Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC KERALA KL KERALA | ₹7.4 L | L1 | Accepted-AOC L1 accepted |
| Sl No | Description | Qty | Unit | JOSEPH SEBASTIAN L1 |
|---|---|---|---|---|
| 1.00frp shutter | ||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 210 | sqm | 14.69 ₹3,084.90 |
| 1.00 | 60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | 12 | metre | 1,218.48 ₹14,621.76 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 168 | hour | 378.17 ₹63,532.56 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 65.11 | cum | 213.22 ₹13,883.18 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 51.3 | sqm | 860.34 ₹44,135.44 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 20.59 | cum | 8,555.92 ₹1.8 L |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 13.6 | sqm | 812.65 ₹11,052.04 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 600.9 | kilogram | 97.93 ₹58,846.14 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 3.15 | cum | 9,050.66 ₹28,509.58 |
Tender Value
₹7.4 L
EMD Value
₹18,583
Closing Date
24 Apr 2025, 6:00 pmClosed
Habi C H
Assistant Executive Engineer,Minor Irrigation Sub Division Koyilandy
DEPOSIT-Construction of SWE/VCB - Construction of Nadukkuni SWE/VCB in Azhiyur Grama panchayath in Vatakara LAC- Kozhikode District-General Civil Work
2025_Irrig_756906_2
IRR/IA/TR/174/2025_5_1_1/1
Open Tender
Civil Works - Others
Azhiyur
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,640
Yes
₹18,583
Yes
25 Apr 2026
11 Apr 2025
26 Apr 2025
11 Apr 2025
24 Apr 2025
11 Apr 2025
Amount
frp shutter
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.63.1:FRP SHUTTERS - Supplying and fixing FRP Channels of "C" profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental .officers.
60.63.2:FRP SHUTTERS - Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the direction of departmental .officers.
60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Bidder Name
JOSEPH SEBASTIAN
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1235069.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
nit.pdf
Tender Documents • 0.03 MB
BOQ_1235069.xls
BOQ • 0.31 MB
sbd.pdf
Tender Documents • 2.16 MB
Download all tender documents and submit your bid