Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.3 L
EMD Value
₹21,870
Closing Date
15 Oct 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER BARAMULLA
REW BARAMULLA
Improvement of road from Mazardef to Wudder with P/Wall at Yall Block Lalpora under ADP(PRI).
2021_RDPR_142131_1
132/Xen/Rew/Bla/2021-2022 Dated. 30/09/2021
Open Tender
Civil Works
Item Rate
60 days
BARAMULLA
Please refer Tender documents.
4 documents required · 4 mandatory
₹300
Yes
EXECUTIVE ENGINEER BARAMULLA
₹21,870
Yes
16 Oct 2021
1 Oct 2021
16 Oct 2021
1 Oct 2021
15 Oct 2021
1 Oct 2021
120 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil
Random Rubble masonry with hard stone from quarry in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand.
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone .
P/L of Back filling of Stone Boulder Nallah nominal size 225mm Etc
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete
Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) Flush/Ruled Pointing
Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil:
Carriage of Sand/Aggregates for an average lead of 15 Km
Carriage of Stone for an average lead of 40 Km
Carriage of Boulders for an average lead of 10 Km
Carriage of Earth for an average lead of 05 Km
Add Provision for signboard in concrete with drawing will be provided by concerned AE at the time of execution & photograph (Pre-Execution, during-Execution and Post-Execution) & Unfroreseen item.
GHULAM MOHI UD DIN DAR
MOHAMMAD YOUSUF BHAT
MOHAMMAD SHAFI LONE
stage.html
html • 0.02 MB
finance_300064.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .