| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.9 LAccepted-AOC PULLIYIL PARAMMA THODY HOUSE MELMURI POST MALAPPURAM 676517 | MELMURI | MALAPPURAM | KERALA | 676517 | 1 | Accepted-AOC L1 | |
| 2 | 2₹15.8 L−₹40,675.90 (2.52%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹15.9 L−₹30,050.11 (1.86%)Rejected-AOC KADAKKADAN HOUSE KOTTAKKAL MALAPPURAM | KOTTAKKAL | MALAPPURAM | KERALA | 676503 | 3 | Rejected-AOC L3 | |
| 4 | 4₹15.9 L−₹30,050.11 (1.86%)Rejected-AOC | 4 | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹28,170
Closing Date
16 Oct 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,Minor Irrigation Division, Mal
Executive Engineer Minor Irrigation Division B1 Block Civil Station Malappuram 676505
Renovation of Enikkal chira in Ward no. X of Kottakkal Municipality.
2021_Irrig_444364_1
EEMI/ET/14/2021-22
Open Tender
Civil Works - Others
Item Rate
365 days
Kottakkal
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,785
₹28,170
24 Dec 2021
8 Oct 2021
20 Oct 2021
8 Oct 2021
16 Oct 2021
8 Oct 2021
60 days
Amount
Dtailed Estimate
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
60.7.4 : DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.9.1 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortor
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
60.8 : Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
60.5 : MS Rings - 100mm dia
13.59 : Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
13.33.1 : Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
Appendix-B-Providing shutters to Palapra VCB
60.8 : Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
60.5 : MS Rings - 100mm dia
13.59 : Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
SAMEER HYDER M
K. Abdul Rahim
Baiju A V
Bidder Name
K. Abdul Rahim
P. P. SIRAJUDHEEN
Baiju A V
SAMEER HYDER M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .