Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.3 LAdmitted-Finance PB NO 04 KARUNAGAPALLY KOLLAM 690 518 | KARUNAGAPALLY | KOLLAM | KERALA | 690518 | ₹49.3 L | L1 | Admitted-Finance |
| 2 | L2₹67.1 L+₹17.8 L (36.1%)Admitted-Finance KARNATAKA | RAICHUR | KARNATAKA | 584123 | ₹67.1 L+₹17.8 L (36.1%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical 80 FF BLOCK III EROS FARIDABAD FARIDABAD 121009 | FARIDABAD | HARYANA | 121009 | - | - | Rejected-Technical Party failed to submit documents in line with PQC. |
| Sl No | Description | Qty | Unit | HIND ERECTORS L1 | S.Thartius Enginnering contractors L2 |
|---|---|---|---|---|---|
| 1.00 | Supply including third party inspection, transportation, unloading at site, storing at owners storage point etc. of item:
CS PIPE, SMLS, B36.10, API 5L-GR.B
SIZE: 80 NB, SCH 40 | 6 | M | 1,500 ₹9,000 Lowest | 1,808 ₹10,848 |
| 2.00 | Supply including third party inspection, transportation, unloading at site, storing at owners storage point etc. of item:
CS PIPE, SMLS, B36.10, API 5L-GR.B
SIZE: 100 NB, SCH 40 | 6 | M | 2,100 ₹12,600 Lowest | 2,603 ₹15,618 |
| 3.00 | Supply including third party inspection, transportation, unloading at site, storing at owners storage point etc. of item:
CS PIPE, SMLS, B36.10, API 5L-GR.B
SIZE: 350 NB, SCH 40 | 168 | M | 14,700 ₹24,69,600 Lowest | 16,087 ₹27,02,616 |
| 4.00 | Supply including third party inspection, transportation, unloading at site, storing at owners storage point etc. of item:
ELBOW,90 LR, BW, ASME B16.9, ASTM A234 WPB
SIZE: 80 NB, SCH 40 | 2 | NOS | 550 ₹1,100 Lowest | 587 ₹1,174 |
| 5.00 | Supply including third party inspection, transportation, unloading at site, storing at owners storage point etc. of item:
ELBOW,90 LR, BW, ASME B16.9, ASTM A234 WPB
SIZE: 350 NB, SCH 40 | 8 | NOS | 20,500 ₹1,64,000 | 16,629 ₹1,33,032 Lowest |
| 6.00 | Supply including third party inspection, transportation, unloading at site, storing at owners storage point etc. of item:
ELBOW,45 LR, BW, ASME B16.9, ASTM A234 WPB
SIZE: 350 NB, SCH 40 | 2 | NOS | 16,900 ₹33,800 | 11,297 ₹22,594 Lowest |
| 7.00 | Supply including third party inspection, transportation, unloading at site, storing at owners storage point etc. of item:
FLANGE, SORF, CLASS #150, ASME B16.5, ASTM A105
SIZE: 80 NB | 2 | NOS | 1,100 ₹2,200 | 994 ₹1,988 Lowest |
| 8.00 | Supply including third party inspection, transportation, unloading at site, storing at owners storage point etc. of item:
FLANGE, SORF, CLASS #150, ASME B16.5, ASTM A105
SIZE: 100 NB | 1 | NOS | 1,600 ₹1,600 | 1,536 ₹1,536 Lowest |
| 9.00 | Supply including third party inspection, transportation, unloading at site, storing at owners storage point etc. of item:
FLANGE, SORF, CLASS #150, ASME B16.5, ASTM A105
SIZE: 350 NB | 6 | NOS | 14,000 ₹84,000 | 10,122 ₹60,732 Lowest |
| 10.00 | Supply including third party inspection, transportation, unloading at site, storing at owners storage point etc. of item:
TEE, BW, ASME B16.9, ASTM A234 WPB
SIZE: 350 NB, SCH 40 | 2 | NOS | 23,500 ₹47,000 | 19,883 ₹39,766 Lowest |
Tender Value
Refer Docs
EMD Value
₹65,000
Closing Date
8 Oct 2025, 11:00 amClosed
SM(Mat) C
Contracts Dept. Corporate Materials FACT Udyogamandal
Supply, fabrication and erection of fire hydrant pipeline in Ammonia complex, as per tender conditions.
2025_FACT_877869_1
03012/2025-2026/E32143
Open Tender
Miscellaneous Works
Item Rate
120 days
FACT Udyogamandal
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹65,000
Yes
27 Feb 2026
17 Sept 2025
9 Oct 2025
17 Sept 2025
8 Oct 2025
17 Sept 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .