Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.0 LAccepted-AOC | ₹42.0 L | L1 | Accepted-AOC L1 accepted |
| Sl No | Description | Qty | Unit | KOLLAM FABRICATORS AND ERECTORS L1 |
|---|---|---|---|---|
| 1.00Dredging | ||||
| 1.00 | OD3590/2025-2026:Dredging and deepening harbour basin in all classes of soil using any type of dredger such as Jet suction dredger/Toyo pump, /any type of dredging equipment and removing sand, clay,silt, debris, piece of nets, other waste or mixture or combination of two or more including removing all obstacles such as small rocks scattered granite, wood pieces, piece of net etc and dumping the spoil at location already pointed out by the departmental officers with a lead up to a radial distance of 2000 m , including hire charges of dredger , all tools and plants and accessories ,fuel charges, idling and mobilization charges, demobilization charges, and all type of Survey works, providing and shifting the pipe lines all labour charges, incidental charges etc. complete to an average depth of (-) 3.50m CD with a tolerance of +/- 20 cm complete as per the direction of departmental officers at site | 17,585 | cum | 239 ₹42.0 L |
Tender Value
₹42.4 L
EMD Value
₹50,000
Closing Date
29 Dec 2025, 1:00 pmClosed
Executive EngineerHarbour Engineering Division Kol
Office Of the Executive Engineer Harbour Engineering Division Kollam
Thangassery Fishing Harbour Capital repairs and Maintenance dredging of Fishing Harbours Maintenance dredging of Thangassery Fishing Harbour Basin
2025_HED_823248_1
HED/CEHED/TR/687/2025
Open Tender
Civil Works - Others
180 days
Thangassery Fishing Harbour
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹50,000
Yes
24 Mar 2026
22 Dec 2025
30 Dec 2025
22 Dec 2025
29 Dec 2025
22 Dec 2025
Dredging
OD3590/2025-2026:Dredging and deepening harbour basin in all classes of soil using any type of dredger such as Jet suction dredger/Toyo pump, /any type of dredging equipment and removing sand, clay,silt, debris, piece of nets, other waste or mixture or combination of two or more including removing all obstacles such as small rocks scattered granite, wood pieces, piece of net etc and dumping the spoil at location already pointed out by the departmental officers with a lead up to a radial distance of 2000 m , including hire charges of dredger , all tools and plants and accessories ,fuel charges, idling and mobilization charges, demobilization charges, and all type of Survey works, providing and shifting the pipe lines all labour charges, incidental charges etc. complete to an average depth of (-) 3.50m CD with a tolerance of +/- 20 cm complete as per the direction of departmental officers at site
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1379779.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 2.08 MB
BOQ_1379779.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid