Loading…
Loading…
Tender Value
₹23.7 Cr
EMD Value
₹47.4 L
Closing Date
26 May 2026, 11:00 amClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (RSP)
TENDER
14 conditions · 2 needing a document upload
Eligibility in terms of Turnover: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. NOTE: (i)Financial Year shall normally, be reckoned as 1st April to 31st March of the Next Year. However, for Turnover Criteria, the Financial Year as applicable to the Company/Tenderer is to be considered, if it defers from the above. (ii)Current Financial year is reckoned as the incomplete Financial year in which the date of tender submission falls. (iii)Chartered Accountant statements duly indicating yearly receipts will not be considered until and unless backed by Audited Balance Sheets, Profit & loss account statements. (iv)If the tenderer is not accompanied by the certificates(s) in support of financial eligibility as above, the tender shall be rejected. No post-tender correspondence will be entertained. (v)Attestation of documents may be self attested or attested by a Gazetted Officer. NOTE:List of works on hand that should be in complete without missing wit the best of the agency knowledge in referene to Rly Board Lr.No.94/CE/I/CT/4/(Pt.II) dated 19.11.2003
Eligibility in terms of Experience:(a)The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b)(1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc), tenderer must have successfully completed or substantially completed any of the following during last 07(seven)years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2) In such cases, what constitutes a component in a composite work shall be clearly pre- defined with estimated tender cost of it, as part of the tender documents without any ambiguity.(b)(3)To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contract or through subcontractor fulfilling the requirements as per clause 7 of the Standard GCC or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows:The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: For subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway.In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard GCC with prior approval of Chief Engineer in writing
Defination of Similar Work :- Any Civil Engineering work consisting of Construction of bridge involving Box Pushing/Pipe jacking technique or Bridge Work involving casting and launching of PSC Slab/PSC Girder/PSC Box.
19 conditions · 2 needing a document upload
The Bid Security shall be deposited either in cash through e- payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents
The Bank Guarantee bond shall be as per Annexure-J and shall be valid for a period of 90days beyond the bid validity period. The name of the Beneficiary should be Financial Advisor & Chief Accounts Officer/Construction, S.C.Railway, Secunderabad. In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured: (i)A scanned copy of the Bank Guarantee shall be uploaded on e-Procurement Portal (IREPS) while applying to the tender. (ii)The original Bank Guarantee (in lieu of Bid Security) can be sent by the tenderer through a person or through Post/courier so as to reach the nominated Railway official as indicated in the tender document before closing date for submission of bids (i.e. Excluding the last date of submission of bids).(iii)Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid. (iv)The Tender Security shall remain valid for a period of 90 days beyond the validity period for the Tender. (v)The details of the BG, physically submitted should match with the details available in the scanned copy and the data entered during bid submission time, failing which the bid will be rejected (vi)The Bank Guarantee shall be placed in an envelope, which shall be sealed. The envelope shall clearly bear the identification "Bid for the ***** Project" and shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of the envelope. (vii)The envelope shall be addressed to the officer and address as mentioned in the tender document. (viii)If the envelope is not sealed and marked as instructed above, the Railway assumes no responsibility for the misplacement or premature opening of the contents of the Bid submitted and consequent losses, if any, suffered by the Bidder
Tenderer should mandatory submit documentary proof as per the attached checklist document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Check list with Annexures to be ensured, Annexures of prescribed format may be attached accordingly (reflecting under documents)
The documents attached to the tender document should be clear and legible for evaluation of tenders. Illegible copies will not be considered for evaluation.
All the Tenderers are requested to go through the tender document/conditions attached to this tender and shall submit all the required documents as per latest IRGCC read with correction slips from time to time.
The successful bidder shall submit "Performance Guarantee" amounting to FIVE percent (5%) of contract value after award of the work. Additional Performance Guarantee - If a tender is accepted on the quoted rates of bidder which is below the advertised tender value, an additional performance security shall be submitted by the bidder as below: For bid quoted below 0 to 5% (inclusive) of the advertised cost - Nil additional PG; For bid quoted below 5% of the advertised cost - 5% additional PG
The Defect Liability Period (DLP) shall be 48 months for the works consisting of construction of (i) Buildings, Roads, RCC Tanks, Platform Walls/Surface, concrete/masonry drains, Bridges including FOB/ROBs or major repair/painting of important Bridges unless specifically mentioned otherwise
Guntakal Division: Gooty -WADI Section: Proposal for construction of RUB of size 2x6.0mx5.0m RCC box in lieu of LC-234 at KM 667/7-8 between Wadi and Nalwar Stations by Air-Pushing with RH-girder and RCC Retaining wall.
GSU-GTL-RUB-LC-234-02-26
GSU-GTL-RUB-LC-234-02-26
Open
Works - General
12 Months
Anantapur, Andhra Pradesh
₹0
₹47.4 L
26 May 2026
1 May 2026
12 May 2026
132 items across 18 schedules · ₹12,00,44,174.74 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms with contractor's own earth conforming Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content OMC, mechanical compaction to specified density and dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based initial ground levels before doing benching and (ii) final profile of the bank worked with final levels as per prevailing guidelines. | etc. to to 2) on out | — | — | — | |
| 1 | Using Soil Class SQ1 | cum | 340.00 | 220.94 | 75,119.6 |
| 2 | Using Soil Class SQ2 | cum | 2480.50 | 268.5 | 6,66,014.25 |
| Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be into bank formation and Unusable spoils shall be dumped / stacked away from of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property the Railways. (iii)Cut trees shall property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract. | of of & per the led toe of be | — | — | — | |
| 3 | In all conditions and classifications of except rock | soil cum | 33357.99 | 104.1 | 34,72,566.76 |
| 4 | Soft rock not requiring blasting | cum | 62.00 | 240.17 | 14,890.54 |
| 5 | In hard rock with hammer / chisel pavement breaker etc. where blasting not permitted due to special circumstances and if specifically ordered writing including drilling and all incidental works thereto. | / cum is in | 25.00 | 855.33 | 21,383.25 |
| Provision of barricading with contractor's bamboos / ballies vertical post of 100mm dia. planted at every 2m interval, projecting at least 1.5m above ground level and driven firmly (minimum 0.5m) inside ground and including painting verticals & horizontals with red luminous paints / strips at alternative bay barricade. Barricades shall be maintained through out the execution of the work shall be removed in workman like manner on completion of the work only after instruction of Engineer in-Charge. Note: 60% payment shall be made on provision of barricading at work-site and balance 40% payment after removal of barricades. (2) The released bamboos / ballies shall the property of the Contractor. | on and (1) be | — | — | — | |
| 6 | With 3 horizontal bamboo / balli members of minimum 50mm dia. spaced equally | RM | 150.00 | 134.69 | 20,203.5 |
| Schedule total | ₹42,70,177.9 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Generalconditions.pdf
ATTACHMENT
GTLGSTenderBooklet24-04-2026.pdf
ATTACHMENT
GCC_April-2022_Upto-11ACS_compressed.pdf
ATTACHMENT
1.SPECIALCONDITIONS-EARTHWORTHWORK.pdf
ATTACHMENT
2.EQUIPMENTCLAUSE.pdf
ATTACHMENT
3.ReviseedApprovedbrands2026.pdf
ATTACHMENT
4.SPECIALCONDITIONSFORGALVANIZATION.pdf
ATTACHMENT
6.SPECIALCONDITIONSFORMETALISATION.pdf
ATTACHMENT
7.SPECIFICATIONFORSTEELFABRICATION.pdf
ATTACHMENT
8.WELDINGCONDITIONS.pdf
ATTACHMENT
8.WELDINGCONDITIONS_1.pdf
ATTACHMENT
9.specialtenderconditionsofconcretemixdesign_organized.pdf Special conditions for Design mix
ATTACHMENT
12.DefectsLiability02-06-2023.pdf
ATTACHMENT
SPECIALCONDITIONS-codesspecificationpayment.pdf
ATTACHMENT
5.SPECIALCONDITIONSFORLAUNCHINGOFGIRDERS-1.pdf
ATTACHMENT
9.specialtenderconditionsofconcretemixdesign_organized.pdf
ATTACHMENT
Generalconditions-05.5.2026.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .