent seals to suit
structural opening size 1,100 x 2,100mm high including cold smoke seal to resist
passage of smoke and fire, complete with all fire door signs, ironmongeries all as
per Schedule of Ironmongeries Drawing No NP/19/26/PD/SCH 5.0 R1; colour to
Architect's approval and all as per Architect's drawing number
NP/19/26/PDSCH3.1R1
4.0 Supply and install GMS fire rated double door including door frame with 60 No 2.00 -
minutes integrity properties and complete with 1No. 350mm x 600mm viewing
panel in laminated clear float glass 8mm thick on each door leaf, intumescent
seals to suit structural opening size 1,400 x 2,100mm high including cold smoke
seal to resist passage of smoke and fire, complete with all fire door signs,
ironmongeries all as per Schedule of Ironmongeries Drawing No
NP/19/26/PD/SCH 5.0 R1; colour to Architect's approval and all as per
Architect's drawing number NP/19/26/PDSCH3.1R1
5.0 Supply and install GMS fire rated double door including door frame with 60 No 2.00 -
minutes integrity properties and complete with 1No. 350mm x 600mm viewing
panel in laminated clear float glass 8mm thick on each door leaf, intumescent
seals to suit structural opening size 1,700 x 2,100mm high including cold smoke
seal to resist passage of smoke and fire, complete with all fire door signs,
ironmongeries all as per Schedule of Ironmongeries Drawing No
NP/19/26/PD/SCH 5.0 R1; colour to Architect's approval and all as per
Architect's drawing number NP/19/26/PDSCH3.1R1
3.16 BILL NO. 3.16 - SUPPLY AND INSTALL SANITARY WARES, TAPWARES & TOILET
SUPPLEMENTARY PREAMBLES
For Preambles see Interior Designer's and Architect's specifications.
Prices shall include for everything necessary to complete the works and shall
include for all labour, materials, finishes (sealer), supervision, etc., necessary to
effect a high standard of finished product.
Note 1: This BOQ must be priced together with the detail drawings. No claim
will be entertained for failure to do so. Note 2: Interior Designer specifications
must be consulted to make sure all the finishes in description and drawings are
well understood and priced. Note 3: Any deviation from these specifications
should be notified to ID for approval.
SANITARY WARES AND TAPWARES
Supply and Fix the following
1.0 Kohler PATIO⢠Urinal 0.5L / flush ref K-4915Y-0 with all required accessories or No 4.00 -
equivalent to Architect's approval
2.0 Wall mounted urinal separator No 4.00 -
Disabled Toilet Set
3.0 Disabled WC Set -ARMITAGE SHANKS, Doc (Includes wc, cisten, Washbasin, Taps, No 1.00 -
grab rails Ref S6966(AC) close coupled left hand corner pack, WC pan, water
saving delay fill cistern with toilet roll holder, seat no cover with retaining
buffers, copper tails on TMV3 mixer tap or equivalent to Architect's approval
Water Closet (WC)
4.0 WC- Kohler - Panache⢠- Ref K-17640IN-S-00 - two-piece toilet with Quiet close No 20.00 -
seat cover or equivalent to Architect's approval
Wash hand basin
5.0 Wash hand basin - Kohler Self-Rimming Basin with single mixer hole - SERIFâ ¢ No 13.00 -
Ref K-2075IN-1-0 With matching bottle trap, cick drain COMPLEMENTARY
ref K-7120T-CPor equivalent to Arhcitect's approval
Wash hand Basin (wall hung)
6.0 Kohler Pedestal Basin BRIVE PLUSâ ¢ No 5.00 -
ref K-8700IN-1-0 . With matching bottle trap, cick drain COMPLEMENTARY
ref K-7120T-CP or equivalent to Arhcitect's approval
Wash Hand Basin Mixer
7.0 WashHand Basin Mixer - Kohler Single temperature pillar tap JULY â ¢ No 33.00 -
ref K-16312IN-4-BN ( Cold water only) or equivalent to Architect's approval
8.0 Stainless Steel double bowl sink complete with PVC bottle trap No 1.00 -
9.0 Stainless Steel single bowl sink complete with PVC bottle trap No 1.00 -
10.0 Kitchen Mixer - Kohler Single-control Kitchen Mixer KUMINâ ¢ No 2.00
ref K-99480T-4E-CP,( hot and Cold ) or equivalent to Architect's approval.
TOILET & BATHROOM ACCESSORIES
Supply and install the following as per Architect's specifications or similar
1: Any deviation from these specifications should be notified to the Architect for
Toilet paper holder
11.0 Toilet Paper holder - MEDICLINICS toilet paper dispenser, Ref PR2784CS Stainless No 20.00 -
steel AISI 304 satin finish, with 2 standard rolls, lock with standard Mediclinics
key or equivalent to Architect's approval
12.0 Spare toilet Paper holder No 20.00 -
13.0 Soap dispenser - MEDICLINICS Liquid soap dispenser, Ref DJ0037ACS AISI 304 No 14.00 -
stainless steel satin finish 1L capacity or equivalent to Architect's approval
14.0 Hand Dryer - MEDICLINICS Hand dryer Machflow, Ref M09ACS, AISI 304 stainless No 9.00 -
steel satin finish or equivalent to Architect's approval
15.0 Tower rail - Kohler towel ring TOOBIâ ¢ No 3.00
Ref K-5671-CP or equivalent to Architect's approval
16.0 Sanitary Bin - MEDICLINICS 12L Circular pedal operated bin, Ref PP1312CS. AISI No 4.00 -
430 steel with satin finish, or equivalent to Architect's approval
17.0 Sanitary bin - MEDICLINICS 65L Manually activated self closing lid, Ref PP0065CS. No 9.00 -
AISI 430 steel with satin finish, or equivalent to Architect's approval
18.0 Mirrors - MEDICLINICS Ref EP0350CS 5mm thick glass mirror with one piece frame No 17.00 -
700x500mm AISI 304 stainless steel, backed with medium density fibre
waterproof board that reinforces the glass, making it stronger . Or equivalent to
Architect's approval
3.17 BILL NO. 3.17 - METAL WORKS
ALL REMEASURABLE
The tenderer is referred to the MLC Preambles (Eleventh Edition) which is to be
read in conjunction with these bills of quantities.
Balustrade and Handrails should include for design, supply and installation of
Stainless steel parts including bends, corners, stop ends, ramps, knees and
fixation to floor. Rates should also include for all connection pieces (e.g. pins,
plates, bolts, nuts, shoes, brackets, spacers, rails, etc) required for fixing as per
SUPPLEMENTARY PREAMBLES
Architect General Note: Shop drawings to be made and co-ordination will be
needed prior to start installation works. All GMS Sizes & Fixing are as Per
Structural Engineer's 2. Drawing to be read in conjunction with of all relevant
Structural Engineer's Drawings. 3. Shop drawing to be submitted for approval
prior to manufacture. 4. All metal parts to be Hot Dip Galvanised, Primed &
Painted, Colour to architect approval. 5. Sample to be submitted for Arch
Architect Design Intent All metal parts / elements to be primed & painted
colour as per Architects final approval. 2. Sample for one whole steps with
recessed base plate & timber with all finishes to be submitted for Arch.
approval 3. Submit shop drawings for gms staircase for Arch. approval 4. All
metal parts / elements to as per S.Eng sizing & confirmation staircase support
5. Glazed Panel to balustrade to be clear tempered safety glass - Thickness,
Type of glass & fixation to be as per specialist recommendation & spec's and to
be fit for purpose & to comply with BS Standard.
Engineer Additional Note: Connection Details to be as Subcontractor's Shop
Drawings. All dimensions to be checked on site.
Tender Drawings
The Tenderer shall refer to the Architect's and Structural Engineer's list of
drawings accompanying these bills of quantities for tendering purposes.
The Tenderer is in addition advised to inspect the drawings issued with this
enquiry and to satisfy themselves as to the nature and requirements of the
Design Requirements
The Tenderer shall allow for all costs in their rates to satisfy the above
requirements as no extras shall be entertained due to the Tenderer failure to do
Technical Specifications
The Tenderer shall take note of the following technical specifications when
pricing the bills of quantities: Design calculation and shop drawings to be
provided for handrail to withstand a horizontal load of 1.5KN/m. Ditto for
fixation detail to concrete structure.
The successful Tenderer shall provide full shop drawings including all sections
and fixing details for approval by the Architect/Engineer prior to commencing
Prices shall include for everything necessary to complete the works and shall
include for all labour, materials, supervision, scaffolding, cartage, etc.,
necessary to effect a high standard of finished product.
Note 1: Sizes to be measured on site prior to manufacture. Note 2: Dimensions
need to be adjusted in relation to Concrete Stair. Note 3: It should be cyclone
resistant. Note 4: Prices should also include for connection pieces (e.g. pins,
plates, bolts, nuts, shoes, etc.) required for fixing. Note 5: Stainless Steel: 316
Note 6 : All stainless steel finish to be as per Architect later approval
STAINLESS STEEL BALUSTRADE
Supply and installation of Stainless Steel balustrade consisting of 60mm
diameter S/S pipe welded and connected to 50mm diameter main vertical S/S
by 15mm diameter S/S rod. Main vertical S/S hollow section to be fixed at
every 3 steps to S/S shoe made up of 115mm diameter S/S plate 6mm thick in
turn fixed to staircase steps by 3Nos. rawbolts of 5mm diameter. 4 Nos.
Intermediate S/S bars to be of 16mm diameter rods at 160mm spacing. rate
to include for all fixation and accessories, all as per Specialist specifications
and Architect drawing numbers NP/19/26/PD 12.0
1.0 Horizontal Stainless steel balustrade of overall clear height of 1,100mm high m 7.00 -
2.0 Raking Stainless steel balustrade of overall clear height of 1,100mm high m 58.00 -
STAINLESS STEEL HANDRAIL
Staircases 1 & 2
Supply and installation of Stainless Steel handrail of size 60mm diameter
fixed to 16mm stainless steel rod curved to shape and fixed to wall on a
70mm diameter steel cover plate 8mm thick including all fixation and
accessories, all as per Specialist specifications and Architect drawing
numbers NP/19/26/PD12.1
3.0 Horizontal Stainless Steel handrail of fixed at a height of 1,015mm m 46.00 -
4.0 Raking Stainless Steel handrail fixed at a height of 1,015mm m 74.00 -
NEW GMS METAL STAIRCASE WITH WOODEN STEPS
Design, Supply and Installation of GMS Metal Staircase overall size 6,300mm x
3,70mm consisting of 2 Nos. flights of 15 steps each 280mm wide and 2 No.
landings 900mm and 1,190mm wide each made up of the following: -Main
Stringer in GMS SHS of size 120x120x5mm as rakings and landings including
connections made of metal plates connected with M16 anchor bolts complete
with nuts and washers as per Structural Engineers detail 2·GMS 12mm thick
tapered plates fixed to Equal Angles of size 50x75x6mm,·40mm thick solid
balau with 10mm chambered edge and V- groove at nosing (3Nos) fixed to
GMS Metal Plate for landing and steps. All complete as per Structural
Engineer's Drawings Number Drawing No. 2020/BOB/O3-001, Drawing No.
2020/BOB/O2-002 and Specifications, Subject to Shop drawings, Samples and
Architect Approval.
5.0 Metal Steel Staircase from First to Second Floor No 1.00 -
STAINLESS STEEL ENTRANCE CANOPY
6.0 Design, supply and install metal canopy of overall size 8,299mm x 2,433mm No 1.00 -
consisting of 4 Nos. CHS 139mm diameter along X & Y Axes, 4 Nos. 88.9
diameter CHS purlins at 300mm C/C and 3 Nos. slanted galvanised CHS 88.9mm
diameter. Whole metal canopy to be connected to existing and new concrete
columns with MS galvanised plates 250x250x16mm and M16 anchor bolts
complete with nuts and washers as per Structural Engineer's drawing No.
Drawing No. 2020/BOB/O2-002 details 1&4. Connections as per details 2,3 & Y
shall be to a SHS 120 x 120 x 5 mm in turn fixed to a vertical SHS 120 x 120 x
5mm fixed to New reinforced column T1 with M16 anchor bolt 100mm deep at
every 300mm C/C complete with nuts and washers. Rate to include for the
galvanisation of all metal components, together with all fixations, metal plates,
bolts,nuts & washers, continuous fillet welding and paint finish complete all as
per structural Engineer's and Architects approval and as per Structural Engineer's
drawing number Drawing No. 2020/BOB/O2-001eted installation or part the
7.0 Design, Supply and fix glass panel topping to top of stainless steel canopy all as m² 19.00 -
per specialist details and to Architect's & Structural Engineers approval and as
per Architects drawing number NP/19/26/PD 10.0. Thickness of glass to be
provided by Specialist.
8.0 Design, Supply and fix PVC Nicoll gutters / downpipe elite gutter LG30 of brown m 14.00 -
colour RAL 8017 or equivalent complete with all necessary fixations all as per
specialist details and recommendation and to Architect's approval and as per
Architects drawing number NP/19/26/PD 10.0
9.0 Design, Supply and fix PVC square downpipe TD70 of brown colour RAL 8017 or m 3.00 -
equivalent inclusive of bends and shoes complete with all necessary fixations all
as per specialist details and recommendation and to Architect's approval and as
per Architects drawing number NP/19/26/PD 10.0
SUNDRY METAL WORKS
Cat Ladder to water tank
10.0 GMS Cat ladder overall size 640mm wide x 4500mm high comprising of Hot No 1.00 -
Dipped Galvanised GMS Hollow Section frame 30 x 50mm fixed to wall and
upstand by the necessary bolted fixations and metal plate, 14 Numbers
Galvanised Solid rung (R-B 25mmdia x 440mm LG) 5mm inside each side frame
complete with all required fittings and fixings, Cat ladder to be finished with
one coat primer and two coats epoxy paint (colour to architect's approval) all to
Architect's approval.
EXTERNAL GMS METAL STAIRCASE
Repair and reinstate existing emergency metal staircase consisting of 3 Nos
flights comprising of 37 Nos. checquered metal plate steps main stringers,
landings and metal balustrades. Rate shall include for the sand blasting of
the metal structure and painting with 99% zinc at rusted areas only as well as
the replacement of rusted bolts and nuts all as per Structural engineer's
approval and as per Structural engineer Drawing No. 2020/BOB/O1-002.
Contractor to carry out a survey of the existing metal staircase and draft a
report on the extent of the reinstatements works for the Structural
Engineer's comments and approval.
11.0 External Fire Staircase from Ground to Third Floor No 1.00 -
Repair and reinstate existing emergency metal staircase consisting of 8 Nos
flights comprising of checquered metal plate steps main stringers, landings
and metal balustrades. Rate shall include for the sand blasting of the metal
structure and painting with 99% zinc at rusted areas only as well as the
replacement of rusted bolts and nuts all as per Structural engineer's approval
and as per Structural engineer Drawing No. 2020/BOB/O1-002. Contractor to
carry out a survey of the existing metal staircase and draft a report on the
extent of the reinstatements works for the Structural Engineer's comments
13.0 External Fire Staircase from Third to Seventh Floor No 1.00 -
3.18 BILL NO. 3.18- FACADE FINISHES
Design, Supply & Install Curtain Walling, Aluminium Openings & Alucobond
The following aluminium openings shall be manufactured and installed to
Contractor's design. All openings shall be in approved aluminium extruded
sections to BS Standards to Contractor's design including laminated clear glass,
unless otherwise specified, thickness suitable to resist cyclonic wind speeds of
over 280 km/hr (see Note No. 3 below) including all necessary mullions,
transoms, beadings, glazing beads and the like. Sections shall be powder coated
finish to BS 6496, unless otherwise described, (sample colour to be submitted for
Architect's approval), coating to be 60 microns minimum thickness and
guaranteed for 10 years. Perimeter of opening to be pointed with matching
silicone mastic all round internally and externally, all joints to be made weather
tight with neoprene gaskets, etc. as specified by specialist and fixing within
concrete or reveals. Maximum gap of 3m is accepted between opening frame
and opening fixture. Openings to be fitted with all the ironmongery items
including approved handles, ceted installation or part thereof. If faults and
defects are upon verification discovered in the installation a list of these
shortcomings shall be given
Shop drawings and design calculations are to be submitted to Architect and
Engineer for approval, all aluminium shall be designed, fabricated and installed
in accordance with British Standard Code of Practice CP 118; thickness of glass
shall not be as per openings schedule but to Contractor's design to withstand
windloads as required by the Engineer in accordance with BS 6262.
Design of sections, fittings and general assembly to be to Architect's/Engineer's
approval and as per Architect's schedule of aluminium openings.
All exposed doors to have threshold to manufacturer's details and to architect's
approval.All exposed openings to have weather bar and water-proof gasket to
manufacturer's details and to architect's approval. All aluminium sections to
have an overflow and drip.
1. Structural Opening sizes to be measured on site prior to manufacturing.
Contractor to check all left hand and right hand opening configuration prior to
ordering any door frames and locks
2. All ironmongery to be supplied as per manufacturers specifications including
pull / lever handles, locks, latches, hinges, push bars and panic exit devices,
Dorma door closers, door stops, concealed restrictors, deadlocks. toilet
indicator bolts, escutcheons, lockcase, cylinder locks all as per Architect
3. All aluminium frames to be fixed to concrete unless otherwise specified. All
aluminium fixed to steel sections shall be done so using stainless steel fixings
onlyGlazing Glazing shall be designed to withstand wind pressure resulting from
the following:-(i) Design to CP3 Chapter V, Part 2, Code of Basic Data for the
Design of BuildingsWind Loads(ii) 3 seconds gust winds speeds of 75m per second
(280km per hr)(iii) S1 = 1.0(iv) S3 = 1.0(v) S2 = Terrain Category 1 Class A
4. All corner glazed panel to be treated with approved clear structural silicone
5. Thickness of glazing in BOQ is Indicative and shall be confirmed by
contractor. Contractor to specify thickness of glass quoted.
6. The Contractor shall submit complete detailed calculations to justify the
proposed profiles, fixing screws (diameters, length, spacing, etc.) and glazing
thickness accompanied with shop drawings for the approval of the Structural
7. The Contractor shall confirm in his tender that he will comply with all clauses
above and that he will make, at his own costs, all necessary changes to his
design / drawings which may be required in order to make his design / drawings
comply with the requirements of British Codes of Practice
8. The Contractor is to specify against each bill item the designed glass
thickness. No extra costs will be entertained for changes to glass thickness
following shop drawings approval
9. Contractor to submit certificate for any "Patented" sections/profile that is
being proposed for this tender
10. Typical frame section sample to be delivered with Tender
11. Contractor to provide sample to all ironmongery items prior to order.
12. All ironmongery to be as specified or similar approved.
13. Tenderer to take into consideration general notes on Architect's drawings
FLAT ALUMINIUM COMPOSITE PANELLING
1.0 Design, Supply and Install alucomat PVDF, silver mica KF-4834 (ACP 1) flat m² 382.00 -
aluminium composite panelling complete with all necessary mechanical fixing
fixtures & fittings and pointing with approved sealants as per manufacturers
specifications and to Architect's / Structural Engineers's approval.
2.0 Design, Supply and Install alucomat PVDF, dark grey mica KF-4835B (ACP 2) flat m² 239.00 -
aluminium composite panelling complete with all necessary mechanical fixing
fixtures & fittings and pointing with approved sealants as per manufacturers
specifications and to Architect's / Structural Engineers's approval.
BENT ALUMINIUM COMPOSITE PANELLING
3.0 Design, Supply and Install alucomat PVDF, silver mica KF-4834 (ACP 1) flat m² 392.00 -
aluminium composite panelling complete with all necessary mechanical fixing
fixtures & fittings and pointing with approved sealants as per manufacturers
specifications and to Architect's / Structural Engineers's approval.
GRANITE WALL CLADDING
4.0 Design, Supply and Install 20 mm non porous, Polished Granite Colombo m² 42.00 -
Guparama complete with all necessary mechanical fixing fixtures & fittings and
pointing with approved sealants as per manufacturers specifications and to
Architect's / Structural Engineer's approval.
3.19 BILL No. 3.19 - EXTERNAL WORKS
THE FOLLOWING TO STORMWATER DRAINAGE
ALL PROVISIONAL
Tenderers are to refer to longitudinal sections and ensure rates are inclusive of
all cut and fill operations to achieve the drain invert levels.
1.0 Excavate for and build storm water catch pit size 900mm x 900mm x 600mm No 2.00 -
deep internally, comprising of 150mm thick reinforced concrete wall on 150mm
concrete bottom slab 300mm diameter drain hole, dished in to form channel,
benching and rounding with concrete Grade 15/20 including reinforced concrete
edge beam with 25 x 25mm chamfer, 50mm thick blinding layer and 600mm x
600mm clear opening to receive grating cover with frame (e/m), rendered
internally 10mm thick with cement and sand slurry (1:3), compacted to 95% BS
Heavy compaction. Rate to include all necessary form work, reinforcement,
excavation, etc, all to Engineer's approval
Supply and fix hot dipped galvanised special pedestrian anti skid metal
grating (Heel proof). rate to include for anchoring in concrete, angle bar, etc
bedded in cement mortar (1:3) all to Architect's approval.
300mm wide m 10.00 -
3.20 BILL NO. 3.20 - BUILDER'S WORK IN CONNECTION WITH SERVICES
For Preambles see MLC Standard Preambles (1ST Edition)
Works incidental to air-conditioning, ventilation, plumbing and drainage, fire
fighting, electrical, music, TV, PABX, Data and Telephone Installations
concealed fixings
Coordination with other engineering installations and marking and setting out
positions, for all work, including cutting or forming all holes, mortices, chases,
building in or cutting and pinning brackets or the like and all associated builder's
work and making good of finishes, including all protective and decorative
Builder's work in connection with services including marking and setting out
positions, for all work, including cutting or forming all holes, mortices, chases,
building in or cutting and pinning brackets or the like and all associated builder's
work and making good of finishes, including all protective and decorative
1.0 Builder's works in connection with services for all works to Bank of Baroda Item 1.00 -
Building complete including demolition, repairs and new works
3.21 PROVISIONAL SUMS AND BUDGETARY ALLOWANCES
ALL REMEASURABLE
Unless otherwise described, the Preambles and full descriptions of the items in
the previous Sections are to apply equally to this Section.
Provisional Sums
1.0 Provide the sum of MUR 569,160.00 (Five Hundred and Sixty Nine Thousand One Item 1.00 5,69,160.00 5,69,160.00
Hundred and Sixty Rupees Only) for Shopfittings
2.0 Provide the sum of MUR 100,000.00 (One Hundred Thousand Rupees Only) for 2 Item 1.00 1,00,000.00 1,00,000.00
Nos. Metal Gates
3.0 Provide the sum of MUR 250,000.00 (Two Hundred and Fifty Thousand Rupees Item 1.00 2,50,000.00 2,50,000.00
Only) for Signage
4.0 Provide the sum of MUR 1,500,000.00 (One Million Five Hundred Thousand Item 1.00 15,00,000.00 15,00,000.00
Rupees Only) for Temporary works for bank operations during construction
TOTAL OF BILL NO. 03 C/F TO MAIN SUMMARY 24,19,160
NBCC (India) Limited
Office of ED (CPG), NBCC Bhawan, Lodhi Road, New Delhi -110003 (INDIA)
Quoting Sheet for the Bidder (Bill No. 04)
NIT No.: NBCC/CPG/BOB/MAURITIUS/2021/295
Name of Work: Renovation of Bank of Baroda Building at Port Louis, Mauritius
Mechanical, Electrical & Plumbing Works BoQ
Name of The Bidder
ITEM DESCRIPTION UNIT QUANTITY Rate Amount in MUR
Bill No. PG: Preliminaries & General Allowances
Preliminaries and General
This bill of quantities has been measured in accordance with the Royal Institution of
Chartered Surveyors, New Rules of Measurement: Detailed of measurement for Building
Works (hereafter referred to as NRM2), save and except where stipulated herein to the
contrary; thus forming a bespoke schedule of rates.
Electrical Services
1 Primary Equipment
Primary equipment is defined as plant or equipment from which a system originates, e.g.
main switch board, main control box and the like and are measured in numbers.
2 Terminal equipment and Fittings
Terminal equipment and fittings are defined as any item to which a system is distributed
to e.g. luminaires, switches, actuators and the like and are measured in numbers.
3 Cable containment
Generally, all cable containment to be measured inclusive of all fittings, i.e joint boxes,
connectors, flanges, bends, tees, junctions, reducers, spihots, fire barriers and the like and
are measured in meters.
Measured in meters.
6 Cable terminations and joints
Includes all pots, seals, glands, lugs, connector blocks and shrouds and are measured in
7 Final Circuits
Includes all containment not measured separately, junction boxes, terminations, pots,
seals, glands, lug, connector blocks and shrouds. Includes fixing containment and cables
in chases, surface or suspended from soffits and are measured in numbers.
Generally, all busbars to be measured inclusive of all fittings, i.e. connectors, flanges,
bends, tees, sets, junctions, feeder units, tap-off boxes, fire barriers and the like and are
measured in meters.
Includes all connectors, joints, test clamps and are measured in meters.
12 Electrodes, earth rods, air terminations, termination bars
Measured in numbers.
13 Fire Stopping and other associated fire protection work
Measured in numbers with respect to size of opening to be stopped, size of service
stopping to be installed around, depth and fire rating.
14 Identification
Measured as an item and deemed to include plates, discs, labels, tapes, symbols, bands,
charts or diagrams as specified.
Measured as an item and deemed to include all static tests.
16 Commissioning
Measured as an item.
17 System Validation
Measured as an item.
18 Operation and Maintenance Manuals
Measured as in item.
19 Drawings Preparation
Measured as an item and deemed to include installation, co-ordination, as installed and
record drawings.
Measured as an item.
21 Loose Ancillaries
Measured as an item and include keys, tools, spares, chemicals.
22 Post Practical Completion Services
Measured as an item and include maintenance, adjustments, servicing and the like.
Mechanical Services
Item of Work and its method of measurement.
1 Primary Equipment
Primary equipment is defined as plant or equipment from which a system originates, eg.
Boiler, main storage tank, air handling unit, fan and the like and measured in numbers.
2 Terminal equipment and fittings
Terminal equipment and fittings are defined as any item to which a system is distributed
to, e.g. heat emitters, grilles, fan coil units and the like and are measured in numbers.
Generally, all pipework to be measured inclusive of all fittings, i.e unions, connectors,
flanges, bends, tees, junctions, reducers, test points, bosses, sockets, tappings and the
like. All fittings are deemed to be included.
5 Pipe Ancillaries
Valves, strainers, expansion bellows, anchors, guides, and rollers, gullies, outlets,
turndishes, traps, gends, tees, junctions, reducers, spigots, test holes and the likes and
are measured in numbers.
9 Insulation and Fire Protection
Generally, all insulations to pipework to be measured inclusive of all fittings, i.e. unions,
connectors, flanges, bends, tees, sets, junctions, reducers, test points, bosses, sockets,
tappings and the like and are measured in meters.
11 Insulation and Fire Protection to pipe ancillaries
Valves, strainers, expansion bellows, guillies, outlets, turndishes, traps, pipe sleeves and
the like and are measured in numbers.
12 Insulation and Fire Protection to Ventilation Ducts
Generally, all insulations to ductwork to be measured inclusive of all fittings i.e.
connectors, flanges, bends, tees sets, junctions, reducers, spigots, test holes and the like,
on the external girth of the duct to be insulated and are measured in m².
14 Insulation and fire protection to equipment
Insulation to equipment measured separately where not given in the description of the
items to which it relates and are measured in m².
15 Fire Stopping
Measured in numbers with respect to size of opening to be stopped, size of service
stopping to be installed around, depth and fire rating.
16 Identification
Measured as an item and deemed to include plates, discs, labels, tapes, symbols, bands,
charts or diagrams as specified.
Measured as an item and deemed to include chemical treatment, purging, sterilisation,
pressure testing and other static and pre functional tests.
18 Commissioning
Measured as an item and deemed to include all final balancing, calibration and setting to
19 System Validation
Measured as an item.
20 Operation and Maintenance Manuals
Measured as an item.
21 Drawing Preparation
Measured as an item and deemed to include installation, co-ordination, as installed and
record drawings.
Measured as an item.
23 Loose Ancillaries
Measured as an item and deemed to include keys, tools, spares, chemicals and the like.
24 Post-completion services
Measured as an item and deemed to include maintenance, adjustments, servicing and
Drainage Above Ground
Measured in meters over all fittings.
2 Pipework Ancillaries
Ancillaries include valves, non-return flaps, traps and the like and are measured in
3 Pipe sleeves through walls, floors and ceiling
Measured in numbers.
6 Fittings and Accessories
Measured in numbers.
7 Marking, position of and leaving or forming all holes, mortices, chases and the like
required in the structure
Measured as an item.
8 Identification
Measured as an item and deemed to include plates, discs, labels, tapes, symbols, bands,
charts or diagrams as specified.
9 Testing and Commissioning
Measured as an item.
10 Preparing Drawings
Measured as an item and deemed to include installation, co-ordination, as installed and
record drawings.
11 Operation & Maintenance Manual
Measured as an item.
Drainage Below Ground
Drain runs are measured in meters from external face of manhole to external face of
manhole or accessory.
Accessories are measured in numbers and include gullies, traps, inspection shoes fresh
air inlets, non-return flaps, valves, rodding eyes and the like and are deemed to include
gratings, covers, frames, baskets, filters and other integral and or associated fittings.
Measured in numbers.
Septic tanks, other tanks and pits
Measured in numbers.
17 Testing and Commissioning
Measured as an item. Provision of water and other supplies is deemed to be included.
Provision of test certificates is deemed to be included.
The contractor is referred to the Drawing Schedule A11 for the drawings and their
revision or issue references used in the preparation of this document.
Where the following abbreviations have been used in this Bill of Quantities, they shall
have the meanings as indicated below:
kg — kilogramme
kN — kilonewton
m — linear metre
m² — square metre
m3 — cubic metre
mm — millimetre
mm2 — square millimetre
mm3 — cubic millimetre
MPa — Mega Pascal
DN — Nominal Diameter
BTU — British Themal Units
BQ — bill of quantities
BQBS — BQ breakdown structure
RIBA — Royal Institute of British Architects
RICS — Royal Institution of Chartered Surveyors
WBS — work breakdown structure
WP — Waterproof
GMS — Galvanised Mild Steel
VCD — Volume Control Damper
This bill of quantities is constructed to cover all obligations and requirements of the
General Conditions of Contract, Project Specification, A64 General Conditions and any
liabilities not covered elsewhere.
Sub-Contractors Preliminaries & General Allowances
Allow all your preliminaries & General Allowances required as detailed in Specification
A64 and broken down as follows:
1.2.1 MANAGEMENT AND STAFF
PG.1 Project Specific Management and Staff item 1 -
PG.2 Staff Travel item 1 -
1.2.2 SITE ESTABLISHMENT
PG.3 Site Storage & Offices item 1 -
PG.4 Temporary Works in connection with site establishment item 1 -
PG.5 Furniture and Equipment item 1 -
PG.6 IT Systems item 1 -
PG.7 Consumables & Sundries item 1 -
1.2.3 TEMPORARY SERVICES
PG.8 Temporary Water, electricity and communication supply item 1 -
1.2.6 CONTROL AND PROTECTION
PG.9 Survey, inspection and monitoring item 1 -
PG.10 Setting out item 1 -
PG.11 Protection of Works item 1 -
PG.12 Samples item 1 -
1.2.7 MECHANICAL PLANT
PG.13 Tools and measuring instruments item 1 -
1.2.8 TEMPORARY WORKS
PG.14 Access Scafolding item 1 -
PG.15 Temporary Works item 1 -
1.2.9 SITE RECORDS
PG.16 Site Records item 1 -
1.2.10 COMPLETION AND POST COMPLETION REQUIREMENT
PG.17 Testing & Commissioning Plan item 1 -
PG.18 Handover item 1 -
1.2.11 CLEANING
PG.19 Site Tidy item 1 -
1.2.12 FEES & CHARGES
PG.20 Charges item 1 -
1.2.14 INSURANCES
PG.21 Insurances item 1 -
Bill No. C10: Removal of Complete Systems
REMOVAL OF COMPLETE SYSTEMS (C10)
Survey the existing building installations and provide for removal of the existing systems
as per specification C10 and broken down as follows:
1. DISMANTLING OF EXISTING MEP SYSTEMS AND CARTING AWAY
Dismantle and Cart-Away
C10.1 Ground Floor Systems nr 1 -
C10.2 First Floor Systems nr 1 -
C10.3 Second Floor Systems nr 1 -
C10.4 Third Floor Systems nr 1 -
C10.5 Fourth Floor Systems nr 1 -
C10.6 Roof Systems nr 1 -
PORTABLE FIRE EXTINGUISHERS (N10)
Supply and install portable fire extinguishers as described in specification N10, tender
drawings and broken down as follows:
1. PRIMARY EQUIPMENT
C10.8 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 2 -
C10.9 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 2 -
16. IDENTIFICATION
C10.10 Fire Extinguisher Signage nr 2 -
C10.11 No Smoking Sign nr 2 -
1. PRIMARY EQUIPMENT
C10.12 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 1 -
C10.13 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 1 -
16. IDENTIFICATION
C10.14 Fire Extinguisher Signage nr 1 -
C10.15 No Smoking Sign nr 1 -
1. PRIMARY EQUIPMENT
C10.16 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 1 -
C10.17 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 1 -
16. IDENTIFICATION
C10.18 Fire Extinguisher Signage nr 1 -
C10.19 No Smoking Sign nr 1 -
1. PRIMARY EQUIPMENT
C10.20 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 1 -
C10.21 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 1 -
16. IDENTIFICATION
C10.22 Fire Extinguisher Signage nr 1 -
C10.23 No Smoking Sign nr 1 -
1. PRIMARY EQUIPMENT
C10.24 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 1 -
C10.25 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 1 -
16. IDENTIFICATION
C10.26 Fire Extinguisher Signage nr 1 -
C10.27 No Smoking Sign nr 1 -
FIFTH FLOOR TO SEVENTH FLOOR
1. PRIMARY EQUIPMENT
C10.28 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 3 -
C10.29 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 3 -
16. IDENTIFICATION
C10.30 Fire Extinguisher Signage nr 3 -
C10.31 No Smoking Sign nr 3 -
1. PRIMARY EQUIPMENT
C10.32 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 1 -
C10.33 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 1 -
16. IDENTIFICATION
C10.34 Fire Extinguisher Signage nr 1 -
C10.35 No Smoking Sign nr 1 -
SANITARY APPLIANCES / FITTINGS (N13)
Take delivery and install appliances/fittings as described in specification N13, tender
drawings and broken down as follows:
4. FIXTURES, FITTINGS OR EQUIPMENT SUPPLIED BY THE EMPLOYER
C10.37 Water Closet (W.C. Pan connector and Cistern) nr 19 -
C10.38 Urinal (c/w Tap and waste connection) nr 3 -
C10.39 Wash Hand Basin (c/w Mixer Tap and Waste Connection) nr 21 -
C10.40 Kitchen sink (c/w Mixer Tap and Waste Connection) nr 2 -
FOUL DRAINAGE ABOVE GROUND (R11)
Supply and install Drainage above Ground as per specification R11, tender drawings and
broken down as follows:
Waste & Sewer Pipes c/w Fittings & Supports
C10.42 uPVC PN6 DN50 m 53 -
C10.43 uPVC PN6 DN75 m 80 -
C10.44 uPVC PN6 DN110 m 85 -
C10.45 uPVC PN6 DN160 m 168 -
Waste & Sewer Pipes c/w Fittings, 35mm thick acoustic insulation & Supports
C10.46 uPVC PN6 DN50 m 55 -
2. PIPEWORK ANCILLARIES
Waste & Sewer Pipes
C10.47 Chrome Plated Bottle Trap - Dia 50mm nr 22 -
C10.48 Extendable pan connector & fin Dia 105; length: 600mm nr 19 -
C10.49 uPVC DN50 U-Trap for Urinal nr 3 -
FD-01-Floor Drain in PVC-100mm x 100mm of Make Kessel or Equivalent with Flanged
Type Vertical Outlet Dia 50mm, Trap Seal and Stainless Steel 304 Grating with Lock and
C10.50 Lift Locking System nr 20 -
C10.51 PVC DN75 Vent cowl complete with insect screen nr 2 -
C10.52 PVC DN110 Vent cowl complete with insect screen nr 2 -
C10.53 PVC DN160 Vent cowl complete with insect screen nr 6 -
C10.54 uPVC DN50 Puddle Flange nr 20 -
C10.55 uPVC DN50 Rodding Eye nr 12 -
C10.56 uPVC DN75 Rodding Eye nr 6 -
C10.57 uPVC DN110 Rodding Eye nr 17 -
C10.58 uPVC DN160 Rodding Eye nr 18 -
C10.59 uPVC DN50 End Cap nr 22 -
C10.60 uPVC DN110 End Cap nr 19 -
C10.61 uPVC DN160 End Cap nr 6 -
DRAINAGE BELOW GROUND (R12)
Supply and install Drainage below Ground as per specification R12 and broken down as
FOUL DRAINAGE BELOW GROUND
C10.63 uPVC SN8 DN110 RRJ Sewer Pipes & Fittings m 10 -
C10.64 uPVC SN8 DN160 RRJ Sewer Pipes & Fittings m 48 -
C10.65 Gully Trap nr 4 -
COLD WATER (S10)
Supply and install cold water distribution system as described in specification S10, tender
drawings and broken down as follows:
1. PRIMARY EQUIPMENT
C10.67 Buried HDPE PN16 Dia 40mm Pipe m 28 -
Potable Water Plantroom Pipework c/w Fittings & Supports (@Ground Floor)
C10.68 PPR PN16 Dia 50mm Pipe m 10 -
Potable Water Plantroom Ancillaries (@Ground Floor)
C10.70 DN25 Heavy Duty Float Valve nr 2 -
C10.71 GMS 1 1/2" HDG Vortex Inhibitor nr 1 -
C10.72 DN50 Foot Valve nr 1 -
C10.73 DN40 Expansion Bellow nr 1 -
C10.74 DN50 Y-Strainer nr 1 -
C10.75 DN50 Quarter-Turn Isolating Valve nr 9 -
C10.76 DN40 Solenoid Valve nr 1 -
C10.77 DN40 Water Meter Pulse Type nr 1 -
C10.78 GMS 3" HDG Puddle Flange Flanged-End 800mm Long nr 1 -
Potable Water Plantroom Pipework c/w Fittings & Supports (@Roof)
C10.79 PPR PN16 Dia 50mm Pipe m 10 -
C10.80 uPVC PN10 Dia 75mm pipe (overflow pipe) m 7 -
Potable Water Plantroom Ancillaries (@Roof)
C10.81 DN40 Water Meter Pulse Type nr 2 -
C10.82 DN40 Heavy Duty Float Valve nr 1 -
C10.83 DN40 Expansion Bellow nr 1 -
C10.84 DN40 Y-Strainer nr 1 -
C10.85 DN40 Quarter-Turn Isolating Valve nr 9 -
C10.86 GMS 1-1/2" HDG Puddle Flange Flanged-End 800mm Long nr 2 -
C10.87 uPVC Puddle Flange Dia 50mm nr 4 -
C10.88 PPR Funnel Dia 75mm nr 1 -
2. TERMINAL EQUIPMENT & FITTINGS
Potable Water Transfer Pumpset (@Ground Floor)
Pump Set operating on duty + stand-by + alternate mode c/w VSD, Control Panel,
Valves, Manifold, Base, Pressure Switches, Pressure Vessel, Manometers, Dry Run
Protection, Fittings, Isolating Valves, Check Valves, Anti-Vibration Mounts and
C10.89 Nominal Capacity: 4.3 m3/h @ 8 bar each Set 1 -
Electrical wiring from pumps control panel to main electrical panel in plantroom inclusive
C10.90 of all associated cable trays and fixings item 1 -
Water level monitoring system for domestic water tank including submersible level
C10.91 transmitters, tank level display fixed in plantroom, conduits and wiring item 1 -
Potable Water Booster Pumpset (@Roof)
Pump Set operating on duty + stand-by + alternate mode c/w VSD, Control Panel,
Valves, Manifold, Base, Pressure Switches, Pressure Vessel, Manometers, Dry Run
Protection, Fittings, Isolating Valves, Check Valves, Anti-Vibration Mounts and
C10.92 Nominal Capacity: 3.7 m3/h @ 2.5 bar each Set 1 -
Electrical wiring from pumps control panel to main electrical panel in plantroom inclusive
C10.93 of all associated cable trays and fixings item 1 -
Water level monitoring system for domestic water tank including submersible level
C10.94 transmitters, tank level display fixed in plantroom, conduits and wiring item 1 -
Pipes c/w Fittings, Supports & Sleeves
C10.95 Buried HDPE PN16 Dia 32mm Pipe m 28 -
C10.96 PPR PN16 Dia 50mm m 45 -
C10.97 PPR PN16 Dia 40mm m 13 -
C10.98 PPR PN16 Dia 32mm m 80 -
C10.99 PPR PN16 Dia 25mm m 20 -
C10.100 PPR PN16 Dia 20mm m 160 -
5. PIPEWORK ANCILLARIES
C10.101 DN40 Quarter-Turn Isolating Valve nr 1 -
C10.102 DN32 Quarter-Turn Isolating Valve nr 6 -
C10.103 DN25 Quarter-Turn Isolating Valve nr 2 -
C10.104 DN20 Quarter-Turn Isolating Valve nr 8 -
C10.105 DN40 Swing Type Check Valve nr 1 -
C10.106 DN40 Automatic Air Release Valve nr 1 -
C10.107 DN32 Automatic Air Release Valve nr 1 -
C10.108 DN25 Automatic Air Release Valve nr 3 -
C10.109 DN25 Pressure Regulating Valve c/w Glycerine Type Manometer nr 3 -
C10.110 DN20 Pressure Regulating Valve c/w Glycerine Type Manometer nr 5 -
C10.111 DN15 Chrome Angle Valve nr 45 -
C10.112 304 SS Braided Hose 3 / EPDM hose - 1/2" BSP - 600 mm nr 45 -
C10.113 Bib Tap 3/4" - Lever of Lockable Type nr 1 -
Acrylic based latex paint; Colour: White. For exposed PRR cold water pipes and PVC
C10.114 waste and sewage pipes on roof Item 1 -
FIRE HOSE REELS (S60)
Supply and install fire hose reels as described in specification S60, tender drawings and
broken down as follows:
2. TERMINAL EQUIPMENT and FITTINGS
C10.116 Fire Hose Reel (Automatic Swing) nr 10 -
C10.117 Fire Hose Reel Cabinet (wall-mounted) nr 10 -
C10.118 GMS Sch40 Ø1" c/w fittings and supports m 143 -
C10.119 GMS Sch40 Ø2" c/w fittings and supports m 61 -
5. PIPE ANCILLIARIES
C10.120 PN25 DN25 Isolating valve nr 20 -
C10.121 PN25 DN25 Pressure Reducing Valve nr 10 -
C10.122 Pressure Gauge (0 - 16 bar) nr 10 -
C10.123 Automatic Air Release Valve DN25 nr 1 -
C10.124 Painting of GMS pipe and fittings Item 1 -
16. IDENTIFICATION
C10.125 Fire Hose Reel Signage nr 10 -
C10.126 Assembly Point Signage nr 2 -
DRY RISERS (S61)
Supply and install wet risers as described in specification S61, tender drawings and
broken down as follows:
2. TERMINAL EQUIPMENT and FITTINGS
C10.128 2-way Breeching Inlet Flanged 100mm nr 1 -
C10.129 2-way Breeching Inlet Cabinet nr 1 -
C10.130 DN65 Oblique Threaded Landing Valve nr 8 -
C10.131 DN65 Type 3 Fire Hose; Length: 30m nr 8 -
C10.132 GMS Sch40 Ø2-1/2" c/w fittings and supports m 10 -
C10.133 GMS Sch40 Ø4" c/w fittings and supports m 42 -
5. PIPE ANCILLIARIES
C10.134 Automatic Air Release Valve DN65 nr 1 -
C10.135 Painting of GMS pipe and fittings Item 1 -
16. IDENTIFICATION
C10.136 Dry Riser Signage nr 8 -
T62 - VRF Air Conditioning
Supply, install, test & commission VRF Air Conditioning as per specification T62, tender
drawings, and broken down as follows:
1. PRIMARY EQUIPMENT
VRF Outdoor Unit Cooling only type -
C10.138 Nominal Capacity: 56kWc, Connection Ratio: 100% nr 2 -
VRF Outdoor Unit Cooling only type
C10.139 Nominal Capacity: 84kWc, Connection Ratio: 100% nr 1 -
VRF Outdoor Unit Cooling only type
C10.140 Nominal Capacity: 95.2kWc, Connection Ratio: 100% nr 1 -
C10.141 Central Controller for VRF System set 4 -
C10.142 Power cable between isolator and outdoor unit c/w supports and accessories item 4 -
2. TERMINAL EQUIPMENT AND FITTINGS
4WC: 4-Way Cassette Type Indoor Unit
C10.143 Nominal Capacity: 3.6 kWc nr 27 -
4WC: 4-Way Cassette Type Indoor Unit
C10.144 Nominal Capacity: 5.6 kWc nr 12 -
4WC: 4-Way Cassette Type Indoor Unit
C10.145 Nominal Capacity: 7.1 kWc nr 8 -
CCD: Medium Static Ceiling Concealed Ducted Unit
C10.146 Nominal Capacity: 7.1 kWc nr 3 -
C10.147 Wired Controller complete with PVC sleeve, cabling and accessories nr 3 -
C10.148 Wireless Remote Controller c/w wall supports nr 44 -
C10.149 Power cable between isolator and indoor unit c/w supports and accessories item 50 -
Refrigerant Pipe and Cable Tray c/w all fittings & Supports
Note: All outdoor exposed refrigerant pipes to be coated with anti UV paint .
Note: All outdoor refrigerant pipes at third floor terrace to run inside GMS cable tray c/w
Note: All indoor refrigerant pipes to run inside GMS cable tray.
Outdoor Refrigerant Pipes
C10.150 Liquid Refrigerant Pipe m 60 -
C10.151 Gas Refrigerant Pipe m 60 -
Indoor Refrigerant Pipes
C10.152 Liquid Refrigerant Pipe m 384 -
C10.153 Gas Refrigerant Pipe m 384 -
Outdoor Cable Tray
C10.154 GMS Cable Tray c/w cover - 200mm x 50mm m 60 -
Indoor Cable Tray
C10.155 GMS Cable Tray - 200mm x 50mm m 384 -
Condensate Pipes c/w all fittings, Supports & traps
C10.156 uPVC PN6 DN25 - Fixed on ceiling soffit m 119 -
C10.157 uPVC PN6 DN32 - Fixed on ceiling soffit m 57 -
C10.158 uPVC PN6 DN40 - Fixed on ceiling soffit m 80 -
C10.159 uPVC PN6 DN50 - Fixed on ceiling soffit m 15 -
uPVC PN6 DN75 - Fixed on ceiling soffit & connect to condensate drain pipe stack to run
C10.160 outside on surface of building m 52 -
C10.161 uPVC PN6 DN40 - condensate drain pipe stack to run outside on surface of building m 10 -
C10.162 uPVC PN6 DN110 - condensate drain pipe stack to run outside on surface of building m 60 -
5. PIPE ANCILLIARIES
C10.163 uPVC PN6 DN50 Sleeve nr 10 -
C10.164 uPVC PN6 DN110 Sleeve nr 10 -
C10.165 Y-Branch nr 54 -
6. VENTILATION DUCTS
For air conditioning
GMS Duct 350x250mm including necessory fittings, connection canvas, accessories and
C10.166 supports c/w 19mm thick closed cell rubber internal insulation and aluminum cladding m 67 -
GMS Duct 200mm including necessory fittings, connection canvas, accessories and
C10.167 supports c/w 19mm thick closed cell rubber internal insulation and aluminum cladding m 22 -
C10.168 Insulated flexible Duct Aluminium DN200 c/w accessories and supports nr 24 -
8. AIR DISTRIBUTION ANCILLARIES
SAD-01: Anodised Aluminum 4 direction Supply Air Diffuser for False Ceiling
C10.169 300x300mm, Free Area 0.0435 m2 nr 12 -
RAG-01: Anodised Aluminum 4 direction Return Air Grille for False Ceiling 300x300mm,
C10.170 Free Area 0.0435 m2 nr 12 -
C10.171 VCD: Volume Control Damper DN 200 nr 24 -
Associated Plenum Boxes for supply
C10.172 Insulated Plenum box for Medium Static Ceiling Concealed Ducted Unit CCD nr 12 -
Associated Plenum Boxes for return
C10.173 Insulated Plenum box for Medium Static Ceiling Concealed Ducted Unit CCD nr 12 -
Closed Cell NBR Foam Sleeve:
C10.174 13mm thick for condensate pipework m 393 -
C10.175 19mm thick for liquid refrigerant pipework m 384 -
C10.176 19mm thick for gas refrigerant pipework m 384 -
U10 - General Ventilation
Supply, install, test & commission general ventilation system described in specification
U10, tender drawings and broken down as follows:
1. PRIMARY EQUIPMENT
C10.178 FAF-01 Centrifugal Fresh Air fan 750 m3/h at 400 Pa External Static Pressure nr 1 -
C10.179 FAF-02 Centrifugal Fresh Air fan 488 m3/h at 340 Pa External Static Pressure nr 1 -
C10.180 FAF-03 Centrifugal Fresh Air fan 522 m3/h at 315 Pa External Static Pressure nr 1 -
C10.181 FAF-04 Centrifugal Fresh Air fan 472 m3/h at 325 Pa External Static Pressure nr 1 -
C10.182 FAF-05 Centrifugal Fresh Air fan 215 m3/h at 400 Pa External Static Pressure nr 1 -
C10.183 FAF-06 Centrifugal Fresh Air fan 800 m3/h at 400 Pa External Static Pressure nr 1 -
C10.184 FAF-07 Centrifugal Fresh Air fan 514 m3/h at 320 Pa External Static Pressure nr 1 -
C10.185 FAF-08 Centrifugal Fresh Air fan 400 m3/h at 350 Pa External Static Pressure nr 1 -
C10.186 Wall Mounted Extract Fan 1170 m3/h at 50 Pa External Static Pressure nr 1 -
Power cable between fresh air fan FAF-01 and WP isolator switch c/w supports and
C10.187 accessories nr 1 -
Power cable between fresh air fan FAF-02 and WP isolator switch c/w supports and
C10.188 accessories nr 1 -
Power cable between fresh air fan FAF-03 and WP isolator switch c/w supports and
C10.189 accessories nr 1 -
Power cable between fresh air fan FAF-04 and WP isolator switch c/w supports and
C10.190 accessories nr 1 -
Power cable between fresh air fan FAF-05 and WP isolator switch c/w supports and
C10.191 accessories nr 1 -
Power cable between fresh air fan FAF-06 and WP isolator switch c/w supports and
C10.192 accessories nr 1 -
Power cable between fresh air fan FAF-07 and WP isolator switch c/w supports and
C10.193 accessories nr 1 -
Power cable between fresh air fan FAF-08 and WP isolator switch c/w supports and
C10.194 accessories nr 1 -
Power cable between wall-mounted extract fan and WP isolator switch c/w supports and
C10.195 accessories nr 1 -
2. VENTILATION DUCT
C10.196 GMS Duct DN110 c/w fittings, accessories & supports m 165 -
C10.197 GMS Duct DN150 c/w fittings, accessories & supports m 50 -
C10.198 GMS Duct DN200 c/w fittings, accessories & supports m 60 -
C10.199 GMS Duct DN250 c/w fittings, accessories & supports m 70 -
C10.200 GMS Duct DN300 c/w fittings, accessories & supports m 5 -
C10.201 Uninsulated Flexible Aluminium Duct DN110 c/w accessories and supports m 40 -
3. DUCT ANCILLARIES
C10.202 VCD: Volume Control Damper DN110 nr 66 -
C10.203 VCD: Volume Control Damper DN150 nr 3 -
C10.204 VCD: Volume Control Damper DN200 nr 2 -
Removable Air Filter 305x305mm, 800 m3/h, 101Pa pressure drop, 3.72 m2 filter surface
C10.205 area, at inlet of Fresh Air Fan - Grade F6 c/w filter support box and other accessories nr 8 -
C10.206 VC: GMS Vent Cowl c/w insect screen nr 1 -
C10.207 GMS Plenum Box 1000x300x200mm nr 1 -
C10.208 GMS Plenum Box 800x300x200mm nr 1 -
C10.209 GMS Plenum Box 600x300x200mm nr 5 -
C10.210 GMS Plenum Box 600x200x200mm nr 1 -
C10.211 GMS Plenum Box 300x300x200mm nr 8 -
4.FRESH AIR INTAKE ANCILLARIES
External Fresh Air Weather Louver Grille c/w insect screen 1000x300mm, Free Area 0.13
External Fresh Air Weather Louver Grille c/w insect screen 800x300mm, Free Area 0.10
External Fresh Air Weather Louver Grille c/w insect screen 600x300mm, Free Area 0.08
External Fresh Air Weather Louver Grille c/w insect screen 600x200mm, Free Area 0.08
C10.216 Extruded Anodised Aluminum Door Grillle 300x300mm, Free Area 0.05 m2 nr 1 -
C10.217 Extruded Anodised Aluminum Door Grillle 300x150mm, Free Area 0.02 m2 nr 1 -
U11 - Toilet Ventilation
Supply, install, test & commission toilet ventilation system described in specification U11,
tender drawings and broken down as follows:
1. PRIMARY EQUIPMENT
EAF-01 Centrifugal Extract Air fan 720 m3/h at 250 Pa External Static Pressure and
C10.219 associated accessories nr 2 -
EAF-03 Centrifugal Extract Air fan 540 m3/h at 200 Pa External Static Pressure and
C10.220 associated accessories nr 1 -
WMEAF-01, WMEAF-02, WMEAF-03, WMEAF-04, WMEAF-05, WMEAF-06 Wall Mounted
C10.221 Extract Fan 90 m3/h nr 6 -
Power cable between WMEAF 01-06 extract air fans and WP isolator switch c/w supports
C10.222 and accessories item 6 -
Power cable between EAF-01 and EAF-02 extract air fans and WP isolator switch c/w
C10.223 supports and accessories item 2 -
Power cable between EAF-03 extract air fan and WP isolator switch c/w supports and
C10.224 accessories item 1 -
C10.225 Provide delay timer for cut-off of all extract fans nr 9 -
C10.226 Connection of extract air fans to light switch and delay timer item 9 -
2. VENTILATION DUCT
C10.227 GMS Duct DN125 c/w fittings, accessories & supports m 28 -
C10.228 GMS Duct DN150 c/w fittings, accessories & supports m 8 -
C10.229 GMS Duct DN200 c/w fittings, accessories & supports m 2 -
C10.230 GMS Duct DN250 c/w fittings, accessories & supports m 2 -
C10.231 GMS Duct DN300 c/w fittings, accessories & supports m 15 -
C10.232 Uninsulated Flexible Aluminium Duct DN125 c/w accessories and supports item 32 -
3. DUCT ANCILLARIES
C10.233 VCD: Volume Control Damper DN125 nr 21 -
C10.234 GMS Plenum Box 800x300x200mm nr 2 -
C10.235 GMS Plenum Box 700x300x200mm nr 1 -
C10.236 Extract Disc Valve for False Ceiling DN125 nr 21 -
4. Extract Air Ancillaries
External Extract Air Weather Louver Grille c/w insect screen 800x300mm, Free Area 0.10
External Extract Air Weather Louver Grille c/w insect screen 700x300mm, Free Area 0.08
4. Fresh Air Ancillaries
C10.239 Extruded Anodised Aluminum Door Grillle 600x300mm, Free Area 0.10 m2 nr 2 -
C10.240 Extruded Anodised Aluminum Door Grillle 500x300mm, Free Area 0.09 m2 nr 2 -
C10.241 Extruded Anodised Aluminum Door Grillle 300x300mm, Free Area 0.05 m2 nr 3 -
C10.242 Extruded Anodised Aluminum Door Grillle 300x150mm, Free Area 0.02 m2 nr 4 -
U60 - Air Conditioning Units
Supply, install, test & commission air conditioning units as per specification U60, tender
drawings, and broken down as follows:
1. PRIMARY EQUIPMENT
WMIU - Wall Mounted Inverter Split Type Air Conditioning c/w visual and audible alarm
in the event of temperature alarm
C10.244 Nominal Capacity: 5.3 kWc nr 6 -
C10.245 Power cable between outdoor unit and indoor unit c/w supports and accessories item 6 -
2. TERMINAL EQUIPMENT AND FITTINGS
U60.3 Wireless Remote controller c/w support to be fixed on wall nr 6 -
Control Panel with switchgears for Server Room Split Wall Mounted Units to operate
U60.4 diagonally in duty and standy modes. Switching to occur automatically at 3hr intervals nr 1 -
Control Panel with switchgears for ATM Room Split Wall Mounted Units to operate in
U60.5 duty and standy modes. Switching to occur automatically at 3hr intervals nr 1 -
Refrigerant Pipe and Cable Tray c/w all fittings & Supports
Note: All outdoor exposed refrigerant pipes to be coated with anti UV paint.
Note: All outdoor refrigerant pipes at third floor terrace to run inside GMS cable tray c/w
Note: All indoor refrigerant pipes to run inside GMS cable tray.
C10.249 Liquid Refrigerant Pipe m 60 -
C10.250 Gas Refrigerant Pipe m 60 -
Outdoor Cable Tray
C10.251 GMS Cable Tray c/w cover - 200mm x 50mm m 60 -
Indoor Cable Tray
C10.252 GMS Cable Tray - 200mm x 50mm m 30 -
Condensate Pipes c/w all fittings, Supports & traps
C10.253 uPVC PN6 DN25 - Fixed on wall surface & connect to main condensate drain pipe m 6 -
5. PIPE ANCILLIARIES
C10.254 uPVC PN6 DN110 Sleeve nr 10 -
Closed Cell NBR Foam Sleeve:
C10.255 13mm thick for condensate pipework m 6 -
C10.256 19mm thick for liquid refrigerant pipework m 60 -
C10.257 19mm thick for gas refrigerant pipework m 60 -
Testing & Commissioning
Provide Fire Stopping, Identification, Testing, Commissioning, drawings preparation and
Training as per specification broken down as follows:
13. FIRE STOPPING AND OTHER ASSOCIATED FIRE PROTECTION WORK
C10.259 Fire rated Foam of a minimum of 60 min fire rating item 1 -
16. IDENTIFICATION
C10.260 Labelling as per BS1710 and detailed in specification Y54 item 1 -
C10.261 All Testing as described in specification Y51 item 1 -
18. COMMISSIONING
C10.262 All Commisioning as described in specification Y51 item 1 -
21. DRAWING PREPARATION
C10.263 Installation drawings (incl. builder's work information) item 1 -
C10.264 All Training as described in specification A64 item 1 -
Testing & Commissioning
Provide Fire Stopping, Identification, Testing, Commissioning, drawings preparation and
Training as per specification broken down as follows:
13. FIRE STOPPING AND OTHER ASSOCIATED FIRE PROTECTION WORK
C10.266 Fire rated Foam of a minimum of 60 min fire rating item 1 -
16. IDENTIFICATION
C10.267 Labelling as per BS1710 and detailed in specification Y54 item 1 -
C10.268 All Testing as described in specification Y51 item 1 -
18. COMMISSIONING
C10.269 All Commisioning as described in specification Y51 item 1 -
21. DRAWING PREPARATION
C10.270 Installation drawings (incl. builder's work information) item 1 -
C10.271 All Training as described in specification A64 item 1 -
Testing & Commissioning
Provide Fire Stopping, Identification, Testing, Commissioning, drawings preparation and
Training as per specification broken down as follows:
13. FIRE STOPPING AND OTHER ASSOCIATED FIRE PROTECTION WORK
C10.273 Fire rated Foam of a minimum of 60 min fire rating item 1 -
16. IDENTIFICATION
C10.274 Labelling as per BS1710 and detailed in specification Y54 item 1 -
C10.275 All Testing as described in specification Y51 item 1 -
18. COMMISSIONING
C10.276 All Commisioning as described in specification Y51 item 1 -
21. DRAWING PREPARATION
C10.277 Installation drawings (incl. builder's work information) item 1 -
C10.278 All Training as described in specification A64 item 1 -
Testing & Commissioning
Provide Fire Stopping, Identification, Testing, Commissioning, drawings preparation and
Training as per specification broken down as follows:
13. FIRE STOPPING AND OTHER ASSOCIATED FIRE PROTECTION WORK of a minimum
of 4 hours fire rating
C10.280 U10 - General Ventilation item 1 -
C10.281 U11 - Toilet Ventilation item 1 -
C10.282 T62 - VRF Air Conditioning item 1 -
C10.283 U60 - Air Conditioning Units item 1 -
14. IDENTIFICATION as described in specification Y82
C10.284 U10 - General Ventilation item 1 -
C10.285 U11 - Toilet Ventilation item 1 -
C10.286 T62 - VRF Air Conditioning item 1 -
C10.287 U60 - Air Conditioning Units item 1 -
15. TESTING as described in specification Y81
C10.288 U10 - General Ventilation item 1 -
C10.289 U11 - Toilet Ventilation item 1 -
C10.290 T62 - VRF Air Conditioning item 1 -
C10.291 U60 - Air Conditioning Units item 1 -
16. COMMISSIONING as described in specification Y81
C10.292 U10 - General Ventilation item 1 -
C10.293 U11 - Toilet Ventilation item 1 -
C10.294 T62 - VRF Air Conditioning item 1 -
C10.295 U60 - Air Conditioning Units item 1 -
19. DRAWING PREPARATION
C10.296 Coordinated drawings c/w Builder's work information item 1 -
22. TRAINING as described in specification A64
C10.297 U10 - General Ventilation item 1 -
C10.298 U11 - Toilet Ventilation item 1 -
C10.299 T62 - VRF Air Conditioning item 1 -
C10.300 U60 - Air Conditioning Units item 1 -
Bill No. N10: Portable Fire Extinguishers
PORTABLE FIRE EXTINGUISHERS (N10)
Supply and install portable fire extinguishers as described in specification N10, tender
drawings and broken down as follows:
1. PRIMARY EQUIPMENT
N10.1 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 2 -
N10.2 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 2 -
16. IDENTIFICATION
N10.3 Fire Extinguisher Signage nr 2 -
N10.4 No Smoking Sign nr 2 -
1. PRIMARY EQUIPMENT
N10.5 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 1 -
N10.6 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 1 -
16. IDENTIFICATION
N10.7 Fire Extinguisher Signage nr 1 -
N10.8 No Smoking Sign nr 1 -
1. PRIMARY EQUIPMENT
N10.9 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 1 -
N10.10 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 1 -
16. IDENTIFICATION
N10.11 Fire Extinguisher Signage nr 1 -
N10.12 No Smoking Sign nr 1 -
1. PRIMARY EQUIPMENT
N10.13 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 1 -
N10.14 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 1 -
16. IDENTIFICATION
N10.15 Fire Extinguisher Signage nr 1 -
N10.16 No Smoking Sign nr 1 -
1. PRIMARY EQUIPMENT
N10.17 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 1 -
N10.18 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 1 -
16. IDENTIFICATION
N10.19 Fire Extinguisher Signage nr 1 -
N10.20 No Smoking Sign nr 1 -
FIFTH FLOOR TO SEVENTH FLOOR
1. PRIMARY EQUIPMENT
N10.21 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 3 -
N10.22 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 3 -
16. IDENTIFICATION
N10.23 Fire Extinguisher Signage nr 3 -
N10.24 No Smoking Sign nr 3 -
1. PRIMARY EQUIPMENT
N10.25 ABC Dry Powder Fire Extinguisher - 4kg - 21A/113B nr 1 -
N10.26 Carbon Dioxide Fire Extinguisher - 5kg - 55B nr 1 -
16. IDENTIFICATION
N10.27 Fire Extinguisher Signage nr 1 -
N10.28 No Smoking Sign nr 1 -
Bill No. N13: Sanitary Appliances / Fittings
SANITARY APPLIANCES / FITTINGS (N13)
Take delivery and install appliances/fittings as described in specification N13, tender
drawings and broken down as follows:
4. FIXTURES, FITTINGS OR EQUIPMENT SUPPLIED BY THE EMPLOYER
N13.1 Water Closet (W.C. Pan connector and Cistern) nr 19 -
N13.2 Urinal (c/w Tap and waste connection) nr 3 -
N13.3 Wash Hand Basin (c/w Mixer Tap and Waste Connection) nr 21 -
N13.4 Kitchen sink (c/w Mixer Tap and Waste Connection) nr 2 -
Bill No. R11: Foul Drainage Above Ground
FOUL DRAINAGE ABOVE GROUND (R11)
Supply and install Drainage above Ground as per specification R11, tender drawings and
broken down as follows:
Waste & Sewer Pipes c/w Fittings & Supports
R11.1 uPVC PN6 DN50 m 53 -
R11.2 uPVC PN6 DN75 m 80 -
R11.3 uPVC PN6 DN110 m 85 -
R11.4 uPVC PN6 DN160 m 168 -
Waste & Sewer Pipes c/w Fittings, 35mm thick acoustic insulation & Supports
R11.5 uPVC PN6 DN50 m 55 -
2. PIPEWORK ANCILLARIES
Waste & Sewer Pipes
R11.6 Chrome Plated Bottle Trap - Dia 50mm nr 22 -
R11.7 Extendable pan connector & fin Dia 105; length: 600mm nr 19 -
R11.8 uPVC DN50 U-Trap for Urinal nr 3 -
FD-01-Floor Drain in PVC-100mm x 100mm of Make Kessel or Equivalent with Flanged
Type Vertical Outlet Dia 50mm, Trap Seal and Stainless Steel 304 Grating with Lock and
R11.9 Lift Locking System nr 20 -
R11.10 PVC DN75 Vent cowl complete with insect screen nr 2 -
R11.11 PVC DN110 Vent cowl complete with insect screen nr 2 -
R11.12 PVC DN160 Vent cowl complete with insect screen nr 6 -
R11.13 uPVC DN50 Puddle Flange nr 20 -
R11.14 uPVC DN50 Rodding Eye nr 12 -
R11.15 uPVC DN75 Rodding Eye nr 6 -
R11.16 uPVC DN110 Rodding Eye nr 17 -
R11.17 uPVC DN160 Rodding Eye nr 18 -
R11.18 uPVC DN50 End Cap nr 22 -
R11.19 uPVC DN110 End Cap nr 19 -
R11.20 uPVC DN160 End Cap nr 6 -
Bill No. R12: Drainage Below Ground
DRAINAGE BELOW GROUND (R12)
Supply and install Drainage below Ground as per specification R12 and broken down as
FOUL DRAINAGE BELOW GROUND
R12.1 uPVC SN8 DN110 RRJ Sewer Pipes & Fittings m 10 -
R12.2 uPVC SN8 DN160 RRJ Sewer Pipes & Fittings m 48 -
R12.3 Gully Trap nr 4 -
Bill No. S10: Cold Water
COLD WATER (S10)
Supply and install cold water distribution system as described in specification S10, tender
drawings and broken down as follows:
1. PRIMARY EQUIPMENT
S10.1 Buried HDPE PN16 Dia 40mm Pipe m 28 -
Potable Water Plantroom Pipework c/w Fittings & Supports (@Ground Floor)
S10.2 PPR PN16 Dia 50mm Pipe m 10 -
Potable Water Plantroom Ancillaries (@Ground Floor)
S10.4 DN25 Heavy Duty Float Valve nr 2 -
S10.5 GMS 1 1/2" HDG Vortex Inhibitor nr 1 -
S10.6 DN50 Foot Valve nr 1 -
S10.7 DN40 Expansion Bellow nr 1 -
S10.8 DN50 Y-Strainer nr 1 -
S10.9 DN50 Quarter-Turn Isolating Valve nr 9 -
S10.10 DN40 Solenoid Valve nr 1 -
S10.11 DN40 Water Meter Pulse Type nr 1 -
S10.12 GMS 3" HDG Puddle Flange Flanged-End 800mm Long nr 1 -
Potable Water Plantroom Pipework c/w Fittings & Supports (@Roof)
S10.13 PPR PN16 Dia 50mm Pipe m 10 -
S10.14 uPVC PN10 Dia 75mm pipe (overflow pipe) m 7 -
Potable Water Plantroom Ancillaries (@Roof)
S10.15 DN40 Water Meter Pulse Type nr 2 -
S10.16 DN40 Heavy Duty Float Valve nr 1 -
S10.17 DN40 Expansion Bellow nr 1 -
S10.18 DN40 Y-Strainer nr 1 -
S10.19 DN40 Quarter-Turn Isolating Valve nr 9 -
S10.20 GMS 1-1/2" HDG Puddle Flange Flanged-End 800mm Long nr 2 -
S10.21 uPVC Puddle Flange Dia 50mm nr 4 -
S10.22 PPR Funnel Dia 75mm nr 1 -
2. TERMINAL EQUIPMENT & FITTINGS
Potable Water Transfer Pumpset (@Ground Floor)
Pump Set operating on duty + stand-by + alternate mode c/w VSD, Control Panel,
Valves, Manifold, Base, Pressure Switches, Pressure Vessel, Manometers, Dry Run
Protection, Fittings, Isolating Valves, Check Valves, Anti-Vibration Mounts and
S10.23 Nominal Capacity: 4.3 m3/h @ 8 bar each Set 1 -
Electrical wiring from pumps control panel to main electrical panel in plantroom inclusive
S10.24 of all associated cable trays and fixings item 1 -
Water level monitoring system for domestic water tank including submersible level
S10.25 transmitters, tank level display fixed in plantroom, conduits and wiring item 1 -
Potable Water Booster Pumpset (@Roof)
Pump Set operating on duty + stand-by + alternate mode c/w VSD, Control Panel,
Valves, Manifold, Base, Pressure Switches, Pressure Vessel, Manometers, Dry Run
Protection, Fittings, Isolating Valves, Check Valves, Anti-Vibration Mounts and
S10.26 Nominal Capacity: 3.7 m3/h @ 2.5 bar each Set 1 -
Electrical wiring from pumps control panel to main electrical panel in plantroom inclusive
S10.27 of all associated cable trays and fixings item 1 -
Water level monitoring system for domestic water tank including submersible level
S10.28 transmitters, tank level display fixed in plantroom, conduits and wiring item 1 -
Pipes c/w Fittings, Supports & Sleeves
S10.29 Buried HDPE PN16 Dia 32mm Pipe m 28 -
S10.30 PPR PN16 Dia 50mm m 45 -
S10.31 PPR PN16 Dia 40mm m 13 -
S10.32 PPR PN16 Dia 32mm m 80 -
S10.33 PPR PN16 Dia 25mm m 20 -
S10.34 PPR PN16 Dia 20mm m 160 -
5. PIPEWORK ANCILLARIES
S10.35 DN40 Quarter-Turn Isolating Valve nr 1 -
S10.36 DN32 Quarter-Turn Isolating Valve nr 6 -
S10.37 DN25 Quarter-Turn Isolating Valve nr 2 -
S10.38 DN20 Quarter-Turn Isolating Valve nr 8 -
S10.39 DN40 Swing Type Check Valve nr 1 -
S10.40 DN40 Automatic Air Release Valve nr 1 -
S10.41 DN32 Automatic Air Release Valve nr 1 -
S10.42 DN25 Automatic Air Release Valve nr 3 -
S10.43 DN25 Pressure Regulating Valve c/w Glycerine Type Manometer nr 3 -
S10.44 DN20 Pressure Regulating Valve c/w Glycerine Type Manometer nr 5 -
S10.45 DN15 Chrome Angle Valve nr 45 -
S10.46 304 SS Braided Hose 3 / EPDM hose - 1/2" BSP - 600 mm nr 45 -
S10.47 Bib Tap 3/4" - Lever of Lockable Type nr 1 -
Acrylic based latex paint; Colour: White. For exposed PRR cold water pipes and PVC
S10.48 waste and sewage pipes on roof Item 1 -
Bill No. S60: Fire Hose Reels
FIRE HOSE REELS (S60)
Supply and install fire hose reels as described in specification S60, tender drawings and
broken down as follows:
2. TERMINAL EQUIPMENT and FITTINGS
S60.1 Fire Hose Reel (Automatic Swing) nr 10 -
S60.2 Fire Hose Reel Cabinet (wall-mounted) nr 10 -
S60.3 GMS Sch40 Ø1" c/w fittings and supports m 143 -
S60.4 GMS Sch40 Ø2" c/w fittings and supports m 61 -
5. PIPE ANCILLIARIES
S60.5 PN25 DN25 Isolating valve nr 20 -
S60.6 PN25 DN25 Pressure Reducing Valve nr 10 -
S60.7 Pressure Gauge (0 - 16 bar) nr 10 -
S60.8 Automatic Air Release Valve DN25 nr 1 -
S60.9 Painting of GMS pipe and fittings Item 1 -
16. IDENTIFICATION
S60.10 Fire Hose Reel Signage nr 10 -
S60.11 Assembly Point Signage nr 2 -
Bill No. S61: Dry Risers
DRY RISERS (S61)
Supply and install wet risers as described in specification S61, tender drawings and
broken down as follows:
2. TERMINAL EQUIPMENT and FITTINGS
S61.1 2-way Breeching Inlet Flanged 100mm nr 1 -
S61.2 2-way Breeching Inlet Cabinet nr 1 -
S61.3 DN65 Oblique Threaded Landing Valve nr 8 -
S61.4 DN65 Type 3 Fire Hose; Length: 30m nr 8 -
S61.5 GMS Sch40 Ø2-1/2" c/w fittings and supports m 10 -
S61.6 GMS Sch40 Ø4" c/w fittings and supports m 42 -
5. PIPE ANCILLIARIES
S61.7 Automatic Air Release Valve DN65 nr 1 -
S61.8 Painting of GMS pipe and fittings Item 1 -
16. IDENTIFICATION
S61.9 Dry Riser Signage nr 8 -
Bill No. T62: VRF Air Conditioning
T62 - VRF Air Conditioning
Supply, install, test & commission VRF Air Conditioning as per specification T62, tender
drawings, and broken down as follows:
1. PRIMARY EQUIPMENT
VRF Outdoor Unit Cooling only type -
T62.1 Nominal Capacity: 56kWc, Connection Ratio: 100% nr 2 -
VRF Outdoor Unit Cooling only type
T62.2 Nominal Capacity: 84kWc, Connection Ratio: 100% nr 1 -
VRF Outdoor Unit Cooling only type
T62.3 Nominal Capacity: 95.2kWc, Connection Ratio: 100% nr 1 -
T62.4 Central Controller for VRF System set 4 -
T62.5 Power cable between isolator and outdoor unit c/w supports and accessories item 4 -
2. TERMINAL EQUIPMENT AND FITTINGS
4WC: 4-Way Cassette Type Indoor Unit
T62.6 Nominal Capacity: 3.6 kWc nr 27 -
4WC: 4-Way Cassette Type Indoor Unit
T62.7 Nominal Capacity: 5.6 kWc nr 12 -
4WC: 4-Way Cassette Type Indoor Unit
T62.8 Nominal Capacity: 7.1 kWc nr 8 -
CCD: Medium Static Ceiling Concealed Ducted Unit
T62.9 Nominal Capacity: 7.1 kWc nr 3 -
T62.10 Wired Controller complete with PVC sleeve, cabling and accessories nr 3 -
T62.11 Wireless Remote Controller c/w wall supports nr 44 -
T62.12 Power cable between isolator and indoor unit c/w supports and accessories item 50 -
Refrigerant Pipe and Cable Tray c/w all fittings & Supports
Note: All outdoor exposed refrigerant pipes to be coated with anti UV paint .
Note: All outdoor refrigerant pipes at third floor terrace to run inside GMS cable tray c/w
Note: All indoor refrigerant pipes to run inside GMS cable tray.
Outdoor Refrigerant Pipes
T62.13 Liquid Refrigerant Pipe m 60 -
T62.14 Gas Refrigerant Pipe m 60 -
Indoor Refrigerant Pipes
T62.15 Liquid Refrigerant Pipe m 384 -
T62.16 Gas Refrigerant Pipe m 384 -
Outdoor Cable Tray
T62.17 GMS Cable Tray c/w cover - 200mm x 50mm m 60 -
Indoor Cable Tray
T62.18 GMS Cable Tray - 200mm x 50mm m 384 -
Condensate Pipes c/w all fittings, Supports & traps
T62.19 uPVC PN6 DN25 - Fixed on ceiling soffit m 119 -
T62.20 uPVC PN6 DN32 - Fixed on ceiling soffit m 57 -
T62.21 uPVC PN6 DN40 - Fixed on ceiling soffit m 80 -
T62.22 uPVC PN6 DN50 - Fixed on ceiling soffit m 15 -
uPVC PN6 DN75 - Fixed on ceiling soffit & connect to condensate drain pipe stack to run
T62.23 outside on surface of building m 52 -
T62.24 uPVC PN6 DN40 - condensate drain pipe stack to run outside on surface of building m 10 -
T62.25 uPVC PN6 DN110 - condensate drain pipe stack to run outside on surface of building m 60 -
5. PIPE ANCILLIARIES
T62.26 uPVC PN6 DN50 Sleeve nr 10 -
T62.27 uPVC PN6 DN110 Sleeve nr 10 -
T62.28 Y-Branch nr 54 -
6. VENTILATION DUCTS
For air conditioning
GMS Duct 350x250mm including necessory fittings, connection canvas, accessories and
T62.29 supports c/w 19mm thick closed cell rubber internal insulation and aluminum cladding m 67 -
GMS Duct 200mm including necessory fittings, connection canvas, accessories and
T62.30 supports c/w 19mm thick closed cell rubber internal insulation and aluminum cladding m 22 -
T62.31 Insulated flexible Duct Aluminium DN200 c/w accessories and supports nr 24 -
8. AIR DISTRIBUTION ANCILLARIES
SAD-01: Anodised Aluminum 4 direction Supply Air Diffuser for False Ceiling
T62.32 300x300mm, Free Area 0.0435 m2 nr 12 -
RAG-01: Anodised Aluminum 4 direction Return Air Grille for False Ceiling 300x300mm,
T62.33 Free Area 0.0435 m2 nr 12 -
T62.34 VCD: Volume Control Damper DN 200 nr 24 -
Associated Plenum Boxes for supply
T62.35 Insulated Plenum box for Medium Static Ceiling Concealed Ducted Unit CCD nr 12 -
Associated Plenum Boxes for return
T62.36 Insulated Plenum box for Medium Static Ceiling Concealed Ducted Unit CCD nr 12 -
Closed Cell NBR Foam Sleeve:
T62.37 13mm thick for condensate pipework m 393 -
T62.38 19mm thick for liquid refrigerant pipework m 384 -
T62.39 19mm thick for gas refrigerant pipework m 384 -
Bill No. U10: General Ventilation
U10 - General Ventilation
Supply, install, test & commission general ventilation system described in specification
U10, tender drawings and broken down as follows:
1. PRIMARY EQUIPMENT
U10.1 FAF-01 Centrifugal Fresh Air fan 750 m3/h at 400 Pa External Static Pressure nr 1 -
U10.2 FAF-02 Centrifugal Fresh Air fan 488 m3/h at 340 Pa External Static Pressure nr 1 -
U10.3 FAF-03 Centrifugal Fresh Air fan 522 m3/h at 315 Pa External Static Pressure nr 1 -
U10.4 FAF-04 Centrifugal Fresh Air fan 472 m3/h at 325 Pa External Static Pressure nr 1 -
U10.5 FAF-05 Centrifugal Fresh Air fan 215 m3/h at 400 Pa External Static Pressure nr 1 -
U10.6 FAF-06 Centrifugal Fresh Air fan 800 m3/h at 400 Pa External Static Pressure nr 1 -
U10.7 FAF-07 Centrifugal Fresh Air fan 514 m3/h at 320 Pa External Static Pressure nr 1 -
U10.8 FAF-08 Centrifugal Fresh Air fan 400 m3/h at 350 Pa External Static Pressure nr 1 -
U10.9 Wall Mounted Extract Fan 1170 m3/h at 50 Pa External Static Pressure nr 1 -
Power cable between fresh air fan FAF-01 and WP isolator switch c/w supports and
U10.10 accessories nr 1 -
Power cable between fresh air fan FAF-02 and WP isolator switch c/w supports and
U10.11 accessories nr 1 -
Power cable between fresh air fan FAF-03 and WP isolator switch c/w supports and
U10.12 accessories nr 1 -
Power cable between fresh air fan FAF-04 and WP isolator switch c/w supports and
U10.13 accessories nr 1 -
Power cable between fresh air fan FAF-05 and WP isolator switch c/w supports and
U10.14 accessories nr 1 -
Power cable between fresh air fan FAF-06 and WP isolator switch c/w supports and
U10.15 accessories nr 1 -
Power cable between fresh air fan FAF-07 and WP isolator switch c/w supports and
U10.16 accessories nr 1 -
Power cable between fresh air fan FAF-08 and WP isolator switch c/w supports and
U10.17 accessories nr 1 -
Power cable between wall-mounted extract fan and WP isolator switch c/w supports and
U10.18 accessories nr 1 -
2. VENTILATION DUCT
U10.19 GMS Duct DN110 c/w fittings, accessories & supports m 165 -
U10.20 GMS Duct DN150 c/w fittings, accessories & supports m 50 -
U10.21 GMS Duct DN200 c/w fittings, accessories & supports m 60 -
U10.22 GMS Duct DN250 c/w fittings, accessories & supports m 70 -
U10.23 GMS Duct DN300 c/w fittings, accessories & supports m 5 -
U10.24 Uninsulated Flexible Aluminium Duct DN110 c/w accessories and supports m 40 -
3. DUCT ANCILLARIES
U10.25 VCD: Volume Control Damper DN110 nr 66 -
U10.26 VCD: Volume Control Damper DN150 nr 3 -
U10.27 VCD: Volume Control Damper DN200 nr 2 -
Removable Air Filter 305x305mm, 800 m3/h, 101Pa pressure drop, 3.72 m2 filter surface
U10.28 area, at inlet of Fresh Air Fan - Grade F6 c/w filter support box and other accessories nr 8 -
U10.29 VC: GMS Vent Cowl c/w insect screen nr 1 -
U10.30 GMS Plenum Box 1000x300x200mm nr 1 -
U10.31 GMS Plenum Box 800x300x200mm nr 1 -
U10.32 GMS Plenum Box 600x300x200mm nr 5 -
U10.33 GMS Plenum Box 600x200x200mm nr 1 -
U10.34 GMS Plenum Box 300x300x200mm nr 8 -
4.FRESH AIR INTAKE ANCILLARIES
External Fresh Air Weather Louver Grille c/w insect screen 1000x300mm, Free Area 0.13
External Fresh Air Weather Louver Grille c/w insect screen 800x300mm, Free Area 0.10
External Fresh Air Weather Louver Grille c/w insect screen 600x300mm, Free Area 0.08
External Fresh Air Weather Louver Grille c/w insect screen 600x200mm, Free Area 0.08
U10.39 Extruded Anodised Aluminum Door Grillle 300x300mm, Free Area 0.05 m2 nr 1 -
U10.40 Extruded Anodised Aluminum Door Grillle 300x150mm, Free Area 0.02 m2 nr 1 -
Bill No. U11: Toilet Ventilation
U11 - Toilet Ventilation
Supply, install, test & commission toilet ventilation system described in specification U11,
tender drawings and broken down as follows:
1. PRIMARY EQUIPMENT
EAF-01 Centrifugal Extract Air fan 720 m3/h at 250 Pa External Static Pressure and
U11.1 associated accessories nr 2 -
EAF-03 Centrifugal Extract Air fan 540 m3/h at 200 Pa External Static Pressure and
U11.2 associated accessories nr 1 -
WMEAF-01, WMEAF-02, WMEAF-03, WMEAF-04, WMEAF-05, WMEAF-06 Wall Mounted
U11.3 Extract Fan 90 m3/h nr 6 -
Power cable between WMEAF 01-06 extract air fans and WP isolator switch c/w supports
U11.4 and accessories item 6 -
Power cable between EAF-01 and EAF-02 extract air fans and WP isolator switch c/w
U11.5 supports and accessories item 2 -
Power cable between EAF-03 extract air fan and WP isolator switch c/w supports and
U11.6 accessories item 1 -
U11.7 Provide delay timer for cut-off of all extract fans nr 9 -
U11.8 Connection of extract air fans to light switch and delay timer item 9 -
2. VENTILATION DUCT
U11.9 GMS Duct DN125 c/w fittings, accessories & supports m 28 -
U11.10 GMS Duct DN150 c/w fittings, accessories & supports m 8 -
U11.11 GMS Duct DN200 c/w fittings, accessories & supports m 2 -
U11.12 GMS Duct DN250 c/w fittings, accessories & supports m 2 -
U11.13 GMS Duct DN300 c/w fittings, accessories & supports m 15 -
U11.14 Uninsulated Flexible Aluminium Duct DN125 c/w accessories and supports item 32 -
3. DUCT ANCILLARIES
U11.15 VCD: Volume Control Damper DN125 nr 21 -
U11.16 GMS Plenum Box 800x300x200mm nr 2 -
U11.17 GMS Plenum Box 700x300x200mm nr 1 -
U11.18 Extract Disc Valve for False Ceiling DN125 nr 21 -
4. Extract Air Ancillaries
External Extract Air Weather Louver Grille c/w insect screen 800x300mm, Free Area 0.10
External Extract Air Weather Louver Grille c/w insect screen 700x300mm, Free Area 0.08
4. Fresh Air Ancillaries
U11.21 Extruded Anodised Aluminum Door Grillle 600x300mm, Free Area 0.10 m2 nr 2 -
U11.22 Extruded Anodised Aluminum Door Grillle 500x300mm, Free Area 0.09 m2 nr 2 -
U11.23 Extruded Anodised Aluminum Door Grillle 300x300mm, Free Area 0.05 m2 nr 3 -
U11.24 Extruded Anodised Aluminum Door Grillle 300x150mm, Free Area 0.02 m2 nr 4 -
Bill No. U60: Air Conditioning Units
U60 - Air Conditioning Units
Supply, install, test & commission air conditioning units as per specification U60, tender
drawings, and broken down as follows:
1. PRIMARY EQUIPMENT
WMIU - Wall Mounted Inverter Split Type Air Conditioning c/w visual and audible alarm
in the event of temperature alarm
U60.1 Nominal Capacity: 5.3 kWc nr 6 -
U60.2 Power cable between outdoor unit and indoor unit c/w supports and accessories item 6 -
2. TERMINAL EQUIPMENT AND FITTINGS
U60.3 Wireless Remote controller c/w support to be fixed on wall nr 6 -
Control Panel with switchgears for Server Room Split Wall Mounted Units to operate
U60.4 diagonally in duty and standy modes. Switching to occur automatically at 3hr intervals nr 1 -
Control Panel with switchgears for ATM Room Split Wall Mounted Units to operate in
U60.5 duty and standy modes. Switching to occur automatically at 3hr intervals nr 1 -
Refrigerant Pipe and Cable Tray c/w all fittings & Supports
Note: All outdoor exposed refrigerant pipes to be coated with anti UV paint.
Note: All outdoor refrigerant pipes at third floor terrace to run inside GMS cable tray c/w
Note: All indoor refrigerant pipes to run inside GMS cable tray.
U60.6 Liquid Refrigerant Pipe m 60 -
U60.7 Gas Refrigerant Pipe m 60 -
Outdoor Cable Tray
U60.8 GMS Cable Tray c/w cover - 200mm x 50mm m 60 -
Indoor Cable Tray
U60.9 GMS Cable Tray - 200mm x 50mm m 30 -
Condensate Pipes c/w all fittings, Supports & traps
U60.10 uPVC PN6 DN25 - Fixed on wall surface & connect to main condensate drain pipe m 6 -
5. PIPE ANCILLIARIES
U60.11 uPVC PN6 DN110 Sleeve nr 10 -
Closed Cell NBR Foam Sleeve:
U60.12 13mm thick for condensate pipework m 6 -
U60.13 19mm thick for liquid refrigerant pipework m 60 -
U60.14 19mm thick for gas refrigerant pipework m 60 -
Bill No. TCD: Testing & Commissioning - Drainage Services
Testing & Commissioning
Provide Fire Stopping, Identification, Testing, Commissioning, drawings preparation and
Training as per specification broken down as follows:
13. FIRE STOPPING AND OTHER ASSOCIATED FIRE PROTECTION WORK
TCD.1 Fire rated Foam of a minimum of 60 min fire rating item 1 -
16. IDENTIFICATION
TCD.2 Labelling as per BS1710 and detailed in specification Y54 item 1 -
TCD.3 All Testing as described in specification Y51 item 1 -
18. COMMISSIONING
TCD.4 All Commisioning as described in specification Y51 item 1 -
21. DRAWING PREPARATION
TCD.5 Installation drawings (incl. builder's work information) item 1 -
TCD.6 All Training as described in specification A64 item 1 -
Bill No. TCW: Testing & Commissioning - Water Services
Testing & Commissioning
Provide Fire Stopping, Identification, Testing, Commissioning, drawings preparation and
Training as per specification broken down as follows:
13. FIRE STOPPING AND OTHER ASSOCIATED FIRE PROTECTION WORK
TCW.1 Fire rated Foam of a minimum of 60 min fire rating item 1 -
16. IDENTIFICATION
TCW.2 Labelling as per BS1710 and detailed in specification Y54 item 1 -
TCW.3 All Testing as described in specification Y51 item 1 -
18. COMMISSIONING
TCW.4 All Commisioning as described in specification Y51 item 1 -
21. DRAWING PREPARATION
TCW.5 Installation drawings (incl. builder's work information) item 1 -
TCW.6 All Training as described in specification A64 item 1 -
Bill No. TFF: Testing and Commissioning - FHR & Dry Riser
Testing & Commissioning
Provide Fire Stopping, Identification, Testing, Commissioning, drawings preparation and
Training as per specification broken down as follows:
13. FIRE STOPPING AND OTHER ASSOCIATED FIRE PROTECTION WORK
TFF.1 Fire rated Foam of a minimum of 60 min fire rating item 1 -
16. IDENTIFICATION
TFF.2 Labelling as per BS1710 and detailed in specification Y54 item 1 -
TFF.3 All Testing as described in specification Y51 item 1 -
18. COMMISSIONING
TFF.4 All Commisioning as described in specification Y51 item 1 -
21. DRAWING PREPARATION
TFF.5 Installation drawings (incl. builder's work information) item 1 -
TFF.6 All Training as described in specification A64 item 1 -
Bill No. TCH: Testing and Commissioning - HVAC Services
Testing & Commissioning
Provide Fire Stopping, Identification, Testing, Commissioning, drawings preparation and
Training as per specification broken down as follows:
13. FIRE STOPPING AND OTHER ASSOCIATED FIRE PROTECTION WORK of a minimum
of 4 hours fire rating
TCH.1 U10 - General Ventilation item 1 -
TCH.2 U11 - Toilet Ventilation item 1 -
TCH.3 T62 - VRF Air Conditioning item 1 -
TCH.4 U60 - Air Conditioning Units item 1 -
14. IDENTIFICATION as described in specification Y82
TCH.5 U10 - General Ventilation item 1 -
TCH.6 U11 - Toilet Ventilation item 1 -
TCH.7 T62 - VRF Air Conditioning item 1 -
TCH.8 U60 - Air Conditioning Units item 1 -
15. TESTING as described in specification Y81
TCH.9 U10 - General Ventilation item 1 -
TCH.10 U11 - Toilet Ventilation item 1 -
TCH.11 T62 - VRF Air Conditioning item 1 -
TCH.12 U60 - Air Conditioning Units item 1 -
16. COMMISSIONING as described in specification Y81
TCH.13 U10 - General Ventilation item 1 -
TCH.14 U11 - Toilet Ventilation item 1 -
TCH.15 T62 - VRF Air Conditioning item 1 -
TCH.16 U60 - Air Conditioning Units item 1 -
19. DRAWING PREPARATION
TCH.17 Coordinated drawings c/w Builder's work information item 1 -
22. TRAINING as described in specification A64
TCH.18 U10 - General Ventilation item 1 -
TCH.19 U11 - Toilet Ventilation item 1 -
TCH.20 T62 - VRF Air Conditioning item 1 -
TCH.21 U60 - Air Conditioning Units item 1 -
Bill No. V11: HV Supply/Distribution/Public Utility Supply
V11 - HV Supply/Distribution/Public Utility Supply
Supply and install distribution for public utility supply as described in specification V11,
tender drawings and broken down as follows:
1. PRIMARY EQUIPMENT
V11.1 Liaise with Authorities to obtain metered permanent power supply item 1 -
2. TERMINAL EQUIPMENT AND FITTINGS
V11.2 Heavy Duty Cable tray HD 300 x 50 mm m 30 -
V11.3 Solid Marine Board c/w fixations for CEB meter nr 1 -
Bill No. V20: LV Distribution
V20 - LV Distribution
Supply and install LV system as described in specification V20, tender drawings and
broken down as follows:
1. PRIMARY EQUIPMENT
V20.1 CEB Busbar Panel CEB-BB 4P 800A nr 1 -
V20.2 Main Low Voltage Panel MLVP nr 1 -
V20.3 Electrical Distribution Board MDB-ESS nr 1 -
V20.4 Electrical Distribution Board MDB-UPS nr 1 -
V20.5 Electrical Distribution Board DBNE-GF nr 1 -
V20.6 Electrical Distribution Board DBNE-1F nr 1 -
V20.7 Electrical Distribution Board DBNE-2F nr 1 -
V20.8 Electrical Distribution Board DBNE-3F nr 1 -
V20.9 Electrical Distribution Board DBNE-4F nr 1 -
V20.10 Electrical Distribution Board DBE-GF nr 1 -
V20.11 Electrical Distribution Board DBE-1F nr 1 -
V20.12 Electrical Distribution Board DBE-2F nr 1 -
V20.13 Electrical Distribution Board DBE-3F nr 1 -
V20.14 Electrical Distribution Board DBE-4F nr 1 -
V20.15 Electrical Distribution board DBE-RF nr 1 -
V20.16 Electrical Distribution Board DBU-GF nr 1 -
V20.17 Electrical Distribution Board DBU-1F nr 1 -
V20.18 Electrical Distribution Board DBU-2F nr 1 -
V20.19 Electrical Distribution Board DBU-3F nr 1 -
V20.20 Electrical Distribution Board DBU-4F nr 1 -
3. CABLE CONTAINMENT
V20.21 Extra Heavy Duty Cable Tray 450 x 80 mm - Feeder Cables m 10 -
V20.22 Heavy Duty Cable Tray 300 x 50 mm c/w divider - CEB & Generator Supply m 45 -
V20.23 Heavy Duty Cable tray HD 300 x 50 mm c/w divider - Earthing Cables m 25 -
V20.24 Heavy Duty Cable tray HD 100 x 50 mm - Earthing Cables m 15 -
V20.25 Heavy Duty Cable tray HD 300 x 50 mm c/w divider - LV Final Circuits m 40 -
V20.26 Heavy Duty Cable tray HD 150 x 50 mm - UPS Final Circuits m 40 -
V20.27 Heavy Duty Cable tray HD 300 x 50 mm c/w divider - LV Final Circuits m 40 -
V20.28 Heavy Duty Cable tray HD 150 x 50 mm - UPS Final Circuits m 40 -
V20.29 Heavy Duty Cable tray HD 150 x 50 mm c/w divider - LV Final Circuits m 30 -
V20.30 Heavy Duty Cable tray HD 150 x 50 mm - UPS Final Circuits m 30 -
V20.31 Heavy Duty Cable tray HD 300 x 50 mm c/w divider - LV Final Circuits m 50 -
V20.32 Heavy Duty Cable tray HD 150 x 50 mm - UPS Final Circuits m 50 -
ELECTRICAL RISER
V20.33 Extra Heavy Duty Cable Tray 450 x 80 mm - Feeder Cables m 20 -
V20.34 Heavy Duty Cable tray HD 300 x 50 mm - Feeder Cables from MLVP m 20 -
V20.35 Heavy Duty Cable tray HD 300 x 50 mm - Feeder Cables from MDB-ESS m 20 -
V20.36 Heavy Duty Cable tray HD 300 x 50 mm - Feeder Cables from MDB-UPS m 20 -
V20.37 Medium Duty Cable Tray HD 50 x 25 mm - Telecom Cables m 20 -
V20.38 Heavy Duty Cable Tray 100 x 50 mm - Feeder Cables m 20 -
V20.39 Heavy Duty Cable tray HD 75 x 50 mm - Pump Room m 20 -
FEEDER CABLES FROM BUSBAR TO DB
V20.40 4C x 240 mm² Cu/XLPE/PVC - From CEB-BB to MLVP m 20 -
FEEDER CABLES FROM MLVP TO CHANGEOVER
V20.41 4C x 150 mm² Cu/XLPE/PVC From MLVP to MATS m 54 -
FEEDER CABLES FROM CHANGEOVER TO DB
V20.42 4C x 150 mm² Cu/XLPE/PVC From MATS to MDB-ESS m 54 -
FEEDER CABLES FROM MLVP TO DB
V20.43 5C x 6 mm² Cu/XLPE/PVC From MLVP to DBNE-GF m 18 -
V20.44 5C x 6 mm² Cu/XLPE/PVC From MLVP to DBNE-1F m 26 -
V20.45 5C x 10 mm² Cu/XLPE/PVC From MLVP to DBNE-2F m 32 -
V20.46 4C x 120 mm² Cu/XLPE/PVC From MLVP to DBNE-3F m 37 -
V20.47 5C x 10 mm² Cu/XLPE/PVC From MLVP to DBNE-4F m 43 -
FEEDER CABLES FROM MDB TO DB
V20.48 5C x 4 mm² Cu/XLPE/PVC From MDB-ESS to DBE-GF m 18 -
V20.49 3C x 16 mm² Cu/XLPE/PVC From MDB-ESS to DBE-1F m 26 -
V20.50 2C x 25 mm² Cu/XLPE/PVC From MDB-ESS to DBE-2F m 32 -
V20.51 5C x 6 mm² Cu/XLPE/PVC From MDB-ESS to DBE-3F m 37 -
V20.52 2C x 25 mm² Cu/XLPE/PVC From MDB-ESS to DBE-4F m 43 -
V20.53 3C x 95 mm² Cu/XLPE/PVC From MDB-ESS to DB-ITX1 m 76 -
V20.54 3C x 95 mm² Cu/XLPE/PVC From MDB-ESS to DB-ITX2 m 74 -
V20.55 5C x 16 mm² Cu/XLPE/PVC From MDB-ESS to DBE-RF m 74 -
V20.56 2C x 35 mm² Cu/XLPE/PVC From MDB-UPS to DBU-GF m 70 -
V20.57 5C x 10 mm² Cu/XLPE/PVC From MDB-UPS to DBU-1F m 52 -
V20.58 5C x 10 mm² Cu/XLPE/PVC From MDB-UPS to DBU-2F m 55 -
V20.59 2C x 25 mm² Cu/XLPE/PVC From MDB-UPS to DBU-3F m 55 -
V20.60 5C x 10 mm² Cu/XLPE/PVC From MDB-UPS to DBU-4F m 15 -
FEEDER CABLES FROM DB TO ISOLATION TRANSFORMER
V20.61 3C x 95 mm² Cu/XLPE/PVC From DB-ITX1 to ITX1 m 3 -
V20.62 3C x 95 mm² Cu/XLPE/PVC From DB-ITX2 to ITX2 m 3 -
FEEDER CABLES FROM ISOLATION TRANSFORMER TO UPS
V20.63 4C x 95 mm² Cu/XLPE/PVC From ITX1 to UPS1 m 3 -
V20.64 4C x 95 mm² Cu/XLPE/PVC From ITX2 to UPS2 m 3 -
FEEDER CABLES FROM UPS TO MDB
V20.65 4C x 95 mm² Cu/XLPE/PVC From UPS1 to MDB-UPS m 5 -
V20.66 4C x 95 mm² Cu/XLPE/PVC From UPS2 to MDB-UPS m 5 -
Bill No. V21: General Lighting
V21 - General Lighting
Supply and install general lighting system as described in specification V21, tender
drawings and broken down as follows:
2. TERMINAL EQUIPMENT AND FITTINGS
V21.1 Light fittings (Take Delivery on Site & Install only) nr 51 -
V21.2 1 Gang 1 Way Switch nr 4 -
V21.3 1 Gang 2 Way Switch nr 2 -
V21.4 1 Gang 1 Way Switch (Waterproof) nr 1 -
V21.5 2 Gang 1 Way Switch nr 2 -
V21.6 Motion Detector Type A nr 8 -
V21.7 Motion Detector Type B nr 3 -
V21.8 Motion Detector Type C nr 6 -
V21.9 Motion Detector Type D nr 1 -
V21.10 Light fittings (Take Delivery on Site & Install only) nr 110 -
V21.11 1 Gang 1 Way Switch nr 10 -
V21.12 2 Gang 2 Way Switch nr 1 -
V21.13 Intermediate Switch nr 1 -
V21.14 Motion Detector Type B nr 9 -
V21.15 Motion Detector Type D nr 1 -
V21.16 Light fittings (Take Delivery on Site & Install only) nr 112 -
V21.17 1 Gang 1 Way Switch nr 14 -
V21.18 1 Gang 2 Way Switch nr 2 -
V21.19 2 Gang 1 Way Switch nr 1 -
V21.20 Motion Detector Type B nr 9 -
V21.21 Motion Detector Type C nr 1 -
V21.22 Motion Detector Type D nr 2 -
V21.23 Light fittings (Take Delivery on Site & Install only) nr 56 -
V21.24 1 Gang 1 Way Switch nr 5 -
V21.25 3 Gang 1 Way Switch nr 1 -
V21.26 Dimmer Switch nr 1 -
V21.27 Motion Detector Type B nr 4 -
V21.28 Motion Detector Type C nr 4 -
V21.29 Motion Detector Type D nr 1 -
V21.30 Light fittings (Take Delivery on Site & Install only) nr 95 -
V21.31 1 Gang 1 Way Switch nr 19 -
V21.32 Motion Detector Type B nr 12 -
V21.33 Motion Detector Type C nr 1 -
V21.34 Light fittings (Take Delivery on Site & Install only) nr 3 -
V21.35 1 Gang 1 Way Switch (Waterproof) nr 1 -
7. FINAL CIRCUITS
GROUND FLOOR - FROM DBE-GF TO FITTINGS
V21.36 L1 3C x 1.5 mm² Cu/PVC/PVC nr 12 -
V21.37 L2 3C x 1.5 mm² Cu/PVC/PVC nr 10 -
V21.38 EXTL1 3C x 2.5 mm² Cu/PVC/PVC nr 13 -
V21.39 ML1 3C x 1.5 mm² Cu/PVC/PVC + 1C x 1.5 mm² Cu/PVC nr 9 -
V21.40 ML2 3C x 1.5 mm² Cu/PVC/PVC + 1C x 1.5 mm² Cu/PVC nr 9 -
V21.41 Switch Points 3C x 1.5 mm² Cu/PVC/PVC nr 7 -
GROUND FLOOR - FROM DBU-GF TO FITTINGS
V21.42 L1 3C x 1.5 mm² Cu/PVC/PVC nr 15 -
V21.43 Switch Points 3C x 1.5 mm² Cu/PVC/PVC nr 4 -
FIRST FLOOR - FROM DBE-1F TO FITTINGS
V21.44 L1 3C x 1.5 mm² Cu/PVC/PVC nr 17 -
V21.45 L2 3C x 1.5 mm² Cu/PVC/PVC nr 24 -
V21.46 L3 3C x 1.5 mm² Cu/PVC/PVC nr 13 -
V21.47 L4 3C x 1.5 mm² Cu/PVC/PVC nr 10 -
V21.48 L5 3C x 1.5 mm² Cu/PVC/PVC nr 16 -
V21.49 L6 3C x 1.5 mm² Cu/PVC/PVC nr 11 -
V21.50 L7 3C x 1.5 mm² Cu/PVC/PVC nr 10 -
V21.51 EXTL1 3C x 2.5 mm² Cu/PVC/PVC nr 10 -
V21.52 ML1 3C x 1.5 mm² Cu/PVC/PVC + 1C x 1.5 mm² Cu/PVC nr 5 -
V21.53 ML2 3C x 1.5 mm² Cu/PVC/PVC + 1C x 1.5 mm² Cu/PVC nr 5 -
V21.54 Switch Points 3C x 1.5 mm² Cu/PVC/PVC nr 12 -
SECOND FLOOR - FROM DBE-2F TO FITTINGS
V21.55 L1 3C x 1.5 mm² Cu/PVC/PVC nr 19 -
V21.56 L2 3C x 1.5 mm² Cu/PVC/PVC nr 15 -
V21.57 L3 3C x 1.5 mm² Cu/PVC/PVC nr 15 -
V21.58 L4 3C x 1.5 mm² Cu/PVC/PVC nr 11 -
V21.59 L5 3C x 1.5 mm² Cu/PVC/PVC nr 29 -
V21.60 L6 3C x 1.5 mm² Cu/PVC/PVC nr 18 -
V21.61 ML1 3C x 1.5 mm² Cu/PVC/PVC + 1C x 1.5 mm² Cu/PVC nr 6 -
V21.62 ML2 3C x 1.5 mm² Cu/PVC/PVC + 1C x 1.5 mm² Cu/PVC nr 6 -
V21.63 Switch Points 3C x 1.5 mm² Cu/PVC/PVC nr 17 -
THIRD FLOOR - FROM DBE-3F TO FITTINGS
V21.64 L1 3C x 1.5 mm² Cu/PVC/PVC nr 14 -
V21.65 L2 3C x 1.5 mm² Cu/PVC/PVC nr 19 -
V21.66 L3 3C x 1.5 mm² Cu/PVC/PVC nr 17 -
V21.67 EXTL1 3C x 2.5 mm² Cu/PVC/PVC nr 8 -
V21.68 ML1 3C x 1.5 mm² Cu/PVC/PVC + 1C x 1.5 mm² Cu/PVC nr 4 -
V21.69 ML2 3C x 1.5 mm² Cu/PVC/PVC + 1C x 1.5 mm² Cu/PVC nr 5 -
V21.70 Switch Points 3C x 1.5 mm² Cu/PVC/PVC nr 7 -
FOURTH FLOOR - FROM DBE-4F TO FITTINGS
V21.71 L1 3C x 1.5 mm² Cu/PVC/PVC nr 16 -
V21.72 L2 3C x 1.5 mm² Cu/PVC/PVC nr 14 -
V21.73 L3 3C x 1.5 mm² Cu/PVC/PVC nr 14 -
V21.74 L4 3C x 1.5 mm² Cu/PVC/PVC nr 7 -
V21.75 L5 3C x 1.5 mm² Cu/PVC/PVC nr 20 -
V21.76 L6 3C x 1.5 mm² Cu/PVC/PVC nr 14 -
V21.77 ML1 3C x 1.5 mm² Cu/PVC/PVC + 1C x 1.5 mm² Cu/PVC nr 7 -
V21.78 ML2 3C x 1.5 mm² Cu/PVC/PVC + 1C x 1.5 mm² Cu/PVC nr 6 -
V21.79 Switch Points 3C x 1.5 mm² Cu/PVC/PVC nr 18 -
FOURTH FLOOR - FROM DBU-4F TO FITTINGS
V21.80 L1 3C x 1.5 mm² Cu/PVC/PVC nr 4 -
V21.81 Switch Points 3C x 1.5 mm² Cu/PVC/PVC nr 1 -
ROOF - FROM DBE-RF TO FITTINGS
V21.82 L1 3C x 1.5 mm² Cu/PVC/PVC nr 3 -
V21.83 Switch Points 3C x 1.5 mm² Cu/PVC/PVC nr 1 -
Bill No. V22: General Power
V22 - General LV Power
Supply and install general LV power as described in specification V22, tender
drawings and broken down as follows:
2. TERMINAL EQUIPMENT AND FITTINGS
V22.1 Flush Mounted 13A BS Single Socket Outlet nr 3 -
V22.2 Trunking Mounted 13A BS Single Socket Outlet nr 8 -
V22.3 Trunking Mounted 16A French Single Socket Outlet nr 6 -
V22.4 Surface Mounted 13A BS Single Socket Outlet nr 4 -
V22.5 Surface Mounted 16A French Single Socket Outlet nr 1 -
V22.6 Flush Mounted BS 13A & 16A French Double Socket Outlet nr 3 -
V22.7 Surface Mounted BS 13A & 16A French Double Socket Outlet nr 5 -
V22.8 Surface Mounted 20A Double Pole Switch nr 4 -
V22.9 Surface Mounted 20A Double Pole Switch (Waterproof) nr 1 -
V22.10 Flush Mounted Unswitched Fuse Connection Unit nr 1 -
V22.11 Surface Mounted Switched Fuse Connection Unit nr 1 -
V22.12 Trunking Mounted 13A BS Single Socket Outlet nr 67 -
V22.13 Trunking Mounted 16A French Single Socket Outlet nr 9 -
V22.14 Surface Mounted 13A BS Single Socket Outlet nr 1 -
V22.15 Flush Mounted BS 13A & 16A French Double Socket Outlet nr 6 -
V22.16 Surface Mounted BS 13A & 16A French Double Socket Outlet nr 1 -
V22.17 Surface Mounted 20A Double Pole Switch nr 1 -
V22.18 Flush Mounted Unswitched Fuse Connection Unit nr 2 -
V22.19 Surface Mounted Switched Fuse Connection Unit nr 22 -
V22.20 Trunking Mounted 13A BS Single Socket Outlet nr 62 -
V22.21 Trunking Mounted 16A French Single Socket Outlet nr 8 -
V22.22 Surface Mounted 13A BS Single Socket Outlet nr 1 -
V22.23 Flush Mounted Unswitched Fuse Connection Unit nr 2 -
V22.24 Surface Mounted Switched Fuse Connection Unit nr 28 -
Multi-Outlet Station c/w 8Nos 2P+E 16A sockets, non-manageable switch with 6Nos RJ45
V22.25 Cat6 outlets, 1No 1 m length VGA cord with female jack nr 1 -
V22.26 Flush Mounted 13A BS Single Socket Outlet nr 2 -
V22.27 Flush Mounted 16A French Single Socket Outlet nr 1 -
V22.28 Surface Mounted 13A BS Single Socket Outlet nr 1 -
V22.29 Flush Mounted BS 13A & 16A French Double Socket Outlet nr 10 -
V22.30 Surface Mounted BS 13A & 16A French Double Socket Outlet nr 3 -
V22.31 Surface Mounted 20A Double Pole Switch nr 1 -
V22.32 Surface Mounted Switched Fuse Connection Unit nr 13 -
Multi-Outlet Station c/w 8Nos 2P+E 16A sockets, non-manageable switch with 6Nos RJ45
V22.33 Cat6 outlets, 1No 1 m length VGA cord with female jack nr 3 -
V22.34 Flush Mounted 13A BS Single Socket Outlet nr 3 -
V22.35 Trunking Mounted 13A BS Single Socket Outlet nr 58 -
V22.36 Trunking Mounted 16A French Single Socket Outlet nr 6 -
V22.37 Surface Mounted 13A BS Single Socket Outlet nr 1 -
V22.38 Flush Mounted BS 13A & 16A French Double Socket Outlet nr 20 -
V22.39 Flush Mounted 20A Double Pole Switch nr 2 -
V22.40 Surface Mounted 20A Double Pole Switch nr 2 -
V22.41 Flush Mounted Unswitched Fuse Connection Unit nr 2 -
V22.42 Surface Mounted Switched Fuse Connection Unit nr 29 -
Multi-Outlet Station c/w 8Nos 2P+E 16A sockets, non-manageable switch with 6Nos RJ45
V22.43 Cat6 outlets, 1No 1 m length VGA cord with female jack nr 1 -
V22.44 Surface Mounted 13A BS Switched Single Socket Outlet (Waterproof) nr 2 -
ELECTROMECHANICAL EQUIPMENT
V22.45 Four Pole Isolator 63A - Outdoor VRFs nr 1 -
V22.46 Four Pole Isolator 80A - Outdoor VRFs nr 3 -
V22.47 Four Pole Isolator 40A - Water Pumps nr 1 -
V22.48 Four Pole Isolator 40A - Elevator System nr 1 -
V22.49 Four Pole Isolator 20A - Booster Pump nr 1 -
V22.50 Two Pole Isolator 20A - Boom Barrier nr 1 -
3. CABLE CONTAINMENT
V22.51 Double Compartment Trunking 130 x 50 mm m 20 -
V22.52 Double Compartment Trunking 130 x 50 mm m 110 -
V22.53 PVC Floor Trunking 92 x 20 mm m 15 -
V22.54 Mini-Column Type A nr 5 -
V22.55 Double Compartment Trunking 130 x 50 mm m 135 -
V22.56 PVC Floor Trunking 92 x 20 mm m 35 -
V22.57 Mini-Column Type A nr 1 -
V22.58 Double Compartment Trunking 130 x 50 mm m 135 -
V22.59 PVC Floor Trunking 92 x 20 mm m 5 -
V22.60 Mini-Column Type A nr 1 -
7. FINAL CIRCUITS
GROUND FLOOR - FROM DBNE-GF TO FITTINGS
V22.61 P1 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.62 P2 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.63 P3 3C x 2.5 mm² Cu/PVC/PVC nr 4 -
V22.64 P4 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.65 P5 3C x 2.5 mm² Cu/PVC/PVC nr 4 -
V22.66 P6 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.67 P7 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.68 DB-AC 3C x 4.0 mm² Cu/PVC/PVC m 30 -
V22.69 AC01 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.70 AC02 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.71 FCU1 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
GROUND FLOOR - FROM DBE-GF TO FITTINGS
V22.72 RS1 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.73 RS2 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.74 RS3 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
FIRST FLOOR - FROM DBNE-1F TO FITTINGS
V22.75 P1 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.76 P2 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.77 P3 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.78 P4 3C x 2.5 mm² Cu/PVC/PVC nr 4 -
V22.79 P5 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.80 P6 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.81 HD1 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.82 HD2 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.83 HD3 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.84 HD4 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.85 FCU1 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.86 FCU2 3C x 2.5 mm² Cu/PVC/PVC nr 5 -
V22.87 FCU3 3C x 2.5 mm² Cu/PVC/PVC nr 7 -
FIRST FLOOR - FROM DBE-1F TO FITTINGS
V22.88 RS1 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.89 V1 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.90 V2 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
SECOND FLOOR - FROM DBNE-2F TO FITTINGS
V22.91 P1 3C x 2.5 mm² Cu/PVC/PVC nr 8 -
V22.92 P2 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.93 P3 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.94 P4 3C x 2.5 mm² Cu/PVC/PVC nr 6 -
V22.95 P5 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.96 P6 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.97 HD1 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.98 HD2 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.99 HD3 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.100 FCU1 3C x 2.5 mm² Cu/PVC/PVC nr 8 -
V22.101 FCU2 3C x 2.5 mm² Cu/PVC/PVC nr 15 -
SECOND FLOOR - FROM DBE-2F TO FITTINGS
V22.102 V1 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.103 V2 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
THIRD FLOOR - FROM DBNE-3F TO FITTINGS
V22.104 P1 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.105 P2 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.106 P3 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.107 P4 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.108 P5 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.109 P6 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.110 P7 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.111 HD1 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.112 FCU1 3C x 2.5 mm² Cu/PVC/PVC nr 8 -
V22.113 EWH 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
THIRD FLOOR - FROM DBE-3F TO FITTINGS
V22.114 P1 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.115 P2 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.116 V1 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.117 V2 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
FOURTH FLOOR - FROM DBNE-4F TO FITTINGS
V22.118 P1 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.119 P2 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.120 P3 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.121 P4 3C x 2.5 mm² Cu/PVC/PVC nr 4 -
V22.122 P5 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.123 P6 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.124 P7 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.125 P8 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.126 P9 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.127 P10 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V22.128 HD1 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.129 HD2 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.130 HD3 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V22.131 FCU1 3C x 2.5 mm² Cu/PVC/PVC nr 11 -
V22.132 FCU2 3C x 2.5 mm² Cu/PVC/PVC nr 10 -
V22.133 FCU3 3C x 2.5 mm² Cu/PVC/PVC nr 4 -
FOURTH FLOOR - FROM DBE-4F TO FITTINGS
V22.134 V1 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.135 V2 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V22.136 DB-AC 3C x 10.0 mm² Cu/PVC/PVC m 55 -
ROOF - FROM DBE-RF TO FITTINGS
V22.137 P1 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
ELECTROMECHANICAL EQUIPMENT - From DB TO FITTING
V22.138 BG1/DBE-GF 3C x 2.5 mm² Cu/PVC/PVC m 5 -
V22.139 WP/DBNE-GF 5C x 2.5 mm² Cu/PVC/PVC m 10 -
V22.140 VRF1/DBNE-GF 4C x 25 mm² Cu/PVC/PVC + CPC 1C x 16 mm² Cu/PVC m 50 -
V22.141 VRF2/DBNE-GF 4C x 25 mm² Cu/PVC/PVC + CPC 1C x 16 mm² Cu/PVC m 53 -
V22.142 VRF3/DBNE-GF 5C x 10 mm² Cu/PVC/PVC m 56 -
V22.143 VRF4/DBNE-GF 4C x 25 mm² Cu/PVC/PVC + CPC 1C x 16 mm² Cu/PVC m 59 -
V22.144 LFT1/DBE-RF 5C x 4 mm² Cu/PVC/PVC m 25 -
V22.145 BP/DBE-RF 5C x 1.5 mm² Cu/PVC/PVC m 25 -
Bill No. V32: Uninterruptible Power Supply
V32 - Uninterruptible Power Supply
Supply and install general uninterruptible power supply system as described in
specification V32, tender drawings and broken down as follows:
1. PRIMARY EQUIPMENT
V32.1 30 kVA Double Conversion Online UPS nr 1 -
V32.2 30 kVA Isolation Transformer nr 1 -
2. TERMINAL EQUIPMENT AND FITTINGS
V32.3 Trunking Mounted 16A Single Socket Outlet Red nr 4 -
V32.4 Flush Mounted 20A Double Pole Switch nr 1 -
V32.5 Trunking Mounted 16A Single Socket Outlet Red nr 58 -
V32.6 Trunking Mounted 16A Single Socket Outlet Red nr 54 -
V32.7 Trunking Mounted 16A Single Socket Outlet Red nr 3 -
V32.8 Trunking Mounted 16A Single Socket Outlet Red nr 53 -
7. FINAL CIRCUITS
GROUND FLOOR - FROM DBU-GF TO FITTINGS
V32.9 P1 3C x 2.5 mm² Cu/PVC/PVC nr 3 -
V32.10 RP 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V32.11 AM 3C x 4.0 mm² Cu/PVC/PVC nr 1 -
FIRST FLOOR - FROM DBU-1F TO FITTINGS
V32.12 P1 3C x 2.5 mm² Cu/PVC/PVC nr 9 -
V32.13 P2 3C x 2.5 mm² Cu/PVC/PVC nr 9 -
V32.14 P3 3C x 2.5 mm² Cu/PVC/PVC nr 10 -
V32.15 P4 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
SECOND FLOOR - FROM DBU-2F TO FITTINGS
V32.16 P1 3C x 2.5 mm² Cu/PVC/PVC nr 10 -
V32.17 P2 3C x 2.5 mm² Cu/PVC/PVC nr 9 -
V32.18 P3 3C x 2.5 mm² Cu/PVC/PVC nr 9 -
P4 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
THIRD FLOOR - FROM DBU-3F TO FITTINGS
V32.20 P1 3C x 2.5 mm² Cu/PVC/PVC nr 5 -
FOURTH FLOOR - FROM DBU-4F TO FITTINGS
V32.21 P1 3C x 2.5 mm² Cu/PVC/PVC nr 5 -
V32.22 P2 3C x 2.5 mm² Cu/PVC/PVC nr 5 -
V32.23 P3 3C x 2.5 mm² Cu/PVC/PVC nr 12 -
V32.24 P4 3C x 2.5 mm² Cu/PVC/PVC nr 2 -
V32.25 P5 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V32.26 P6 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V32.27 P7 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V32.28 FA 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
V32.29 BP 3C x 2.5 mm² Cu/PVC/PVC nr 1 -
Bill No. V33: LV Earthing and Bonding
V33 - LV Earthing and Bonding
Supply and install LV earthing and bonding as described in specification V20, V21, V22,
V33, V35, tender drawings and broken down as follows:
3. CABLE CONTAINMENT
V33.1 PVC MD DN50 m 5 -
V33.2 PVC MD DN50 m 5 -
ELECTRICAL RISER
V33.3 Medium Duty Cable Tray 50 x 25 mm - Clean Earth Cables m 20 -
V33.4 Medium Duty Cable Tray HD 50 x 25 mm - Clean Earth Cables m 50 -
1 x 120 mm² Cu/PVC Green/Yellow complete with terminations - From Raw Earth Bar to
1 x 120mm² Cu/PVC Green/Yellow complete with terminations - From earth rod to Raw
V33.6 Earth Bar m 20 -
V33.7 Bare Cu cable 120 mm2 - From earth rod to earth rod m 15 -
V33.8 1C x 120 mm² CPC Cu/PVC complete with terminations - From MLVP to CEB-BB m 20 -
V33.9 1C x 95 mm² CPC Cu/PVC complete with terminations - From MLVP to MDB-ESS m 10 -
V33.10 1C x 70 mm² CPC Cu/PVC complete with terminations - From MLVP to DBNE-3F m 37 -
V33.11 1C x 16 mm² CPC Cu/PVC complete with terminations - From MDB-ESS to DBE-2F m 32 -
V33.12 1C x 16 mm² CPC Cu/PVC complete with terminations - From MDB-ESS to DBE-4F m 43 -
1 x 120 mm² Cu/PVC Green/Yellow complete with terminations - Clean Earth Bar to
V33.13 Server Room m 50 -
1 x 120mm² Cu/PVC Green/Yellow complete with terminations - From earth rod to
V33.14 Clean Earth Bar m 30 -
V33.15 Bare Cu cable 120 mm2 - From earth rod to earth rod m 15 -
1C x 50 mm² CPC Cu/PVC complete with terminations - From Earth Bar in Server Room
V33.16 to DB-ITX1 m 5 -
1C x 50 mm² CPC Cu/PVC complete with terminations - From Earth Bar in Server Room
V33.17 to DB-ITX2 m 5 -
1C x 50 mm² CPC Cu/PVC complete with terminations - From Earth Bar in Server Room
1C x 50 mm² CPC Cu/PVC complete with terminations - From Earth Bar in Server Room
1C x 50 mm² CPC Cu/PVC complete with terminations - From Earth Bar in Server Room
1C x 50 mm² CPC Cu/PVC complete with terminations - From Earth Bar in Server Room
1C x 16 mm² CPC Cu/PVC complete with terminations - From Earth Bar in Server Room
V33.22 to MDB-UPS m 15 -
V33.23 1C x 16 mm² CPC Cu/PVC complete with terminations - From MDB-UPS to DBU-GF m 70 -
V33.24 1C x 16 mm² CPC Cu/PVC complete with terminations - From MDB-UPS to DBU-1F m 52 -
V33.25 1C x 16 mm² CPC Cu/PVC complete with terminations - From MDB-UPS to DBU-2F m 55 -
V33.26 1C x 16 mm² CPC Cu/PVC complete with terminations - From MDB-UPS to DBU-3F m 55 -
V33.27 1C x 16 mm² CPC Cu/PVC complete with terminations - From MDB-UPS to DBU-4F m 15 -
12. ELECTRODES, EARTH RODS, AIR TERMINATIONS, TERMINATION BARS
V33.28 Testing of existing earthing system item 1 -
V33.29 Main earth bar with disconnecting links nr 1 -
V33.30 Earth rod copper cladded steel of Ø15 mm, length 1200 mm c/w coupling nr 6 -
V33.31 Earth clamp suitable for Ø15 mm earth rod and 120 mm² copper cable nr 3 -
V33.32 Earth Inspection Pit nr 1 -
V33.33 Equipotential bonding of all extraneous metal parts item 1 -
V33.34 Testing of existing earthing system item 1 -
V33.35 Main earth bar with disconnecting links nr 2 -
V33.36 Earth rod copper cladded steel of Ø15 mm, length 1200 mm c/w coupling nr 3 -
V33.37 Earth clamp suitable for Ø15 mm earth rod and 50 mm² copper cables nr 3 -
V33.38 Earth Inspection Pit nr 1 -
GENERATOR EARTH
V33.39 Testing of existing earthing system for genset item 1 -
Bill No. V35: Lightning & Surge Protection
V35 - Lightning & Surge Protection
Supply and install lightning & surge protection as described in specification V20, V21,
V22, V33, V35, tender drawings and broken down as follows:
1. PRIMARY EQUIPMENT
V35.1 Early Streamer Emission Air Terminal nr 1 -
V35.2 Mast Adaptor nr 1 -
V35.3 3m FRP insulated Upper Insulating Support nr 1 -
V35.4 Inline coupling nr 1 -
V35.5 Stainless Steel Guy Wire m 25 -
V35.6 Guy ring nr 1 -
V35.7 HV Upper termination kit nr 1 -
V35.8 HV Lower termination kit nr 1 -
V35.9 3m Galvanised Mast c/w Support Base nr 1 -
2. TERMINAL EQUIPMENT AND FITTINGS
V35.10 Lightning Event Counter nr 1 -
3. CABLE CONTAINMENT
V35.11 PVC MD DN32 Conduit - From earth inspection pit to MLVP Room m 30 -
V35.12 50mm2 High-Voltage Resistant Insulated Copper Downconductor m 45 -
V35.13 1c70 mm2 Cu/PVC cable green/yellow for equipotential bonding - Raw Earth Earth m 45 -
V35.14 1c70 mm2 Cu/PVC cable green/yellow for equipotential bonding - Clean Earth m 45 -
12. ELECTRODES, EARTH RODS, AIR TERMINATIONS, TERMINATION BARS
V35.15 Earth rod copper cladded steel of Ø15 mm, length 1200 mm c/w coupling nr 8 -
V35.16 Earth clamp suitable for Ø15 mm earth rod and 70 mm² copper cable nr 4 -
V35.17 Bare copper cable 70 mm2 from earth rod to earth rod m 15 -
1c70 mm2 Cu/PVC cable green/yellow from main earth Bar to Lightning protection earth
V35.19 Transient Earth Clamp nr 2 -
V35.20 Earth Inspection Pit nr 1 -
V35.21 Waterproofing Mastic item 1 -
V35.22 Equipotential bonding item 1 -
Bill No. V40: Emergency Lighting
V40 - Emergency Lighting
Supply and install emergency lighting as described in specification V40, tender drawings
and broken down as follows:
2. TERMINAL EQUIPMENT AND FITTINGS
V40.1 Emergency Light Type L nr 3 -
V40.2 Emergency Light Type M nr 10 -
V40.3 Exit Light Type O nr 1 -
V40.4 Exit Light Type P nr 1 -
V40.5 Directional Light Type R nr 2 -
V40.6 Emergency Lighting Test Switch nr 1 -
V40.7 Emergency Light Type L nr 10 -
V40.8 Exit Light Type O nr 3 -
V40.9 Directional Light Type Q nr 2 -
V40.10 Emergency Lighting Test Switch nr 1 -
V40.11 Emergency Light Type L nr 19 -
V40.12 Emergency Light Type N nr 1 -
V40.13 Exit Light Type O nr 2 -
V40.14 Directional Light Type Q nr 6 -
V40.15 Emergency Lighting Test Switch nr 1 -
V40.16 Emergency Light Type L nr 9 -
V40.17 Emergency Light Type M nr 6 -
V40.18 Emergency Light Type N nr 4 -
V40.19 Exit Light Type O nr 3 -
V40.20 Directional Light Type Q nr 3 -
V40.21 Emergency Lighting Test Switch nr 1 -
V40.22 Emergency Light Type L nr 16 -
V40.23 Exit Light Type O nr 2 -
V40.24 Directional Light Type Q nr 7 -
V40.25 Emergency Lighting Test Switch nr 1 -
V40.26 Emergency Light Type M nr 1 -
V40.27 Emergency Lighting Test Switch nr 1 -
7. FINAL CIRCUITS
GROUND FLOOR - FROM DBE-GF TO FITTINGS
V40.28 EML1 3C x 1.5 mm² Cu/PVC/PVC nr 18 -
V40.29 Switch points 3C x 1.5 mm² Cu/PVC/PVC nr 1 -
FIRST FLOOR - FROM DBE-1F TO FITTINGS
V40.30 EML1 3C x 1.5 mm² Cu/PVC/PVC nr 16 -
V40.31 Switch points 3C x 1.5 mm² Cu/PVC/PVC nr 1 -
SECOND FLOOR - FROM DBE-2F TO FITTINGS
V40.32 EML1 3C x 1.5 mm² Cu/PVC/PVC nr 28 -
V40.33 Switch points 3C x 1.5 mm² Cu/PVC/PVC nr 1 -
THIRD FLOOR - FROM DBE-3F TO FITTINGS
V40.34 EML1 3C x 1.5 mm² Cu/PVC/PVC nr 25 -
V40.35 Switch points 3C x 1.5 mm² Cu/PVC/PVC nr 1 -
FOURTH FLOOR - FROM DBE-4F TO FITTINGS
V40.36 EML1 3C x 1.5 mm² Cu/PVC/PVC nr 25 -
V40.37 Switch points 3C x 1.5 mm² Cu/PVC/PVC nr 1 -
ROOF - FROM RF-CS TO FITTINGS
V40.38 EML1 3C x 1.5 mm² Cu/PVC/PVC nr 1 -
V40.39 Switch points 3C x 1.5 mm² Cu/PVC/PVC nr 1 -
Bill No. W20: Closed Circuit Television (CCTV)
W20 - Closed Circuit Television
Supply and install closed circuit television as described in specification W20, W70, tender
drawings and broken down as follows:
1. PRIMARY EQUIPMENT
W20.1 Network Video Recorder 32 channels nr 2 -
W20.2 Hard disk drive 10TB nr 10 -
W20.3 Central Processing Unit nr 2 -
W20.4 Data Switch Type SA nr 2 -
W20.5 Data Switch Type SB nr 2 -
W20.6 Data Switch Type SC nr 1 -
W20.7 Patch cord 1 m nr 16 -
W20.8 Patch cord 2 m nr 18 -
W20.9 Patch cord 3 m nr 16 -
W20.10 Patch cord 5 m nr 16 -
W20.11 SFP Transceiver Module nr 10 -
W20.12 Media Converter nr 4 -
2. TERMINAL EQUIPMENT AND FITTINGS
W20.13 Fixed Lens Bullet Camera Type T1 nr 9 -
W20.14 Varifocal Lens Bullet Camera Type T2 nr 2 -
W20.15 Fixed Lens Dome Camera Type T3 nr 5 -
W20.16 Pinhole Camera nr 1 -
W20.17 Monitor nr 4 -
W20.18 Fixed Lens Dome Camera Type T3 nr 16 -
W20.19 Fixed Lens Dome Camera Type T3 nr 7 -
W20.20 Fixed Lens Dome Camera Type T3 nr 3 -
W20.21 Fixed Lens Dome Camera Type T3 nr 10 -
W20.22 Monitor nr 1 -
W20.23 6 Core Multimode OM3 50/125 µm 10 Gbps Optic Fibre Cable - From DC1-GF to MDF m 80 -
W20.24 6 Core Multimode OM3 50/125 µm 10 Gbps Optic Fibre Cable - From DC1-1F to MDF m 75 -
W20.25 HDMI Cable 10 m c/w terminations nr 4 -
W20.26 6 Core Multimode OM3 50/125 µm 10 Gbps Optic Fibre Cable - From DC1-2F to MDF m 70 -
W20.27 F/UTP Cat 6 - From DC1-3F to MDF m 70 -
6 Core Multimode OM3 50/125 µm 10 Gbps Optic Fibre Cable - From DC1-4F to MDF 5 -
W20.28 HDMI Cable 10 m c/w terminations nr 1 -
6. CABLE TERMINATIONS AND JOINTS
W20.29 RJ45 Cat6 Plug nr 2 -
W20.30 LC Connector nr 24 -
7. FINAL CIRCUITS
GROUND FLOOR - FROM DC1 TO CAMERAS
W20.31 Fixed Lens Bullet Camera F/UTP Cat6 nr 9 -
W20.32 Varifocal Lens Bullet Camera F/UTP Cat6 nr 2 -
W20.33 Fixed Lens Dome Camera F/UTP Cat6 nr 5 -
W20.34 Pinhole Camera nr 1 -
FIRST FLOOR - FROM DC2 TO CAMERAS
W20.35 Fixed Lens Dome Camera F/UTP Cat6 nr 16 -
SECOND FLOOR - FROM DC3 TO CAMERAS
W20.36 Fixed Lens Dome Camera F/UTP Cat6 nr 7 -
THIRD FLOOR - FROM DC4 TO CAMERAS
W20.37 Fixed Lens Dome Camera F/UTP Cat6 nr 3 -
FOURTH FLOOR - FROM MDF TO CAMERAS
W20.38 Fixed Lens Dome Camera F/UTP Cat6 nr 10 -
Bill No. W41: Security Detection & Alarm
W41 - Security Detection and Alarm
Supply, and install security detection and alarm as described in specification W41, tender
drawings and broken down as follows:
1. PRIMARY EQUIPMENT
W41.1 8-Zones Hardwired Burglar Alarm Panel nr 1 -
W41.2 Keypad nr 1 -
W41.3 Zone Expander - 16 Zones nr 2 -
W41.4 GSM Module nr 1 -
2. TERMINAL EQUIPMENT AND FITTINGS
W41.5 Vibration Detector nr 1 -
W41.6 Magnetic Contact nr 3 -
W41.7 Heavy Duty Roller Shutter Contact nr 3 -
W41.8 PIR Detector nr 3 -
W41.9 Internal Sounder nr 1 -
W41.10 External Sounder nr 2 -
W41.11 Keypad nr 1 -
W41.12 Vibration Detector nr 2 -
W41.13 Magnetic Contact nr 1 -
W41.14 Panic Button nr 2 -
W41.15 Magnetic Contact nr 2 -
W41.16 PIR Detector nr 1 -
W41.17 Panic Button nr 1 -
W41.18 Seismic Detector nr 3 -
W41.19 Keypad nr 1 -
W41.20 Magnetic Contact nr 1 -
W41.21 PIR Detector nr 1 -
W41.22 Panic Button nr 1 -
W41.23 Seismic Detector nr 4 -
W41.24 Vibration Detector nr 25 -
W41.25 Magnetic Contact nr 4 -
W41.26 Heavy Duty Roller Shutter Contact nr 1 -
W41.27 PIR Detector nr 4 -
W41.28 Internal Sounder nr 1 -
W41.29 Panic Button nr 17 -
W41.30 Keypad nr 1 -
W41.31 Vibration Detector nr 27 -
W41.32 Magnetic Contact nr 3 -
W41.33 PIR Detector nr 7 -
W41.34 Internal Sounder nr 1 -
W41.35 Panic Button nr 4 -
W41.36 Keypad nr 1 -
W41.37 Vibration Detector nr 11 -
W41.38 Magnetic Contact nr 2 -
W41.39 PIR Detector nr 2 -
W41.40 Internal Sounder nr 1 -
W41.41 Panic Button nr 1 -
W41.42 Vibration Detector nr 16 -
W41.43 Magnetic Contact nr 1 -
W41.44 PIR Detector nr 1 -
W41.45 Keypad nr 1 -
W41.46 Vibration Detector nr 26 -
W41.47 Magnetic Contact nr 3 -
W41.48 PIR Detector nr 5 -
W41.49 Internal Sounder nr 1 -
W41.50 Panic Button nr 2 -
W41.51 Keypad nr 1 -
W41.52 Vibration Detector nr 5 -
W41.53 Magnetic Contact nr 1 -
W41.54 Panic Button nr 1 -
7. FINAL CIRCUITS
W41.55 Vibration Detector nr 1 -
W41.56 Magnetic Contact nr 3 -
W41.57 Heavy Duty Roller Shutter Contact nr 3 -
W41.58 PIR Detector nr 3 -
W41.59 Internal Sounder nr 1 -
W41.60 External Sounder nr 2 -
W41.61 Keypad nr 1 -
W41.62 Vibration Detector nr 2 -
W41.63 Magnetic Contact nr 1 -
W41.64 Panic Button nr 2 -
W41.65 Magnetic Contact nr 2 -
W41.66 PIR Detector nr 1 -
W41.67 Panic Button nr 1 -
W41.68 Seismic Detector nr 3 -
W41.69 Keypad nr 1 -
W41.70 Magnetic Contact nr 1 -
W41.71 PIR Detector nr 1 -
W41.72 Panic Button nr 1 -
W41.73 Seismic Detector nr 4 -
W41.74 Vibration Detector nr 25 -
W41.75 Magnetic Contact nr 4 -
W41.76 Heavy Duty Roller Shutter Contact nr 1 -
W41.77 PIR Detector nr 4 -
W41.78 Internal Sounder nr 1 -
W41.79 Panic Button nr 17 -
W41.80 Keypad nr 1 -
W41.81 Vibration Detector nr 27 -
W41.82 Magnetic Contact nr 3 -
W41.83 PIR Detector nr 7 -
W41.84 Internal Sounder nr 1 -
W41.85 Panic Button nr 4 -
W41.86 Keypad nr 1 -
W41.87 Vibration Detector nr 11 -
W41.88 Magnetic Contact nr 2 -
W41.89 PIR Detector nr 2 -
W41.90 Internal Sounder nr 1 -
W41.91 Panic Button nr 1 -
W41.92 Vibration Detector nr 16 -
W41.93 Magnetic Contact nr 1 -
W41.94 PIR Detector nr 1 -
W41.95 Keypad nr 1 -
W41.96 Vibration Detector nr 26 -
W41.97 Magnetic Contact nr 3 -
W41.98 PIR Detector nr 5 -
W41.99 Internal Sounder nr 1 -
W41.100 Panic Button nr 2 -
W41.101 Keypad nr 1 -
W41.102 Vibration Detector nr 5 -
W41.103 Magnetic Contact nr 1 -
W41.104 Panic Button nr 1 -
Bill No. W50: Fire Detection & Alarm
W50 - Fire Detection and Alarms
Supply, and install fire detection and alarms as described in specification W50, tender
drawings and broken down as follows:
1. PRIMARY EQUIPMENT
W50.1 4-Loop Addressable Fire Alarm Panel nr 1 -
W50.2 Integrated Standby Battery 15 AH nr 1 -
W50.3 Fire Alarm Repeater panel nr 1 -
2. TERMINAL EQUIPMENT AND FITTINGS
W50.4 Signage for Manual Break Glash Push Button nr 19 -
W50.5 Heat Detector nr 7 -
W50.6 Smoke Detector nr 8 -
W50.7 Manual Break Glass Push Button nr 2 -
W50.8 Manual Break Glass Push Button IP65 nr 1 -
W50.9 Fire Alarm Sounder c/w Strobe Light nr 2 -
W50.10 Fire Alarm Sounder c/w Strobe Light IP65 nr 1 -
W50.11 Isolating Module nr 3 -
W50.12 Output Control Module nr 2 -
W50.13 Smoke Detector nr 23 -
W50.14 Manual Break Glass Push Button nr 5 -
W50.15 Fire Alarm Sounder c/w Strobe Light nr 5 -
W50.16 Isolating Module nr 3 -
W50.17 Smoke Detector nr 31 -
W50.18 Manual Break Glass Push Button nr 3 -
W50.19 Fire Alarm Sounder c/w Strobe Light nr 3 -
W50.20 Isolating Module nr 3 -
W50.21 Smoke Detector nr 23 -
W50.22 Manual Break Glass Push Button nr 4 -
W50.23 Fire Alarm Sounder c/w Strobe Light nr 4 -
W50.24 Isolating Module nr 3 -
W50.25 Output Control Module nr 1 -
W50.26 Smoke Detector nr 34 -
W50.27 Manual Break Glass Push Button nr 3 -
W50.28 Fire Alarm Sounder c/w Strobe Light nr 3 -
W50.29 Isolating Module nr 3 -
W50.30 Smoke Detector nr 1 -
W50.31 Manual Break Glass Push Button nr 1 -
W50.32 Fire Alarm Sounder c/w Strobe Light IP65 nr 1 -
W50.33 Isolating Module nr 3 -
W50.34 Smoke Detector nr 1 -
W50.35 Isolating Module nr 2 -
W50.36 Output Control Module nr 1 -
3. CABLE CONTAINMENT
W50.37 Medium Duty Cable Tray HD 50 x 25 mm - For Fire Alarm Cables m 35 -
W50.38 Medium Duty Cable Tray HD 50 x 25 mm - For Fire Alarm Cables m 40 -
W50.39 Medium Duty Cable Tray HD 50 x 25 mm - For Fire Alarm Cables m 40 -
W50.40 Medium Duty Cable Tray HD 50 x 25 mm - For Fire Alarm Cables m 30 -
W50.41 Medium Duty Cable Tray HD 50 x 25 mm - For Fire Alarm Cables m 50 -
ELECTRICAL RISER
W50.42 Medium Duty Cable Tray HD 50 x 25 mm - For Fire Alarm Cables m 20 -
2C+CPC x 1.5 mm2 Fire Resistant Screened Cable - From Fire Alarm Panel to Fire Alarm
W50.43 Repeater Panel m 80 -
W50.44 2C+CPC x 1.5 mm2 Fire Resistant Screened Cable - Control Cables m 80 -
7. FINAL CIRCUITS
LOOP-1 ZONE A 2C+CPC X 1.0 MM2 FIRE RESISTANT SCREENED CABLE
W50.45 Heat Detector nr 7 -
W50.46 Smoke Detector nr 8 -
W50.47 Manual Break Glass Push Button nr 2 -
W50.48 Manual Break Glass Push Button IP65 nr 1 -
W50.49 Fire Alarm Sounder c/w Strobe Light nr 2 -
W50.50 Fire Alarm Sounder c/w Strobe Light IP65 nr 1 -
W50.51 Isolating Module nr 3 -
W50.52 Output Control Module nr 2 -
LOOP-1 ZONE B 2C+CPC X 1.0 MM2 FIRE RESISTANT SCREENED CABLE
W50.53 Smoke Detector nr 23 -
W50.54 Manual Break Glass Push Button nr 5 -
W50.55 Fire Alarm Sounder c/w Strobe Light nr 5 -
W50.56 Isolating Module nr 3 -
LOOP-2 ZONE C 2C+CPC X 2.5 MM2 FIRE RESISTANT SCREENED CABLE
W50.57 Smoke Detector nr 31 -
W50.58 Manual Break Glass Push Button nr 3 -
W50.59 Fire Alarm Sounder c/w Strobe Light nr 3 -
W50.60 Isolating Module nr 3 -
LOOP-2 ZONE D 2C+CPC X 2.5 MM2 FIRE RESISTANT SCREENED CABLE
W50.61 Smoke Detector nr 23 -
W50.62 Manual Break Glass Push Button nr 4 -
W50.63 Fire Alarm Sounder c/w Strobe Light nr 4 -
W50.64 Isolating Module nr 3 -
W50.65 Output Control Module nr 1 -
LOOP-2 ZONE E 2C+CPC X 2.5 MM2 FIRE RESISTANT SCREENED CABLE
W50.66 Smoke Detector nr 34 -
W50.67 Manual Break Glass Push Button nr 3 -
W50.68 Fire Alarm Sounder c/w Strobe Light nr 3 -
W50.69 Isolating Module nr 3 -
LOOP-3 ZONE I 2C+CPC X 1.5 MM2 FIRE RESISTANT SCREENED CABLE
W50.70 Smoke Detector nr 1 -
W50.71 Manual Break Glass Push Button nr 1 -
W50.72 Fire Alarm Sounder c/w Strobe Light IP65 nr 1 -
W50.73 Isolating Module nr 3 -
LOOP-3 ZONE J 2C+CPC X 1.5 MM2 FIRE RESISTANT SCREENED CABLE
W50.74 Smoke Detector nr 1 -
W50.75 Isolating Module nr 2 -
W50.76 Output Control Module nr 1 -
Bill No. W70: Structured Cabling
W70 - Structured Cabling
Supply and install structured cabling as described in specification W20, W70, tender
drawings and broken down as follows:
1. PRIMARY EQUIPMENT
W70.1 Laying of cables from Incoming Telecom Network to Server Room item 1 -
W70.2 Liaise with Telecom Authorities item 1 -
W70.3 42U Data Cabinet nr 3 -
W70.4 21U Data Cabinet nr 5 -
W70.5 24 Port CAT 6 Patch Panel nr 10 -
W70.6 Cable Manager nr 10 -
W70.7 Power bar nr 10 -
W70.8 Patch cord nr 225 -
2. TERMINAL EQUIPMENT AND FITTINGS
W70.9 RJ45 Telephone Single Socket Outlet nr 2 -
W70.10 RJ45 Data Single Socket Outlet nr 5 -
W70.11 RJ45 Telephone Single Socket Outlet nr 29 -
W70.12 RJ45 Data Single Socket Outlet nr 34 -
W70.13 RJ45 Telephone Single Socket Outlet nr 27 -
W70.14 RJ45 Data Single Socket Outlet nr 34 -
W70.15 RJ45 Data Single Socket Outlet nr 3 -
W70.16 RJ45 Telephone Single Socket Outlet nr 26 -
W70.17 RJ45 Data Single Socket Outlet nr 35 -
3. CABLE CONTAINMENT
W70.18 PVC MD DN32 - From Telecom Network to ATM Room m 35 -
W70.19 Medium Duty Cable Tray HD 50 x 25 mm - Telecom Cables m 3 -
W70.20 Medium Duty Cable Tray HD 50 x 25 mm - ELV Cables m 30 -
W70.21 Heavy Duty Cable Tray 300 x 50 mm c/w divider - ELV Cables m 30 -
W70.22 Heavy Duty Cable Tray HD 100 x 50 mm - Structured Cabling System m 40 -
W70.23 Heavy Duty Cable Tray HD 100 x 50 mm - CCTV Cables m 40 -
W70.24 Heavy Duty Cable Tray HD 100 x 50 mm - Structured Cabling System m 40 -
W70.25 Heavy Duty Cable Tray HD 100 x 50 mm - CCTV Cables m 40 -
W70.26 Heavy Duty Cable Tray HD 100 x 50 mm - Structured Cabling System m 30 -
W70.27 Heavy Duty Cable Tray HD 100 x 50 mm - CCTV Cables m 30 -
W70.28 Medium Duty Cable Tray HD 50 x 25 mm - Telecom Cables m 50 -
W70.29 Heavy Duty Cable Tray HD 100 x 50 mm - Structured Cabling System m 50 -
W70.30 Heavy Duty Cable Tray HD 100 x 50 mm - CCTV Cables m 50 -
ELECTRICAL RISER
W70.31 Medium Duty Cable Tray HD 50 x 25 mm - Telecom Cables m 20 -
W70.32 Heavy Duty Cable Tray HD 100 x 50 mm - Structured Cabling System m 20 -
W70.33 Heavy Duty Cable Tray HD 100 x 50 mm - CCTV Cables m 20 -
7. FINAL CIRCUITS
GROUND FLOOR - FROM DATA CABINET TO FITTINGS
W70.34 F/UTP Cat 6 - From DC1-GF to Telephone point nr 2 -
W70.35 F/UTP Cat 6 - From DC1-GF to Data point nr 5 -
FIRST FLOOR - FROM DATA CABINET TO FITTINGS
W70.36 F/UTP Cat 6 - From DC1-1F to Telephone point nr 30 -
W70.37 F/UTP Cat 6 - From DC1-1F to Data point nr 34 -
SECOND FLOOR - FROM DATA CABINET TO FITTINGS
W70.38 F/UTP Cat 6 - From DC1-2F to Telephone point nr 30 -
W70.39 F/UTP Cat 6 - From DC1-2F to Data point nr 34 -
THIRD FLOOR - FROM DATA CABINET TO FITTINGS
W70.40 F/UTP Cat 6 - From DC1-3F to Telephone point nr 4 -
W70.41 F/UTP Cat 6 - From DC1-3F to Data point nr 10 -
FOURTH FLOOR - FROM DATA CABINET TO FITTINGS
W70.42 F/UTP Cat 6 - From DC1-4F to Telephone point nr 32 -
W70.43 F/UTP Cat 6 - From DC1-4F to Data point nr 35 -
Bill No. LF: Light Fittings
LF - Light Fittings
Supply and deliver to site the following light fittings as described in Reference Schedule
V21-Luminaires and broken down as follows:
2. TERMINAL EQUIPMENT AND FITTINGS
LF.1 Surface mounted ceiling light Type A nr 35 -
LF.2 Surface mounted wall light Type B nr 4 -
LF.3 Recessed LED panel Type C nr 12 -
LF.4 Surface mounted wall light Type B nr 7 -
LF.5 Recessed LED panel Type C nr 14 -
LF.6 Recessed LED panel Type D nr 50 -
LF.7 Recessed ceiling light Type E nr 18 -
LF.8 Surface mounted ceiling light Type F nr 5 -
LF.9 Surface mounted ceiling light Type G nr 6 -
LF.10 Surface mounted ceiling light Type H nr 10 -
LF.11 Surface mounted wall light Type B nr 12 -
LF.12 Recessed LED panel Type C nr 12 -
LF.13 Recessed LED panel Type D nr 68 -
LF.14 Recessed ceiling light Type E nr 20 -
LF.15 Surface mounted wall light Type B nr 5 -
LF.16 Recessed LED panel Type C nr 17 -
LF.17 Recessed LED panel Type D nr 9 -
LF.18 Recessed ceiling light Type E nr 6 -
LF.19 Recessed ceiling light Type I nr 4 -
LF.20 Recessed ceiling light Type J nr 15 -
LF.21 Surface mounted wall light Type B nr 4 -
LF.22 Recessed LED panel Type C nr 15 -
LF.23 Recessed LED panel Type D nr 58 -
LF.24 Recessed ceiling light Type E nr 18 -
LF.25 Surface mounted ceiling light Type A nr 3 -
Bill No. TLV: Testing & Commissioning - LV Electrical System
Testing & Commissioning
Provide Fire stopping, Identification, Testing, Commissioning, drawings preparation and
Training for the whole electrical and associated services installation as per specification
broken down as follows:
13. FIRE STOPPING AND OTHER ASSOCIATED FIRE PROTECTION WORK
TLV.1 Fire rated Foam of a minimum of 60 min fire rating item 1 -
14. IDENTIFICATION
TLV.2 Labelling as per BS1710 and detailed in specifications V20, V21, V22, V33, V40, V41 item 1 -
TLV.3 All Testing as described in specifications V20, V21, V22, V33, V40, V41 item 1 -
16. COMMISSIONING
TLV.4 All Commisioning as described in specifications V20, V21, V22, V33, V40, V41 item 1 -
19. DRAWING PREPARATION
TLV.5 Installation drawings c/w builder's work information item 1 -
TLV.6 All Training as described in specification A64 item 1 -
Bill No. TLP: Testing & Commissioning - Lightning Protection System
Testing & Commissioning
Provide Identification, Testing, Commissioning, drawings preparation and Training for the
lightning and protection system installation as per specification broken down as follows:
14. IDENTIFICATION
TLP.1 Labelling as per BS1710 and detailed in specifications V33, V35 item 1 -
TLP.2 All Testing as described in specifications V33, V35 item 1 -
16. COMMISSIONING
TLP.3 All Commisioning as described in specifications V33, V35 item 1 -
19. DRAWING PREPARATION
TLP.4 Installation drawings c/w builder's work information item 1 -
TLP.5 All Training as described in specification A64 item 1 -
Bill No. TCV: Testing & Commissioning - Closed Circuit Television (CCTV)
Testing & Commissioning
Provide Identification, Testing, Commissioning, drawings preparation and Training for the
whole CCTV installation as per specification broken down as follows:
14. IDENTIFICATION
TCV.1 Labelling as per BS1710 and detailed in specification W20 item 1 -
TCV.2 All Testing as described in specification W20 item 1 -
16. COMMISSIONING
TCV.3 All Commisioning as described in specification W20 item 1 -
19. DRAWING PREPARATION
TCV.4 Installation drawings c/w builder's work information item 1 -
TCV.5 All Training as described in specification A64 item 1 -
Bill No. TSD: Testing & Commissioning - Security & Detection Alarm
Testing & Commissioning
Provide Identification, Testing, Commissioning, drawings preparation and Training for the
security and detection alarm system installation as per specification and broken down as
14. IDENTIFICATION
TSD.1 Labelling as per BS1710 and detailed in specification W41 item 1 -
TSD.2 All Testing as described in specification W70 item 1 -
16. COMMISSIONING
TSD.3 All Commisioning as described in specification W70 item 1 -
19. DRAWING PREPARATION
TSD.4 Installation drawings c/w builder's work information item 1 -
TSD.5 All Training as described in specification A64 item 1 -
Bill No. TFA: Testing & Commissioning - Fire Detection & Alarm
Testing & Commissioning
Provide Identification, Testing, Commissioning, drawings preparation and Training for the
whole fire alarm and detection systems as per specification broken down as follows:
14. IDENTIFICATION
TFA.1 Labelling as per BS1710 and detailed in specification W50 item 1 -
TFA.2 All Testing as described in specification W50 item 1 -
16. COMMISSIONING
TFA.3 All Commisioning as described in specification W50 item 1 -
19. DRAWING PREPARATION
TFA.4 Installation drawings c/w builder's work information item 1 -
TFA.5 All Training as described in specification A64 item 1 -
Bill No. TSC: Testing & Commissioning - Structured Cabling
Testing & Commissioning
Provide Identification, Testing, Commissioning, drawings preparation and Training for the
structured cabling system installation as per specification broken down as follows:
14. IDENTIFICATION
TSC.1 Labelling as per BS1710 and detailed in specification W70 item 1 -
TSC.2 All Testing as described in specification W70 item 1 -
16. COMMISSIONING
TSC.3 All Commisioning as described in specification W70 item 1 -
19. DRAWING PREPARATION
TSC.4 Installation drawings c/w builder's work information item 1 -
TSC.5 All Training as described in specification A64 item 1 -
Bill No. RD: Record Documentation
Record Documentation
Provide operating and maintenance manuals, systems records and full documentation in
accordance with specification A64 section 810.000 broken down as follows:
RD.1 Record drawings and Schedules item 1 -
RD.2 Plantroom drawings, schedules and schematics item 1 -
RD.3 Operating and Maintenance Manual item 3 -
RD.4 Blank maintenance log item 1 -
Fire Fighting layout as-made drawings prior project completion for application to
RD.5 Mauritius fire services. item 1 -
Bill No. PS: Provisional Sums & Contingencies
Provisional Sums & Contingencies
The folloiwng provisional sums have been allocated for items that have not been
conceptualised yet
PS.1 Contingencies (MUR 1,400,000/-) item 1 1400000 14,00,000.00
PS.2 Lighting Management for Covered Parking (MUR 25,000/-) item 1 25000 25,000.00
PS.3 Emergency assistance alarm (MUR 100,000/-) item 1 100000 1,00,000.00
PS.4 Allowance for furniture fitted sockets (MUR 250,000/-) item 1 100000 2,50,000.00
PS.5 Allowance for instantaneous under counter electric water heater (MUR 25,000/-) item 1 25000 25,000.00
Allowance for modification of electrical supply and fire alarm to single tenant on 3rd
Allowance for connection to existing light points and power points in staircase, lobby and
PS.7 corridor on 5th floor, 6th Floor and 7th Floor (MUR 50,000/-) item 1 50000 50,000.00
PS.8 Allowance for access control (MUR 534,000/-) item 1 534000 5,34,000.00
PS.9 Allowance for earthing enhancement of existing 78 kVA generator (MUR 5,000/-) item 1 5000 5,000.00
PS.10 Multimode fibre link c/w LC connectors (MUR 80,000/-) item 1 80000 80,000.00
PS.11 Provision of temporary supplies during project (MUR 200,000/-) item 1 200000 2,00,000.00
TOTAL OF BILL NO. 04 CARRIED TO MAIN SUMMARY 27,19,000.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
NITBOB.pdf
Tender Document
RBOB DrawingsArchstruMEP1to50.pdf
Tender Document
CS_cover_2_QuotesheetBOB.xlsx
Tender Document
RBOBDrawingsArchstruMEP51to100.pdf
Tender Document
IntegrityPactBOB.pdf
Tender Document
RBOBCDR.pdf
Tender Document
RBOBITTandPCC.pdf
Tender Document
BOBSpecifications.pdf
Tender Document
RBOBDrawingsArchstruMEP101to138.pdf
Tender Document
Addl_Tender_Drgs.pdf
Tender Document
AnnexiiiSCHEDULEOFFINISHES.pdf
Tender Document
Addendum01alongwithBOQ.pdf
Tender Document
corrigendum-260-Corrigendum_06_Mauritius.pdf
pdf • 0.07 MB
corrigendum-224-Corrigendum_05_Mauritius.pdf
pdf • 3.49 MB
corrigendum-207-Corrigendum_04_Mauritius.pdf
pdf • 0.10 MB
addendum-4708ae9b0763-Corrigendum_04_Mauritius.pdf
pdf • 0.10 MB
corrigendum-194-Corrigendum_03_Mauritius.pdf
pdf • 0.08 MB
corrigendum-185-Corrigendum_02_Mauritius.pdf
pdf • 0.11 MB
corrigendum-166-Corrigendum_01_Mauritius.pdf
pdf • 0.09 MB
addendum-f32d4248d70d-Quote Sheet BOB final.pdf
pdf • 1.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .