Loading…
Loading…
Tender Value
₹3.0 L
EMD Value
₹5,920
Closing Date
27 Aug 2026, 6:00 pmDue today
Executive Engineer Rew Baramulla
REW Baramulla
Construction of Community Sanitary Complex near Masjid Sharief Badipora Chandilora Tangmarag
2026_RDPR_320061_13
189/Xen/Rew/Bla/2026-27 Dated 08/08/2026
Open Tender
Civil Works
Percentage
30 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹5,920
8 Aug 2026
8 Aug 2026
28 Aug 2026
8 Aug 2026
27 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechenical means in trenches for foundation (Not exceeding 1.5m in width), depth upto 1.5m incl. disposal of excavated earth upto 1m from cutting edge. (All Kinds of Soil) | 20.38 | cum | - | - |
| 2 | Providing & Laying of Dry stone soling hand packed and plum in concrete | 2.73 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm N. size) | 1.06 | cum | 1 | ₹1.06 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 4.72 | cum | 1 | ₹4.72 |
| 5 | P/L of D.P.C. 40mm thick with Cement Concrete 1:2:4 (20 mm N/S ) | 4.38 | sqm | 1 | ₹4.38 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) upto plinth lvl | 8.03 | cum | - | - |
| 7 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 6 | cum | - | - |
| 8 | P/F of mild steel door/window frame and shutter complete job incl. Prime coat and painting | 80 | kg | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platforms. | 13.96 | sqm | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases of columns etc. for mass concrete. | 9.62 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1062502.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].