| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹37.6 CrAccepted-AOC | ₹37.6 Cr Quoted ₹41.4 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹42.0 CrRejected-AOC | ₹42.0 Cr | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹11.6 L
Closing Date
6 Mar 2025, 3:00 pmClosed
Superintending Engineer C and M
OFFICE OF THE SUPERINTENDING ENGINEER (CONTRACTS and MONITORING), No.1, Pumping Station Road, Chintadripet, Chennai 02
SewerPackage IC Replacement/Enlargement of various sizes of damaged DWC/PSC/SWP/CI pipes in various location in Area IV under Vada Chennai ValarchiThittam.
2025_CMWSS_521828_1
CNT/SEW/NCB/VCVT/3653/2024-25
Open Tender
Civil Works - Water Works
365 days
Chennai
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹11.6 L
1 Jul 2025
30 Jan 2025
7 Mar 2025
30 Jan 2025
6 Mar 2025
8 Feb 2025
Amount
Bill No. 1 - Strengthening of sewer collection system in Tondiarpet A and E SPS commanding Area (Depot 39, 40, 42, 43 and 48), Area-IV
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3.0 m deep
at 3.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3.5 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
900mm dia CI pipe
at 5.5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 5.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.5m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Bus Route
Asphalt Road
Cutting DWC Pipes
Cutting CI Pipes
900mm dia CI pipe
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Bus Route
Bedding
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Bus Route
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow,including, but not limited, to pumps, pipes,connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of machinehole including R.C.C. top slab, C.I.cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 5.5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.5m deep
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (<2KM)
For the Point Underground Surface Assets along the Road
Hire charges for diesel pumpset for 5HP with fuel and crew charges including transportation
Bill No. 2 : Strengthening of sewer collection system in RK Nagar South SPS, New Sastri Nagar and Bharathi Nagar SPS commanding area (Depot 41 & 47), Area IV
Bill No. 2A Strengthening of sewer collection system in RK Nagar (South) SPS commanding Area (Depot 41 and 47), Area-IV
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3 m deep
597/500mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4 m deep
at 4.5 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3 m deep
at 3.5 m deep
597/500mm OD/ID DWC PE or PP pipe
at 3.5 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
250mm dia CI pipe
at 5 m deep
300mm dia CI pipe
at 5 m deep
400mm dia CI pipe
at 5 m deep
at 5.5 m deep
500mm dia CI pipe
at 4.5 m deep
at 5 m deep
600mm dia CI pipe
at 5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
at 5.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 3.5m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Bus Route
Asphalt Road
Cutting DWC Pipes
Cutting CI Pipes
250mm dia CI pipe
300mm dia CI pipe
400mm dia CI pipe
500mm dia CI pipe
600mm dia CI pipe
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Non Bus Route
Bus Route
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Bus Route
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.
Non Bus Route
For 1.5m deep
For 2.0m deep
Bus Route
For 2.0m deep
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
at 5.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Bus Route
Asphalt Road
State Highways/ National Highways
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Bus Route
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
Non Bus Route
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 4.0m deep
at 5m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 4 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
300mm dia CI pipe
at 5 m deep
400mm dia CI pipe
at 5 m deep
600mm dia CI pipe
at 5 m deep
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Hire charges for diesel pumpset for 5 HP for dewatering the sub-soil water and others
As built survey every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (<2KM) = 19000/-. in this estimate 330m length
For the Point Underground Surface Assets along the Road
Bill No. 2B Strengthening of sewer collection system in New Sastri SPS commanding Area (Depot 47), Area-IV
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Cutting DWC Pipes
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Non Bus Route
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.
Non Bus Route
For 1.5m deep
For 2.0m deep
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow,including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
Road Restoration
Non Bus Route
Asphalt Road
Concrete Road
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Bus Route
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.5m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 3.5 m deep
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (<2KM) = 19000/-. in this estimate 330m length
For the Point Underground Surface Assets along the Road
Bill No. 2C Strengthening of sewer collection system in RK Nagar (North) SPS commanding Area (Depot 38 and 41), Area-IV
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3.5 m deep
at 4 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.5m deep
at 4.0m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Bus Route
State Highways/ National Highways
Cutting DWC Pipes
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Bus Route
Bedding
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes,connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Bus Route
For manholes of pipes upto 1200 mm dia
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (<2KM) = 19000/-. in this estimate 330m length
For the Point Underground Surface Assets along the Road
Hire charges for diesel pumpset for 3 HP with fuel and crew charges including transportation
Bill No. 2D Strengthening of sewer collection system in Tondiarpet A SPS commanding Area (Depot 42 and 48), Area-IV
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1 m deep
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4 m deep
at 4.5 m deep
597/500mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4 m deep
at 4.5 m deep
Bus Route
480/400mm OD/ID DWC PE or PP pipe
at 3.5 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
500mm dia CI pipe
at 5 m deep
700mm dia CI pipe
at 5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.0m deep
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.5m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Bus Route
State Highways/ National Highways
Cutting DWC Pipes
Cutting CI Pipes
700mm dia CI pipe
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Bus Route
Bedding
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes,connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Bus Route
For manholes of pipes upto 1200 mm dia
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (<2KM) = 19000/-. in this estimate 330m length
For the Point Underground Surface Assets along the Road
Hire charges for diesel pumpset for 3 HP with fuel and crew charges including transportation
Bill No. 2E Strengthening of sewer collection system in Bharathi Nagar SPS commanding Area (Depot 47), Area-IV
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1 m deep
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.0m deep
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Cutting DWC Pipes
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Non Bus Route
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.
Non Bus Route
For 1.5m deep
For 2.0m deep
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.0m deep
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
Road cutting
Non Bus Route
Asphalt Road
Concrete Road
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Non Bus Route
Brick Machine holes
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3 m deep
at 3.5 m deep
at 4 m deep
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Hire charges for diesel pumpset for 5 HP for dewatering the sub-soil water and others
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (<2KM) = 19000/-. in this estimate 330m length
For the Point Underground Surface Assets along the Road
Bill No. 3 - Strengthening of sewer collection in Commanding areas of Tondiarpet Old F SPS (Depot 40 & 42) Area IV
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 4 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
250mm dia CI pipe
at 5 m deep
500mm dia CI pipe
at 5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Bus Route
Asphalt Road
Cutting DWC Pipes
Cutting CI Pipes
250mm dia CI pipe
500mm dia CI pipe
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Bus Route
Bedding
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Bus Route
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow,including, but not limited, to pumps, pipes,connections, couplings,electrical accessories, support traffic diversions arrangements etc.including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour,Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of manhole including R.C.C. top slab, C.I cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
Bus Route
at 1.5m deep
As built survey every sewage and water pipeline and other assetsmust be done using DGPS based RTK method by transferring the coordinates from the nearest static GCP of CMWSSB. Where there are signal interruption for the RTK method, Total station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co-odinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo reference as per standard coordinate reference system ( WGS 84 UTM Zone 44N). The final basemap with assets and utilities shall be furnished in (.shp) format. The geo reference assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB/PGDB) with the attributes. One set Hard and Soft copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final hard copy in A0 print. a.For the undergrond/surface assets along the roads for the distance ranging from: (<2KM)
For the Point Underground Surface Assets along the Road
Hire charges for diesel pumpset for 5HP with fuel and crew charges including transportation
Sub Total (excluding GST)
VVV CONSTRUCTION PRIVATE LIMITED (BID ID -1263746)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.67 MB
Tenderdocument.rar
Tender Documents • 25.28 MB
Download all tender documents and submit your bid