Superintending Engineer, PIU, Zone-6, Vadodara.
Upgradation of Existing OT (11 Nos) in MOT and New Modular Operation Theater (02 Nos.) in Various Buildings at SSG hospital, Vadodara.
264731
2025-26/134/03
Open
Civil Works - Others
Vadodara
1 document required · 1 mandatory
₹12,000
PIU-General Fund A/c 11-114
₹6.4 L
14 Jan 2026
14 Jan 2026
14 Jan 2026
31 Jan 2026
14 Jan 2026
Name of Work :- Upgradation of Existing OT (11 Nos) in MOT and New Modular Operation Theater (02 Nos.) in Various Buildings at
SSG hospital, Vadodara.
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
NO No Estimated according to
But May be Estimates
In Figures In Words
more Qunatities Rs.
SS Modular OT Sandwich Wall Panel Specification (Double Skin SS 0.8 mm + Core)
A. Construction
Panel type: Factory-made sandwich wall panel, double skin stainless steel.
Face sheets (both sides):
Stainless Steel 0.8 mm thick each side (inside and outside).
Recommended grade: AISI 304, finish 2B / satin (hairline optional only if client accepts).
SS sheet to be plain, scratch-free, without dents, waviness, oil canning.
Addi. Rupees ElevenThousand
1 941.91 Core material (choose as per project requirement): 11,000.00 Sq Mtrs.
PIR / PUF: density 40 ± 2 kg/m³ (typical) for insulation, light weight.
Rockwool: density 80–100 kg/m³ for superior fire performance and acoustic.
Core to be uniform, void-free, non-sagging.
B. Panel Thickness
Overall thickness: commonly 50 mm - 60 mm (final as per OT HVAC heat load and design).
Thickness tolerance: ±1 mm (typical).
C. Bonding and Integrity
SS skins bonded
Modular to core using
OT Sandwich industrial
Ceiling grade adhesive
Panel Specification / hot-press
(Double Skin SSlamination.
A. Construction
Panel type: Factory-made sandwich wall panel, double skin stainless steel.
Face sheets (both sides):
Stainless Steel 0.8 mm thick each side (inside and outside).
Recommended grade: AISI 304, finish 2B / satin (hairline optional only if client accepts).
SS sheet to be plain, scratch-free, without dents, waviness, oil canning.
Addi. Rupees TenThousand
2 606.25 Core material (choose as per project requirement): 10,000.00 Sq Mtrs.
PIR / PUF: density 40 ± 2 kg/m³ (typical) for insulation, light weight.
Rockwool: density 80–100 kg/m³ for superior fire performance and acoustic.
Core to be uniform, void-free, non-sagging.
B. Panel Thickness
Overall thickness: commonly 40 mm - 50 mm (final as per OT HVAC heat load and design).
Thickness tolerance: ±1 mm (typical).
C. Bonding and Integrity
SS skins bonded to core using industrial grade adhesive / hot-press lamination.
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
NO No Estimated according to
But May be Estimates
Supply, Installation, Testing and Commissioning of Ceiling Filtration System - The ceiling filtration system in the
more Qunatities Rs.
surgical theatre should ensure a unidirectional distribution of sterile air, covering all areas affected by the
airflow. It should consist of a laminar flow system incorporated within a frame made from thick extruded
aluminum profiles, complete with a sealed gasket to prevent leaks. The system should incorporate "H 14" class
HEPA filters positioned in the ceiling plenum. These filters should achieve an MPPS average efficiency greater
than 99.95% and a 3-micron DOP efficiency greater than 99.99%. The filters should also be designed to handle
a final pressure drop of no more than 600 Pa, operate at a maximum temperature of 60 degrees Celsius, and
function effectively within a relative humidity range of 40-50%. The filtration ceiling system should be capable
of maintaining a constant airflow velocity of 0.25 m/s at the diffuser. This should be accomplished through the
use of a diffuser or flow equalizer that ensures uniform and constant air distribution over the entire surface
area. The structure holding the filtration system, including the filter frames and top plenum, should be made
Addi. Rupees Three Lakh
3 13.00 from either aluminum or stainless steel. The system should be CE/UL certified and designed to achieve an ISO 3,90,000.00 Nos.
Spech. Ninety Thousand Only
14644/1 classification of ISO 5, with a bacteriological class of B (5 CFU/m3) and particle decontamination
kinetics CP of 5 minutes. After installation, the system's performance should be validated by a third-party
government-approved environmental lab to ensure compliance with specified standards. A positive pressure
should be maintained inside the operating theatre to prevent contamination from external air sources. The
supplier should provide test certificates for the HEPA filters and the laminar airflow systems from the original
manufacturers. Furthermore, the size of the laminar airflow system should be a minimum of 8 feet by 8 feet.
Finally, the entire system should meet CE/BIS certification standards, ensuring it adheres to both European and
Indian safety and performance regulations and including validation.
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
NO No Estimated according to
But May be Estimates
The flooring within the surgical theatre should consist of a minimum of 2mm thick antistatic seamless PVC,
more Qunatities Rs.
ensuring durability and safety. This floor should be smooth, non-slip, and made from an impervious material
with sufficient conductivity to dissipate static electricity effectively, yet not so conductive as to risk electric
shock to personnel. The PVC used should be of very high quality, particularly designed for electrostatic charge
dissipation, and should not be less than 2 mm in thickness. The installation process should utilize continuous
rolls, and joints should be seamlessly welded using special PVC thermal welding units with welding bars of the
same color to ensure uniformity and prevent contamination. The sheets should be highly durable, capable of
resisting shocks, indentations, and scratches. The conductive material should be uniformly impregnated within
the PVC as grains to enhance its antistatic properties. Additionally, the flooring should be inert to body fluids,
chemicals, and disinfectants, and remain unaffected by temperature variations typical within an operating
theatre. It should efficiently discharge electric charges up to 2 kV, and the electrical resistance (point to
ground) should be maintained within 2.5x10^4 to 5x10^6 ohms, ensuring no buildup of electrical charge
beyond 100 volts. Floor installation should be performed by skilled workers from accredited agencies
Addi. Rupees Four Thousand
4 635.50 authorized by the PVC sheet supplier. The installation should include a conductive copper grid beneath the PVC 4,250.00 Sq Mtrs.
Spech. Two Hundred Fifty Only
sheet, supported by liquid epoxy compounds to create a uniform and level surface. Copper strips should be
made visible by grinding and not project more than 0.5mm above the floor level to prevent damage to the PVC
sheet, with one earthing lead brought out from every 150 sq.ft area and attached to the main earthing
strip/ground. The flooring should also be mechanically shockproof, scratchproof, flame retardant, and
antimicrobial. Corners of the flooring should be uniformly curved, and a concealed cove-former (aluminium)
should overlap the wall panel to a height of approximately 25mm and be sealed perfectly and uniformly.
Before laying the PVC, suitable self-leveling compounds should be used to prevent any undulations within the
operating theatre. The final surface should be non-corrosive to biological fluids and detergents, with a color
that is uniform, pleasant, and matching with the ambience as approved by the respective consignee.
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
NO No Estimated according to
But May be Estimates
The door to the surgical theatre should be a hermetically sealed, single sliding door measuring 2.1 meters in
more Qunatities Rs.
height and 1.5 meters in width. The door should be equipped with a controller capable of being operated by
elbow switches, foot switches, and a touchless sensor, providing multiple, accessible control options. The track
for the door should be made from stainless steel or aluminum, with the running surface for the top rollers
angled appropriately to minimize resistance and facilitate smoother movement. The door leaf should be
suspended using high-quality hard plastic rollers with double bearings at the top. These rollers should run
under the stainless steel or aluminum track to ensure smooth and noiseless operation. The opening and
closing mechanisms of the door should be controlled by a microprocessor for precise electromechanical
movement. The material of the door should be either SMS or HPL, with a color that matches the interior
design. The door should be designed to be strong yet lightweight for ease of use. In case the automatic
mechanism fails, the door should still be able to open and close effortlessly manually. The handle of the door
should be made from stainless steel with a matte finish and equipped with a high-quality cylindrical or ESPg
lock for security. The door leaf should incorporate a high-quality synthetic rubber gasket with long durability
Addi. to ensure hermetic sealing and maintain a 99.99% air tightness at a minimum pressure of 75Pa. The floor on Rupees Two Lakh Ninety
Spech. Five Thousand Only
either side of the door should be perfectly level, with a maximum permissible difference of +1mm, to avoid any
tripping hazards or unsealed gaps. The overall thickness of the finished door should range from 30-60mm, with
the inner part of the door filled with CFC-free polyurethane foam, approximately 48mm thick, sealed airtight to
block any microbial ingress. The door and its controls should comply with IEE regulations, utilizing DC brushless
or PMDC motors that are effectively isolated from mains power to ensure safety and reliability. Additionally,
the door should include a vision window measuring 300mm x 300mm, featuring double-glazed panels that are
hermetically sealed to maintain the integrity of the seal.
The movement of the door should be as quiet as possible, and the time to start moving after
receiving a signal should be adjustable between 0.5 to 20 seconds.The door controller should be CE marked,
BIS certified, or IEC 60601 certified to meet international and national safety standards. A test certificate for
the hermetically sealed door frame should be included in the pre-dispatch documents to verify compliance
with the specified standards and functionality.
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
NO No Estimated according to
But May be Estimates
The door to the surgical theatre should be a hermetically sealed, single sliding door measuring minimu
more Qunatities Rs.
meters in height and 1.0 meters in width. The door should be equipped with a controller capable of being
operated by elbow switches, foot switches, and a touchless sensor, providing multiple, accessible control
options. The track for the door should be made from stainless steel or aluminum, with the running surface for
the top rollers angled appropriately to minimize resistance and facilitate smoother movement. The door leaf
should be suspended using high-quality hard plastic rollers with double bearings at the top. These rollers
should run under the stainless steel or aluminum track to ensure smooth and noiseless operation. The opening
and closing mechanisms of the door should be controlled by a microprocessor for precise electromechanical
movement. The material of the door should be either SMS or HPL, with a color that matches the interior
design. The door should be designed to be strong yet lightweight for ease of use. In case the automatic
mechanism fails, the door should still be able to open and close effortlessly manually. The handle of the door
should be made from stainless steel with a matte finish and equipped with a high-quality cylindrical or ESPg
lock for security. The door leaf should incorporate a high-quality synthetic rubber gasket with long durability
Addi. to ensure hermetic sealing and maintain a 99.99% air tightness at a minimum pressure of 75Pa. The floor on Rupees Two Lakh Fifteen
Spech. Thousand Only
either side of the door should be perfectly level, with a maximum permissible difference of +1mm, to avoid any
tripping hazards or unsealed gaps. The overall thickness of the finished door should range from 30-60mm, with
the inner part of the door filled with CFC-free polyurethane foam, approximately 48mm thick, sealed airtight to
block any microbial ingress. The door and its controls should comply with IEE regulations, utilizing DC brushless
or PMDC motors that are effectively isolated from mains power to ensure safety and reliability. Additionally,
the door should include a vision window measuring 300mm x 300mm, featuring double-glazed panels that are
hermetically sealed to maintain the integrity of the seal.
The movement of the door should be as quiet as possible, and the time to start moving after
receiving a signal should be adjustable between 0.5 to 20 seconds.The door controller should be CE marked,
BIS certified, or IEC 60601 certified to meet international and national safety standards. A test certificate for
the hermetically sealed door frame should be included in the pre-dispatch documents to verify compliance
with the specified standards and functionality.
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
NO No Estimated according to
But May be Estimates
Supply, Installation, Testing and Commissioning of Membrane-Type Operation Switch and Communication
more Qunatities Rs.
Controller - The Operation Switch and Comms Controller should encompass all necessary controls to ensure
the proper operation and monitoring of equipment and services in the operating room (OR). Positioned for
optimal visibility in the surgeon's line of sight and the OT staff, the wall-mounted membrane-buttons should
be easily accessible to the nurse for operation and assistance. In addition to hosting a digital clock and elapsed
time indicator, the panel should feature a medical gas alarm, clearly indicating high and low gas pressures for
each gas service, including vacuum, supported by an audible alarm. The Operation Switch and Comms
Controller should also provide an alarm mute option for fault annunciation, with pressure sensors strategically
located near isolation valves. Controls for general lighting, including ON/OFF and dimming, organized in groups
Addi. Rupees One Lakh Ninety
6 13.00 for uniform illumination, should be present. Furthermore, the panel should facilitate control over operating 1,95,000.00 Nos.
Spech. Five Thousand Only
lights (major and satellite) and camera functions (on/off and intensity). A hands-free telephone set with
memory should be conveniently situated, and temperature and humidity controls for the room, linked to the
AHU (+/5%) using NO/NC or Chilled Water/Hot Water Actuator Control Valve (whichever is applicable), should
be adjustable from the Operation Switch and Comms Controller. Real-time indicators, such as a digital room
pressure indicator and HEPA filter bank differential pressure indicator, are essential for monitoring and
maintaining a safe and controlled environment in the operating room. Telephone with Alpha-numeric
keyboard is required with Speed-dialing option
Hatch boxes should be provided in each operating theater to facilitate the safe and efficient removal of waste
materials to the dirty linen area or adjacent corridor. Each hatch box should be equipped with two doors,
operated electrically or motorized, designed such that only one door can be opened at a time to prevent cross-
Addi. contamination. UV lighting should be installed to ensure sterilization and should remain on when both doors Rupees One Lakh Fifteen
Spech. are closed, automatically turning off when either door is opened. Indicators should be provided on both sides Thousand Only
of the operating theater to monitor the door open/close status. The material of the hatch box should also be
SS304 grade stainless steel, with a minimum size of 600mm x 600mm.
In each operating theater, an operating list board should be installed. It should be made of ceramic with
magnetic properties and should be flush with the wall to maintain cleanliness and ease of use. LED type flat
panel X-ray viewing panels should be provided, complying with relevant electrical safety codes, and mounted
flush with the wall to prevent dust accumulation and microbial growth. The body should be made of extruded Rupees TwentyEight
8 13.00 aluminum, powder-coated with a bacteria-resistant and disinfectant-resistant finish. The diffuser on the front 28,500.00 Thousand Five Hundred Nos.
panel should provide a uniformly lit screen, and dimming controls should be easily accessible. Additionally, a Only
proper spring-loaded film clip with rollers should be included to securely hold and easily remove films without
causing scratches.
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
NO No Estimated according to
But May be Estimates
LED type flat panel X-ray viewing panel should be supplied. This should comply with relevant electrical safely
more Qunatities Rs.
codes. This should be a 2-panel viewing screen. Mounting should be flush with the wall to avoid dust
or less Rupees FourtyOne
accumulation and growth or organisms between wall and panel. Body should be of extruded aluminium
9 14.00 powder coated black with bacteria resistant and disinfectant resistant finish. The diffuser on the front panel 41,500.00 Thousand Five Hundred Nos.
should be a uniformly lit screen. Dimming electronic control should be enclosed at the bottom of the cabinet. Only
Proper spring-loaded film clip with rollers should be provided to hold the films firmly and to remove the film
without scratches
Supply, Installation, Testing and Commissioning of Double-Bay Scrub Sink - The scrub station should be
compact, designed for use in the OT complex, and facilitate pre-procedural scrubbing. It should be made from
heavy gauge type 304 stainless steel with a minimum thickness of 1.5mm and feature seamless welded
construction polished to a satin finish. The scrub sink should have a front access panel for easy maintenance of
Addi. water control valves, waste connections, stoppers, and strainers. Hands-free operation should be enabled Rupees One Lakh Twenty
Spech. through infrared sensors with programmable adjustments. Thermostatic mixing valve control should maintain Six Thousand Only
constant water temperature and be located behind the access panel. Timing should be adjustable to meet
individual usage requirements, and units should have reduced anti-splash fronts. An additional knee/foot-
operated switch should also be provided for enhanced functionality.
Supply, Installation, Testing and Commissioning of Storage Units - Storage units should be constructed with
same material, as wall and ceiling panels. The shelves, made of glass and, should be removable for cleaning.
Addi. The unit should be divided into two or more parts, each with individual glass doors equipped with a high- Rupees EightyFive
Spech. quality locking system. The overall size of the storage unit should Thousand Only
be approximately 200 cm (H) x 120 cm (W) x 35 cm (D).
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
NO No Estimated according to
But May be Estimates
Supply, Installation, Testing and Commissioning of Peripheral Lighting - To enhance the operational
more Qunatities Rs.
environment of each operating theatre, peripheral lighting and clean room luminaries should be installed, with
a minimum of eight units per theatre. These lights should offer an intensity of at least 500 Lux and be housed
in highly specular anodized aluminum with an optical antiglare system to minimize visual fatigue and glare.
Each peripheral light should measure 2' x 1'. The covers for these luminaries should be constructed from highly
resistant, disinfectant-proof laminated safety glass or acrylic, featuring a stylish, fine-grained surface that
complements the clean and sterile environment of the operating theatre. The body of the luminaries should be
made from sheet steel, perfectly powder-coated to resist contamination and facilitate easy cleaning, and
should be ready for connection either as individual units or within a series circuit. This setup should include
Addi. Rupees Twelve Thousand
12 140.00 digital electronic control gear utilizing multilamp technology to optimize energy efficiency and light output. The 12,000.00 Nos.
installation of these luminaries should ensure that the recess frames are gas tight. Each fitting should be flush
with the ceiling and designed to be removable from either the top or bottom for ease of maintenance. It is
crucial that the light fittings are uniformly and aesthetically distributed across the ceiling to provide consistent
illumination throughout the OT, without interfering with visibility during procedures such as green mode
endoscopy. Furthermore, the peripheral lighting system should conform to IP65 or IP54 international
protection ratings, ensuring that the fixtures are dust tight and protected against water ingress, suitable for the
demanding conditions of an operating theatre.
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
NO No Estimated according to
But May be Estimates
Supply, Installation, Testing and Commissioning of Electrical Wiring inside OT - Power distribution within each
more Qunatities Rs.
Operating Theatre (OT) should be handled via distribution boards located locally to each theatre using Fire
Resistance Low Smoke Wiring, layed in PVC conduits of reputed brand. The sub mains power to these panels
should be provided by the general electrical contractor, and all distribution services within the departments
should run from these panels. The power distribution unit should hold certifications such as EN, CE, FDA, IEC,
and BIS to ensure compliance with international safety and performance standards. Each wall of the MOT
should have a minimum of two hybrid switch sockets (6/16A) on each wall, in compliance with IEC standards.
Light fittings within the clinical areas should be recessed LED types equipped with control gear and sealed in
accordance with the IP54 standard. This standard ensures that the fittings are protected against limited dust
ingress and water spray from all directions, suitable for clinical environments. All equipment should be fully
and permanently labeled to clearly identify and describe the function, operation, and voltage of the apparatus
Addi. Rupees Two Lakh Ninety
13 13.00 concerned. Upon completion of the electrical installation, tests should be carried out in accordance with the 2,99,000.00 Job
Spech. Nine Thousand Only
relevant sections of local wiring regulations, with results duly recorded. Each OT should have a distribution
board (DBs) installed, with suitable wiring. A separate enclosure should house all high-voltage equipment to
ensure safety and isolation. The remote cabinet should contain operating lamp transformers, mains failure
relays, UPS, electrical distribution equipment, and circuit protection equipment for all circuits within the
operating theatre. All internal wiring within the DBs should terminate in connectors equipped with screws and
clamp springs. Connections should be of the clip-on type mounted on a rail approved by CE/IEC/BIS standards
and labeled with indelible proprietary labels. All internal circuits should be protected by individual fuses or
miniature circuit breakers to ensure safety and manage potential electrical faults effectively.
AIR HENDALING UNIT Make:KrVelocity: Not More Then 10 mt/second. , Canvass Connection-Heavy duty, non
partical shreding,Fire Retardentuger,Nikotra only , Type: PLUG,Drirect Driven,Dynamically Balanced Selection
of fan-Should run comfortably at 50 HZ at rated capecity. Motor Make:Siemence,B.B,Crompton,ABB
Type:TEFC, IP:55, Foot Mounted, VFD compitable and I2 generation Safety: Motor should have interlocked Rupees Twelve Lakh
Addi. with AHU Motor door/excess/Fire DamperType-TWO TIRE, Floor Mounted , Inner const.:0.6mm plain G.I
14 7.00 12,25,000.00 Twenty Five Thousand Job
Spech. Outer const.:0.8 mm G.I. Pre coated / Powder coated Thickness of Insulation: 25mm,PUF injected having
density 40 to 42 kg/m3. ,Colour:As approved by CLIENT CONDENSING UNIT : Only
Condensing unit for AHU with all assesories and instalation (Copper pipe provide 3 mtr Only Extra will
charged extra) consider 1200 sqfeet insulation and ducting M
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
NO No Estimated according to
But May be Estimates
Double Dome OT Light with Ceiling mounted Double Dome LED OT lights having following features and
more Qunatities Rs.
enclosed technical specifications, having Mobile App Connectivity, Battery Backup
-Light intensity Ec - 160 000 & 160 000 lux, - Light intensity adjustment - 10 – 100% (using Digital Capacitive
Touch (Fully Remote Controlled)
- Color temperature Tc (with adjustment)
-Light field diameter d10 at Ec - 100 - 150 mm
Addi. -Working range - 1 m Rupees Three Lakh
Spech. -Color rendering index 93Ra Ninety Thousand Only
- Focusing Preset: Adjustable
- LED Average life - 50000-60000 hrs
- Diameter of Light - not less than 650 mm per dome
- Power Consumption - not more than 120W
OT Light should be BIS marked; manufacturer should have CDSCO License for this product under Class A,
Compliant to IEC standards such as IEC60601-1:2005+A2:2020, IEC 60601-2-41:201 (Relevant Test Certificates
to be submitted with Bid) Clause-wise Technical Compliance to be
Single-arm surgery/anesthesia pendant designed for Operating Theatres should feature a compact, modular
configuration to meet the precise requirements of hospitals, enabling customization to suit specific operational
needs of both Operating Theatres and Intensive Care Units. It should be equipped with robust ceiling support
capable of mounting a selection of arms. The extension arm, pivotal for functionality, should allow horizontal
movement with a radius of 800-900mm and provide a level rotation ranging from 0 to 330/340 degrees, with
both the extension arm and terminal box designed to rotate together and independently for maximum
versatility. The pendant should support a net loading capacity of min. 100 kg, accommodating a variety of
medical instruments and devices securely. For medical and electrical services, it should offer configurations
that include at least two oxygen outlets, two vacuum outlets, one medical air, one medical air at 7 bar, and an
optional nitrous oxide outlet (In-scope of MGPS vendor) Additionally, there should be six main sockets, each
capable of supporting 5 to 15 amps, conforming to universal standards to facilitate the operation of various
Rupees Two Lakh
Addi. medical and electronic devices. In terms of materials and construction, the pendant should be crafted from
16 7.00 2,84,000.00 EightyFour Thousand Nos.
Spech. high-strength aluminum alloy with a sealed design to enhance durability and maintain sterile conditions. The
arm itself should be made from high-density aluminum alloy extrusion, ensuring both strength and reliability. Only
Installation of the pendant should be ceiling-mounted to provide a reliable and firm setup, optimizing space
usage in the Operating Theatre or ICU while seamlessly integrating with existing medical systems for managing
medical gas, electrical services, data communication, and equipment. Additionally, the pendant should include
practical features such as a stainless steel IV pole and a ward vacuum unit clamp to further enhance its utility in
a medical setting. With a net weight of approximately 105 kg, accessible by the equipment carrier, the pendant
should be robust yet manageable, ensuring it meets the rigorous demands of modern medical environments.
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
NO No Estimated according to
But May be Estimates
Providing and fixing UPS (25KVA) Of Good Quality as directed by engineer incharge Rupees Three Lakh
Addi. more Qunatities Rs.
or less 3,75,000.00 Seventy Five Thousand Job
Medical Gas Pipe Line Of Required dia for OT oxygen(set of 2 point), Vaccum , medical Air and surgical air.. Etc
Addi. reuired Point(from existing line ) as directed by engineer incharge from Outer Nearest Passage to OT Pendant Rupees One Lakh Twenty
Spech. Rate Including , Alarm , Valve (for all line) , and refixing of Point ,Flowmeter and Probe . if alredy then no Five Thousand Only
Medical Gas Pipe Line Of Required dia for OT oxygen , Vaccum , Air.. Etc reuired Point(from existing line ) as
Addi. directed by engineer incharge from Outer Nearest Passage to OT Pendant Rate Including , Alarm , Valve (for all Rupees Three Lakh Fourty
Spech. line) , Point ,Flowmeter and Probe . if alredy then no payment given Five Thousand Only
Execution of all type of Necessary Civil work for brick/block massaonary work, plaster, wall-celing
Antibacterial Paint, Painting, Door - Window sill-jambs of 16-18 mm Granite (OF OT Door -Window Only) tiles
Addi. patchups, new door/window (aluminium) etc and dismentaling door, windows, Brick/Block wall-floor-pcc etc Rupees One Lakh One
Spech. for new door opening, shifting of existing door/window and or closing old door/window as per Site Thousand Only
requirement and as per instruction of engineer incharge (all necessary civil work is to be done for creating
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
ITEM NBO Qnty ITEM DESCRIPTION Estimate Rates UNIT Total Amount
NO No Estimated according to
But May be Estimates
Add Extra (Above item no. 13) for Copper Pipes for AIR HENDALING UNIT with all assesories and instalation
Addi. more Rupees Fifteen Thousand Qunatities Rs.
21 78.00 with insulation etc complete 1,500.00 RMT
Spech. or less Only
Total Estimated Amount
Total Estimated Cost Rupees Six Crore Thirty five Lakh Six Thousand Eight Hundred Eighty Five Only
I / We am / are willing to carry out the work at ……………. % Above / Below percentage a should be written in figures and words of the
Estimated rates mentioned above. Amount of my / our Tender works out as under.
Estimated amount put to tender
Put to tender Rs.
Deduct ………% Below.Rs.
Note-1 All work shall be carried out as per Public Works Department Handbook and other specifications of divisions or as directed.
All the columns in Schedule should be filled in ink and the total of the enteries in the last colummn should be stuck by the contractor under his
Rate quoted includ clearence of site ( prior cmmencement of work at its close ) in all respects and hold good for work under all cinditions, site,
moisture, weather, etc.
Note-4 To be continued on additional sheets, if found necessary.
Serviceable material available ( if any ) after Demolishing / Dismentalling any item should be hand over to the concerned PIU Site
Engineer In Charge as per instruction of engineer in charge.
Deputy Executive Engineer Executive Engineer
Project Implementation Unit Project Implementation Unit
Zone-6, Vadodara City Zone-6, Vadodara City
Deputy Executive Engineer (Elect.) Executive Engineer (Elect.)
Project Implementation Unit Project Implementation Unit
Zone-6, Vadodara City Zone-6, Vadodara City
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Civil Building Specification Book.pdf
02 Electrical Specification Book.pdf
03 Circular Part 1.pdf
04 Circular Part 2.pdf
05 Special Condition.pdf
06-01 Civil Make List 2025.pdf
06-02 Special Instruction to Bidder.pdf
07 SBD MOT.pdf
08 Schedule B of MOT Works.pdf
09 Pre Qualification Criteria.pdf
10 Specifications for OT SSG.pdf
11 Tender Document MOT.pdf
Download all tender documents and submit your bid