Tender Value
₹37.3 Cr
EMD Value
₹74.7 L
Closing Date
15 Jul 2026, 1:00 pm
Similar tender results from the same govt authority in the past 3 years.
Barauni - Katihar - Cess Repair (6m) - 83.31 Tkm & Barauni - Rajendrapul - Cess Repair (3m) - 2.80 Tkm.
SEE26-27-73
SEE26-27-73
Open
18 Months
Katihar, Bihar
₹0
₹74.7 L
22 Jun 2026
22 Jun 2026
1 Jul 2026
Annexure "A-2" attached except cement and steel reinforcement.
All Items of Work provided in the ECR/USSOR - 2021 with upto date corrections as per Annexure "A-
2" attached except cement and steel reinforcement.
S No. Item Description of Item Unit Qty Rate Amount
SONPUR DIVISION-ENGINEERING/EAST CENTRAL RLY
Earthwork in cutting in formation, trolley
refuges, side drains, level crossing
approaches, platforms, catch water drains,
diversion of nallah & finishing to required
dimension and slopes to obtain a neat
appearance to standard profile inclusive of
all labour, materials, plant & machinery,
leading all cut spoils either to make spoil
dumps or for filling in embankment with
leads within 2 km on either side of edge of
the cutting(s) including all lifts, ascent,
descent, loading, unloading, bailing &
pumping out water, if required, clearance of
site and all other works incidental thereto for
completing the work as per RDSO
Specification No. RDSO/2020/GE: IRS-0004
with latest updated correction slips and to
the satisfaction of the Engineer-in-Charge.
Note: (i) All usable earth arising from cut
spoils shall be led into bank formation and
Unusable spoils shall be dumped / stacked
away from toe of embankment. (ii) All hard
rock /and boulders not fit for filling will be
stacked by the contractor and will be
property of the Railways. (iii)Cut trees shall
be property of Railways and to be deposited
in the railway godown unless specified
otherwise in the Conditions of Contract.
1 012011 In all conditions and classifications of soil cum 12916.50 112.56 1453881.24
Turfing / planting, including all lead & lift and
watering as required until properly rooted
with. Note: Initially payment of only 40% will
be made. Balance 60% will be paid after 3
months of maintenance period, only if the
turfing is properly rooted on entire turfed
square closely laid. Sqm
Provision of barricading with contractor's
bamboos / ballies vertical post of 100mm dia.
planted at every 2m interval, projecting at
least 1.5m above ground level and driven
firmly (minimum 0.5m) inside ground and
including painting verticals & horizontals with
red luminous paints / strips at alternative bay
on barricade. Barricades shall be maintained
through out the execution of the work and
shall be removed in workman like manner on
completion of the work only after instruction
of Engineer in-Charge. Note: (1) 60%
payment shall be made on provision of
barricading at work-site and balance 40%
payment after removal of barricades. (2) The
released bamboos / ballies shall be the
property of the Contractor.
3 013051 With 3 horizontal bamboo / balli members of RM 86110.00 124.58 10727583.80
minimum 50mm dia. spaced equally
4 013052 Joining with strong nylon rope in one cross RM 86110.00 99.48 8566222.80
and one horizontal pattern of minimum 5mm
SONPUR DIVISION-ENGINEERING/EAST CENTRAL RLY
5 083040 Removing, screening and salvaging ballast cum 6458.25 275.19 1777245.82
from track, duly digging / scarifying ballast
by beaters / wire brushes or any mechanical
means, leveling and dressing formation with
specified cross slope after salvaging ballast,
separating muck by screening the salvaged
ballast with contractor's 20mm size sieve,
stacking of screened ballast for
measurement, disposing off muck at
specified locations with all lead & lifts as
directed by Engineer in-charge. Note:
Payment shall be made for quantity of ballast
stacked after screening of retrieved ballast
6 113010 Cess repair/widening work as per RDSO cum 728506.00 406.17 295897282.02
Specifications and guidelines RDSO/2020/GE:
IRS-0004 or latest in running line with
suitable soil to the designed profile The work
shall include uprooting and disposing of all
the vegetation, benching at every 30 Cm
vertical height, earthwork in benching portion
and compaction using suitable slope
vibratory Rollers/Compactors etc. to achieve
prescribed MDD. Note: 1. Payment of cess
repairs shall be based on the quantities
worked out from the cross sectional
calculations only and worked out from the
initial ground levels before doing benching
and final levels as done for new
embankment. The earth work in benching
portion shall not be paid extra as the same
has been included in the rate. 2. The earth
work shall be started only after Completing
of the benching and certified. 3. The
benching Work shall be done for a maximum
height of 1.50 m at any time based on the
progress of earthwork starting from toe of
the embankment.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ApprovedTenderDocument73.pdf Tender Document
ATTACHMENT
DrawingAnnexure-VVI.pdf
ATTACHMENT
PolicyRBCE6dt.17.05.2004.pdf
ATTACHMENT
TelecomCircular9-2023.pdf
ATTACHMENT
B.Gsubmissionguideline_.pdf
ATTACHMENT
RBletterforCMB.pdf
ATTACHMENT
ApprovedTenderDocument73.pdf
ATTACHMENT
Download all tender documents and submit your bid