| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC MARATHAKAM PADAPPAKKARA P O KARIKUZHY | KARIKUZHY | THIRUVANANTHAPURAM | KERALA | 691503 | L1 | Accepted-AOC First Lowest | |
| 2 | L2₹10.8 L+₹57,690 (5.62%)Rejected-AOC NEAR GOVT U P SCHOOL PSARA 10 PADAMUGAL KAKKANAD KOCHI PADAMUGAL | KOCHI | ERNAKULAM | KERALA | 682030 | L2 | Rejected-AOC Second Lowest | |
| 3 | L3₹12.8 L+₹2.5 L (24.3%)Rejected-Finance | L3 | Rejected-Finance Third Lowest |
Tender Value
₹12.8 L
EMD Value
₹31,990
Closing Date
23 Jul 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RIQCL TVPM
Executive Engineer RIQCL TVPM
KIIFB 2016 17 Construction of Pandalam Bypass Construction of Pandalam Bypass in Pathanamthitta District Additional Investigation work.
2024_PWD_679980_1
03/RIQCL/TENDER/2024-25
Open Tender
Civil Works - Others
Item Rate
90 days
Pathanamthitta
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,990
Yes
4 Oct 2024
9 Jul 2024
25 Jul 2024
9 Jul 2024
23 Jul 2024
9 Jul 2024
Amount
Soil collection & Testing
OD236138/2023-2024 Collection of sub-grade soil sample at 500m interval carefully by excavating pit of area 1.0*0.6m through overlying bituminous and granular layer or from subgrade of formation area as directed by the engineer in charge for laboratory test and filling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officer at site.
OD236139/2023-2024 Conducting Moisture content, Soil Classification test, Compaction Test, CBR test, Atterberg limits as per the IS Code guidelines and making report of one soil sample
OD236140/2023-2024 Conducting one test consisting of taking deflection at 10 points each @ LHS & RHS at 50m interval on one km stretch according to specification given in 81-1997, number of test conducted is as directed by the engineer in charge- conducting laboratory test to get moisture content and soil classification as per IS standards - For arranging equipment for testing 1km test taking one and half hour - Calculating Characteristic deflection of one test from one test data obtained from part 1 ( one test data means comprising of taking deflecton at 10 points at 50m interval in 1km stretch according to the specification given in IRC81-1997) and submitting in hard and soft copy
OD236141/2023-2024 Study of pavement composition by cutting open pit at tar edge to get the details of layers (thickness and type ) of pavement composition - at one location as suggested by the engineer in charge carefully by excavating pit of area 1.00x 0.60m through overlaying bituminous and granular layer including BC, DBM/BM, WMM and GSB at tar edge and refilling and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site and reporting the pavement composition with photographs and measurements specifying the type of layers
DGPS Survey
OD236128/2023-2024 To carry out DGPS survey to establish primary control points - it includes observation of raw data by using dual constellation GNSS receiver, processing, net work, adjustment and submission of data in WGS 84 datum and UTM/TM projection system including traverse report ( One intervisible pair per 5 Km)
OD236129/2023-2024 Providing and fixing RCC pillars for DGPS control points of size 0.3 m x 0.3 m x 0.5 m , 0.1m above ground level and 0.4 m below GL casted in M20 Grade concrete reinforced with 4 nos of 10 mm dia longitudinal bars and 8mm dia stirrups @ 0.15m c/c, firmly fixed in position using PCC of 0.5m wide and 0.4 m deep around the pillars in M15 grade concrete below ground level including painting 2 coats on exposed surface with paint
OD236130/2023-2024 Providing and fixing RCC pillars for DGPS traverse control points at every 250 m interval along the road, of size 0.15 m x 0.15 m x 0.45 m, 0.15 m above ground level and 0.3 m below GL casted in M20 Grade concrete reinforced with 4 nos of 10mm dia longitudinal bars and 8 mm dia stirrups @ 0.15 m c/c, firmly fixed in position using PCC of 0.40 m wide and 0.30 m deep around the pillars in M15 grade concrete below ground level including painting 2 coats on exposed surface with paint
OD236131/2023-2024 To carry out Traverse to establish horizontal control traverse stations on the proposed road stretch running through from one DGPS station at every 2.50 km using electronic total station instrument at maximum of 250 m interval with an accuracy of 1 in 20000 which includes submission of hard and soft copies as per IRC standards
OD236132/2023-2024 Fly levelling to shift levels from given Bench mark value to next Bench mark station to horizontal traverse station and available permanent structures all along the road for the elevation purpose by closed circuit which includes submission of the hard and soft copies as per IRC Standards
56.12.b Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures.
Traffic Survey
OD236136/2023-2024 Classified Turning movement survey at FOUR ARM Junction-& Conducting turning movement survey at junction for three days 24 hours by recording the classified volume count in the prescribed format, including provision for engaging technicians and setting up of station etc and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials
OD236167/2023-2024 Conducting Origin destination survey at one location for 3 days 24 hours continuously by recording the classified volume count in the prescribed format, including provision for engaging technicians and setting up of station etc. and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials
Inventory details of road
OD236137/2023-2024 Collecting and Tabulating all inventory details of Existing road, Culvert, Bridge, Approach roads, junctions and all other road side utilities and amenities in the prescribed format, complete as per the instructions of PWD officials
Subsoil Investigation
56.1.a Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.5.a Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.4 Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.7 Conducting standard penetration test in bore hole at any depth.
56.8 Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.6 Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.11.a Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.11.c Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring - Extra for additional set for bore holes exceeding 5 nos.
AA AND S CONSTRUCTIONS
Synergy Architects and Engineers
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .