Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹10.4 L+₹36,709.92 (3.67%)Rejected-AOC | L2 | Rejected-AOC second | |
| 3 | Rejected-Technical | - | Rejected-Technical L7 | |
| 4 | Rejected-Technical | - | Rejected-Technical L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical L5 |
| Sl No | Description | Qty | Unit | Emmanuel constructions L10 | SANTHOSHKUMAR R S L6 | ARUN REEJIN K L5 | BINU KUMAR A L8 | Adarshdas D A L4 | VINEEHRAJ R B L2 | Joji L9 | Abhijith S S L7 | Sunil B S L1 | VIBIN L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00construction of anganawadi | |||||||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 21.32 | cum | 360 ₹7,675.56 | 317.34 ₹6,766.01 | 316.61 ₹6,750.44 | 341.9 ₹7,289.65 | 303.28 ₹6,466.23 | 299.65 ₹6,388.84 | 355.59 ₹7,581.53 | 341.94 ₹7,290.5 | 289.03 ₹6,162.41 Lowest | 350 ₹7,462.35 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.45 | cum | 7,938.89 ₹27,373.29 | 6,998.22 ₹24,129.86 | 6,982 ₹24,073.94 | 7,541.5 ₹26,003.09 | 6,706.29 ₹23,123.29 | 6,608.17 ₹22,784.97 | 7,841.58 ₹27,037.77 | 7,540.73 ₹26,000.44 | 6,373.82 ₹21,976.93 | 5,000 ₹17,240 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.82 | cum | 9,971.46 ₹18,177.97 | 8,789.95 ₹16,024.08 | 8,769.59 ₹15,986.96 | 9,472.3 ₹17,268 | 8,423.28 ₹15,355.64 | 8,300.04 ₹15,130.97 | 9,849.23 ₹17,955.15 | 9,471.36 ₹17,266.29 | 8,005.69 ₹14,594.37 | 7,500 ₹13,672.5 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 19.71 | sqm | 386.45 ₹7,616.93 | 340.66 ₹6,714.41 | 339.87 ₹6,698.84 | 367.1 ₹7,235.54 | 326.45 ₹6,434.33 | 321.67 ₹6,340.12 | 381.71 ₹7,523.5 | 367.07 ₹7,234.95 | 310.27 ₹6,115.42 Lowest | 500 ₹9,855 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.19 | cum | 12,781.83 ₹15,210.38 | 11,267.33 ₹13,408.12 | 11,241.22 ₹13,377.05 | 12,142 ₹14,448.98 | 10,797.32 ₹12,848.81 | 10,639.34 ₹12,660.81 | 12,625.16 ₹15,023.94 | 12,140.78 ₹14,447.53 | 10,262.02 ₹12,211.8 | 9,500 ₹11,305 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.78 | cum | 10,496.7 ₹60,649.93 | 9,252.86 ₹53,463.03 | 9,231.52 ₹53,339.72 | 9,971.3 ₹57,614.17 | 8,866.98 ₹51,233.41 | 8,737.24 ₹50,483.77 | 10,368.04 ₹59,906.54 | 9,970.26 ₹57,608.16 | 8,427.38 ₹48,693.4 | 7,500 ₹43,335 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 44.04 | sqm | 763.46 ₹33,622.78 | 673 ₹29,638.92 | 671.44 ₹29,570.22 | 725.25 ₹31,940.01 | 644.93 ₹28,402.72 | 635.49 ₹27,986.98 | 754.11 ₹33,211 | 725.17 ₹31,936.49 | 612.95 ₹26,994.32 | 450 ₹19,818 Lowest |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 8.38 | cum | 13,452.3 ₹1,12,784.08 | 11,858.36 ₹99,420.49 | 11,830.88 ₹99,190.1 | 12,779 ₹1,07,139.14 | 11,363.69 ₹95,273.18 | 11,197.42 ₹93,879.17 | 13,287.41 ₹1,11,401.65 | 12,777.63 ₹1,07,127.65 | 10,800.32 ₹90,549.88 | 8,000 ₹67,072 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 77.76 | sqm | 961.97 ₹74,802.79 | 847.98 ₹65,938.92 | 846.02 ₹65,786.52 | 913.8 ₹71,057.09 | 812.61 ₹63,188.55 | 800.72 ₹62,263.99 | 950.17 ₹73,885.22 | 913.72 ₹71,050.87 | 772.32 ₹60,055.6 | 500 ₹38,880 Lowest |
Tender Value
₹12.7 L
EMD Value
₹31,778
Closing Date
30 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
Assistant Executive Engineer Thiruvananthapuram District Panchayth
Building
2026_LSGD_871948_1
7d(12)/AEE/LSGD/TVM/2026-27
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,778
Yes
7 Nov 2026
23 Sept 2026
3 Oct 2026
23 Sept 2026
30 Sept 2026
23 Sept 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1construction of anganawadi | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 21.32 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.45 | cum | - | - |
| 1.003 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.82 | cum | - | - |
| 1.004 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 19.71 | sqm | - | - |
| 1.005 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.19 | cum | - | - |
| 1.006 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.78 | cum | - | - |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 44.04 | sqm | - | - |
| 1.008 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 8.38 | cum | - | - |
| 1.009 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 77.76 | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1478572.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1478572.xls
BOQ • 0.32 MB
KattavilaSBD.pdf
Tender Documents • 1.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .