| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance | ₹3.7 L | L1 | Admitted-Finance |
| 2 | L2₹4.4 L+₹71,497.36 (19.3%)Admitted-Finance SIVAJYOTHI ENGOLIPARAMBU KARANTHUR 673571 | KOZHIKODE | KERALA | 673571 | ₹4.4 L+₹71,497.36 (19.3%) | L2 | Admitted-Finance |
| 3 | L3₹4.6 L+₹84,568.92 (22.8%)Admitted-Finance EDOLIKUNNATH H CHENNAMANGALUR PO MUKKAM VIA CALICUT 673602 | KOZHIKODE | KERALA | 673602 | ₹4.6 L+₹84,568.92 (22.8%) | L3 | Admitted-Finance |
| 4 | L4₹4.6 L+₹89,362.99 (24.1%)Admitted-Finance | ₹4.6 L+₹89,362.99 (24.1%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | E K IBRAHIMKUTTY L3 | MIQDAD A.T. L1 | AP Construction L4 | SIVADASAN N L2 |
|---|---|---|---|---|---|---|---|
| 1.00EARTH WORK | |||||||
| 1.10Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth anywhere in the campus as directed by Engineer-in-charge. | |||||||
| 1.11 | All kinds of soil | 0.83 | cum | 162 ₹134.46 Lowest | 236.63 ₹196.4 | 310 ₹257.3 | 300 ₹249 |
| 1.20 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers and, consolidating each deposited layer by ramming and watering. Ceaning of site and removal of debris and servicable material of any shall be deposited any where in the campus as per the direction of EIC | 1 | cum | 268 ₹268 | 310 ₹310 | 196 ₹196 Lowest | 350 ₹350 |
| 2.00CEMENT CONCRETE (CAST IN SITU) | |||||||
| 2.10Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||||
| 2.11 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.95 | cum | 9,850 ₹88,157.5 | 8,483.56 ₹75,927.86 | 7,878.5 ₹70,512.58 Lowest | 9,500 ₹85,025 |
| 2.20Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: | |||||||
| 2.30Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||||
| 2.31 | Foundations, footings, bases for columns | 4.86 | sqm | 485 ₹2,357.1 | 354.26 ₹1,721.7 Lowest | 392.15 ₹1,905.85 | 500 ₹2,430 |
Tender Value
₹4.2 L
EMD Value
₹8,400
Closing Date
26 Jun 2026, 6:00 pmClosed
Director
NIT Calicut, NIT Calicut Campus PO, Kerala, 673601
Demolition of damaged car parking slots at FD apartments
2026_NITC_911555_1
Engg/D1/JE7/506/2026-27
Open Tender
Civil Works
Item Rate
120 days
NIT Calicut, NIT Calicut Campus PO, 673601
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,400
Yes
23 Jul 2026
4 Jun 2026
29 Jun 2026
4 Jun 2026
26 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1EARTH WORK | |||||
| 1.1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth anywhere in the campus as directed by Engineer-in-charge. | - | - | - | - |
| 1.11 | All kinds of soil | - | cum | - | - |
| 1.2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers and, consolidating each deposited layer by ramming and watering. Ceaning of site and removal of debris and servicable material of any shall be deposited any where in the campus as per the direction of EIC | - | cum | - | - |
| 2CEMENT CONCRETE (CAST IN SITU) | |||||
| 2.1 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | - | - |
| 2.11 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 2.2 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: | - | - | - | - |
| 2.3 | Centering and shuttering including strutting, propping etc. and removal of form work for: | - | - | - | - |
| 2.31 | Foundations, footings, bases for columns | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_958010.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .