Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.6 LAdmitted-Finance BHAJAN GARH KAILASH GATE MUNI KI RETI DISTT TEHRI GARHWAL | ₹67.6 L | L1 | Admitted-Finance |
| 2 | L2₹71.1 LAdmitted-Finance | ₹71.1 L | L2 | Admitted-Finance |
| 3 | L3₹75.1 LAdmitted-Finance VILL PATA POST DESAU KALSI DEHRADUN | ₹75.1 L | L3 | Admitted-Finance |
| 4 | L4₹84.3 LAdmitted-Finance | ₹84.3 L | L4 | Admitted-Finance |
| 5 | L5₹1.1 CrAdmitted-Finance KOTI COLONY KOTI DEHRADUN | ₹1.1 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Parag Jain L2 | JEET SINGH L3 | SANGAM CONSTRUCTION L1 | M/s Navneet Kumar L5 | M/S BHARAT SINGH TOMAR L6 | RAVISH KUMAR L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. Including supply of all material labour T&P etc required for proper completion of the work | 300 | Sqm | 4.99 ₹1,496.4 | 5.19 ₹1,557.69 | 4.67 ₹1,401 Lowest | 7 ₹2,100 | 7.58 ₹2,274 | 50 ₹15,000 |
| 2.00 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction ofshoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil 11-1-1-1 Upto any depth. Including supply of all material labour T&P etc required for proper completion of the work | 695 | Cum | 150 ₹1,04,250 Lowest | 274.55 ₹1,90,810.86 | 246.97 ₹1,71,644.15 | 395 ₹2,74,525 | 400.8 ₹2,78,556 | 200 ₹1,39,000 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources). Including supply of all material labour T&P etc required for proper completion of the work. | 46.2 | Cum | 4,500 ₹2,07,900 | 4,234.64 ₹1,95,640.17 | 3,809.31 ₹1,75,990.12 | 6,089 ₹2,81,311.8 | 6,181.95 ₹2,85,606.09 | 3,500 ₹1,61,700 Lowest |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) . Including supply of all material labour T&P etc required for proper completion of the work. | 15.38 | Cum | 4,800 ₹73,824 | 4,573.53 ₹70,340.93 | 4,114.18 ₹63,276.09 Lowest | 6,577 ₹1,01,154.26 | 6,676.69 ₹1,02,687.49 | 4,500 ₹69,210 |
| 5.00 | Clearance of land slides (Slip Clearance) Slip clearance (by manual means) of earth and boulders including disposal complete as directed by the Engineer-in-charge. Including supply of all material labour T&P etc required for proper completion of the work | 26.2 | Cum | 150 ₹3,930 | 163.78 ₹4,291.13 | 147.33 ₹3,860.05 Lowest | 236 ₹6,183.2 | 239.1 ₹6,264.42 | 200 ₹5,240 |
| 6.00 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction. Including supply of all material labour T&P etc required for proper completion of the work | 974 | Cum | 3,300 ₹32,14,200 | 2,712.46 ₹26,41,938.96 | 2,440.02 ₹23,76,579.48 Lowest | 3,900 ₹37,98,600 | 3,959.8 ₹38,56,845.2 | 3,000 ₹29,22,000 |
| 7.00 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) GI wire 10 gauge BWG. Including supply of all material labour T&P etc required for proper completion of the work | 371.25 | Cum | 1,000 ₹3,71,250 Lowest | 1,167.45 ₹4,33,414.14 | 1,050.19 ₹3,89,883.04 | 1,679 ₹6,23,328.75 | 1,704.3 ₹6,32,721.38 | 1,000 ₹3,71,250 Lowest |
| 8.00 | Providing and laying in position specified grade of reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm Nominal size). excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. Including supply of all material labour T&P etc required for proper completion of the work. | 68.5 | Cum | 5,200 ₹3,56,200 | 5,251.13 ₹3,59,702.72 | 4,723.72 ₹3,23,574.82 Lowest | 7,551 ₹5,17,243.5 | 7,665.89 ₹5,25,113.46 | 5,500 ₹3,76,750 |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Including supply of all material labour T&P etc required for proper completion of the work. | 8,065.88 | Kg | 65 ₹5,24,282.2 | 62.17 ₹5,01,460.6 | 55.92 ₹4,51,044.01 Lowest | 89 ₹7,17,863.32 | 90.76 ₹7,32,059.27 | 80 ₹6,45,270.4 |
| 10.00 | Centering and shuttering including strutting Foundations, footings, bases of columns, etc. for mass concrete etc. and removal of form for all heightsIncluding supply of all material labour T&P etc required for proper completion of the work. | 219 | Sqm | 200 ₹43,800 Lowest | 227.65 ₹49,854.48 | 204.78 ₹44,846.82 | 327 ₹71,613 | 332.33 ₹72,780.27 | 400 ₹87,600 |
Tender Value
₹1.1 Cr
EMD Value
₹2.7 L
Closing Date
26 May 2026, 3:00 pmClosed
Executive Engineer, PCM, Dhalipur, Dhalipur
Executive Engineer, PCM, Dhalipur, Dehradun
Protection Work of TRC Bund (Asan River Side) Damaged Portion During Heavy Flood in Asan River at Dhalipur, Dehradun
2026_UJVN_95316_1
12/EE/PCM/Dhalipur/ 2026-27
Open Tender
Civil Works
Item Rate
120 days
Executive Engineer, PCM, Dhalipur
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
UJVNL, P.N.B A/c No 0639002100009390
₹2.7 L
Executive Engineer, PCM, Dhalipur, Dehradun
13 Jul 2026
12 May 2026
27 May 2026
12 May 2026
26 May 2026
19 May 2026
13 May 2026 - 15 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. Including supply of all material labour T&P etc required for proper completion of the work | 300 | Sqm | - | - |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction ofshoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil 11-1-1-1 Upto any depth. Including supply of all material labour T&P etc required for proper completion of the work | 695 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources). Including supply of all material labour T&P etc required for proper completion of the work. | 46.2 | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) . Including supply of all material labour T&P etc required for proper completion of the work. | 15.38 | Cum | - | - |
| 5 | Clearance of land slides (Slip Clearance) Slip clearance (by manual means) of earth and boulders including disposal complete as directed by the Engineer-in-charge. Including supply of all material labour T&P etc required for proper completion of the work | 26.2 | Cum | - | - |
| 6 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction. Including supply of all material labour T&P etc required for proper completion of the work | 974 | Cum | - | - |
| 7 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) GI wire 10 gauge BWG. Including supply of all material labour T&P etc required for proper completion of the work | 371.25 | Cum | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm Nominal size). excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. Including supply of all material labour T&P etc required for proper completion of the work. | 68.5 | Cum | - | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Including supply of all material labour T&P etc required for proper completion of the work. | 8,065.88 | Kg | - | - |
| 10 | Centering and shuttering including strutting Foundations, footings, bases of columns, etc. for mass concrete etc. and removal of form for all heightsIncluding supply of all material labour T&P etc required for proper completion of the work. | 219 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
TD_12.pdf
Tender Documents • 3.37 MB
BOQ_112715.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].