| 1 | 1₹1.6 CrAccepted-AOC SHOP NO 9 KHALSA SCHOOL MARKET MODEL TOWN PHAGWARA | ₹1.6 Cr | 1 | Accepted-AOC RANK 1 |
| 2 | 2₹1.7 Cr+₹1.4 L (0.87%)Rejected-Finance HOUSE NO 40 E PARTAP NAGAR PATIALA | PATIALA | PUNJAB | 140401 | ₹1.7 Cr+₹1.4 L (0.87%) | 2 | Rejected-Finance REJECT |
| 3 | 3₹1.7 Cr+₹3.3 L (1.98%)Rejected-Finance NA | ₹1.7 Cr+₹3.3 L (1.98%) | 3 | Rejected-Finance REJECT |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
12 Feb 2024, 9:00 amClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER LDH CANAL AND GROUND WATER DIVN WRD PB LDH
Estimate for concrete Lining of 1-R Minor of 3-R Distributary RD 9000-24019 by using M-15 Concrete
2024_WR_116125_1
266/28A
Open Tender
Civil Works
Item Wise
90 days
LUDHIANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹3.2 L
Yes
2 Mar 2024
19 Jan 2024
12 Feb 2024
19 Jan 2024
12 Feb 2024
19 Jan 2024
Amount
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. Disposal/carraige from 0 upto 450m
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. Disposal/ carraige additional beyond 450m upto 1Km
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads Disposal/carraige for every additional Km upto 10Km
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- ((a)) 0 to 1.5 m depth
Dressing side slopes and preparation of sub grade for lining.
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes
Filling expansion joints with special impervious hot pour 12.5mm wide.
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 9cum/s including boundary road :- ((a)) Discharge upto 1.5 cum/s
Dressing of earth work New work or remodeling work.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Extra bitumen painting at 0.69 Kg. per sqm
Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling.
Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction.
Extra for rolling to specifications.
Polythene films/ sheet of 100,125, 150, 200,250 micron
Filling Contraction/Construction joint with sealing compound complete in all respect Cross sectional area of proposed joint complete in all respect as per PWD specifications
Earth work for outlet: Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling , consolidation and dressing ) With 'H' more than 0.5 m. but upto 0.9 m
Dismantling outlets including removal of dismantled material involving lead upto 100 metres Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling i.e. concrete R.C. Slab and cement masonry. With 'H' more than 0.5 m. but upto 0.9 m
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth
Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure.
Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
Cement concrete 1:3:6 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type
Cement concrete 1:2:4 With stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type
Painting distance marks with synthetic enamel paint: One coat work: Distributaries
NARESH KUMAR DUGGAL
THE RAGHO MAJRA CO-OP L AND C SOCIETY LTD. PATIALA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .